25-0027-UT Water, Reclaimed Water and Well Repair & Improvements
Closed State & local contract opportunity Posted
- Solicitation number
- 25-0027-UT
- State
- Florida
- Responses due
Opportunity facts
- Jurisdictions
- UNSPSC codes
- 20143500 Subsea project installation tools
- 20143400 Subsea umbilicals and related equipment
- 20143005 Sucker rod shear coupling
- 20143004 Continuous sucker rod pin end
- 20131203 Well production additives
- 20143401 Umbilical termination assembly
- 20143803 Subsea wet gas meter
- 20143601 Subsea flexible riser
- 20143703 Subsea buoyancy equipment or module
- 20143706 Vortex induced vibration VIV suppression equipment
Show all 45
- 20143300 Pipeline service equipment
- 20143800 Subsea meters
- 20143001 Alloy steel sucker rods
- 20143802 Subsea flow meter, multi phase
- 20143301 Pipeline pig
- 71161313 Cathodic inspection service
- 20143600 Subsea flexibles
- 20143700 Subsea pipeline materials
- 20143006 Progressive cavity pump sucker rod
- 20143007 Sucker rod wrench
- 20143008 Polished rods and coupling
- 20143009 Polished rod stuffing box
- 20143302 Interior pipeline inspection equipment
- 20143303 Interior pipeline robotic cutter
- 20143402 Umbilical riser and flowline
- 20143501 Subsea running tool
- 20143502 Subsea manifold
- 20143503 Subsea connection system
- 20143504 Subsea jumper installation tool
- 20143505 Subsea production equipment
- 20143507 Subsea production system
- 20143704 Subsea flange
- 20143705 Subsea fitting
- 20143801 Subsea flow meter, single phase
- 40151722 Well pump spare parts
- 72151523 Cathodic protection services
- 20143000 Sucker rods
- 20143002 Pony rods
- 20143003 Continuous sucker rod
- 20143702 Subsea pipe coating and insulation and cathodic protection
- 20143506 Mudline suspension system
- 20143602 Subsea flexible pipe or pipeline
- 20143404 Subsea jumper assembly
- 20143701 Subsea line pipe
- 20143403 Umbilical unit
- Point of contact
-
- Milisa Harris milisa.harris@myclearwater.com (727) 444-8529
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
The City of Clearwater, located in Pinellas County, Florida, is seeking competitive bids for an annual contract (Bid No. 25-0027-UT) to provide on-call water and reclaimed water infrastructure services. The procurement is divided into five distinct groups: water and reclaimed water infrastructure repairs (Group A), trenchless pipeline installations (Group B), asphalt replacement (Group C), concrete replacement (Group D), and well maintenance (Group E). Bidders may submit proposals for one or all groups, with services to be requested via work orders for the city's extensive infrastructure, which includes 44 groundwater wells, 586 miles of potable water mains, and 140 miles of reclaimed water mains. Prospective bidders must be pre-qualified with the Engineering Department's Construction Division in the Water/Reclaimed Water Distribution Mains category, with a minimum qualification amount of $4,000,000.00. The pre-bid conference was held virtually on September 3, 2025, with the bid opening scheduled for September 24, 2025, at 2:00 p.m. EDST, and the anticipated contract award date of November 10, 2025. Contractors must provide current licenses from FDOT, the State of Florida, and Pinellas County, and submit proposals through the OpenGov platform.
The contract does not specify explicit set-aside designations or restrictions for disadvantaged enterprises. The initial contract term is one year with options to renew for up to three additional years, and the City is not obligated to purchase any minimum or maximum amount during the contract period. Emergency response requirements include mobilization within 8 hours and providing estimates within 6 hours. The bid includes a 10% owner's contingency line item that can only be used with written City authorization. While no incumbent vendors are explicitly mentioned, the bid documents include a previous bid tabulation showing TLC Diversified as a recent contractor for similar work, with a total bid amount for Group A: Point Repair at $32,325,000.40. The comprehensive unit pricing structure covers a wide range of infrastructure tasks, from minor repairs like service saddle replacements to complex installations such as directional drilling, suggesting a flexible contract value potentially ranging from several hundred thousand to several million dollars depending on the city's specific infrastructure needs throughout the contract period.
