This document contains an itemized schedule of values cost breakdown for a federal construction project. The schedule provides a line item breakdown of estimated labor and material costs across 31 construction divisions for renovating and replacing a Veterans Affairs transportation equipment building. Key costs include $0 estimated for masonry, metals, wood and plastics, general requirements, existing conditions, concrete, specialties, equipment, furnishings, thermal and moisture protection, doors and windows, finishes, plumbing, HVAC, electrical, special construction, conveying equipment, fire suppression, and exterior improvements. The total base offer cost is $0 with overhead, profit, and bond amounts left blank. The related federal contract opportunity is a solicitation from the Department of Veterans Affairs Veterans Health Administration to renovate and replace the transportation equipment building under project number 673-14-104.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number: Date:
Project Title
Project Location
Offeror Name
Offeror Street
Offeror City State Zip
Item Labor Cost Material Cost Total Cost
Division 1 $ - $ - $ -
Division 2 - - -
Division 3 - - -
Division 4 - - -
Division 5 - - -
Division 6 - - -
Division 7 - - -
Division 8 - - -
Division 9 - - -
Division 10 - - -
Division 11 - - -
Division 12 - - -
Division 13 - - -
Division 14 - - -
Division 21 - - -
Division 22 - - -
Division 23 - - -
Division 26 - - -
Division 27 - - -
Division 28 - - -
Division 31 - - -
Division 32 - - -
Division 33 - - -
Division 34 - - -
Overhead % -
Profit % -
Bond % -
Description
Base Offer Cost Breakdown
Masonry
Metals
Wood and Plastic
General Requirements
Existing Conditions
Concrete
Specialties
Equipment
Furnishings
Thermal & Moisture Protect
Doors and Windows
Finishes
Plumbing
HVAC
Electrical
Special Construction
Conveying Equipment
Fire Suppression
Exterior Improvements
Utilities
Transportation Subtotal
Communications
Electronic Safety & Security
Earthwork
Total Base Offer Cost
Overhead/Profit Subtotals :
Division Subtotals :
0.00%
0.00%
0.00%
File details come from the government source that posted it. Updated .