1234 s. ELM ST - demolition

Closed State & local contract opportunity

Solicitation number
2025-COMMUNITY DEVELOPMENT-023
State
Michigan
Responses due

Opportunity facts

Point of contact

Opportunity details come from procurement.opengov.com. Updated .

About this opportunity

The City of Jackson, Michigan is seeking qualified contractors for a comprehensive demolition project at 1234 S. Elm Street, with quotes due on January 9, 2025, at 9:00 AM. The project involves complete demolition services, including hazardous materials abatement in strict compliance with MIOSHA and DEQ regulations, as identified in the pre-demolition compliance survey. Specific deliverables include removing the existing structure, abating asbestos from windows, HVAC duct wrap, and floor coverings, removing trees and brush, installing new curb and gutter, replacing sidewalks, and planting a 2-inch caliper maple street tree. The demolition is structured as a winter work project with a phased completion schedule: 70% of the contract will be billable upon completion of demolition, tree and brush removal, and winter grading by March 28, 2025, with the remaining 30% payable after final site restoration, including concrete work, topsoil, seeding, and straw installation by May 22, 2025. Contractors must be registered with SAM.gov and possess a Residential Builders License or House Wrecking Maintenance and Alteration Contractor license.

The contract opportunity does not explicitly outline specific set-aside designations or restrictions for disadvantaged enterprises. The project covers a 1,568 square foot residential property and anticipates an average cost not exceeding $15,000 for hazardous material abatement and demolition. Contractors will be subject to liquidated damages of $1,000 per calendar day for work not completed within specified timeframes. The project requires comprehensive documentation, including manifests, demolition checklists, and itemized billing with specific cost categories. All demolition debris must be transported to a state-licensed Type II or Type III landfill, with contractors required to provide manifests as proof of proper disposal. The City reserves the right to reject any and all bids, and the project is federally funded through a Community Development Block Grant (CDBG) program. The total project budget appears to be consistent with typical municipal demolition and site restoration projects, with a focus on comprehensive site preparation and environmental compliance.

Opportunity text

ORDERED DEMOLITION OF 1234 S. Elm Street, Jackson, MI. Quotes are due on or before Thursday, January 9, 2025, by 9:00 AM. Demolition services to include:

  1. Hazardous materials must be abated in accordance with MIOSHA and DEQ regulations and the attached Pre-Demolition Compliance Survey assessment.
  1. Compact all clean backfill material with a hoe-pack or vibrating roller compactor.
  1. Remove 1 curb(s) cut(s) and entry approach(s). (Saw cut- S 12' lineal feet of approach for work to remove access to 1234 S. Elm)
  1. Install 40 lineal feet of curb and gutter to remove access to 1234 S. Elm and restore double wide approach to N. property leading to garage doors
  1. Remove and replace 12 lineal feet of cracked, heaved and broken public sidewalks. (raise grade through walk to allow to cover tree roots and provide positive slope to ROW area)
  1. See enclosed water and sewer service records for approximate location and any special instructions for shared services. If no service card is provided it is the contractor's responsibility to ensure that neighboring water and sewer services are operational at the conclusion of the demolition.
  1. Trees/shrubs: Remove trees to N along neighboring building. Cut flush to grade and cover with topsoil. Remove 5 marked trees to NW corner and cut all small trees and brush along W fence line flush to grade and cover with topsoil. Remove all overgrowth and brush from W and SW corners of property for clean lines. Plant 1- 2 ½" caliper maple street tree to E and S ROW areas centered on yard dimension each side.
  1. Miscellaneous: Remove dog pen to NW, asphalt drive and remove S 12' of triple wide driveway approach and saw cut and install curbing to remove curb access to 1234 S. Elm St and to flare to N. driveway leading to overhead entry doors to N. building.

This will be a winter work demolition project with 70% billable upon completion of all demolitions, tree and brush removals, removal of all listed debris and providing a quality bladed winter grade completed no later than March 28th, 2025. Final completion to bill remaining 30% for concrete, final grade/topsoil/seed/straw then completed no later than May 22, 2025.