Opportunity text
The intent of this bid is to obtain competitive prices to establish an annual contract for on-call (as-needed) services for water and reclaimed water infrastructure repairs and improvements (Group A), on-call (as-needed) services for water and reclaimed water trenchless pipeline installations (Group B), on-call asphalt replacement (Group C), on-call concrete replacement (Group D), and on-call well maintenance (Group E). Bidders may bid on one or all Groups.
The City of Clearwater owns and operates 44 groundwater wells that are the primary source of raw water treated by the City's three water treatment plants. The City of Clearwater also owns, operates, and maintains 586 miles of potable water main and 140 miles of reclaimed water mains. The work that may be included as part of this Contract may include but is not limited to:
Group A: Point repairs, pipe installation/replacement (with various different installation methods), valve installation/replacement, service line installation, hydrant installation, etc.
Group B: Trenchless pipeline installation/replacement including but not limited to horizontal directional drill, pipebursting, and jack and bore.
Group C: Asphalt replacements following public utility point repairs and/or associated maintenance activities.
Group D: Concrete replacement following public utility point repairs and/or associated maintenance activities.
Group E: Well maintenance including all pump removal and replacement, well refurbishment through acidification, well evaluations and mechanical integrity testing of the City's injection well.
Specific work for this contract will be at the request of the City by a work order request. All quantities are estimates only and the city of Clearwater (city) is not obligated to purchase any minimum or maximum amount during the life of the contract. All the work is to be administered per Section III, Section 11.3, Unit Price Work, of the Contract Documents.
The city reserves the right to increase funds during the contract term if work exceeds original estimates, subject to required authorizations. Beyond the initial one-year term, the city reserves the right to renew the contract for up to three (3) years.
The successful contractor will be required to enter into a contract with the City of Clearwater and provide all labor, equipment, and materials for water and reclaimed water infrastructure improvements and repairs. The City has an expectation as part of this contract that the successful contractor(s) will mobilize in an expedited manner during emergencies in order to minimize water and reclaimed water outages for City residents. The City shall define what constitutes as an emergency. For emergency repairs, estimates shall be provided by the contractor within 6 hours and mobilization shall occur within 12 hours. Mobilization, whether nonemergency or emergency, shall be per work order request as defined by the City. Each work order may include more than one individual project.
The various items shall be performed in accordance with City of Clearwater specifications and in conformity with the existing condition of the pipe, its grade, and dimensions. All work shall be completed in accordance with the City of Clearwater Construction Standard Details, unless otherwise directed. Products, materials, dimensions specified in this section (IV) and preferred products list shall supersede those products, materials, and dimension called out in the City of Clearwater Construction Standard Details.
The Contract will be on the basis of materials and equipment specified or described in the bidding documents. The materials and equipment described herein establish a standard of required type, function, and quality. No item of material or equipment will be considered by the Engineer and/or City as an "or-equal" item unless written request for approval has been submitted by the Bidder and has been received by the City at least 15 days prior to the date for receipt of Bids. Each request shall conform to the requirements of the General Conditions. The City's decision of approval or disapproval of a proposed item will be final. Warranty for all work conducted under this contract shall be one (1) year for labor. Materials shall comply with the individual products installed.
The Contractor shall provide copies of a current Contractor License/Registration with the state of Florida and Pinellas County in the bid response.
The Contractor shall provide Fixed and Portable project signs as described in Section III, Section 23 of the Contract Documents. The final number of project signs will be determined at the beginning of the project based on the Contractor's schedule of work submitted for approval. Additional project signs may be required at no additional cost to the city due to the Contractor's schedule of work.
Files
Show all 12
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity