80GSFC22B0003 Attachment C - Drawings.pdf
PDF 32 MB Posted
- Attached to
- Wallops Flight Facility Restoration of Main Base Electrical Infrastructure – Phase 2 Federal contract opportunity
- Solicitation number
- 80GSFC22B0003
About this file
This solicitation requests bids for a firm fixed price construction contract to replace electrical infrastructure at Wallops Flight Facility in Virginia. NASA Goddard Space Flight Center is seeking to replace approximately 20,000 linear feet of direct burial cable with new electrical feeders in conduit, replace five air switches with SF6 gas switches, and create looped circuits to improve power system flexibility and resilience. The contract value is undetermined with an anticipated award date of September 30, 2022 and notice to proceed by November 30, 2022. The performance period is 548 days. An optional site visit will be held on August 17 and bids are due by August 31, with the virtual bid opening occurring that same day. This procurement is set aside for small businesses with a NAICS code of 237130 and size standard of $39.5M. Questions are due by August 19.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 80GSFC22B0004 Amendment Two - Q and A.pdf | ||
| 80GSFC22B0003 - SF30 Amendment 2 - Signed.pdf | ||
| 80GSFC22B0003 Attachment C - Phase 2 Drawings.pdf | ||
| 80GSFC22B0003 Amendment One - Signed.pdf | ||
| 80GSFC22B0003 Attachment G - Drawing Suppl.pdf | ||
| Attachment E - Safety and Health Plan.pdf | ||
| 80GSFC22B0003 IFB.pdf | ||
| 80GSFC22B0003 Attachment D - KTR RPT.pdf | ||
| 80GSFC22B0003 Attachment A - SOW.pdf | ||
| 80GSFC22B0003 IFB Cover Ltr.pdf | ||
| Attachment F - DB Wage Determination.pdf | ||
| 80GSFC22B0003 Attachment B - Specs.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT C
80GSFC22B0003
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
GODDARD SPACE FLIGHT CENTER
WALLOPS FLIGHT FACILITY
WALLOPS ISLAND, VA 23337
MAIN BASE ELECTRICAL
STAMPED CONSTRUCTION DRAWING
Wallops Restoration of Main Base Electrical Infrastructure
LOCATED
AT
NASA GSFC/WALLOPS FLIGHT FACILITY
WALLOPS ISLAND, VIRGINIA
SHEETS NOT INCLUDED
SHEET NOT USED
SHEET
CS-001
E-001
E-002
E-003
ES-101
ES-102
ES-103
ES-104
ES-105
ES-106
ES-107
ES-108
ES-109
ES-110
ES-111
ES-112
ES-113
ES-114
ES-115
ES-116
ES-117
ES-118
ES-119
ES-120
ES-121
ES-122
ES-123
ES-124
ES-125
ES-126
ES-127
ES-128
ES-129
ES-130
ES-131
ES-132
ES-133
ES-134
ES-135
ES-136
ES-137
ES-138
ES-139
ES-140
ES-141
ES-201
ES-202
ES-203
ES-204
ES-205
ES-206
ES-207
ES-208
ES-209
ES-210
ES-211
ES-212
ES-213
ES-214
ES-215
ES-216
ES-217
ES-218
ES-219
ES-220
ES-221
ES-222
ES-223
ES-224
ES-225
ES-226
ES-227
ES-228
ES-229
ES-230
ES-231
ES-232
ES-233
ES-234
ES-235
ES-236
ES-237
ES-238
ES-239
ES-240
ES-241
E-301
E-302
E-303
E-304
E-305
E-306
E-307
E-308
E-309
ES-401
ES-402
ES-403
ES-404
ES-405
ES-406
ES-407
ES-408
ES-409
E-501
E-502
E-503
E-504
E-505
E-506
E-507
E-601
E-602
E-603
E-604
E-605
E-606
E-607
E-608
E-609
E-701
E-702
C-100
C-101
C-102
DWG #
19637
19638
19639
19640
19641
19642
19643
19644
19645
19646
19647
19648
19649
19650
19651
19652
19653
19654
19655
19656
19657
19658
19659
19660
19661
19662
19663
19664
19665
19666
19667
19668
19669
19670
19671
19672
19673
19674
19675
19676
19677
19678
19679
19680
19681
19682
19683
19684
19685
19686
19687
19688
19689
19690
19691
19692
19693
19694
19695
19696
19697
19698
19699
19700
19701
19702
19703
19704
19705
19706
19707
19708
19709
19710
19711
19712
19713
19714
19715
19716
19717
19718
19719
19720
19721
19722
19723
19724
19725
19726
19727
19728
19729
19730
19731
19732
19733
19734
19735
19736
19737
19738
19739
19740
19741
19742
19743
19744
19745
19746
19747
19748
19749
19750
19751
19752
19753
19754
19755
19756
19757
19758
19759
19760
19761
SHEET TITLE
COVER SHEET
SYMBOLS AND ABBREVIATIONS
GENERAL NOTES, SAFETY NOTES & CONTACTS
SITE KEY MAP
ELECTRICAL SITE PLAN - DEMOLITION - AREA A3
ELECTRICAL SITE PLAN - DEMOLITION - AREA A4
ELECTRICAL SITE PLAN - DEMOLITION - AREA A5
ELECTRICAL SITE PLAN - DEMOLITION - AREA B3
ELECTRICAL SITE PLAN - DEMOLITION - AREA B4
ELECTRICAL SITE PLAN - DEMOLITION - AREA B5
ELECTRICAL SITE PLAN - DEMOLITION - AREA B6
ELECTRICAL SITE PLAN - DEMOLITION - AREA C3
ELECTRICAL SITE PLAN - DEMOLITION - AREA C4
NOT USED
ELECTRICAL SITE PLAN - DEMOLITION - AREA C6
ELECTRICAL SITE PLAN - DEMOLITION - AREA D3
ELECTRICAL SITE PLAN - DEMOLITION - AREA D6
ELECTRICAL SITE PLAN - DEMOLITION - AREA D7
ELECTRICAL SITE PLAN - DEMOLITION - AREA D8
ELECTRICAL SITE PLAN - DEMOLITION - AREA E2
ELECTRICAL SITE PLAN - DEMOLITION - AREA E3
ELECTRICAL SITE PLAN - DEMOLITION - AREA E4
ELECTRICAL SITE PLAN - DEMOLITION - AREA E5
ELECTRICAL SITE PLAN - DEMOLITION - AREA E6
ELECTRICAL SITE PLAN - DEMOLITION - AREA E7
ELECTRICAL SITE PLAN - DEMOLITION - AREA F2
ELECTRICAL SITE PLAN - DEMOLITION - AREA F3
ELECTRICAL SITE PLAN - DEMOLITION - AREA F4
ELECTRICAL SITE PLAN - DEMOLITION - AREA F5
ELECTRICAL SITE PLAN - DEMOLITION - AREA F6
ELECTRICAL SITE PLAN - DEMOLITION - AREA G3
ELECTRICAL SITE PLAN - DEMOLITION - AREA G4
ELECTRICAL SITE PLAN - DEMOLITION - AREA G5
ELECTRICAL SITE PLAN - DEMOLITION - AREA H3
ELECTRICAL SITE PLAN - DEMOLITION - AREA H4
ELECTRICAL SITE PLAN - DEMOLITION - AREA H5
ELECTRICAL SITE PLAN - DEMOLITION - AREA I4
