Y1DA--FY23: NRM-Tier 2 (PROJ: 673-14-104) BB Renovate and Replace Transportation Equipment Building 1
Closed Solicitation Posted
- Solicitation number
- 36C24823R0186
- Agency
-
Veterans Integrated Service Network 8
Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 238290 Other Building Equipment Contractors
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation is for construction services to renovate and replace elevators and transportation equipment at the James A. Haley Veterans Medical Center in Tampa, Florida. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8 seeks to modernize ten elevators and upgrade elevator machine room HVAC systems. Offerors must demonstrate experience performing similar renovation and replacement services for evaluation under Factor 2 Subfactor C. Proposals are due by August 24, 2023.
The solicitation is set aside for service-disabled veteran-owned small businesses. The primary NAICS code is 238290 for other building equipment contractors. The work is estimated to have a total value between $5-10 million and will be performed at the James A. Haley Medical Center campus. The period of performance is 602 days from the notice to proceed. General Decision FL20230065 applies to the wage determination.
Notice text
2 versions
Update #2 · Latest ·
Description
Update #1 ·
Page 1
STATEMENT OF WORK
Construction Services: Renovate and Replace Transportation Equipment Building 1
PROJECT # 673-14-104
Completion by 602 days after notice to proceed
Section I - SCOPE OF WORK
Executive Summary
This project scope shall include but not be limited to the replacement and modernization of elevators 1, 2, 3, 4, 5, 6, 9, 10, 11, and 18; building one at the James A. Haley VA hospital, located at 13000 Bruce B. Downs Boulevard, Tampa, Florida as required by the drawings and specifications included in this acquisition package. Elevator equipment of this vintage no longer operates efficiently, and equipment becomes obsolete. See the Specifications and Drawings for the project.
Goals and Needs:
Improve overall system reliability and performance.
Replace aged components to ensure 20 to 25 years of service.
Upgrade existing Firefighters operations to comply with current code requirements.
Replace or modernize existing car and hoistway door equipment to provide safe and reliable operation.
Replace or Modernize elevator car and corridor pushbuttons and signal fixtures to comply with current requirements of the Americans with Disabilities Act (ADA).
Upgrade existing building conditions to comply with current National Elevator Safety Code (ASME A17.1) and Building Code (IBC) requirements.
Place of Performance
James A. Haley Medical Center
Building #1 Main Hospital
13000 Bruce B. Downs Blvd.
Tampa, Fl. 33612
Hours Of Operation and Scheduling
Standard work hours for this site are 7:30 AM to 4:00 PM Monday through Friday except for Federal Holidays. If the Contractor desires to work on Saturday, Sunday, holidays, or outside the project site s standard working hours the contractor must submit a written request for approval to the COR at least seven (7) working days prior to the proposed start of such work.
COMPLIANCE
The contractor shall comply with all the construction documents provisions and all applicable Department of Veterans Affairs Master Specifications, and all project specifications herein.
SECTION II - EXISTING EQUIPMENT REVIEW
(Next sections came from Elevator Survey Report, and it needs to be reviewed with the specification and drawing of the project)
EQUIPMENT INVENTORY
Elevators
Cars 1, 2, 3
Cars 4 & 5
DESCRIPTION
1. Manufacturer
Haughton Machine, Montgomery Controls
Haughton Machine, Montgomery Controls
2. Duty
4000lbs / 400fpm
5000 / 400fpm
3. Door Type and Size
Center-Opening 4 -0 x 7 -0
Center-Opening 4 -0 x 7 -0
4. Operation
3 Car Group
Duplex
5. Hoistway Dimensions
9'-4" x 7'-10 1/8"
8'-4" x 9'- 6 1/2"
6. Floors Served
1-7
1-7
MAJOR COMPONENTS
1. Machine Type
Haughton Gearless 2:1 roping
Haughton Gearless 2:1 roping
2. Power Conversion
SCR Drives for DC motors
SCR Drives for DC motors
3. Operational Control
Montgomery Ultron Group Dispatching
Montgomery Ultron Group Dispatching
4. Door Operation
MAC 104
MAC 104
5. Door Reversal
Proximity Edge
Proximity Edge
6. Governor and Safety
In Secondary Overhead
In Secondary Overhead
7. Buffers
Oil
Oil
8. Landing System
Encoder
Encoder
CAR ENCLOSURE
1. Shell
Steel
Steel
2. Lighting
Florescent
Florescent
3. Ceiling
Plastic diffuser
Plastic diffuser
4. Walls
Plastic Laminate
Plastic Laminate
5. Car Doors
Stainless Steel
Stainless Steel
6. Front Returns
Stainless Steel
Stainless Steel
7. Entrance Columns
Stainless Steel
Stainless Steel
8. Sill
Nickel-Silver
Nickel-Silver
CAR FIXTURES
1. Car Operation Station
2 Applied Panels
2 Applied Panels
2. Car Position Indicator
Digital
Digital
3. Car Direction Indicator
Yes, mounted in car operating panel
Yes, mounted in car operating panel
4. Telephone Cabinet
Yes
Yes
5. Firefighters Recall
Yes, Phase 1 and 2
Yes, Phase 1 and 2
ELEVATOR SURVEY REPORT
James A. Haley Medical Center
LB Project 0100036068
© 2022 Lerch Bates Inc.
