This document contains responses to a request for information (RFI) regarding solicitation number 36C24823R0186 for renovating and replacing a transportation equipment building at a Department of Veterans Affairs facility. The solicitation seeks offers for elevator modernization and replacement work involving 18 elevators. Key details include responses providing clarification that 1:1 roping is acceptable for certain elevators, gearless traction machines can be installed, submersible pumps meet requirements, medical emergency overrides must be reinstalled, and unspecified asbestos discovery will be addressed via change order. The bid due date was extended to August 24, 2023 at 2:00 PM EST. Relevant project information and agency contacts are included.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Information (RFI)

Renovate and Replace Transportation Equipment Building 1

PROJECT # 673-14-104/ 36C24823R0186

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 673-14-104 36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) Tampa

FL

33637 36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) Tampa

FL

33637 To all Offerors/Bidders

36C24823R0186

X x x x The purpose of this amendment is to provide the following:

RFI answers, a revised 01 00 00 General Requirements Specification and lastly an extension of the proposal due date 24 Aug 2023, 2pm EST. Please send proposals to david.hernandez1@va.gov

RFI NBR
Question/

Response

Company Submitted By
Dated Received
1.
Scope of Work (SOW) for Elevators 10 and 11:

In the SOW, Elevators 10 and 11 are listed as roped 2 to 1, but they are currently roped 1 to 1. Are we planning to change the roping to 2 to 1 as specified in the SOW, or should we leave it as is with the current 1 to 1 roping?

Veteran Elevator
06/28/23

VA Response: 1 to 1 Roping is acceptable.

2.
Roping Change for Elevators 1 to 5:

As we plan to change the sling and platform for Elevators 1 to 5, I wanted to inquire if it is feasible to rope these elevators 1 to 1. The existing setup with 2 to 1 roping creates limited space on the car top due to the deflector sheave's position, making it challenging for maintenance personnel to access car top door locks and other maintenance areas in the hoistway. Roping them 1 to 1 would enhance safety and facilitate maintenance work.

Veteran Elevator
06/28/23

VA Response: Retain slings. Replace platforms.

3.
Elevator 6 Speed Rating:

Elevator 6 is currently listed with a speed rating of 400 FPM. However, this elevator has a travel distance of only 27 feet with 3 stops, which makes it practically impossible to achieve that speed in such a short distance. Currently, it is rated at 150 FPM. Could you please clarify the intended speed rating for Elevator 6?

Veteran Elevator
06/28/23

VA Response: 200 fpm is acceptable.

4.
Traction Machines Type:

The contract specifies that all traction machines are to be geared to overhead machines. However, Elevators 1 to 5 are currently equipped with gearless machines. Replacing them with gearless machines, specifically AC variable speed overhead traction machines, would streamline the process.

Q. Can you confirm if installing gearless machines for Elevators 1 to 5 is permissible, or should we proceed with the geared overhead machines as stated in the contract?

Veteran Elevator
06/28/23

VA Response: Gearless Machines are acceptable for all traction cars.

5
Sump Pumps:

Sump pumps. Please identify if you require all elevator shafts to now have sump pumps. If these are not necessary Identify the elevator by their numbers you would like to have the sump pumps installed or replaced.

Veteran Elevator
06/28/23

VA Response: Sump pumps are identified on the plumbing drawings. Refer to plumbing drawings for location and sizes of pumps.

6
ACM Spray Fire Proofing Removal:

In the associated machine rooms with asbestos in the working areas. Please identify how much of the product needs to be removed for the area, if it is only in the machine rooms, identify those machine rooms that are affected and any other areas that require abatement

Veteran Elevator
06/28/23

VA Response: Spray fire proofing was recently tested and is not ACM. See addendum 1 for recently discovered ACM.

7
Undiscovered Asbestos:

If by chance the contractor finds additional areas of asbestos not included in the PWS will the Contracting Authority provide a change order to accommodate the additional work

Veteran Elevator
06/28/23

VA Response: Undiscovered ACM materials will be added to contractor scope as a change order.

8
Hydraulic Pump and Tank unit:

To be certain replacing the hydraulic tank unit for #18 and # 6 elevator submersible pump will be selected for this project.

Veteran Elevator
06/28/23

VA Response: Submersible is acceptable.

9
Picture # 17 / Lerch Bates Elevator SURVEY REPORT Elevator # 18 overhead. Piping inside the hoistway unrelated to the elevator is against code.

Q. What system(s) above the ceiling does this pipe support, where does it extend to through the walls? Do you want it capped off, or rerouted? Please explain more as to this pipe and the service it provides.

Veteran Elevator
06/28/23

VA Response: Per A17.2, 2.8.3.4, drain piping is acceptable. Retain.

10
Pit Ladders

Q. Do you want all pit ladders replaced in all shafts?

Veteran Elevator
06/28/23

VA Response: Provide new ladders for all units

11
CPARS and Past Performance References:

May we use PPQ (Past Performance Questionnaires) submitted and filled out provided previously to the VISN 8 Contracting Authority for other RFQ’s. May we exchange / submit these, or do you require the EXPERIENCE INFORMATION SHEET attachment presented in the document section of the solicitation? They support the same questions and project identification

Veteran Elevator
06/28/23

VA Response: You may submit previously submitted PPQs, provided the PPQ submission complies with the instruction to offerors.

12
Elevator Doghouse:

Q. Are service car elevators 4,5,6,9,10,11,18 need to be provided a doghouse or only elevators 10 & 11 freight cars.

Veteran Elevator
06/28/23

VA Response: Only Elevators 10 & 11 require doghouse.

