Wallops Flight Facility Restoration of Main Base Electrical Infrastructure – Phase 2

Closed Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
80GSFC22B0003
Agency
Goddard Space Center National Aeronautics and Space Administration
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
237130 Power and Communication Line and Related Structures Construction
PSC
J061 Maint/Repair/Rebuild Of Equipment- Electric Wire And Power Distribution Equipment
Place of performance
Wallops Island, Virginia 23337, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The National Aeronautics and Space Administration Goddard Space Flight Center is seeking bids to replace approximately 20,000 linear feet of direct burial cable and 5 air switches at the Wallops Flight Facility Main Base in Wallops Island, Virginia. The firm fixed price contract valued at $3 million will utilize directional boring to install new electrical power feeders in conduit and replace air switches with safer SF6 gas switches, creating looped circuits to improve power system flexibility and resiliency. Bids are due by August 31, 2022 and will be evaluated for price under a sealed bid procurement conducted in accordance with FAR Parts 14 and 36.

This requirement has a North American Industry Classification System code of 237130 for utility system construction and is a total small business set-aside with a size standard of $39.5 million in average annual receipts. The 18 month contract is anticipated to be awarded by September 30, 2022 with a notice to proceed of November 30, 2022. The work must be completed within 548 days thereafter and includes replacing cables, switches, transformers and related equipment across the 15kV backbone system. An optional pre-bid site visit was held on August 17, 2022 and all questions were due by August 19, 2022.

Notice text

3 versions

Update #3 · Latest ·

NOTE:  AMENDMENT TWO

The purpose of this amendment is to provide industry questions and answers.

NOTE:  AMENDMENT ONE

The purpose of this amendment is to revise clause F.7 GSFC 52.217-92 PERIOD OF PERFORMANCE/EFFECTIVE ORDERING PERIOD (JAN 2014) and update section J.1 GSFC 52.211-101 LIST OF ATTACHMENTS (FEB 2016).

You are invited to submit a bid in response to the National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC)/Wallops Flight Facility (WFF) Restoration of Main Base Electrical Infrastructure solicitation. 

This requirement is for the second phase of the Restoration of Main Base Electrical Infrastructure.  This project will replace approximately 20,000 linear feet of direct burial cable with a new electrical power feeder in conduit using directional boring technology.  The work will also include replacing approximately 5 live front air switches throughout the Main Base with more reliable and safer SF6 gas switches.  In addition, looped circuits will be created as part of this project to allow for more flexibility and resiliency during power outages and system maintenance.  This includes replacing all direct burial cables, sectionalized switches, transformers, and other related equipment that make up the system.  The existing backbone feeder throughout the Main Base is 15 kV, 4/0 AWG copper with the exception of a few sections of the system.  These remaining portions shall be replaced with 4/0 AWG feeders. 

This acquisition will be conducted as a total small business set-aside.  The North American Industry Classifications System (NAICS) code for this acquisition is 237130 and the small business size standard is $39.5M.

This competitive procurement will result in a Firm Fixed Price (FFP) contract.  The contract will have a completion date of 548 days or roughly 18 months after the notice to proceed is issued.  The anticipated contract award date is September 30, 2022, with a notice to proceed date of November 30, 2022.  This procurement will be conducted in accordance with FAR Part 14 (SEALED BIDDING) and Part 36 (CONSTRUCTION) and will be evaluated in accordance with the procedures therein.  Bidders shall complete blocks 14 through 20c and block 30 of the attached Standard Form 1442 and submit with their bid.

Site Visit & Site Visit Instructions

An optional site visit has been set for August 17, 2022, at 10:00 A.M. Eastern Standard Time (EST).  Attendees will meet outside of the Wallops Flight Facility Badging Office N-001, at 34200 Fulton Street, Wallops Island, VA 23337, to receive their visitor badge.  Please limit site visit attendees to no more than three (3) people.  Attendees shall travel to each site location using their own personal vehicle.  The Contracting Officer Representative will lead the convoy to each site location.  Please submit a list of all site visit attendees, including legal first name, middle initial, and last names, company, citizenship, and phone number via e-mail, to Contract Specialist Janicea McCree at Janicea.L.McCree@nasa.gov, and courtesy copy Contracting Officer Leslie Adams at Leslie.M.Adams@nasa.gov, no later than (NLT) 3:00 P.M. EST, on August 15, 2022.  Please ensure names of attendees submitted for badge access match EXACTLY as indicated on identification to ensure badge access to the site.