4/1/2022
Page 10
Elevators
Cars 1, 2, 3
Cars 4 & 5
HOISTWAY ENTRANCES
1. Frames
Curved Edge Stainless Steel
Curved Edge Stainless Steel
2. Door Panels
Painted
Painted
3. Sills
Nickel Silver
Nickel Silver
HALL FIXTURES
1. Hall Lanterns
Combo PI Unit
Combo PI Unit
2. Hall Position Indicators
Yes
Yes
3. Phase I Fire Service
Yes
Yes
Elevators
Car 6
Cars 10 & 11
DESCRIPTION
1. Manufacturer
Haughton Machine, Montgomery Controls
Haughton Machine, Montgomery Controls
2. Duty
5000 / 400fpm
5000 / 400fpm
3. Door Type and Size
Two Speed Side-Opening 4 -0 x 7 -0
Center-Opening 4 -0 x 7 -9
4. Operation
Simplex
Duplex
5. Hoistway Dimensions
8 -10 x 9 -8
9'-2" x 10'-3 3/8"
6. Floors Served
1-2
1-7
MAJOR COMPONENTS
1. Machine Type
Geared
Geared
2. Operational Control
SCR Drives for DC motors
SCR Drives for DC motors
3. Governor and Safety
In pit
In Machine Room
4. Buffers
Oil / Walk-in Pit
Oil
5. Door Reversal
Proximity Edge
Proximity Edge
6. Governor and Safety
In Secondary Overhead
In Secondary Overhead
7. Buffers
Oil
Oil
8. Landing System
Encoder
Encoder
CAR ENCLOSURE
1. Shell
Steel
Steel
2. Lighting
Florescent
LED
3. Ceiling
Plastic diffuser drop ceiling
Stainless Drop Ceiling
4. Walls
Plastic Laminate / Stainless Steel
N/A (Pads)
5. Car Doors
Stainless Steel
Stainless Steel
6. Front Returns
Stainless Steel
Stainless Steel
7. Entrance Columns
Stainless Steel
Stainless Steel
8. Sill
Nickel-Silver
Nickel-Silver
Elevators
Car 6
Cars 10 & 11
CAR FIXTURES
1. Car Operation Station
(2), Front and side wall
(2), Both Front
2. Car Position Indicator
Yes
Yes
3. Car Direction Indicator
Yes
Yes
4. Telephone Cabinet
Yes
Yes
5. Firefighters Recall
Yes
Yes
HOISTWAY ENTRANCES
1. Frames
Stainless Steel
Stainless Steel
2. Door Panels
Stainless Steel
Painted
3. Sills
Nickel Silver
Nickel Silver
HALL FIXTURES
1. Hall Lanterns
Combo PI Unit
Combo PI Unit
2. Hall Position Indicators
Combo PI Unit
Combo PI Unit
3. Phase I Fire Service
Yes
Yes
Elevators
Car 9
Car 18
DESCRIPTION
1. Manufacturer
General Elevator
General Elevator
2. Duty
4000
5000
3. Door Type and Size
Center-Opening 4 -0 x 7 -0
Side-Opening 4 -0 x 7 -0
4. Operation
Simplex
Simplex
5. Hoistway Dimensions
8 -1 ½ x 9 -8 1/8
7 -4 x 10 -4
6. Floors Served
B, G, 1
B, G, 1
MAJOR COMPONENTS
1. Machine Type
Hydraulic
Hydraulic
2. Operational Control
General / Relay
MCE
3. Governor and Safety
N/A
N/A
4. Buffers
Spring
Spring
CAR ENCLOSURE
1. Shell
Steel
Steel
2. Lighting
Florescent
Florescent
3. Ceiling
Plastic diffuser
Flat Ceiling
4. Walls
Plastic Laminate
Painted Steel
5. Car Doors
Stainless Steel
Stainless Steel
6. Front Returns
Stainless Steel
Stainless Steel
Elevators
Car 9
Car 18
7. Entrance Columns
Stainless Steel
Stainless Steel
8. Sill
Nickel-Silver
Nickel-Silver
CAR FIXTURES
1. Car Operation Station
2
1
2. Car Position Indicator
Yes
Yes
3. Car Direction Indicator
Yes
Yes
4. Telephone Cabinet
Yes
Yes
5. Firefighters Recall
Yes
Yes
HOISTWAY ENTRANCES
1. Frames
Stainless Steel
Stainless Steel
2. Door Panels
Painted
Painted
3. Sills
Nickel-Silver
Nickel-Silver
HALL FIXTURES
1. Hall Lanterns
Yes
No
2. Hall Position Indicators
Yes
Yes
3. Phase I Fire Service
Yes
Yes
GENERAL
Elevator components were surveyed to determine overall condition and suitability for continued use in conjunction with a modernization or replacement. In addition, machine room, hoistway, and pit spaces were reviewed for compliance with current codes. This section reviews the results of our equipment survey.
EQUIPMENT DISPOSITION
Elevators 1 through 6 are Overhead Traction Cars manufactured by Haughton Elevator in 1969. Cars 1-5 are gearless and car 6 is geared. These elevators were modernized approximately 15-20 years ago by Montgomery Elevator and the Ultron controllers, door operators and fixtures were installed. The hoist machines are the original equipment.
Elevators 1, 2, and 3 have a rated capacity of 4000lbs. and a rated speed of 400fpm and serve levels 1 thru 7. Platform size is approximately 7'-6" wide x 5'-6" deep. Entrances are 4'-0" wide x 7'-0" high, single speed center-opening doors.
Elevators 4 and 5 have a rated capacity of 5000lbs. and a rated speed of 400fpm, serving levels 1 thru 7. Platform size is approximately 5'-8" wide x 8'-0" deep. Entrances are 4'-0" wide x 7'-0" high, Two-Speed side-opening doors.
Elevator 6 is a simplex 5000lb car and rated speed of 200fpm and center-opening single-speed doors. Car 6 has a walk-in pit.
Elevator 9 is a simplex 4000lb in-ground hydraulic car manufactured by General Elevator in 1979. It has a rated speed of 125fpm, and adjacent machine room, and side-opening two-speed painted doors. The aluminum head should be changed as soon as possible, these heads are not considered safe.
Cars 10 and 11 are geared overhead traction duplex elevators with a rated capacity of 5000lbs. and a rated speed of 400fpm. They serve levels 1 thru 7. Platform size is approximately 5'-8" wide x 8'-0" deep. Entrances are 4'-0" wide x 7'-0" high, single- speed center-opening doors. The cab interior was recently refurbished.
Elevator 18 is a simplex in-ground hydraulic 4000lb car manufactured by General Elevator in 1981. It has an MCE controller and a rated speed of 125fpm, and side-opening two-speed painted doors. The machine room is adjacent. The overhead space appears to be less than code compliant and may require a variance.
The existing elevator equipment is in average condition for this vintage of equipment.
The Montgomery and MCE controllers are outdated, and the support and technician's knowledge of this product is limited. Changes in equipment design and technology have made many improvements with dispatching, motor control, and door operation that will greatly benefit the facility.
Door equipment and operators are past their life expectancy, replacement parts are likely difficult to obtain. Advances in door technology have resulted in improved passenger safety via closed loop operation.
Existing signal fixtures such as Car Stations, Hall Stations, and Hall Position Indicators show dents and abrasions, are dated and past life expectancy.
The elevator cab interiors are dated and show damage such as chipped laminate and dented metal wall panels. These are significantly past life expectancy.
Hydraulic elevators No. 9 and No. 18 pumping units and machines are recommended for replacement. The original machines have had a previous modernization. The existing pit depth of 4 -0 will limit cars No. 9 and No. 18 to utilizing hydraulic equipment only. Either a holeless twin-post system or in-ground jack with sealed PVC casing system is acceptable. Overhead space on car No. 18 will need an additional survey to determine overhead height under hoistbeam from finished floor of last landing.
For the traction units, these should be replaced with AC machines with VVVF controls, which consume less power and produce less heat. A second option would be to utilize machine-roomless elevators. According to the building plans provided, there is sufficient overhead space available for Cars 1-6, 10 and 11 for either application. While conventional overhead gearless machines are more expensive than machine-roomless equipment, they will have a longer lifespan and be more reliable in the long run. Machine-roomless applications are acceptable, but there is a trade-off for having the machines located within the hoistway, the motors are smaller, and smaller motors work harder than larger motors. This results in reduced overall lifespan.
CONCLUSIONS
Lerch Bates recommends that all ten (10) elevators be replaced with new equipment, including machines, controllers, cabs, fixtures, wiring, and hoistway equipment. The existing entrance frames may either be completely replaced or retained and wrapped with new cladding material such as stainless steel. If the frames are to be completely replaced, then a rough-opening of 5 -6 wide by 8 -4 high would be required to be saw-cut for 4 -0 wide by 7 -0 high entrances. In addition, the hoistway sills would need to be chipped out of the existing floor slab. Therefore, we believe this would be best handled from a modernization standpoint in lieu of a New Construction stand-point simply because this an existing building. Existing conduit to be reused and may when deemed appropriate by contractor.
SECTION III
MODERNIZATION PLANS
GENERAL
In our opinion, development of a comprehensive modernization plan for the James A. Haley Medical Center should be based on the changes required to the existing elevator systems necessary to achieve reliable elevator service, passenger safety, and life safety, in conjunction with related building work necessary for code compliance.
Modernization should take into consideration cost constraints as well as potential interim inconvenience to tenants during the modernization process. In our judgment, it must also represent a comprehensive, long-term (minimum 25 years) solution in order to justify capital expenditures.
ANTICIPATED LEAD-TIMES
Planning for modernization should include consideration of long lead times for fabrication of equipment and installation. Approximate time frame not including building work is as follows:
Preparation of Bid Specification/Owner Reviews 4 weeks
Bid Review and Award of Contract 6 weeks
Shop Drawing Approval 8 weeks
Equipment Fabrication 22 weeks
Equipment Delivery 2 weeks
Installation Cars 1, 2, 3 10-12 weeks each
Installation Cars 4, 5 10-12 weeks each
Installation Car 6, 9, 18 6-8 weeks each
Installation Car 10, 11 10-12 weeks each
Final Adjusting and Testing 2 weeks
Total Elapsed Time for Project Vary According to Install Crew Availability
EQUIPMENT DISPOSITION
The Equipment Disposition Summaries attached in Appendix A provide details of specific findings and recommend
APPENDIX A
EQUIPMENT DISPOSITION SUMMARY
ELEVATORS
Remove Existing
Retain Existing
Recond. Existing
Provide New
Notes
HOISTWAY ENTRANCE
Entrance Frames
X
Retain frames and wrap with new stainless cladding.
Door Panels
X
X
Transoms
X
X
Sight Guards
X
X
Astragals
X
X
Vision Panels
X
X
Sills
X
X
X
If frames are to be wrapped, then existing sills in acceptable condition should be retained. Damaged sills will need to be jacked out of the concrete.
Sill Supports
X
X
X
If present, then same as with the Sills above.
Fascia
X
X
Toe Guard
X
X
Dust Covers
X
X
Struts and Headers
X
X
Hangers and Tracks
X
X
Hanger Rollers
X
X
Hanger Covers
X
X
Closers
X
X
Relating Mechanism
X
X
Interlocks
X
X
Gibs
X
X
Access
X
X
Floor Identification
X
X
Renumber cars in order from left to right per code
Finish
X
X
CAR
Frame
X
X
Sheave
X
X
Platform
X
X
Safety Devices
X
X
Traction Cars 1-6, 10 and 11.
Isolation
X
X
Plunger Isolation
X
X
Hydraulic Elevators 9 and 18.
ELEVATORS
Remove Existing
Retain Existing
Recond. Existing
Provide New
Notes
Load Weighing Device
X
X
Car Guide Rails
X
To Be Determined, may vary according to manufacturer.
Guide Shoes
X
X
Sills
X
X
Flooring
X
X
Fireproofing
X
X
Toe Guard
X
X
Doors
X
X
Door Hangers
X
X
Door Track
X
X
Door Header
X
X
Door Clutch
X
X
Door Unlocking Device
X
X
Door Operator
X
X
Door Contact
X
X
Door Protection Device
X
X
Top Control Station
X
X
Work Light and Receptacle
X
X
Top Exit Contact
X
X
Selector Tape Switch
X
X
Door Restrictor
X
X
Emergency Lighting
X
X
Voice Announcing
X
MACHINE ROOM
Hoist Machine
X
X
Hoist Ropes
X
X
Support Beams and Tie Downs
X
Retain in place, these are buried in the concrete slabs.
Sleeves and Guards
X
X
SCR Drives
X
X
New AC VVVF Drives
Controller
X
X
Encoder
X
X
ELEVATORS
Remove Existing
Retain Existing
Recond. Existing
Provide New
Notes
Selector
X
X
Group Controller
X
X
For cars 1-3.
Governor
X
X
For cars 1-6, 10 and 11.
Governor Rope
X
X
For cars 1-6, 10 and 11.
Wiring
X
X
For cars 1-6, 10 and 11.
Rope Gripper
X
X
For cars 1-6, 10 and 11.
Pump Unit
X
X
For cars 9 and 18.
Shut-Off Valve
X
X
For cars 9 and 18.
Muffler
X
X
For cars 9 and 18.
Piping
X
X
For cars 9 and 18.
Piping Support
X
X
For cars 9 and 18.
Lighting
X
X
Retain where deemed sufficient by engineer
Access
X
X
Ventilation
X
X
X
Disconnect Switch
X
X
Sprinklers
Retain in place without direction from Fire Marshall
Smoke Detectors
X
X
Heat Detector
X
X
Enclosure
X
Heating/Air Conditioning
X
X
X
Retain where deemed sufficient by engineer
Foreign Equipment
Remove from machinery rooms and hoistways
Ladders/Stairs
X
X
Provide code compliant pit ladders
Hoist Beams
X
X
X
Retain where deemed viable by engineer
HOISTWAY
Main Guide Rails (Car)
X
Counterweight Guide Rails
X
Deflector Sheaves
X
X
Counterweight Frame
X
X
X
To Be Determined, may vary according to manufacturer.
Counterweight Safety
N/A
Counterweight Sheave
X
X
Counterweight Guide Shoes
X
X
ELEVATORS
Remove Existing
Retain Existing
Recond. Existing
Provide New
Notes
Normal and Final Terminal Devices
X
X
Wiring and Traveling Cables
X
X
Projections
X
Any horizontal projections in hoistway wider than 4
must be beveled to 75 degree angle.
Setbacks
X
Any horizontal projections in hoistway wider than 4
must be beveled to 75 degree angle.
Ventilation
To be reviewed by engineer
Enclosure
X
Smoke Detectors
X
X
Sprinklers
Retain in place without direction from Fire Marshall
Foreign Equipment
Remove from machinery rooms and hoistways
PIT
Access Ladder
X
X
Access Door
X
X
Car Buffer
X
X
Counterweight Buffer
X
X
Governor Tension Sheave
X
X
Selector Tension Sheave
X
X
Stop Switches
X
X
Plunger
X
X
For cars 9 and 18.
Cylinder
X
X
For cars 9 and 18.
Shut-Off Valve
X
X
For cars 9 and 18.
Piping
X
X
For cars 9 and 18.
Piping Support
X
X
For cars 9 and 18.
Scavenger
X
X
For cars 9 and 18.
Sump
X
X
Sump Pit/Cover
X
X
Light
X
X
Light Switch
X
X
Outlet
X
X
Sprinkler
X
X
Heat Detector
X
X
ELEVATORS
Remove Existing
Retain Existing
Recond. Existing
Provide New
Notes
CAR ENCLOSURE
Ceiling
X
X
Lighting
X
X
Ventilation
X
X
Walls
X
X
Panels
X
X
Returns
X
X
Handrails
X
X
Flooring
X
X
OPERATING DEVICES
Hall Pushbuttons
X
X
Access Switches
X
X
Firefighters Hall Station
X
X
Main Car Station
X
X
Auxiliary Car Station
X
X
Where applicable
Communications System Wiring
X
X
Lobby Panel
X
X
Fire Command Center
X
X
Signaling Devices (Alarm Bell)
X
X
Car Position Indicator
X
X
Car Travel Lantern
X
X
Hall Position Indicator
X
X
Hall Position Indicator with Lanterns
X
X
Smoke Detector
X
X
Hall Lanterns
X
X
APPENDIX B
SUPPORTING PHOTOGRAPHS
1. Corrosion on platform side. 2. Outdated MAC 104 open loop door operator on Car 1.
3. Group 1, 2, 3 lobby. 4. Secondary overhead machinery space for cars 1, 2, and
3. Deflector sheaves and overspeed governors located here. Locks need to be group 3 security.
5. Car 3 governor in secondary overhead. 6. Dead end hitch plate in secondary overhead.
Car 4 cab interior. New car structure and interiors will be a part of this modernization.
