Burrell Lock Rehabilitation

Closed State & local contract opportunity Posted

Solicitation number
ITB-08249
State
Florida
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from vendor.myfloridamarketplace.com. Updated .

About this opportunity

The State of Florida, through the St. Johns River Water Management District, is procuring a contract for the rehabilitation of the Burrell Lock located in Lake County, Florida. The objective of this $2.5 million water control structure project is to repair the concrete surfaces, reline the lock inflow and outflow pipes, repair and paint the lock mitre gates, provide new mitre gate hydraulic operators, replace the upstream and downstream slide gates and provide new hydraulic operators, replace controls in the control building, and install manatee protection screens. Additional work includes replacing wood fenders, navigation lights, fire extinguisher cabinets, floatation rings, staff gages, signs, lock access gate and ladder, and removal and reinstallation of the manatee detection system. A non-mandatory pre-bid conference will be held on March 26, 2024, and bids are due by 2:00 p.m. on April 12, 2024. The contract term will be from the effective date to the completion date of November 30, 2024, unless extended by mutual agreement.

The procurement does not mention any set-aside designations or restrictions on the types of organizations that can respond. No incumbent vendors or current contractors are listed, and the documents do not indicate any existing infrastructure or technology that requires integration. The estimated budget for this project is $2.5 million, and a bid bond/guaranty is required. Funding for the project is contingent upon availability, which may include ad valorem tax revenues, annual appropriations by the Florida Legislature, or appropriations from other sources.

Opportunity text

The objective of this water control structure rehabilitation project is to repair the concrete surfaces, reline the lock inflow and outflow pipes, repair and paint the lock mitre gates, provide new mitre gate hydraulic operators, replace the upstream and downstream slide gates and provide new hydraulic operators, replace controls in the control building for the lock mitre and slide gates, and install manatee protection screens. Other miscellaneous work includes replacement of wood fenders, navigation lights, fire extinguisher cabinets, floatation rings, staff gages, signs, lock access gate and ladder, and removal and reinstallation of manatee detection system. This work is necessary to ensure the functionality of the lock.

The Burrell Lock is located on Haines Creek connecting Lake Griffin and Lake Eustis in Lake County, Florida. at approximate GPS coordinates of latitude 871049452°, longitude -81.7840086621°.

The estimated budget for this project is $2.5M; a bid bond/guaranty is required.

NON-MANDATORY PRE-BID CONFERENCE: March 26, 2024, at 10:00 AM at

Burrell Lock & Dam

10401 Lock Rd, Leesburg, Fl 34788

Americans With Disabilities Act (ADA)

The District does not discriminate on the basis of disability in its services, programs, or activities. Special accommodations for disabilities may be requested through Amy Lucey, or by calling (800) 955-8771 (TTY), at least five business days before the date needed.

Files

File Type Posted
BURRELL LOCK REHAB COST SCHEDULE 2024-02-21.xlsx XLSX spreadsheet
COST SCHEDULE revised Addendum 2 - Copy.xlsx XLSX spreadsheet
IFB 39422_Addendum 1.pdf PDF
IFB 39422_Addendum 2 .pdf PDF
39422 BURRELL LOCK REHAB BID dwngs 2024-02-19.pdf PDF
IFB 39422Final Clean.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities