COST SCHEDULE revised Addendum 2 - Copy.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- Burrell Lock Rehabilitation
- Solicitation number
- ITB-08249
- Issued by
- Lake County, Florida
About this file
This document is a detailed cost schedule related to the Burrell Lock Rehabilitation project, a state and local contract opportunity in Florida. The objective of this project is to repair the concrete surfaces, reline the lock inflow and outflow pipes, repair and paint the lock mitre gates, provide new mitre gate hydraulic operators, replace the upstream and downstream slide gates and provide new hydraulic operators, replace controls in the control building for the lock mitre and slide gates, and install manatee protection screens. The project also includes replacement of various other components such as wood fenders, navigation lights, fire extinguisher cabinets, floatation rings, staff gages, signs, lock access gate and ladder, and removal and reinstallation of manatee detection system. The project is located in Lake County, Florida and has an estimated budget of $2.5 million. A non-mandatory pre-bid conference will be held on March 26, 2024.
The cost schedule provides detailed line items and quantities for the various work components, including mobilization, erosion/sediment control, dewatering, demolition, concrete repairs, painting, new installations, and other miscellaneous work. The schedule also includes a supplemental work allowance of $125,000. The project is being procured by the State of Florida and Brevard County.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BURRELL LOCK REHAB COST SCHEDULE 2024-02-21.xlsx | XLSX spreadsheet | |
| IFB 39422_Addendum 1.pdf | ||
| IFB 39422_Addendum 2 .pdf | ||
| 39422 BURRELL LOCK REHAB BID dwngs 2024-02-19.pdf | ||
| IFB 39422Final Clean.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| COST SCHEDULE REVISED ADDENDUM 2 | |||||
| BURRELL LOCK REHABILITATION | |||||
| ITEM | ESTIMATED | TOTAL | |||
| NO. | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | AMOUNT |
| 1 | MOBILIZATION | 1 | LS | ||
| 2 | EROSION/SEDIMENT CONTROL | 1 | LS | ||
| 3 | TEMPORARY DEWATERING BULKHEADS | 1 | LS | ||
| 4 | PUMPING/DEWATERING | 1 | LS | ||
| 5 | REMOVE MANATEE SONAR DETECTION SYSTEM | 1 | LS | ||
| 6 | REMOVE SEDIMENT AND DEBRIS | 50 | CY | ||
| 7 | PRESSURE WASH ALL CONCRETE AND STEEL SURFACES | 12,800 | SF | ||
| 8 | DEMO - LOCK MITRE GATE OPERATORS AND CONTROLS | 4 | EA | ||
| 9 | DEMO - SLIDE GATES, OPERATORS, AND CONTROLS | 4 | EA | ||
| 10 | DEMO - ABANDONED ELECTRICAL BOXES AND CONDUITS | 4 | EA | ||
| 11 | DEMO AND REPLACE - UPSTREAM AND DOWNSTREAM FENDERS | 1 | LS | ||
| 12 | DEMO AND REPLACE - INTERNAL LOCK FENDERS | 1 | LS | ||
| 13 | DEMO AND REPLACE - NAVIGATION LIGHTS | 4 | EA | ||
| 14 | DEMO AND REPLACE - STAFF GAGES | 2 | EA | ||
| 15 | DEMO AND REPLACE - FIRE EXTINGUISHER CABINETS | 4 | EA | ||
| 16 | DEMO AND REPLACE - FLOATATION RINGS | 4 | EA | ||
| 17 | DEMO/SALVAGE LOCK SIGNS - REPLACE/REINSTALL | 1 | LS | ||
| 18 | LOCK MITRE GATE REHABILITATION | 4 | EA | ||
| 18.1 | LOCK GATE STEEL REPAIRS (IF REQUIRED) | 200 | LBS | ||
| 18.2 | LOCK GATE HINGE PINS (IF REQUIRED) | 1 | EA | ||
| 18.3 | LOCK GATE HINGE BEARINGS (IF REQUIRED) | 1 | EA | ||
| 18.4 | LOCK GATE LUMBER COMPONENTS (IF REQUIRED) | 180 | LF | ||
| 19 | CONCRETE - HYDRODEMOLITION OF SURFACES (IF REQUIRED) | 400 | SF | ||
| 20 | CONCRETE - ISOLATED PATCHING (IF REQUIRED) | 30 | CF | ||
| 21 | CONCRETE - REBAR REPAIR (IF REQUIRED) | 30 | LF | ||
| 22 | CONCRETE - CRACK REPAIR (IF REQUIRED) | 200 | LF | ||
| 23 | CONCRETE - SAWCUTTING (IF REQUIRED) | 100 | LF | ||
| 24 | CONCRETE - ERODED SURFACE REPAIR (IF REQUIRED) | 400 | SF | ||
| 25 | CONCRETE - TESTING SERVICES (IF REQUIRED) | 1 | LS | ||
| 26 | CONCRETE - SURFACE COATING | 9,200 | SF | ||
| 27 | CONCRETE - HYDRAULIC CYLINDER PITS | 20 | CY | ||
| 28 | PAINT LOCK FILL AND DISCHARGE PIPES | 4 | EA | ||
| 29 | BLAST AND PAINT EMBEDDED STEEL | 1 | LS | ||
| 30 | NEW HANDRAIL, LOCK ACCESS GATE AND LADDER | 1 | LS | ||
| 31 | NEW WATER LINE | 1 | LS | ||
| 32 | INSTALL LOCK MITRE GATES AND NEW HYDRAULIC OPERATORS | 4 | EA | ||
| 33 | INSTALL NEW SLIDE GATES AND NEW HYDRAULIC OPERATORS | 4 | EA | ||
| 34 | NEW CONTROLS FOR LOCK GATE AND SLIDE GATE OPERATORS | 1 | LS | ||
| 35 | INSTALL NEW MANATEE PROTECTION SCREENS | 8 | EA | ||
| 36 | REINSTALL MANATEE SONAR DETECTION SYSTEM | 1 | LS | ||
| 37 | AS-BUILT SURVEY | 1 | LS | ||
| 38 | SITE CLEANUP AND DEMOBILIZATION | 1 | LS | ||
| 39 | DAILY OVERFLOW IMPACT FEE | 10 | DAYS | ||
| 40 | SUPPLEMENTAL WORK ALLOWANCE | $125,000 | |||
| TOTAL CONSTRUCTION COST |