Car 4 landing sill. Car sill is worn and will be replaced. Hall sills will be cleaned and polished
Car 4 outdated aftermarket Hall Position Indicator will be replaced with flush mounted ADA compliant fixture in the same location.
Elevator 6 pit door should have electro-mechanical interlock on the access door because the platform travels below the door height. All walk in pit doors need to be group 3 security.
Car 6 cab light switch in machine room. True 110 VAC disconnects will be required as part of this modernization
Car 6 outdated machine room cooling system. Remove, blank off and install HVAC recommended.
Car 9 aluminum jack head. This needs to be replaced immediately. Replacement of the entire jack assembly is recommended.
Car 9 outdated General Relay logic oil- draulic installed in 1979.
Car 9 auxiliary car station. 16. Car 10 Pit ladder not code compliant but existing conditions need to be considered when new is installed.
Elevator 18 overhead. Piping inside the hoistway unrelated to the elevator is against code.
Elevator 18 car top.
Elevator 18 MCE whitebox control from 1991 is obsolete.
Elevator 18 corrosion on the door panels.
Elevator 18 Car door significant wear; will be completely replaced.
Car 1 Data Plate from 1969.
Car 2 Data Plate from 1969. 24. Car 3 Data Plate from 1969.
ELEVATOR SURVEY REPORT
James A. Haley Medical Center
LB Project 0100036068
© 2022 Lerch Bates Inc.
4/1/2022
Page 21
25. Car 4 Data Plate from 1969. 26. Car 5 Data Plate from 1969.
27. Car 6 Data Tag. 28. Car 9 Data Tag from 1979.
29. Car 10 Data Tag. 30. Car 11 Data Tag.
Car 18 Data Tag from 1992.
ELEVATOR SURVEY REPORT
James A. Haley Medical Center
LB Project 0100036068
© 2022 Lerch Bates Inc.
4/1/2022
Page 23
Appendix b Related work
Hoistway and Pit:
Clear, plumb, substantially flush hoistway with variations not to exceed 1" at any point.
Installation of guide rail bracket supports in concrete. Inserts or embeds, if used, will be furnished under this Section.
Wall block outs and fire rated closure for control and signal fixture boxes which penetrate walls.
Cutting and patching walls and floors.
Decorating of walls and floors.
Structural slab, concrete wall pockets, and/or structural steel beams for support of hoist machine, rope sheaves, and dead-end hitch beams. Support deflection shall not exceed 1/1666 of span under static load.
Waterproof pit.
Protect open hoistways and entrances during construction per OSHA Regulations.
Protect car enclosure, hoistway entrance assemblies, and special metal finishes from damage.
Hoistway venting.
Remove existing finished cab flooring. Install new flooring. Coordinate weight of flooring and sill height.
Machine Room and Machinery Spaces:
Enclosure with access.
Self-closing and locking access door.
Ventilation and heating. Maintain minimum temperature of 55° F, maximum 90° F. Maintain maximum 80% relative humidity, non-condensing.
Paint walls and ceiling.
Class ABC fire extinguisher in each elevator machine room.
Seal fireproofing to prevent flaking.
Fire sprinklers where required.
Electrical Service, Conductors, and Devices:
Lighting and GFCI convenience outlets in pit, machine room, and overhead machinery spaces. Provide one additional non-GFCI convenience outlet in pit for sump pump.
Three-phase mainline copper power feeder to terminals of each elevator controller in the machine room
with protected lockable open disconnecting means.
Single-phase copper power feeder to each elevator controller for car lighting and exhaust blower with individual protected lockable open disconnecting means located in machine room.
Emergency telephone line to each individual elevator control panel in elevator machine room.
Fire alarm initiating devices in each elevator lobby, for each group of elevators or single elevator and each machine room to initiate firefighters return feature. Device at top of hoistway if sprinklered. Provide alarm initiating signal wiring from hoistway or machine room connection point to elevator controller terminals. Device in machine room and at top of hoistway to provide signal for general alarm and discrete signal for Phase II firefighters operation.
Temporary power and illumination to install, test, and adjust elevator equipment.
Category 6 Ethernet connection and junction box in each elevator machine room space.
Firefighters telephone jack and announcement speaker in car with connection to individual elevator control panels in elevator machine room and elevator control panel in firefighters control room.
Conduit from the closest hoistway of each elevator group or single elevator to the firefighters control room and/or main control console. Coordinate size, number, and location of conduits with Elevator Contractor.
Means to automatically disconnect power to affected elevator drive unit and controller prior to activation of machine room fire sprinkler system and/or hoistway fire sprinkler system. Manual shut-off means shall be located outside bounds of machine room.
When sprinklers are provided in the hoistway all electrical equipment, located less than 4'-0" above the pit floor shall be identified for use in wet locations. Exception: Seismic protection devices.
Single-phase power feeders to main control console and firefighters control panel.