13
Elevator Max Weight Discrepancies:

Q. Elevators 4 and 5 are itemized in the provided documents as GWL -4000 lbs. cars, the provided list of elevators in the solicitation defines the weight at 5,000 lbs. Please define if the VA is upgrading elevators 4 & 5 to 5,000 lbs.?

Veteran Elevator
06/28/23

VA Response: Provide elevators 4&5 as 5000lb capacity.

14
Card Readers:

Who will supply the card reader stations for medical emergency overrides ?

Veteran Elevator
06/28/23

VA Response: Existing medical emergency overrides (elevators 4,5,10 and 11) are to be salvaged and re-installed into new elevators.

15
Elevator # 6

Q. Will the contractor modify elevator 6 into a freight car or, a service car with Class C3 loading ?

Veteran Elevator
06/28/23

VA Response: Service car with Class C3 loading.

16
HVAC Monitoring

Q. Will the new HVAC Installs be required to interface with Johnston Controls for Fire Safety?

Veteran Elevator
06/28/23

VA Response: See revised drawing included in Addendum 1.

17
Elevator 6

Q. Elevator #6 The Machine room is not big enough for the installation of the Isolation Beams and Deflector Sheaves. There is not enough clearance in the overhead. There is only 2 ½ to 3 FT of space. Everything needs to stay in the hoistway. Please address how you would like to move forward on this task.

Veteran Elevator
06/28/23

VA Response: Provide Gearless machine. Provide 200fpm.

18
What make and model of fire control panel serves the elevators? Can VA provide photograph of fire control panel? Who currently services the fire control panel for the facility, and can you provide a POC (name and phone number)?
M2 FEDERAL
06/28/23

VA Response: Simplex 4100-U/ES Bio Med Tech Will Robinson does repairs

19
Who currently maintains the building fire suppression (sprinkler) system? Do current As Built. DWG files exist for the sprinkler system. Shall the As-Builts be provided for the sprinkler system?
M2 FEDERAL
06/28/23

VA Response: As built drawings will be made available to the successful bidder.

20
Where is the Automatic Transfer Switch (ATS) located within the building that currently serves the elevators? What make and model is the ATS switch? Does the ATS currently provide the elevators with a pre-transfer signal prior to initiating a transfer? Can a POC be provided for who maintains and or programs your ATS?
M2 FEDERAL
06/28/23

VA Response: The elevators are on the equipment ATS’s throughout the campus, which are backed up by the ESS. The contractor needs to provide a pre-transfer signal. Russ Electric programs the system because it is on the SCADA system, he can be reached by email/phone. We test and inspect them, but Eaton does our maintenance.

21
Can the VA identify where a Crane may be parked to move equipment to the roof penthouse for elevators 10 and 11?
M2 FEDERAL
06/28/23

VA Response: Bidder is to suggest means and methods for equipment handling.

22
Can the VA identify the maximum loading that may be placed on the TPU style roofing material? If necessary to fly equipment to the roof from a place other than the access point of the machine room, please identify the maximum load that may be placed on the roofing material?
M2 FEDERAL
06/28/23

VA Response: Bidder is to suggest means and methods for equipment handling.

23
What is the applicable ASME Design code year this project is required to meet?
M2 FEDERAL
06/28/23

VA Response: 2019

24
Can the sump pump be provided under the most recent ASME code year 2019, or will sump pump specifications follow UFC 3-490-06 8 June 2018 Change 1, 13 January 2021?
M2 FEDERAL
06/28/23

VA Response: Sumps are to meet the specification requirements of the contract documents. UFC 3-490-06 is not applicable to VA projects. Refer to specifications and drawings for sump pump requirements.

25
Are machine room doors required to meet 90-minute fire rating?
M2 FEDERAL
06/28/23

VA Response: Doors and door frames for machine rooms are required to be 90 minutes rated. To our knowledge, all existing doors and frames are currently rated.

27
Please confirm removal of governor space deflector sheave and installation of new deflector sheave in machine room space?
M2 FEDERAL
06/28/23

VA Response: Provide Gearless equipment for all traction cars.

28
Shall the contractor replace all platforms and car slings?
M2 FEDERAL
06/28/23

VA Response: Retain car slings. Replace platforms.

29
Request the bid due date be moved to August 17th, 2023, or later.
M2 FEDERAL
06/28/23

VA Response: New due date is August 24th, 2023, at 2 pm

30
Shall contractors be permitted to use the elevators to move equipment to the 7th floor to gain access to the hatch above? Shall the contractor be required to cover the cab interior as described in the specifications?
M2 FEDERAL
06/28/23

VA Response: More information is required, dependent upon equipment being moved and which elevators are utilized.

31
Shall Contractor include pricing to replace guide rails?
M2 FEDERAL
06/28/23

VA Response: Retain guide rails

32
Shall NTP be issued at preconstruction conference after material has been ordered or immediately following contract award?
M2 FEDERAL
06/28/23

VA Response: NTP will be issue NLT 15 days after award.

33
Request contract performance window be 756 days after NTP, if NTP is issued immediately following Contract Award.
M2 FEDERAL
06/28/23

VA Response: The NTP will be awarded within 15-days after contract award.

34
The HVAC company will have to install condenser units on the roofs in some areas. what is the bonding company for the roof and who is responsible for the added penetrations to install these.
Veteran Elevator
06/28/23

VA Response: The trade installing system required penetrations will be responsible for patching at penetrations.

See attached document: 01 00 00- General Requirements - revised Amendment 0001.