ELECTRICAL SITE PLAN - DEMOLITION - AREA J3
ELECTRICAL SITE PLAN - DEMOLITION - AREA J4
ELECTRICAL SITE PLAN - DEMOLITION - AREA J5
ELECTRICAL SITE PLAN - DEMOLITION - AREA K4
ELECTRICAL SITE PLAN - DEMOLITION - AREA L4
ELECTRICAL SITE PLAN - DEMOLITION - AREA L5
ELECTRICAL SITE PLAN - DEMOLITION - AREA M3
ELECTRICAL SITE PLAN - DEMOLITION - AREA M4
ELECTRICAL SITE PLAN - NEW WORK - AREA A3
ELECTRICAL SITE PLAN - NEW WORK - AREA A4
ELECTRICAL SITE PLAN - NEW WORK - AREA A5
ELECTRICAL SITE PLAN - NEW WORK - AREA B3
ELECTRICAL SITE PLAN - NEW WORK - AREA B4
ELECTRICAL SITE PLAN - NEW WORK - AREA B5
ELECTRICAL SITE PLAN - NEW WORK - AREA B6
ELECTRICAL SITE PLAN - NEW WORK - AREA C3
ELECTRICAL SITE PLAN - NEW WORK - AREA C4
ELECTRICAL SITE PLAN - NEW WORK - AREA C5
ELECTRICAL SITE PLAN - NEW WORK - AREA C6
ELECTRICAL SITE PLAN - NEW WORK - AREA D3
ELECTRICAL SITE PLAN - NEW WORK - AREA D6
ELECTRICAL SITE PLAN - NEW WORK - AREA D7
ELECTRICAL SITE PLAN - NEW WORK - AREA D8
ELECTRICAL SITE PLAN - NEW WORK - AREA E2
ELECTRICAL SITE PLAN - NEW WORK - AREA E3
ELECTRICAL SITE PLAN - NEW WORK - AREA E4
ELECTRICAL SITE PLAN - NEW WORK - AREA E5
ELECTRICAL SITE PLAN - NEW WORK - AREA E6
ELECTRICAL SITE PLAN - NEW WORK - AREA E7
ELECTRICAL SITE PLAN - NEW WORK - AREA F2
ELECTRICAL SITE PLAN - NEW WORK - AREA F3
ELECTRICAL SITE PLAN - NEW WORK - AREA F4
ELECTRICAL SITE PLAN - NEW WORK - AREA F5
ELECTRICAL SITE PLAN - NEW WORK - AREA F6
ELECTRICAL SITE PLAN - NEW WORK - AREA G3
ELECTRICAL SITE PLAN - NEW WORK - AREA G4
ELECTRICAL SITE PLAN - NEW WORK - AREA G5
ELECTRICAL SITE PLAN - NEW WORK - AREA H3
ELECTRICAL SITE PLAN - NEW WORK - AREA H4
ELECTRICAL SITE PLAN - NEW WORK - AREA H5
ELECTRICAL SITE PLAN - NEW WORK - AREA I4
ELECTRICAL SITE PLAN - NEW WORK - AREA J3
ELECTRICAL SITE PLAN - NEW WORK - AREA J4
ELECTRICAL SITE PLAN - NEW WORK - AREA J5
ELECTRICAL SITE PLAN - NEW WORK - AREA K4
ELECTRICAL SITE PLAN - NEW WORK - AREA L4
ELECTRICAL SITE PLAN - NEW WORK - AREA L5
ELECTRICAL SITE PLAN - NEW WORK - AREA M3
ELECTRICAL SITE PLAN - NEW WORK - AREA M4
FLOOR PLANS AND DIAGRAMS - ELECTRICAL - BUILDING A-41
FLOOR PLANS AND DIAGRAMS - ELECTRICAL - BUILDING C-94
FLOOR PLANS AND DIAGRAMS - ELECTRICAL - BUILDING E-104
FLOOR PLANS AND DIAGRAMS - ELECTRICAL - BUILDING E-105
FLOOR PLANS AND DIAGRAMS - ELECTRICAL - BUILDING E-106
FLOOR PLANS AND DIAGRAMS - ELECTRICAL - BUILDING E-107
FLOOR PLANS AND DIAGRAMS - ELECTRICAL - BUILDING F-010
FLOOR PLANS AND DIAGRAMS - ELECTRICAL - BUILDING N-169
FLOOR PLANS AND DIAGRAMS - ELECTRICAL - BUILDING N-175
PARTIAL ELECTRICAL SITE PLAN - NEW WORK - AREA C3
PARTIAL ELECTRICAL SITE PLAN - NEW WORK - AREA E5
PARTIAL ELECTRICAL SITE PLAN - NEW WORK - AREA E6
PARTIAL ELECTRICAL SITE PLAN - NEW WORK - AREA F3
PARTIAL ELECTRICAL SITE PLAN - NEW WORK - AREA F5
PARTIAL ELECTRICAL SITE PLAN - NEW WORK - AREA H4
PARTIAL ELECTRICAL SITE PLAN - NEW WORK - AREA J4
PARTIAL ELECTRICAL SITE PLAN - NEW WORK - AREA K4
PARTIAL ELECTRICAL SITE PLAN - NEW WORK - AREA L4
SINGLE LINE DIAGRAM - ELECTRICAL - DEMOLITION
SINGLE LINE DIAGRAM - ELECTRICAL - DEMOLITION
SINGLE LINE DIAGRAM - ELECTRICAL - NEW WORK
SINGLE LINE DIAGRAM - ELECTRICAL - NEW WORK
SINGLE LINE DIAGRAM - ELECTRICAL - NEW WORK
MANHOLE SCHEMATIC - ELECTRICAL - NEW WORK
MANHOLE SCHEMATIC - ELECTRICAL - NEW WORK
DETAILS - ELECTRICAL
DETAILS - ELECTRICAL
DETAILS - ELECTRICAL
DETAILS - ELECTRICAL
DETAILS - ELECTRICAL
DETAILS - ELECTRICAL
DETAILS - ELECTRICAL
DETAILS - ELECTRICAL
DETAILS - ELECTRICAL
SCHEDULES - ELECTRICAL
SCHEDULES - ELECTRICAL
EROSION SEDIMENTATION CONTROL DETAILS AND NOTES
EROSION SEDIMENTATION CONTROL DETAILS AND NOTES
EROSION SEDIMENTATION CONTROL DETAILS AND NOTES
SHEET NO.
NOT USED
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
H.F. LENZ
COMPANY
Engineering
1407 Scalp Avenue Phone: 814.269.9300 Johnstown, PA 15904 www.hflenz.com
Headquarters:
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
VA PRIMARY HWY RT 175
AutoCAD SHX Text
LAUNCH FAC.
AutoCAD SHX Text
AND STORAGE
AutoCAD SHX Text
MAIN GATE
AutoCAD SHX Text F-10
AutoCAD SHX Text
VA PRIMARY HWY RT 175
AutoCAD SHX Text
AREA
AutoCAD SHX Text
ROCKET INSPECTION
AutoCAD SHX Text
VIS. CENTER
AutoCAD SHX Text
TO
AutoCAD SHX Text
ISLAND &
AutoCAD SHX Text
MAINLAND
AutoCAD SHX Text
RUNWAY 04-22
AutoCAD SHX Text
RUNWAY 10-28
AutoCAD SHX Text
HARPOLL STREET
AutoCAD SHX Text
JENSEN STREET
AutoCAD SHX Text
O'REILLY STREET
AutoCAD SHX Text
STUBBS BOULEVARD
AutoCAD SHX Text
RUNWAY 10-28
AutoCAD SHX Text
RUNWAY 10-28
AutoCAD SHX Text
BOND STREET
AutoCAD SHX Text
BLISS STREET
AutoCAD SHX Text
RUNWAY 10-28
AutoCAD SHX Text
RUNWAY 10-28
AutoCAD SHX Text
BOND STREET
AutoCAD SHX Text
WORMHOUDT ROAD
AutoCAD SHX Text
N-161 ROAD
AutoCAD SHX Text
N-162 ROAD
AutoCAD SHX Text
REHOR ROAD
AutoCAD SHX Text
MUNSON CIRCLE
AutoCAD SHX Text
MILL DAM ROAD
AutoCAD SHX Text
REHOR ROAD
AutoCAD SHX Text
REHOR ROAD
AutoCAD SHX Text
REHOR ROAD
AutoCAD SHX Text
REHOR ROAD
AutoCAD SHX Text
REHOR ROAD
AutoCAD SHX Text
REHOR ROAD
AutoCAD SHX Text
REHOR ROAD
AutoCAD SHX Text
REHOR ROAD
AutoCAD SHX Text
REHOR ROAD
AutoCAD SHX Text
REHOR ROAD
AutoCAD SHX Text
REHOR ROAD
AutoCAD SHX Text
REHOR ROAD
AutoCAD SHX Text
REHOR ROAD
AutoCAD SHX Text
REHOR ROAD
AutoCAD SHX Text
REEDER ROAD
AutoCAD SHX Text
REEDER ROAD