Standby Power Provision:
Standby power of normal voltage characteristics via normal electrical feeders to run one elevator at a time at full-rated car speed and capacity.
Conductor from auxiliary form C dry contacts, located in the standby power transfer switch to a designated elevator control panel in each elevator group. Provide a time delay of 30 - 45 seconds for pre-transfer signal in either direction.
Standby single-phase power to group controller, and each elevator controller for car lighting, exhaust blower, emergency signaling device.
Means for absorbing regenerated power during an overhauling load condition per NEC 620.91. Elevator(s) will employ IGBT drive, presenting a non-linear active load.
Standby power to machine room ventilation or air conditioning.
Standby power to emergency communications device(s).
MECHANICAL
EXISTING CONDITIONS
This report is commissioned based upon the field work and understanding of the scope of work. A site visit and assessment were performed by Above Group Inc., in conjunction with RDC / John Poe Architects and Lerch Bates on March 11, 2022. The following is based upon that site visit.
The scope of this project is to modernize or replace (10) ten elevators at the James A. Haley Veterans Medical Center. The elevators to be evaluated as part this report are: 1-6, 9-11, and 18. Elevators 1-6 are Overhead Traction Cars manufactured in 1969. Elevators 1-3 share a single combined pit, while elevators 4 and 5 share a combined pit. Elevator 6 has a walk-in pit.
Elevator 9 is an in-ground hydraulic car manufactured in 1979. It has an in-ground pit not connected to any other elevators. Elevators 10 and 11 are geared overhead traction duplex elevators and share a combined pit.
Elevator 18 is a simplex in-ground hydraulic car manufactured in 1981 and has an in-ground pit separate from all other elevators.
Pits serving Elevators 1-6, and 9 are sprinklered but a sump pump was not observed during the site visit. The pit serving Elevator 18 is also sprinklered but contains a sump pump while the pit serving elevator 10 & 11 is not sprinklered and did not contain a sump pump.
Elevators Served
Sump Pump
Sprinklered
1, 2, 3
No
Yes
4,5
No
Yes
6
No
Yes
9
No
Yes
10,11
No
No
18
Yes
Yes
Elevator equipment is contained within existing elevator machine rooms located above the 7th floor for elevators 1-5, 10 and 11. The equipment rooms for elevator 6 is located above the top floor it serves while equipment rooms for 9 and 18 are located in the basement. Equipment serving elevators 1-5 are housed in one machine room. Equipment serving elevators 10 and 11 are contained in a separate machine room. Equipment serving elevators 6, 9, and 18 are located in separate, individual machine rooms.
None of the machine rooms were observed to have dedicated HVAC systems serving the machine room only. The machine room serving elevators 1-5 had HVAC routed from an adjacent server room into the machine room. The remaining machine rooms (6, 9, 10&11, 18) do not have HVAC cooling; they are only served by exhaust fans and outdoor air louvers.
RECOMMENDATIONS
All elevator pits for elevators that have Firefighters Emergency Operation shall have a drain or sump
pump in accordance with ASME A17.1 Section 2.2.2.5. The drain or sump pump shall discharge into the
sanitary or storm drainage system through an indirect waste connection. The sump pump or drain shall have the capacity to remove a minimum of 3,000 gallons per hour per elevator car (50 GPM per car).
In hydraulic elevator pits, separators shall be installed into which an all oil-bearing, grease-bearing or flammable wastes shall be discharged before emptying into the building drainage system or other point of disposal. However, an oil separator is not required in hydraulic elevator pits where an approved alarm system is installed and an indirect waste connection is provided.
Elevators Served
Sump Pump
Sprinklered
1, 2, 3
New 150 GPM
To be modified
4,5
New 100 GPM
To be modified
6
New 50 GPM
To be modified
9
New 50 GPM (oil-minder)
To be modified
10,11
New 100 GPM
To be installed
18
New 50 GPM (oil-minder)
To be modified
All elevator machine rooms are required by International Building Code 2021 Section 3005.2 Venting to have independent ventilation or air-conditioning to protect against overheating.
Elevator machine rooms, machinery spaces that contain the driving machine, and control rooms or spaces that contain the operation or motion controller for elevator operation shall be provided with an independent ventilation or air-conditioning system to protect against the overheating of the electrical equipment. The system shall be capable of maintain temperatures within the range established for the elevator equipment.
Given that all of the machine rooms do not have independent air conditioning systems, only exhaust systems, it is recommended that as part of this project new, split-system air conditioning systems be provided for each elevator machine room to control the equipment room space temperatures. It is estimated that each machine room will have a unit that is sized at approximately 1-1/2 tons per elevator machine within room. Existing exhaust fans will be removed and louvers will be blanked off.
Elevators In Machine Room
Recommended HVAC Sizing
1, 2, 3, 4, 5
7-1/2 tons
6
1-1/2 tons
9
1-1/2 tons
10, 11
3 tons
18
1-1/2 tons
ELECTRICAL
EXISTING CONDITIONS
This report is commissioned based upon the field work and understanding of the scope of work. A site visit and assessment were performed by Above Group Inc., in conjunction with RDC / John Poe Architects and Lerch Bates on March 11, 2022. The following is based upon that site visit.
The scope of this project is to modernize or replace (10) ten elevators at the James A. Haley Veterans
Medical Center. The elevators to be evaluated as part this report are: 1-6, 9-11, and 18.
