80GSFC22B0003 Attachment D - KTR RPT.pdf

PDF 43 KB Posted

Attached to
Wallops Flight Facility Restoration of Main Base Electrical Infrastructure – Phase 2 Federal contract opportunity
Solicitation number
80GSFC22B0003
Issued by
National Aeronautics and Space Administration Goddard Space Center

About this file

This solicitation package describes a federal contract opportunity for the restoration of electrical infrastructure at the Wallops Flight Facility in Virginia. The National Aeronautics and Space Administration Goddard Space Flight Center is seeking to replace approximately 20,000 linear feet of direct burial cable with new electrical power feeder in conduit, as well as replacing five air switches with safer SF6 gas switches. This project will create looped circuits to improve flexibility and resiliency during outages. The solicitation requests bids to replace cables, switches, transformers, and other equipment that make up the existing 15kV electrical system throughout the main base. This is a total small business set-aside with a NAICS code of 237130 and size standard of $39.5M. Bids are due by August 31st and the contract will be a firm fixed-price award with an estimated completion date of 18 months after the November 30th notice to proceed.

View the file

Other files for this federal contract opportunity

Other files attached to Wallops Flight Facility Restoration of Main Base Electrical Infrastructure – Phase 2, newest first.
File Type Posted
80GSFC22B0004 Amendment Two - Q and A.pdf PDF
80GSFC22B0003 - SF30 Amendment 2 - Signed.pdf PDF
80GSFC22B0003 Attachment C - Phase 2 Drawings.pdf PDF
80GSFC22B0003 Amendment One - Signed.pdf PDF
80GSFC22B0003 Attachment A - SOW.pdf PDF
80GSFC22B0003 IFB Cover Ltr.pdf PDF
80GSFC22B0003 Attachment G - Drawing Suppl.pdf PDF
Attachment E - Safety and Health Plan.pdf PDF
80GSFC22B0003 Attachment C - Drawings.pdf PDF
80GSFC22B0003 IFB.pdf PDF
Attachment F - DB Wage Determination.pdf PDF
80GSFC22B0003 Attachment B - Specs.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT D

80GSFC22B0003

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION

GODDARD SPACE FLIGHT CENTER

WALLOPS FLIGHT FACILITY

WALLOPS ISLAND, VA 23337

CONTRACTORS DAILY REPORT

FORM WI 452

FOR

Wallops Restoration of Main Base Electrical Infrastructure

LOCATED

AT

NASA GSFC/WALLOPS FLIGHT FACILITY

WALLOPS ISLAND, VIRGINIA

NASA WI-452

DAILY CONSTRUCTION REPORT

Contract No. ___________ Date: ______________ Report No. ____________

Description and Location of Work: ________________________________________________

Weather: (Clear) (P. Cloudy) (Cloudy) Temperature ______ Min: ______ Max: _______ Rainfall: __________ inches.

Contractor/Subcontractors and Area of Responsibility with Labor Count for Each:

a. __________________________________ d. __________________________________

b. __________________________________ e. __________________________________

c. __________________________________ f. __________________________________

Equipment Data: (Indicate items of construction equipment, other than hand tools, at the job site, and whether or not used.)

1. Work Performed Today: (Indicate location and description or work performed. Refer to work performed by prime and/or subcontractors by letter in Table above.)

NASA WI-452

2. Result of Surveillance: (Include satisfactory work completed, or deficiencies with action to be taken.)

3. Test Required by Plans and/or Specifications Performed and Results of Tests:

4. Verbal Instruction Received: (List any instructions given by Government personnel on construction deficiencies, retesting required, etc., with action to be taken.)

5. Remarks: (Cover any conflicts in plans, specifications, or instructions on any delay to the job attributable to weather conditions.)

6. Results of Safety Inspections: (Include safety violations and corrective actions taken.)

CONTRACTOR’S VERIFICATION: The above report is complete and correct and all material and equipment used and work performed during this reporting period are in compliance with the contract plans and specifications except as noted above.

(Contractor’s Approved Authorized Representative)

(NASA Inspector)