AutoCAD SHX Text
REEDER ROAD
AutoCAD SHX Text
KNEELAND ROAD
AutoCAD SHX Text
REEDER ROAD
AutoCAD SHX Text
BLOUGH ROAD
AutoCAD SHX Text
BLOUGH ROAD
AutoCAD SHX Text
WORMHOUDT ROAD
AutoCAD SHX Text
WORMHOUDT STREET
AutoCAD SHX Text
WORMHOUDT STREET
AutoCAD SHX Text
WORMHOUDT STREET
AutoCAD SHX Text
BOND STREET
AutoCAD SHX Text
BOND STREET
AutoCAD SHX Text
BLISS STREET
AutoCAD SHX Text
BLISS STREET
AutoCAD SHX Text
BLISS STREET
AutoCAD SHX Text
KLINE STREET
AutoCAD SHX Text
AVERY STREET
AutoCAD SHX Text
AVERY STREET
AutoCAD SHX Text
AVERY STREET
AutoCAD SHX Text
STUBBS BOULEVARD
AutoCAD SHX Text
STUBBS BOULEVARD
AutoCAD SHX Text
STUBBS BOULEVARD
AutoCAD SHX Text
STUBBS BOULEVARD
AutoCAD SHX Text
STUBBS BOULEVARD
AutoCAD SHX Text
STUBBS BOULEVARD
AutoCAD SHX Text
STUBBS BOULEVARD
AutoCAD SHX Text
STUBBS BOULEVARD
AutoCAD SHX Text
ANDERSON STREET
AutoCAD SHX Text
ANDERSON STREET
AutoCAD SHX Text
ANDERSON STREET
AutoCAD SHX Text
ANDERSON STREET
AutoCAD SHX Text
O'REILLY STREET
AutoCAD SHX Text
O'REILLY STREET
AutoCAD SHX Text
RICKETTE STREET
AutoCAD SHX Text
RICKETTE STREET
AutoCAD SHX Text
PIERCE STREET
AutoCAD SHX Text
ODUM COURT
AutoCAD SHX Text
ODUM COURT
AutoCAD SHX Text
ODUM COURT
AutoCAD SHX Text
ODUM COURT
AutoCAD SHX Text
ODUM COURT
AutoCAD SHX Text
ODUM COURT
AutoCAD SHX Text
MILL DAM ROAD
AutoCAD SHX Text
MILL DAM ROAD
AutoCAD SHX Text
MILL DAM ROAD
AutoCAD SHX Text
ATLANTIC ROAD
AutoCAD SHX Text
FULTON STREET
AutoCAD SHX Text
FULTON STREET
AutoCAD SHX Text
FULTON STREET
AutoCAD SHX Text
FULTON STREET
AutoCAD SHX Text
FULTON STREET
AutoCAD SHX Text
FULTON STREET
AutoCAD SHX Text
CHINCOTEAGUE ROAD
AutoCAD SHX Text
CHINCOTEAGUE ROAD
AutoCAD SHX Text
CHINCOTEAGUE ROAD
AutoCAD SHX Text
CHINCOTEAGUE ROAD
AutoCAD SHX Text
CHINCOTEAGUE ROAD
AutoCAD SHX Text
CHINCOTEAGUE ROAD
AutoCAD SHX Text
CHINCOTEAGUE ROAD
AutoCAD SHX Text
CHINCOTEAGUE ROAD
AutoCAD SHX Text
CHINCOTEAGUE ROAD
AutoCAD SHX Text
CHINCOTEAGUE ROAD
AutoCAD SHX Text
CHINCOTEAGUE ROAD
AutoCAD SHX Text
CHINCOTEAGUE ROAD
AutoCAD SHX Text
CHINCOTEAGUE ROAD
AutoCAD SHX Text
CHINCOTEAGUE ROAD
AutoCAD SHX Text
CHINCOTEAGUE ROAD
AutoCAD SHX Text
CHINCOTEAGUE ROAD
AutoCAD SHX Text
CHINCOTEAGUE ROAD
AutoCAD SHX Text
CHINCOTEAGUE ROAD
AutoCAD SHX Text
CHINCOTEAGUE ROAD
AutoCAD SHX Text
CHINCOTEAGUE ROAD
AutoCAD SHX Text
CHINCOTEAGUE ROAD
AutoCAD SHX Text
CHINCOTEAGUE ROAD
AutoCAD SHX Text
CHINCOTEAGUE ROAD
AutoCAD SHX Text
CHINCOTEAGUE ROAD
AutoCAD SHX Text
CHINCOTEAGUE ROAD
AutoCAD SHX Text
CHINCOTEAGUE ROAD
AutoCAD SHX Text
CHINCOTEAGUE ROAD
AutoCAD SHX Text
CHINCOTEAGUE ROAD
AutoCAD SHX Text
CHINCOTEAGUE ROAD
AutoCAD SHX Text
ATLANTIC ROAD
AutoCAD SHX Text
ATLANTIC ROAD
AutoCAD SHX Text
ATLANTIC ROAD
AutoCAD SHX Text
ATLANTIC ROAD
AutoCAD SHX Text
ATLANTIC ROAD
AutoCAD SHX Text
ATLANTIC ROAD
AutoCAD SHX Text
ATLANTIC ROAD
AutoCAD SHX Text
ATLANTIC ROAD
AutoCAD SHX Text
BLADES CIRCLE
AutoCAD SHX Text
BLADES CIRCLE
AutoCAD SHX Text
BLADES CIRCLE
AutoCAD SHX Text
BLADES CIRCLE
AutoCAD SHX Text
REHOR ROAD
AutoCAD SHX Text
REHOR ROAD
AutoCAD SHX Text
ENTERPRISE STREET
AutoCAD SHX Text
KEARSAGE CIRCLE
AutoCAD SHX Text
YORK TOWN DRIVE
AutoCAD SHX Text
YORK TOWN DRIVE
AutoCAD SHX Text
KEARSAGE CIRCLE
AutoCAD SHX Text
KEARSAGE CIRCLE
AutoCAD SHX Text
KEARSAGE CIRCLE
AutoCAD SHX Text
ENTERPRISE STREET
AutoCAD SHX Text F-11
AutoCAD SHX Text Q-29
AutoCAD SHX Text Q-30
AutoCAD SHX Text R-20
AutoCAD SHX Text R-10
AutoCAD SHX Text G-44
AutoCAD SHX Text F-9
AutoCAD SHX Text E-105
AutoCAD SHX Text E-5
AutoCAD SHX Text N-181
AutoCAD SHX Text N-167
AutoCAD SHX Text N-177
AutoCAD SHX Text N-169C
AutoCAD SHX Text N-169
AutoCAD SHX Text
TRAILER
AutoCAD SHX Text R-22
AutoCAD SHX Text R-25
AutoCAD SHX Text N-222
AutoCAD SHX Text N-174A
AutoCAD SHX Text N-174B
AutoCAD SHX Text N-180
AutoCAD SHX Text N-162
AutoCAD SHX Text N-128
AutoCAD SHX Text N-127
AutoCAD SHX Text F-10
AutoCAD SHX Text F10A
AutoCAD SHX Text F10B
AutoCAD SHX Text F-157
AutoCAD SHX Text F-19
AutoCAD SHX Text N-134
AutoCAD SHX Text F-167
AutoCAD SHX Text N-133
AutoCAD SHX Text F-14
AutoCAD SHX Text F-7
AutoCAD SHX Text N-159
AutoCAD SHX Text N-161
AutoCAD SHX Text N-179
AutoCAD SHX Text N-175
AutoCAD SHX Text N-166
AutoCAD SHX Text N-157
AutoCAD SHX Text N-163
AutoCAD SHX Text 812N
AutoCAD SHX Text F-161
AutoCAD SHX Text F-160
AutoCAD SHX Text F-162
AutoCAD SHX Text F-164
AutoCAD SHX Text F-163
AutoCAD SHX Text F-6
AutoCAD SHX Text F-1
AutoCAD SHX Text F-2
AutoCAD SHX Text F-5
AutoCAD SHX Text F-4
AutoCAD SHX Text F-3
AutoCAD SHX Text F-36
AutoCAD SHX Text E-144
AutoCAD SHX Text E-135
AutoCAD SHX Text E-134
AutoCAD SHX Text D-10
AutoCAD SHX Text E-6
AutoCAD SHX Text E-107
AutoCAD SHX Text E-106
AutoCAD SHX Text E-108
AutoCAD SHX Text E-2
AutoCAD SHX Text E-132
AutoCAD SHX Text N-116
AutoCAD SHX Text N-117
AutoCAD SHX Text E-7
AutoCAD SHX Text E-4
AutoCAD SHX Text E-104
AutoCAD SHX Text B-30
AutoCAD SHX Text E-8
AutoCAD SHX Text H-30
AutoCAD SHX Text F-23
AutoCAD SHX Text F-26
AutoCAD SHX Text F-25
AutoCAD SHX Text F-24
AutoCAD SHX Text F-21
AutoCAD SHX Text F-16
AutoCAD SHX Text F-170
AutoCAD SHX Text F-44
AutoCAD SHX Text F-17
AutoCAD SHX Text M-1
AutoCAD SHX Text M-21
AutoCAD SHX Text M-18
AutoCAD SHX Text M-20
AutoCAD SHX Text M-184
AutoCAD SHX Text D-35
AutoCAD SHX Text D-4
AutoCAD SHX Text D-137
AutoCAD SHX Text D-4A
AutoCAD SHX Text D-49
AutoCAD SHX Text D-2
AutoCAD SHX Text D-102
AutoCAD SHX Text D-39
AutoCAD SHX Text D-1
AutoCAD SHX Text D-101
AutoCAD SHX Text D-8
AutoCAD SHX Text M-22
AutoCAD SHX Text M-22A
AutoCAD SHX Text M-15
AutoCAD SHX Text M-183
AutoCAD SHX Text M-25
AutoCAD SHX Text N-180
AutoCAD SHX Text M-17
AutoCAD SHX Text M-19
AutoCAD SHX Text C-15
AutoCAD SHX Text C-94
AutoCAD SHX Text A-40
AutoCAD SHX Text A-38
AutoCAD SHX Text B-129
AutoCAD SHX Text B-31
AutoCAD SHX Text A-3
AutoCAD SHX Text A-1
AutoCAD SHX Text A-27
AutoCAD SHX Text A-41
AutoCAD SHX Text A-41A
AutoCAD SHX Text A-131
AutoCAD SHX Text J-17
AutoCAD SHX Text J-219
AutoCAD SHX Text D-50
AutoCAD SHX Text M-11
AutoCAD SHX Text M-14
AutoCAD SHX Text M-16
AutoCAD SHX Text M-9
AutoCAD SHX Text M-10
AutoCAD SHX Text M-12
AutoCAD SHX Text M-183
AutoCAD SHX Text D-12
AutoCAD SHX Text F-20
AutoCAD SHX Text M-8
AutoCAD SHX Text B-29
AutoCAD SHX Text F-22
AutoCAD SHX Text D-36
AutoCAD SHX Text D-95
AutoCAD SHX Text N-174
AutoCAD SHX Text J-20
AutoCAD SHX Text J-93
AutoCAD SHX Text D-53
AutoCAD SHX Text N-165
AutoCAD SHX Text F-13
AutoCAD SHX Text F-12
AutoCAD SHX Text
PICNIC CANOPY
AutoCAD SHX Text N-172
AutoCAD SHX Text Q-39
AutoCAD SHX Text Q-41
AutoCAD SHX Text Q-36
AutoCAD SHX Text Q-38
AutoCAD SHX Text Q-35
AutoCAD SHX Text Q-37
AutoCAD SHX Text Q-31
AutoCAD SHX Text Q-33
AutoCAD SHX Text Q-34
AutoCAD SHX Text Q-32
AutoCAD SHX Text Q-42
AutoCAD SHX Text Q-40
AutoCAD SHX Text Q-44
AutoCAD SHX Text Q-46
AutoCAD SHX Text Q-51
AutoCAD SHX Text Q-53
AutoCAD SHX Text Q-47
AutoCAD SHX Text Q-43
AutoCAD SHX Text Q-45
AutoCAD SHX Text Q-49
AutoCAD SHX Text E-109
AutoCAD SHX Text E-100
AutoCAD SHX Text H-100
AutoCAD SHX Text A-46
AutoCAD SHX Text D-051
AutoCAD SHX Text D-052
AutoCAD SHX Text D-054
AutoCAD SHX Text D-98A
AutoCAD SHX Text D-98
AutoCAD SHX Text D-12D
AutoCAD SHX Text D-97
AutoCAD SHX Text D-97
AutoCAD SHX Text D-12B
AutoCAD SHX Text D-12A
AutoCAD SHX Text D-12F
AutoCAD SHX Text D-12E
AutoCAD SHX Text D-99
AutoCAD SHX Text D-100
AutoCAD SHX Text D-12G
AutoCAD SHX Text D-96
AutoCAD SHX Text D-12J
AutoCAD SHX Text M-24
AutoCAD SHX Text D-23
AutoCAD SHX Text F-224
AutoCAD SHX Text F-15
AutoCAD SHX Text E-10
AutoCAD SHX Text R-1
AutoCAD SHX Text R-2
AutoCAD SHX Text G-45
AutoCAD SHX Text G-46
AutoCAD SHX Text G-47
AutoCAD SHX Text G-48
AutoCAD SHX Text G-37
AutoCAD SHX Text G-38
AutoCAD SHX Text G-24
AutoCAD SHX Text G-25
AutoCAD SHX Text G-26
AutoCAD SHX Text G-20
AutoCAD SHX Text G-19
AutoCAD SHX Text
NOAA
AutoCAD SHX Text
NOAA
AutoCAD SHX Text
NOAA
AutoCAD SHX Text
NOAA
AutoCAD SHX Text
NOAA
AutoCAD SHX Text
NOAA
AutoCAD SHX Text
NOAA
AutoCAD SHX Text
NOAA
AutoCAD SHX Text
NOAA
AutoCAD SHX Text
NOAA
AutoCAD SHX Text
NOAA
AutoCAD SHX Text
NOAA
AutoCAD SHX Text
NOAA
AutoCAD SHX Text
NOAA
AutoCAD SHX Text
NOAA
AutoCAD SHX Text
NOAA GUARDSHACK
AutoCAD SHX Text E-106B
AutoCAD SHX Text N-159F
AutoCAD SHX Text N-175B
AutoCAD SHX Text N-175A
AutoCAD SHX Text N-223
AutoCAD SHX Text F-33
AutoCAD SHX Text G-36
AutoCAD SHX Text G-35
AutoCAD SHX Text N-125
AutoCAD SHX Text N-132
AutoCAD SHX Text G-18
AutoCAD SHX Text G-17
AutoCAD SHX Text G-16
AutoCAD SHX Text G-29
AutoCAD SHX Text G-28
AutoCAD SHX Text G-1
AutoCAD SHX Text G-34
AutoCAD SHX Text G-33
AutoCAD SHX Text G-30
AutoCAD SHX Text G-31
AutoCAD SHX Text G-15
AutoCAD SHX Text G-14
AutoCAD SHX Text G-13
AutoCAD SHX Text G-8
AutoCAD SHX Text Q-2
AutoCAD SHX Text Q-1
AutoCAD SHX Text Q-21
AutoCAD SHX Text Q-20
AutoCAD SHX Text Q-19
AutoCAD SHX Text Q-18
AutoCAD SHX Text Q-17
AutoCAD SHX Text Q-16
AutoCAD SHX Text Q-15
AutoCAD SHX Text Q-14
AutoCAD SHX Text Q-13
AutoCAD SHX Text Q-12
AutoCAD SHX Text Q-11
AutoCAD SHX Text Q-10
AutoCAD SHX Text Q-9
AutoCAD SHX Text Q-8
AutoCAD SHX Text Q-7
AutoCAD SHX Text Q-6
AutoCAD SHX Text Q-5
AutoCAD SHX Text Q-4
AutoCAD SHX Text Q-3
AutoCAD SHX Text Q-28
AutoCAD SHX Text Q-27
AutoCAD SHX Text Q-26
AutoCAD SHX Text Q-25
AutoCAD SHX Text Q-24
AutoCAD SHX Text Q-23
AutoCAD SHX Text Q-22
AutoCAD SHX Text N-162B
AutoCAD SHX Text N-173
AutoCAD SHX Text N-162A
AutoCAD SHX Text N-164
AutoCAD SHX Text N-169A
AutoCAD SHX Text Q-302
AutoCAD SHX Text Q-304
AutoCAD SHX Text Q-303
AutoCAD SHX Text Q-301
AutoCAD SHX Text Q-305
AutoCAD SHX Text Q-307
AutoCAD SHX Text Q-309
AutoCAD SHX Text Q-311
AutoCAD SHX Text Q-313
AutoCAD SHX Text Q-315
AutoCAD SHX Text Q-317
AutoCAD SHX Text Q-319
AutoCAD SHX Text Q-321
AutoCAD SHX Text Q-323
AutoCAD SHX Text Q-325
AutoCAD SHX Text Q-327
AutoCAD SHX Text Q-329
AutoCAD SHX Text Q-331
AutoCAD SHX Text Q-333
AutoCAD SHX Text Q-335
AutoCAD SHX Text Q-335
AutoCAD SHX Text Q-337
AutoCAD SHX Text Q-318
AutoCAD SHX Text Q-314
AutoCAD SHX Text
Q-CG
AutoCAD SHX Text Q-312
AutoCAD SHX Text Q-310
AutoCAD SHX Text Q-308
AutoCAD SHX Text Q-306
AutoCAD SHX Text N-182
AutoCAD SHX Text N-160
AutoCAD SHX Text N-158A
AutoCAD SHX Text N-158B
AutoCAD SHX Text
WORK SITE
AutoCAD SHX Text
AutoCAD SHX Text
WASHINGTON
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DOVER
AutoCAD SHX Text
MD.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SALISBURY
AutoCAD SHX Text
DEL.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
VA.
AutoCAD SHX Text
AutoCAD SHX Text
CAMBRIDGE
AutoCAD SHX Text
MD.
AutoCAD SHX Text
ANNAPOLIS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FREDERICKSBURG
AutoCAD SHX Text
AutoCAD SHX Text
EASTERN SHORE
AutoCAD SHX Text
VIRGINIA'S
AutoCAD SHX Text
ATLANTIC OCEAN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
HAMPTON
AutoCAD SHX Text
NORFOLK
AutoCAD SHX Text
NEWPORT
AutoCAD SHX Text
NEWS
AutoCAD SHX Text
VIRGINIA
AutoCAD SHX Text
BEACH
AutoCAD SHX Text
CHESAPEAKE BAY
AutoCAD SHX Text
AutoCAD SHX Text
RICHMOND
AutoCAD SHX Text
PETERSBURG
AutoCAD SHX Text
FLIGHT FACILITY-
AutoCAD SHX Text
NASA-WALLOPS
AutoCAD SHX Text
MAINBASE
AutoCAD SHX Text
FLIGHT FACILITY-
AutoCAD SHX Text
NASA-WALLOPS
AutoCAD SHX Text
ISLAND
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
VICINITY MAP
AutoCAD SHX Text
LOCATION MAP
AutoCAD SHX Text
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
AutoCAD SHX Text
WALLOPS ISLAND, VIRGINIA
AutoCAD SHX Text
GODDARD SPACE FLIGHT CENTER
AutoCAD SHX Text
WALLOPS FLIGHT FACILITY
AutoCAD SHX Text
RESTORATION OF MAIN BASE ELECTRICAL INFRASTRUCTURE
AutoCAD SHX Text
DRAWING INDEX
AutoCAD SHX Text
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
AutoCAD SHX Text
GODDARD SPACE FLIGHT CENTER
AutoCAD SHX Text
WALLOPS FLIGHT FACILITY
AutoCAD SHX Text
WALLOPS ISLAND, VIRGINIA 23337
AutoCAD SHX Text
ENGINEERING GROUP LEADER
AutoCAD SHX Text
ENGINEERING APPROVAL
AutoCAD SHX Text
BRANCH HEAD
AutoCAD SHX Text
BRANCH APPROVAL
AutoCAD SHX Text
PROJECT MANAGER
AutoCAD SHX Text
NASA SAFETY
AutoCAD SHX Text
FIRE PROTECTION
AutoCAD SHX Text
PROJECT ENGINEER
AutoCAD SHX Text
SUBMITTED BY
AutoCAD SHX Text
DATE :
AutoCAD SHX Text
DATE :
AutoCAD SHX Text
REVISED:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
LET.
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
CK.
AutoCAD SHX Text
AP.
AutoCAD SHX Text
FILE NAME:
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
PROJECT NUMBER:
AutoCAD SHX Text
DR.
AutoCAD SHX Text
CK.
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
AUTOCAD - RELEASE 2018
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
DATE :
AutoCAD SHX Text
DATE :
AutoCAD SHX Text
DATE :
AutoCAD SHX Text
DATE :
AutoCAD SHX Text
DATE :
AutoCAD SHX Text O & M
AutoCAD SHX Text
CONSTRUCTION MANAGEMENT
AutoCAD SHX Text
DATE :
AutoCAD SHX Text 7/31/20
AutoCAD SHX Text
RESTORATION OF MAIN BASE
AutoCAD SHX Text
ELECTRICAL INFRASTRUCTURE
AutoCAD SHX Text
80GRC019D004
AutoCAD SHX Text
AutoCAD SHX Text
CONSTRUCTION DOCUMENTS
AutoCAD SHX Text
THOMAS F. DETER
AutoCAD SHX Text 7/31/20
AutoCAD SHX Text
BRIAN D. SCHMIDT
AutoCAD SHX Text 7/31/20
AutoCAD SHX Text
CS-001
AutoCAD SHX Text
COVER SHEET
AutoCAD SHX Text 19637
AutoCAD SHX Text
BDS
AutoCAD SHX Text
TFD
AutoCAD SHX Text
AutoCAD SHX Text
NTS
AutoCAD SHX Text
190460-EECS-001.DWG
AutoCAD SHX Text
NOT TO SCALE
AMP TRIP OR AMP TAP
AMERICAN WIRE GAGE
BELOW FINISHED GRADE
CIRCUIT BREAKER
AUXILIARY
CENTERLINE
CURRENT LIMITING FUSE
CURRENT LIMITING
CEILING EXHAUST FAN
CLOSED CIRCUIT TV
COMMUNICATION SYSTEM
DIAMETER
CABINET UNIT HEATER
CONTROL SWITCH
CURRENT TRANSFORMER
DIRECT CURRENT
DIRECT BURIAL / DECIBEL
BOLTED PRESSURE SWITCH
AUTOMATIC TEMPERATURE CONTROL
AUTOMATIC TRANSFER SWITCH
AMP SWITCH OR AMMETER SWITCH
COMPUTER CONTROLLED BUSINESS
CABINET
CU
DB
CUH
DIA
DC
DEMO DISCONNECT AND REMOVE ELECTRICAL EQUIPMENT
COPPER
CKT
CL
CLF
CS
CLG
CT
CEILING
C
CIRCUIT
C
CB
CAB
BPS
CBX
CEF
CCTV
CONDUIT
AS
AT
ATC
AUX
BFG
AWG
ATS
AT
ABOVE FINISHED FLOOR
AMP FRAME, AMP FUSE
AIR HANDLING UNIT
ABOVE FINISHED GRADE
ALTERNATING CURRENT
APPROXIMATELY
ALTERNATE
AMPLITUDE MODULATION
ABOVE COUNTER
AMERICANS W/DISABILITIES ACT
AUTOMATIC GAIN CONTROL
AFF
AFG
AHU
AGC
AM
ALT
APPROX
A
AC
AF
ADA
AB
AMPERE
L
OVERCURRENT PROTECTIVE DEVICE
MOTOR OPERATED DAMPER
MAIN DISTRIBUTION PANEL
MANHOLE OR METAL HALIDE
MAIN DISTRIBUTION SWITCHBOARD
THOUSAND CIRCULAR MILS
PRIVATE BRANCH EXCHANGE
NATIONAL ELECTRICAL CODE
OHD OVERHEAD DOOR
PILOT LIGHT
PANELBOARD
PRIMARY
POWER PANEL
PRI
PR PAIR
PNL
PP
PL
PLUMBING CONTRACTOR
POLE(S) OR PILOT
PULLBOX
OVERLOAD ELEMENT
POST INDICATOR VALVE
POWER FACTORPF
PIV
PBX
PC
P
PB
OL
OUTSIDE DIAMETER
NOT IN CONTRACT
OVERHEAD
ON CENTER
NORMALLY OPEN
NOT TO SCALE
OC
OD
OH
OCP
NTS
N.O.
NIC
MOUNTED
NORMAL EMERGENCY
NORMALLY CLOSED
NON FUSED
NEUTRAL
NON FUSED SWITCHNFS
NF
NEUT
NEC
N.C.
NE
MOD
MTD
MULTIOUTLET ASSEMBLY
MAIN LUGS ONLY
MISCELLANEOUS
MINIMUM
MICROPHONE
MINERAL INSULATED
MIN
MLO
MOA
MISC
MIC
MH
MI
MAIN CIRCUIT BREAKER
MOTOR CONTROL CENTERMCC
MDS
MDP
MCM
MCB
KILOVOLT AMPERES
KILOVOLT
KILOWATT
MAXIMUM
LOCAL AREA NETWORK
CLAD CABLE
KILOWATT HOURS
MECHANICAL CONTRACTOR / METALMC
MAX
KV
KVA
KW
KVAR
LAN
KWH
KILOVAR
EXHAUST FAN
EMERGENCY LIGHTING UNIT
ELECTRICAL CONTRACTOR
FAN COIL UNIT
EMERGENCY
EXISTING TO REMAIN
END OF LINE RESISTOR
GENERAL CONTRACTOR
FREQUENCY MODULATION
FUSIBLE SWITCH
GENERATOR
HORSEPOWER
HEATING CONTRACTOR
HIGH PRESSURE SODIUM
JUNCTION BOX
FOOD SERVICE EQUIPMENT CONTRACTOR
GROUND FAULT INTERRUPTER
FIRE EXTINGUISHER CABINET
ELECTRICAL METALLIC TUBING
EXISTING (EXIST)
FIRE ALARM / FEEDER AMPLIFIER
HIGH INTENSITY DISCHARGE
FREQUENCY IN CYCLES PER SECOND
THOUSAND CIRCULAR MILS
HID
HP
HPS
HZ
JB
KCMIL
FM
GEN
GC
FU
GRD
HC
GFI
GROUND
FUSE
ETR
FA
EX
FCU
FEC
FDR
FSC
FS
FEEDER
EC
EF
ELU
EA
EM
ELR
EMT
EACH
DRAWINGDWG
DN DOWN
UNLESS NOTED OTHERWISE
UNINTERRUPTIBLE POWER SUPPLY
W WIRE
TRANSFORMER
WEATHERPROOF
EXPLOSION PROOFXP
XFMR
WP
W/ WITH
ULTRA HIGH FREQUENCY
VERY HIGH FREQUENCYVHF
V VOLT
UPS
UHF
UNO
TEMPERATURE CONTROL PANEL
SINGLE POLE DOUBLE THROW
TELEPHONE TERMINAL CABINET
TEMPERATURE CONTROL VALVE
PVC POLYVINYL CHLORIDE
UNDERGROUND
TELEVISION
TEMPORARY
TYPICAL
TWISTED SHIELDED PAIR
TYP
UG
TSP
TV
TTC
TEMP
SWITCHBOARD
SWITCHGEAR
SWITCH
STARTER
TELEPHONE
SWGR
TCV
TEL
TCP
SW
SWBD
STR
SPECIFICATIONS
RIGHT OF WAY
ROOF TOP UNIT
SECONDARY
SPECS
STL
SPDT
STEEL
SHT
SEC
R/W
RTU
SHEET
POTENTIAL TRANSFORMER
REQUIRED
RECEPTACLE
REMOTE CONTROL
REVISION
REHEAT COIL
RECP
REV
RHC
REQ'D
R
RC
PT
RELAY
POWER ROOF VENTILATORPRV
TYPICAL ABBREVIATIONS
THIS SCHEDULE IS A STANDARD SCHEDULE. CERTAIN SYMBOLS & ABBREVIATIONS INDICATED ON THIS SCHEDULE MAY NOT
APPEAR ON THE DRAWINGS. EQUIPMENT SYMBOLS SHOWN DASHED ON THE DRAWINGS INDICATE EXISTING EQUIPMENT.