Elevators 1, 2, 3, 4 and 5:
Each elevator is fed from a 100A disconnect switch in the 7th floor elevator machine room, which is in turn fed from a 125AF/100AT shunt-trip circuit breaker in existing panelboard MB9 (Equipment Branch; 400A MCB; 480V, 3 phase, 3 wire; Eaton PRL3a series).
Each elevator s cab lighting is fed from a 30A disconnect switch mounted adjacent to each respective elevator controller, which is in turn fed from a 20/1 branch circuit breaker in existing panelboard X.3.A (Normal Branch; 125A MLO; 208Y/120V, 3 phase, 4 wire; GE A series).
Lighting footcandle (fc) overview:
Elevator machine room: Lighting exceeds code minimum of 20fc, except at 1 corner where a measurement of 10.1fc was observed. See image below:
Secondary overhead machinery spaces: Lighting does not meet code minimum 20fc.
Elevator sills in lobby space: footcandle measurements were taken at the sill of all (8) floors serviced by each elevator. All measurements met or exceeded the code minimum 10fc when the elevator doors were open.
Elevator pit: Lighting does not meet the code minimum 10fc.
Fire alarm observations:
Smoke detectors were appropriately in place in the elevator machine room / hoistway and at every elevator lobby.
Heat detectors were appropriately in place within 24 of every sprinkler head in the elevator machine room and all hoistway sprinkler heads located more than 24 above the elevator pit floor.
Only 2 fire alarm relays observed. A 3rd fire alarm relay is required for appropriate primary, secondary and fireman s hat functions.
Miscellaneous observations:
Elevators 1, 2, 3, 4 and 5 share a common machine room, enclosed by a wire fence. The elevator disconnects were wall mounted within sight of the elevator controllers, but were not located at the entry to the machine room.
Elevator 6:
Elevator is fed from a 200A disconnect switch located at the entry to the machine room, which is in turn fed from a 70A shunt trip circuit breaker in existing panelboard 3B-XEQ-L1 (Equipment Branch; 250A MLO; 480Y/277V, 3 phase, 4 wire; Eaton PRL3a series).
The elevator s cab lighting is fed from a toggle switch mounted adjacent on the elevator controller. The source was not labeled and could not be identified.
Lighting footcandle (fc) overview:
Elevator machine room: Lighting does not meet code minimum of 20fc.
Elevator sills in lobby space: footcandle measurements were taken at the sill of all floors serviced by elevator. All measurements met or exceeded the code minimum 10fc when the elevator doors were open.
Elevator pit: Lighting does not meet the code minimum 10fc. Fire alarm observations:
Smoke detectors were appropriately in place in the elevator machine room / hoistway and at every elevator lobby.
Heat detectors were not appropriately in place within 24 of every sprinkler head in the elevator
machine room.
Only 2 fire alarm relays observed. A 3rd fire alarm relay is required for appropriate primary,
secondary and fireman s hat functions.
Elevator 9:
Elevator is fed from a 60A disconnect switch located at the entry to the elevator machine room, which is in turn fed from a busway circuit breaker (Normal Branch; 60A; 480V, 3 phase; Eaton POW-R-WAY III series) on existing normal vertical bus NR-A in room GA-016.
Each elevator s cab lighting is fed from a 30A disconnect switch located at the entry to the elevator machine room, which is in turn fed from a 20/1 branch circuit breaker in existing panelboard AGK (Normal Branch; fed via 30kVA transformer from vertical bus NR-A).
Lighting footcandle (fc) overview:
Elevator machine room: Lighting exceeds code minimum of 20fc.
Elevator sills in lobby space: footcandle measurements were taken at the sill of all floors serviced by each elevator. All measurements met or exceeded the code minimum 10fc when the elevator doors were open.
Elevator pit: Lighting does not meet the code minimum 10fc.
Fire alarm observations:
Smoke detectors were appropriately in place in the elevator machine room / hoistway and at every elevator lobby.
Heat detectors were appropriately in place within 24 of every sprinkler head in the elevator machine room and all hoistway sprinkler heads located more than 24 above the elevator pit floor.
Only 2 fire alarm relays observed. A 3rd fire alarm relay is required for appropriate primary,
secondary and fireman s hat functions.
Elevators 10 and 11:
Each elevator is fed from a 100A disconnect switch located in the entryway in the penthouse elevator machine room, which is in turn fed from a 100A shunt-trip circuit breaker in existing panelboard MB10 (Equipment Branch; 400A MCB; 480Y/277V, 3 phase, 4 wire; Eaton PRL3a series).
Each elevator s cab lighting is fed from a 30A disconnect switch located in the entryway in the penthouse elevator machine room, which is in turn fed from a disconnect and transformer fed from panel MB10.
Lighting footcandle (fc) overview:
Elevator machine room: Lighting exceeds code minimum of 20fc.
Elevator sills in lobby space: footcandle measurements were taken at the sill of all (8) floors serviced by each elevator. All measurements met or exceeded the code minimum 10fc when the elevator doors were open.
Elevator pit: Lighting does not meet the code minimum 10fc. Fire alarm observations:
Smoke detectors were appropriately in place in the elevator machine room / hoistway and at every elevator lobby.
Heat detectors were appropriately in place within 24 of every sprinkler head in the elevator
machine room.
Only 2 fire alarm relays observed. A 3rd fire alarm relay is required for appropriate primary,
secondary and fireman s hat functions.
Elevator 18:
Elevator is fed from a 200A disconnect switch located at the entry to the machine room, which is in turn fed from a 125A circuit breaker in existing panelboard CBG (Normal Branch; 400A MLO; 480Y/277V, 3 phase, 4 wire; Eaton PRL3a series).