Bid Opening

In response to COVID-19 Restrictions, the Bid Opening for the above reference Solicitation will be live streamed using the teleconference software Microsoft Teams in lieu of an in person Bid Opening.  The Virtual Bid Opening will take place on August 31, 2022, at 2:00 P.M. EST.

Electronic bid packages must be received by Leslie Adams by 11:00 A.M. EST on August, 31, 2022.  The bidding opening will take place August 31, 2022, at 2:00 P.M. EST via Microsoft Teams. 

In order to attend the Virtual Bid Opening, Prime Contractors MUST submit an e-mail request with a list containing the following information for each Bid Opening Attendee: First Name, Last Name, Company Name, Citizenship, Phone Number, and E-mail Address.  Please submit the e-mail request to Janicea.L.McCree@nasa.gov and cc’ Leslie.M.Adams@nasa.gov and Stephen.A.Mariner@nasa.gov by 2:00 P.M. EST, on August 30, 2022.  Requests to attend Bid Opening after the deadline will be denied.  A MS Team meeting link and call-in number will be provided via e-mail to all confirmed attendees by close-of-business, August 30, 2022.  Viewers are advised they may need to download the Microsoft Teams app to their device in order to view the Bid Opening.

All documents related to this procurement, including this letter, the solicitation, attachments, exhibits, enclosures, and any amendments will be obtainable electronically from the World Wide Web through https://SAM.gov.

Bid Guarantee

The Prime Contractor shall also provide a bid bond with their electronic Bid Submission Proposal Package that clearly identifies the IFB number in the amount of twenty percent (20%) of the bid price, or $3 Million, whichever is lower, and MUST acknowledgment any and all amendments.

Bid Packages with missing information shall be considered incomplete and non-responsive.

Potential bidders are requested to periodically monitor the website for updates.

All site visit questions and IFB questions MUST be submitted in writing, electronically to Mrs. Janicea McCree Contract Specialist, at Janicea.L.McCree@nasa.gov and cc’ Mrs. Leslie Adams, Contracting Officer at Leslie.M.Adams@nasa.gov on or before August 19, 2022, local time, 3:00 P.M. EST.  Bidders are encouraged to submit questions as soon as possible for consideration.

Update #2 ·

NOTE:  AMENDMENT ONE

The purpose of this amendment is to revise clause F.7 GSFC 52.217-92 PERIOD OF PERFORMANCE/EFFECTIVE ORDERING PERIOD (JAN 2014) and update section J.1 GSFC 52.211-101 LIST OF ATTACHMENTS (FEB 2016).

You are invited to submit a bid in response to the National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC)/Wallops Flight Facility (WFF) Restoration of Main Base Electrical Infrastructure solicitation. 

This requirement is for the second phase of the Restoration of Main Base Electrical Infrastructure.  This project will replace approximately 20,000 linear feet of direct burial cable with a new electrical power feeder in conduit using directional boring technology.  The work will also include replacing approximately 5 live front air switches throughout the Main Base with more reliable and safer SF6 gas switches.  In addition, looped circuits will be created as part of this project to allow for more flexibility and resiliency during power outages and system maintenance.  This includes replacing all direct burial cables, sectionalized switches, transformers, and other related equipment that make up the system.  The existing backbone feeder throughout the Main Base is 15 kV, 4/0 AWG copper with the exception of a few sections of the system.  These remaining portions shall be replaced with 4/0 AWG feeders. 

This acquisition will be conducted as a total small business set-aside.  The North American Industry Classifications System (NAICS) code for this acquisition is 237130 and the small business size standard is $39.5M.

This competitive procurement will result in a Firm Fixed Price (FFP) contract.  The contract will have a completion date of 548 days or roughly 18 months after the notice to proceed is issued.  The anticipated contract award date is September 30, 2022, with a notice to proceed date of November 30, 2022.  This procurement will be conducted in accordance with FAR Part 14 (SEALED BIDDING) and Part 36 (CONSTRUCTION) and will be evaluated in accordance with the procedures therein.  Bidders shall complete blocks 14 through 20c and block 30 of the attached Standard Form 1442 and submit with their bid.

Site Visit & Site Visit Instructions

An optional site visit has been set for August 17, 2022, at 10:00 A.M. Eastern Standard Time (EST).  Attendees will meet outside of the Wallops Flight Facility Badging Office N-001, at 34200 Fulton Street, Wallops Island, VA 23337, to receive their visitor badge.  Please limit site visit attendees to no more than three (3) people.  Attendees shall travel to each site location using their own personal vehicle.  The Contracting Officer Representative will lead the convoy to each site location.  Please submit a list of all site visit attendees, including legal first name, middle initial, and last names, company, citizenship, and phone number via e-mail, to Contract Specialist Janicea McCree at Janicea.L.McCree@nasa.gov, and courtesy copy Contracting Officer Leslie Adams at Leslie.M.Adams@nasa.gov, no later than (NLT) 3:00 P.M. EST, on August 15, 2022.  Please ensure names of attendees submitted for badge access match EXACTLY as indicated on identification to ensure badge access to the site.

Bid Opening

In response to COVID-19 Restrictions, the Bid Opening for the above reference Solicitation will be live streamed using the teleconference software Microsoft Teams in lieu of an in person Bid Opening.  The Virtual Bid Opening will take place on August 31, 2022, at 2:00 P.M. EST.

Electronic bid packages must be received by Leslie Adams by 11:00 A.M. EST on August, 31, 2022.  The bidding opening will take place August 31, 2022, at 2:00 P.M. EST via Microsoft Teams. 

In order to attend the Virtual Bid Opening, Prime Contractors MUST submit an e-mail request with a list containing the following information for each Bid Opening Attendee: First Name, Last Name, Company Name, Citizenship, Phone Number, and E-mail Address.  Please submit the e-mail request to Janicea.L.McCree@nasa.gov and cc’ Leslie.M.Adams@nasa.gov and Stephen.A.Mariner@nasa.gov by 2:00 P.M. EST, on August 30, 2022.  Requests to attend Bid Opening after the deadline will be denied.  A MS Team meeting link and call-in number will be provided via e-mail to all confirmed attendees by close-of-business, August 30, 2022.  Viewers are advised they may need to download the Microsoft Teams app to their device in order to view the Bid Opening.

All documents related to this procurement, including this letter, the solicitation, attachments, exhibits, enclosures, and any amendments will be obtainable electronically from the World Wide Web through https://SAM.gov.

Bid Guarantee

The Prime Contractor shall also provide a bid bond with their electronic Bid Submission Proposal Package that clearly identifies the IFB number in the amount of twenty percent (20%) of the bid price, or $3 Million, whichever is lower, and MUST acknowledgment any and all amendments.

Bid Packages with missing information shall be considered incomplete and non-responsive.

Potential bidders are requested to periodically monitor the website for updates.

All site visit questions and IFB questions MUST be submitted in writing, electronically to Mrs. Janicea McCree Contract Specialist, at Janicea.L.McCree@nasa.gov and cc’ Mrs. Leslie Adams, Contracting Officer at Leslie.M.Adams@nasa.gov on or before August 19, 2022, local time, 3:00 P.M. EST.  Bidders are encouraged to submit questions as soon as possible for consideration.

Update #1 ·

You are invited to submit a bid in response to the National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC)/Wallops Flight Facility (WFF) Restoration of Main Base Electrical Infrastructure solicitation. 

This requirement is for the second phase of the Restoration of Main Base Electrical Infrastructure.  This project will replace approximately 20,000 linear feet of direct burial cable with a new electrical power feeder in conduit using directional boring technology.  The work will also include replacing approximately 5 live front air switches throughout the Main Base with more reliable and safer SF6 gas switches.  In addition, looped circuits will be created as part of this project to allow for more flexibility and resiliency during power outages and system maintenance.  This includes replacing all direct burial cables, sectionalized switches, transformers, and other related equipment that make up the system.  The existing backbone feeder throughout the Main Base is 15 kV, 4/0 AWG copper with the exception of a few sections of the system.  These remaining portions shall be replaced with 4/0 AWG feeders. 

This acquisition will be conducted as a total small business set-aside.  The North American Industry Classifications System (NAICS) code for this acquisition is 237130 and the small business size standard is $39.5M.

This competitive procurement will result in a Firm Fixed Price (FFP) contract.  The contract will have a completion date of 548 days or roughly 18 months after the notice to proceed is issued.  The anticipated contract award date is September 30, 2022, with a notice to proceed date of November 30, 2022.  This procurement will be conducted in accordance with FAR Part 14 (SEALED BIDDING) and Part 36 (CONSTRUCTION) and will be evaluated in accordance with the procedures therein.  Bidders shall complete blocks 14 through 20c and block 30 of the attached Standard Form 1442 and submit with their bid.

Site Visit & Site Visit Instructions

An optional site visit has been set for August 17, 2022, at 10:00 A.M. Eastern Standard Time (EST).  Attendees will meet outside of the Wallops Flight Facility Badging Office N-001, at 34200 Fulton Street, Wallops Island, VA 23337, to receive their visitor badge.  Please limit site visit attendees to no more than three (3) people.  Attendees shall travel to each site location using their own personal vehicle.  The Contracting Officer Representative will lead the convoy to each site location.  Please submit a list of all site visit attendees, including legal first name, middle initial, and last names, company, citizenship, and phone number via e-mail, to Contract Specialist Janicea McCree at Janicea.L.McCree@nasa.gov, and courtesy copy Contracting Officer Leslie Adams at Leslie.M.Adams@nasa.gov, no later than (NLT) 3:00 P.M. EST, on August 15, 2022.  Please ensure names of attendees submitted for badge access match EXACTLY as indicated on identification to ensure badge access to the site.

Bid Opening

In response to COVID-19 Restrictions, the Bid Opening for the above reference Solicitation will be live streamed using the teleconference software Microsoft Teams in lieu of an in person Bid Opening.  The Virtual Bid Opening will take place on August 31, 2022, at 2:00 P.M. EST.

Electronic bid packages must be received by Leslie Adams by 11:00 A.M. EST on August, 31, 2022.  The bidding opening will take place August 31, 2022, at 2:00 P.M. EST via Microsoft Teams. 

In order to attend the Virtual Bid Opening, Prime Contractors MUST submit an e-mail request with a list containing the following information for each Bid Opening Attendee: First Name, Last Name, Company Name, Citizenship, Phone Number, and E-mail Address.  Please submit the e-mail request to Janicea.L.McCree@nasa.gov and cc’ Leslie.M.Adams@nasa.gov and Stephen.A.Mariner@nasa.gov by 2:00 P.M. EST, on August 30, 2022.  Requests to attend Bid Opening after the deadline will be denied.  A MS Team meeting link and call-in number will be provided via e-mail to all confirmed attendees by close-of-business, August 30, 2022.  Viewers are advised they may need to download the Microsoft Teams app to their device in order to view the Bid Opening.

All documents related to this procurement, including this letter, the solicitation, attachments, exhibits, enclosures, and any amendments will be obtainable electronically from the World Wide Web through https://SAM.gov.

Bid Guarantee

The Prime Contractor shall also provide a bid bond with their electronic Bid Submission Proposal Package that clearly identifies the IFB number in the amount of twenty percent (20%) of the bid price, or $3 Million, whichever is lower, and MUST acknowledgment any and all amendments.

Bid Packages with missing information shall be considered incomplete and non-responsive.

Potential bidders are requested to periodically monitor the website for updates.

All site visit questions and IFB questions MUST be submitted in writing, electronically to Mrs. Janicea McCree Contract Specialist, at Janicea.L.McCree@nasa.gov and cc’ Mrs. Leslie Adams, Contracting Officer at Leslie.M.Adams@nasa.gov on or before August 19, 2022, local time, 3:00 P.M. EST.  Bidders are encouraged to submit questions as soon as possible for consideration.

Attachments

Show all 13

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Wallops Flight Facility Restoration of Main Base Electrical Infrastructure – Phase 2 Award Award Notice
Wallops Flight Facility Restoration of Main Base Electrical Infrastructure – Phase 2 Latest solicitation Solicitation
Wallops Flight Facility Restoration of Main Base Electrical Infrastructure – Phase 2 Pre-Solicitation
Wallops Flight Facility Restoration of Main Base Electrical Infrastructure – Phase 2 This notice Solicitation
Wallops Flight Facility - Restoration of Electrical Infrastructure Pre-Solicitation
Wallops Flight Facility - Restoration of Electrical Infrastructure Original Pre-Solicitation