SYMBOLS AND ABBREVIATIONS SCHEDULE
FLR FLOOR
SINGLE LINE DIAGRAM SYMBOLSPOWER SYMBOL LEGEND
HOMERUN TO PANELBOARD - 3 #12-1/2"C UNO
TRANSFORMER - SIZE AND VOLTAGE AS NOTED
COMBINATION DISCONNECT SWITCH AND STARTER-RATING AS NOTED
FINAL CONNECTION BY EC TO EQUIPMENT
EXISTING WIRING
SWITCHED CIRCUIT
BRANCH CIRCUIT
SWITCH LEG
CABLE TRAY 4"x 12" UNO
INDICATES NOTES ELSEWHERE
BUSWAY
PHASE
Ø
T
CT
EX
1200N FEEDER SIZE (REFER TO RISER DIAGRAM SHEETS)
Y
TRANSFORMER
FUSED SWITCH
CIRCUIT BREAKER OR PROTECTED WAY RELAY
DEVICE W/ SWITCH
SWITCH OR SWITCHED WAY
DETAIL NUMBER
DRAWING NUMBER WHERE DRAWN
SECTION NUMBER
EX.X
X
EX.X
X
NEW CONNECTION TO EXISTING
DISCONNECT EXISTING EQUIPMENT
1=DETAIL DESIGNATION / E6.01 = DRAWING
NUMBER DETAIL IS SHOWN ON
1/E6.01
DRAWING NUMBER WHERE DRAWN
ELECTRICAL PANELBOARD - SURFACE MOUNTED
SITE WORK POWER SYMBOL LEGEND
EU
x
EUD
AEU
AUD
EDB
EUP
EPD EPD
EUS EUS
CROSSHATCHING INDICATES EQUIPMENT, CONDUIT/CONDUCTORS AND
ASSOCIATED DISCONNECTING MEANS TO BE RENDERED DEAD AND REMOVED
UNDER DEMOLITION WORK BACK TO THE SOURCE OR DESTINATION UNLESS
NOTED OR SHOWN OTHERWISE
EXISTING PRIMARY VOLTAGE UNDERGROUND ELECTRICAL FEEDER IN
DUCT BANK
EXISTING PRIMARY VOLTAGE DIRECT BURIED ELECTRICAL FEEDER
ABANDONED UNDERGROUND ELECTRICAL FEEDER IN DUCT BANK
ABANDONED PRIMARY VOLTAGE DIRECT BURIED ELECTRICAL FEEDER
PRIMARY VOLTAGE UNDERGROUND DIRECTIONAL BORED
UNDERGROUND ELECTRICAL FEEDER
PRIMARY VOLTAGE UNDERGROUND ELECTRICAL FEEDER IN EXISTING
DUCT BANK
PRIMARY VOLTAGE UNDERGROUND ELECTRICAL FEEDER IN DUCT BANK
SECONDARY VOLTAGE UNDERGROUND ELECTRICAL FEEDER IN DUCT
BANK
J
EXISTING ABOVE GROUND SECTIONALIZING JUNCTION CABINET
J
600A ABOVE GROUND SECTIONALIZING JUNCTION CABINET, UNO
EXISTING ELECTRICAL MANHOLE
EXISTING TRANSFORMER - RATING AS INDICATED
ELECTRICAL MANHOLE
TRANSFORMER - RATING AS INDICATED
DM
DIGITAL DEMAND METER WITH CURRENT TRANSFORMERS AND
POTENTIAL TRANSFORMERS. BASIS OF DESIGN VERIS MODEL
E50H2A W/ #AH04 FUSE KIT, #E683D502 CTS, AND #AE012 NEMA
4X ENCLOSURE, COORDINATE CT RATIO W/ SERVICE SIZE.
S
EXISTING AIR INSULATED PAD MOUNTED MV SWITCHGEAR
G
EXISTING GAS (SF6) INSULATED PAD MOUNTED MV SWITCHGEAR
GAS (SF6) INSULATED PAD MOUNTED MV SWITCHGEAR - RATING AS
INDICATED
G
SECTIONALIZINGSECT
ABOVE GROUND SECTIONALIZING JUNCTION CABINET RATED
600A UNO.
52 MEDIUM VOLTAGE DRAWOUT CIRCUIT BREAKER W/ RELAY
OR G
DIESEL FIRED GENERATOR SET - RATING AS INDICATED
IN ITS ENTIRETY. EXISTING FEEDERS TO REMAIN UNO.
M OR
OR
SPD
SURGE PROTECTION DEVICE, COORDINATE VOLTAGE WITH
SERVICE VOLTAGE, REFER TO SPECIFICATIONS FOR VOLTAGE
AND kA RATINGS.
X
EX.XX
SECTION NUMBER
DRAWING NUMBER WHERE DRAWN
H.F. LENZ
COMPANY
Engineering
1407 Scalp Avenue Phone: 814.269.9300
Johnstown, PA 15904 www.hflenz.com
Headquarters:
AutoCAD SHX Text
%%USECTION MARKS
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
AutoCAD SHX Text
GODDARD SPACE FLIGHT CENTER
AutoCAD SHX Text
WALLOPS FLIGHT FACILITY
AutoCAD SHX Text
WALLOPS ISLAND, VIRGINIA 23337
AutoCAD SHX Text
ENGINEERING GROUP LEADER
AutoCAD SHX Text
ENGINEERING APPROVAL
AutoCAD SHX Text
BRANCH HEAD
AutoCAD SHX Text
BRANCH APPROVAL
AutoCAD SHX Text
PROJECT MANAGER
AutoCAD SHX Text
NASA SAFETY
AutoCAD SHX Text
FIRE PROTECTION
AutoCAD SHX Text
PROJECT ENGINEER
AutoCAD SHX Text
SUBMITTED BY
AutoCAD SHX Text
DATE :
AutoCAD SHX Text
DATE :
AutoCAD SHX Text
REVISED:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
LET.
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
CK.
AutoCAD SHX Text
AP.
AutoCAD SHX Text
FILE NAME:
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
PROJECT NUMBER:
AutoCAD SHX Text
DR.
AutoCAD SHX Text
CK.
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
AUTOCAD - RELEASE 2018
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
DATE :
AutoCAD SHX Text
DATE :
AutoCAD SHX Text
DATE :
AutoCAD SHX Text
DATE :
AutoCAD SHX Text
DATE :
AutoCAD SHX Text O & M
AutoCAD SHX Text
CONSTRUCTION MANAGEMENT
AutoCAD SHX Text
DATE :
AutoCAD SHX Text 7/31/20
AutoCAD SHX Text
RESTORATION OF MAIN BASE
AutoCAD SHX Text
ELECTRICAL INFRASTRUCTURE
AutoCAD SHX Text
80GRC019D004
AutoCAD SHX Text
AutoCAD SHX Text
CONSTRUCTION DOCUMENTS
AutoCAD SHX Text
THOMAS F. DETER
AutoCAD SHX Text 7/31/20
AutoCAD SHX Text
BRIAN D. SCHMIDT
AutoCAD SHX Text 7/31/20
AutoCAD SHX Text E-001
AutoCAD SHX Text
SYMBOLS AND ABBREVIATIONS
AutoCAD SHX Text 19638
AutoCAD SHX Text
BDS
AutoCAD SHX Text
TFD
AutoCAD SHX Text
AutoCAD SHX Text
NTS
AutoCAD SHX Text
190460-EEGI-001.DWG
1. The work consists of the installation of new underground electrical distribution facilities and removal, rearrangement, or modification of existing underground electrical distribution facilities, all within the area of the Goddard Space Flight Facility Wallops Flight Facility in the northeast portion of Virginia.
2. Work on this project involves working over, under, near, around, and on 12.47kV/7.2 kV underground electric distribution facilities owned by NASA. The project work includes the installation of new precast concrete manholes, SF6 switchgear, junction enclosures, 3-phase transformers, directional boring of HDPE conduit, copper conductors, and all associated hardware and equipment. The work also includes the removal of existing SF6 switchgear, 3-phase transformers, copper conductors all as detailed in the project plans and drawings.
3. Work on the project will be performed using a segmented or phased installation in order to maintain electric service to existing facilities, maintain existing electric system operation and coordinate the work with other projects in the area.
4. Base facility plans used for the design base of this work were furnished by NASA-Wallops
Flight Facility. Work to be performed under this contract was added by H.F. Lenz Co. and shall be used solely for work on this project.
5. All existing overhead and underground facilities shown on the base plans are diagrammatic in nature and for informational purpose only. Actual locations shall be field verified and documented prior to excavation or execution of the work. Additionally, the contractor shall be responsible for the field verification of the accuracy of all as-built documents used in the process of the work. All redlines and notes of offering construction or field conditions shall be reported and supplied to the NASA Project Manager for incorporation into the record drawings.
6. Contractor shall locate and mark all electrical circuits and underground utilities in the area of construction prior to any excavation. The contractor shall physically verify the location and elevation of the existing utilities indicated prior to the starting construction. Obtain digging/excavation permissions prior to the start of excavation by contacting the NASA project manager or representative.
7. Notify the NASA project manager or representative at least 7 days prior to starting excavation work. Contact the Government utility locate department system 48 hours prior to excavating.
8. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing facilities which are to remain. Repair or replace portions of any existing facility which has been altered during construction operations to match existing or adjoining work as approved by the NASA project manager. At the completion of construction, existing facilities shall be in a condition equal to or better than that which existed before new work started.
9. Permission to interrupt any base roads, parking lots and /or utility service shall be requested in writing a minimum of 15 days prior to the desired date of interruption.
10. All work around/involving roadways, to include roadway excavations and utility crossings, will be conducted in accordance with the Manual of Uniform Traffic Control Devices
(MUTCD) and the NASA General Safety Program Requirements (NPR 8715.3C).
Contractors shall provide and ensure appropriate road closure and detour signs are established as necessary for motor traffic management.
11. In order to minimize interruption to Wallops Flight Facility roadways, the contractor shall coordinate and schedule road crossing construction and closings per work phase to accomplish as many crossing as possible within the scheduled closing time frame.
12. Utility cutovers and interruptions should be scheduled after normal working hours or on
Saturday, Sunday, and government holidays. Contractor shall conform to procedures required in notes 13 and 14.
13. Regular working hours can consist of up to an 9.5 hour period between 7 a.m. and 4:30 p.m., Monday through Friday, excluding Government holidays.
14. Work outside the regular working hours shall be arranged in advance with the NASA project manager.
15. The contractor will be working around existing buildings which are occupied. Do not enter the buildings without prior approval of the NASA project manager.
16. Operation of installation utilities: The contractor shall not operate nor disturb the setting of the control devices on the base utilities system, including water, sewer, electrical, and communication services. Base personal will operate the control devices as required for normal conduct of the work
17. Personnel and Vehicle Access and Cell Phone Usage.
a. The contractor shall be required to obtain contractor tradesman passes for all personnel to access the installation and government property. Provide a list of employees (prime and subcontractors) on company letterhead for clearance into the project work area. The list shall be provided to the NASA project manager a minimum of 5 work days prior to scheduled work to be performed. Additionally, the list shall be maintained and updated a minimum of 5 working days prior to the time new employees need access to the jobsite.
b. Cell phone usage on Wallops Flight Facility while driving is strictly prohibited and violators will be ticketed. The contractor shall make sure all employees and those of subcontractors are aware of this restriction.
18. The contractor shall make every effort to cause as little disturbance as possible and protect the natural environment and resources of the base during the course of the work.
19. The contractor is responsible for the installation and maintenance of erosion control devices to control run off from the construction site for the duration of the contract. The contractor shall install approved erosion control devices as necessary to protect drainage course including temporary protection on side and back slopes as soon as rough grading is complete.
20. All excess soil, excavation, waste and debris shall be removed from the site as soon as practical during the course of the work. Soil and excavation materials should be removed from the Base and not stock piled unless they are to be reused.
21. The finish elevation of pad-mounted or ground sleeve mounted equipment should be a minimum of 24" above surrounding grade or adjacent roadways or as approved by the NASA project manager. Equipment is not to be installed within drainage control areas, areas subject to flooding or water holding areas.
22. Cable tags shall be provided for all underground circuitry, including medium and low voltage system cabling. Tags shall be provided at all accessible locations within the circuit.
Identification markings shall include the circuit designation, phase, source (from) and feed
(to) locations. For example, tags at the first handhole on an exterior lighting circuit would include, circuit designation (MDP-1), source (MDP ckt 1), feed (Lighting Pole 1). Tags at a transformer would include, source (Primary Riser Pole #xxxx) feed (Transformer #2). All cable identification tag information shall be identified and approved by the Public Works
Engineer prior to installation.
23. Single-phase fault indicators shall be provided on all incoming and outgoing conductors located within the medium voltage equipment enclosures. This includes all pad mounted enclosures for medium voltage equipment, such as transformers, sectionalizing cabinets, medium voltage switches, etc. Individually fireproof medium voltage conductors in all underground structures.
24. All conduits installed will include pulling lines/cables for installation of conductors.
25. Contractor is responsible for keeping one clean set of drawings for as-built markups. These markups will bereturned to the engineer for completion of a final set of as-built drawings to be presented to NASA Wallops Flight Facility as record drawings.
26. The contractor shall divert at least 50% of Construction and Demolition materials and debris through recycling. The contractor shall keep track of the weight (in pounds or tons) diverted and provide the data in a brief report upon completion of the project.
27. Contractor shall contact Chad Combs with NASA Safety, Code 803, for MEC Awareness
Training. There is a low likelihood that the contractor will come into contact with munitions and explosive constituents. Contractor to schedule MEC Awareness Training through the
COTR. Contractor shall contact NASA airfield Operations Center for training on airfield procedures prior to starting any construction on or near the airfield. Contractor to complete briefing on processes and regulations for conducting work in the Magazine Storage Area due to the ongoing explosive operations.
28. Contractor is responsible for providing a complete arc flash analysis for all ELECTRICAL
EQUIPMENT installations for the project. Contractor shall supply and affix arc flash hazard labels in accordance with NFPA 70E.
29. Contractor shall provide means for de-watering of open pits for the installation of junction cabinets, switchgear, and transformers before installing stone base if necessary.
30. All electrical work shall be installed in accordance with the 2017 National Electrical Code and all applicable federal, state and local codes. All electrical work, wiring, connections and associated equipment within the area of work shall be as per applicable articles of the
National Electrical Code. Coordinate with specifications for device requirements.
31. It is called to the contractors attention that the entire installation must be grounded in compliance with the National Electrical Code.
32. All wire, conduit, connectors, boxes, etc. necessary to achieve a complete electrical installation, where an electrical device is required by code but not shown shall be furnished and installed as though fully shown and specified.
33. Wallops Flight Facility is currently supporting various airfield operations and launch mission activities from the facilities in which work will be performed. It is the contractor's responsibility to schedule work so as to not interfere with airfield operations and launch mission activities in the area.
34. NASA reserves first right of refusal for all equipment demolished under this contract.
Coordinate removal of demolished equipment with NASA project manager, and deliver all equipment identified by NASA project manager to be salvaged to the on-site location directed by the NASA project manager. The contractor shall be responsible for the disposal of all demolished equipment refused by the NASA project manager.
35. It is called to the contractors attention that all circuit breakers with adjustable instantaneous feature and all circuit breakers with electronic trip circuit breakers with LSI or LSIG trip functions shall be adjusted by the contractor in accordance with the coordination and arc-flash study performed as part of this contract.
36. It is called to the contractor's attention that if any item indicated on the document conflicts with field conditions or conflicts with information indicated on the construction documents, the contractor shall immediately submit an RFI to the NASA project manager. Should no RFI be submitted for clarification the contractor shall include in his bid the more expensive option of the conflicting information.
1. Refer to the approved safety plan for detailed safety information and requirements.
2. All contractors must comply with Federal, State, and Local regulations pertaining to the environment. Additionally all work must comply with the approved project safety plan, as well as OSHA requirements and standards.
3. The contractor is responsible for safety of on-site personnel. If safety department personnel observe an unsafe condition, work will be stopped without contract extension until the unsafe condition(s) is/are remedied. Accident report forms (OSHA Form 301 or
300) will be submitted for each reportable occupational injury, illness, or lost time accident.
The contractor is responsible for notifying OSHA in the event of a serious employee illness or injury. Provide a copy of the accident report to the safety office.
4. All conductors and equipment shall be considered “Energized” unless checked, tagged, grounded, and checked again.
5. The contractor shall conduct daily “Tailgate” safety meetings covering the following items:
a. Proper wearing/use of personal protective equipment (PPE) and training to properly
DON/DOFF all PPE.
b. Control access to the job site and cleanliness of the jobsite.
c. Electrical safety on the jobsite.
d. Recognition of potential hazards at the jobsite and establishing abatement procedures to minimize them.
e. As required during work performance, abide by all excavation and trenching regulations.
6. Materials with "Environmental Conditions" or hazardous substances will be the government's responsibility for proper handling and disposal. The term “Environmental
Conditions” shall, without limitation, include the presence of or condition involving any pollutant, hazardous or solid waste, hazardous material or hazardous or condition involving any pollutant, hazardous or solid waste, hazardous material or hazardous or toxic substance regulated under any federal, state, or local law (including, without limitation, common law), regulation or ordinance or any substance (including, without limitation mold or other myotoxins) which may create an unsafe condition or pose any threat to health or safety (collectively "Hazardous Substances").
7. The Contractor shall conduct the fueling and lubricating of equipment and motor vehicles in a manner that protects against spills and evaporation. All used oil generated on site will be managed in accordance with 40 CFR 279. The Contractor will determine if any used oil generated while on-site exhibits a characteristic of hazardous waste. In addition, used oil containing 1000 parts per million of solvents will be considered a hazardous waste and disposed of at Contractor's expense. Used oil mixed with a hazardous waste will also be considered a hazardous waste. All hazardous waste will be managed with the approved
Environmental Protection Plan.
8. The Contractor shall take precautions to prevent releases/spills of oil and hazardous materials. In the event of any releases of oil and hazardous materials, chemicals, or gases;
immediately (within 15 minutes) notify the Base or Activity Fire Department, and the NASA
Project Manager. The Base Environmental Office shall make verbal and written notifications as required by the federal 40 CFR 355, State, local regulations and NASA Instructions. Spill response shall be in accordance with 40 CFR 300 and applicable State and local regulations.
Contain and clean up these spills without cost to the Government. If Government assistance is requested or required, the Contractor shall reimburse the Government for such assistance.
9. In addition to the requirements of the approved safety plan for this project the Contractor shall comply with the following:
a. Confined space work shall conform to OSHA 29 CFR 1910.146 and GPR 1700.6A
b. Any potential for a hazard in a confined space requires a permit system to be used.
c. Entry Procedures. Prohibit entry into confined space by personnel for any purpose until the qualified person has conducted appropriate tests to ensure the confined or enclosed space is safe for the work intended and that all potential hazards are controlled or eliminated and documented.
d. Forced air ventilation is required for all confined space entry operations and the minimum air exchange requirements must be maintained to ensure exposure to any hazardous atmosphere is kept below its' action level.
e. Workers shall have confined space safety training and be trained and knowledgeable in the proper use of confined space atmospheric monitoring equipment.
10. Contractor must maintain a copy of “Material Safety Data Sheet” (MSDS) for all chemical products or hazardous material that is required to perform the job. No lead, lead based, or
Chromium products will be allowed on Wallops Flight Facility.
GENERAL NOTES: SAFETY NOTES:
H.F. LENZ
COMPANY
Engineering
1407 Scalp Avenue Phone: 814.269.9300
Johnstown, PA 15904 www.hflenz.com
Headquarters:
AutoCAD SHX Text
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
AutoCAD SHX Text
GODDARD SPACE FLIGHT CENTER
AutoCAD SHX Text
WALLOPS FLIGHT FACILITY
AutoCAD SHX Text
WALLOPS ISLAND, VIRGINIA 23337
AutoCAD SHX Text
ENGINEERING GROUP LEADER
AutoCAD SHX Text
ENGINEERING APPROVAL
AutoCAD SHX Text
BRANCH HEAD
AutoCAD SHX Text
BRANCH APPROVAL
AutoCAD SHX Text
PROJECT MANAGER
AutoCAD SHX Text
NASA SAFETY
AutoCAD SHX Text
FIRE PROTECTION
AutoCAD SHX Text
PROJECT ENGINEER
AutoCAD SHX Text
SUBMITTED BY
AutoCAD SHX Text
DATE :
AutoCAD SHX Text
DATE :
AutoCAD SHX Text
REVISED:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
LET.
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
CK.
AutoCAD SHX Text
AP.
AutoCAD SHX Text
FILE NAME:
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
PROJECT NUMBER:
AutoCAD SHX Text
DR.
AutoCAD SHX Text
CK.
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
AUTOCAD - RELEASE 2018
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
DATE :
AutoCAD SHX Text
DATE :
AutoCAD SHX Text
DATE :
AutoCAD SHX Text
DATE :
AutoCAD SHX Text
DATE :
AutoCAD SHX Text O & M
AutoCAD SHX Text
CONSTRUCTION MANAGEMENT
AutoCAD SHX Text
DATE :
AutoCAD SHX Text 7/31/20
AutoCAD SHX Text
RESTORATION OF MAIN BASE
AutoCAD SHX Text
ELECTRICAL INFRASTRUCTURE
AutoCAD SHX Text
80GRC019D004
AutoCAD SHX Text
AutoCAD SHX Text
CONSTRUCTION DOCUMENTS
AutoCAD SHX Text
THOMAS F. DETER
AutoCAD SHX Text 7/31/20
AutoCAD SHX Text
BRIAN D. SCHMIDT
AutoCAD SHX Text 7/31/20
AutoCAD SHX Text E-002
AutoCAD SHX Text
GENERAL NOTES, SAFETY NOTES
AutoCAD SHX Text
& CONTACTS
AutoCAD SHX Text 19639
AutoCAD SHX Text
BDS
AutoCAD SHX Text
TFD
AutoCAD SHX Text
AutoCAD SHX Text
NTS
AutoCAD SHX Text
190460-EEGI-001.DWG
1. The work consists of the installation of new underground electrical distribution facilities and removal, rearrangement, or modification of existing underground electrical distribution facilities, all within the area of the Goddard Space Flight Facility Wallops Flight Facility in the northeast portion of Virginia.
2. Work on this project involves working over, under, near, around, and on 12.47kV/7.2 kV underground electric distribution facilities owned by NASA. The project work includes the installation of new precast concrete manholes, SF6 switchgear, junction enclosures, 3-phase transformers, directional boring of HDPE conduit, copper conductors, and all associated hardware and equipment. The work also includes the removal of existing SF6 switchgear, 3-phase transformers, copper conductors all as detailed in the project plans and drawings.
3. Work on the project will be performed using a segmented or phased installation in order to maintain electric service to existing facilities, maintain existing electric system operation and coordinate the work with other projects in the area.
4. Base facility plans used for the design base of this work were furnished by NASA-Wallops
Flight Facility. Work to be performed under this contract was added by H.F. Lenz Co. and shall be used solely for work on this project.
5. All existing overhead and underground facilities shown on the base plans are diagrammatic in nature and for informational purpose only. Actual locations shall be field verified and documented prior to excavation or execution of the work. Additionally, the contractor shall be responsible for the field verification of the accuracy of all as-built documents used in the process of the work. All redlines and notes of offering construction or field conditions shall be reported and supplied to the NASA Project Manager for incorporation into the record drawings.
6. Contractor shall locate and mark all electrical circuits and underground utilities in the area of construction prior to any excavation. The contractor shall physically verify the location and elevation of the existing utilities indicated prior to the starting construction. Obtain digging/excavation permissions prior to the start of excavation by contacting the NASA project manager or representative.
7. Notify the NASA project manager or representative at least 7 days prior to starting excavation work. Contact the Government utility locate department system 48 hours prior to excavating.
8. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing facilities which are to remain. Repair or replace portions of any existing facility which has been altered during construction operations to match existing or adjoining work as approved by the NASA project manager. At the completion of construction, existing facilities shall be in a condition equal to or better than that which existed before new work started.
9. Permission to interrupt any base roads, parking lots and /or utility service shall be requested in writing a minimum of 15 days prior to the desired date of interruption.
10. All work around/involving roadways, to include roadway excavations and utility crossings, will be conducted in accordance with the Manual of Uniform Traffic Control Devices
(MUTCD) and the NASA General Safety Program Requirements (NPR 8715.3C).
Contractors shall provide and ensure appropriate road closure and detour signs are established as necessary for motor traffic management.
11. In order to minimize interruption to Wallops Flight…