The elevator s cab lighting is fed from a 30A disconnect switch located at the entry to the machine room, which is in turn fed from a 20/1 branch circuit breaker in existing panelboard CBEL (Equipment Branch; 125A MLO; 208Y/120V, 3 phase, 4 wire; GE A series).
Lighting footcandle (fc) overview:
Elevator machine room: Lighting does meet code minimum of 20fc.
Elevator sills in lobby space: footcandle measurements were taken at the sill of all (2) floors serviced by elevator. All measurements do not meet the code minimum 10fc when the elevator doors were open.
Elevator pit: Lighting does not meet the code minimum 10fc.
Fire alarm observations:
Smoke detectors were appropriately in place in the elevator machine room / hoistway and at every elevator lobby.
Heat detectors were appropriately in place within 24 of every sprinkler head in the elevator machine room and all hoistway sprinkler heads located more than 24 above the elevator pit floor.
Miscellaneous observations:
The elevator machine room lighting was controlled by a wall mounted occupancy sensor.
RECOMMENDATIONS
Elevators 1, 2, 3, 4 and 5:
Replace existing elevator disconnect switches with new Eaton Bussmann Power Module Switch elevator disconnects, or equal.
Provide power for new elevator machine room HVAC air conditioning split system units. See mechanical section for further details.
Upgrade lighting in elevator machine room, secondary overhead space and elevator pit to meet code minimum footcandle levels. Elevator hoistway lighting to be stacked vertically in the rear of the hoistway near the corners to meet PG-18-10 Elevator Design Manual requirements.
Existing fire alarm smoke detectors and heat detectors should be replaced after the elevator replacement. Relays should be replaced and upgraded to include fireman s hat function.
Elevator 6:
Replace existing elevator disconnect switch with new Eaton Bussmann Power Module Switch elevator disconnects, or equal.
Provide power for new elevator machine room HVAC air conditioning split system unit. See mechanical section for further details.
Upgrade lighting in elevator machine room and elevator pit to meet code minimum footcandle levels. Elevator hoistway lighting to be stacked vertically in the rear of the hoistway near the corners to meet PG-18-10 Elevator Design Manual requirements.
Elevator cab lighting toggle switch should be replaced with a 30A unfused disconnect switch.
Existing fire alarm smoke detectors and heat detectors should be replaced after the elevator
replacement. Relays should be replaced and upgraded to include fireman s hat function.
Elevator 9:
Replace existing elevator disconnect switch with new Eaton Bussmann Power Module Switch elevator disconnects, or equal.
Provide power for new elevator machine room HVAC air conditioning split system unit. See mechanical section for further details.
Upgrade lighting in elevator pit to meet code minimum footcandle levels. Elevator hoistway lighting to be stacked vertically in the rear of the hoistway near the corners to meet PG-18-10 Elevator Design Manual requirements.
Existing fire alarm smoke detectors and heat detectors should be replaced after the elevator
replacement. Relays should be replaced and upgraded to include fireman s hat function.
Elevators 10 and 11:
Replace existing elevator disconnect switches with new Eaton Bussmann Power Module Switch elevator disconnects, or equal.
Provide power for new elevator machine room HVAC air conditioning split system units. See mechanical section for further details.
Upgrade lighting in elevator pit to meet code minimum footcandle levels. Elevator hoistway lighting to be stacked vertically in the rear of the hoistway near the corners to meet PG-18-10 Elevator Design Manual requirements.
Existing fire alarm smoke detectors and heat detectors should be replaced after the elevator
replacement. Relays should be replaced and upgraded to include fireman s hat function.
Elevator 18:
Replace existing elevator disconnect switch with new Eaton Bussmann Power Module Switch elevator disconnects, or equal.
Provide power for new elevator machine room HVAC air conditioning split system unit. See mechanical section for further details.
Upgrade lighting in elevator pit to meet code minimum footcandle levels. Elevator hoistway lighting to be stacked vertically in the rear of the hoistway near the corners to meet PG-18-10 Elevator Design Manual requirements.
Upgrade lighting at each elevator landing to meet code minimum footcandle levels.
Replace occupancy sensing wall switch with toggle switch in elevator machine room.
Existing fire alarm smoke detectors, heat detectors and relays should be replaced after the elevator replacement.
Files
Show all 14
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Y1DA--FY23: NRM-Tier 2 (PROJ: 673-14-104) BB Renovate and Replace Transportation Equipment Building 1 | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Z1DA--537-26-101 Construction of Ogden Elevator Cab Interiors Jesse Brown VA Medical Center | Veterans Integrated Service Network 12 | Service-Disabled Veteran-Owned Small Business | |
| J039--561A4-25-500 Elevator Repair Building 6 and 53 | Veterans Integrated Service Network 2 | Service-Disabled Veteran-Owned Small Business | |
| Z1DA--Modernize Damen (Bldg. 1) Elevators Construction 537-24-101 | Veterans Integrated Service Network 12 | Service-Disabled Veteran-Owned Small Business | |
| WTX Elevator Inspections and Load Testing Services | Veterans Integrated Service Network 17 | Service-Disabled Veteran-Owned Small Business | |
| H399--36C242-27-AP-0524| 528-27-1-6893-0009 Elevator Inspections, VA Medical Center (VAMC) & Bath VA Medical Center (VAMC) | Veterans Integrated Service Network 2 | Service-Disabled Veteran-Owned Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity