80GSFC22B0003 Attachment C - Drawings.pdf

PDF 32 MB Posted

Attached to
Wallops Flight Facility Restoration of Main Base Electrical Infrastructure – Phase 2 Federal contract opportunity
Solicitation number
80GSFC22B0003
Issued by
National Aeronautics and Space Administration Goddard Space Center

About this file

This solicitation requests bids for a firm fixed price construction contract to replace electrical infrastructure at Wallops Flight Facility in Virginia. NASA Goddard Space Flight Center is seeking to replace approximately 20,000 linear feet of direct burial cable with new electrical feeders in conduit, replace five air switches with SF6 gas switches, and create looped circuits to improve power system flexibility and resilience. The contract value is undetermined with an anticipated award date of September 30, 2022 and notice to proceed by November 30, 2022. The performance period is 548 days. An optional site visit will be held on August 17 and bids are due by August 31, with the virtual bid opening occurring that same day. This procurement is set aside for small businesses with a NAICS code of 237130 and size standard of $39.5M. Questions are due by August 19.

View the file

Other files for this federal contract opportunity

Other files attached to Wallops Flight Facility Restoration of Main Base Electrical Infrastructure – Phase 2, newest first.
File Type Posted
80GSFC22B0004 Amendment Two - Q and A.pdf PDF
80GSFC22B0003 - SF30 Amendment 2 - Signed.pdf PDF
80GSFC22B0003 Attachment C - Phase 2 Drawings.pdf PDF
80GSFC22B0003 Amendment One - Signed.pdf PDF
80GSFC22B0003 Attachment G - Drawing Suppl.pdf PDF
Attachment E - Safety and Health Plan.pdf PDF
80GSFC22B0003 IFB.pdf PDF
80GSFC22B0003 Attachment D - KTR RPT.pdf PDF
80GSFC22B0003 Attachment A - SOW.pdf PDF
80GSFC22B0003 IFB Cover Ltr.pdf PDF
Attachment F - DB Wage Determination.pdf PDF
80GSFC22B0003 Attachment B - Specs.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT C

80GSFC22B0003

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION

GODDARD SPACE FLIGHT CENTER

WALLOPS FLIGHT FACILITY

WALLOPS ISLAND, VA 23337

MAIN BASE ELECTRICAL

STAMPED CONSTRUCTION DRAWING

Wallops Restoration of Main Base Electrical Infrastructure

LOCATED

AT

NASA GSFC/WALLOPS FLIGHT FACILITY

WALLOPS ISLAND, VIRGINIA

SHEETS NOT INCLUDED

SHEET NOT USED

SHEET

CS-001

E-001

E-002

E-003

ES-101

ES-102

ES-103

ES-104

ES-105

ES-106

ES-107

ES-108

ES-109

ES-110

ES-111

ES-112

ES-113

ES-114

ES-115

ES-116

ES-117

ES-118

ES-119

ES-120

ES-121

ES-122

ES-123

ES-124

ES-125

ES-126

ES-127

ES-128

ES-129

ES-130

ES-131

ES-132

ES-133

ES-134

ES-135

ES-136

ES-137

ES-138

ES-139

ES-140

ES-141

ES-201

ES-202

ES-203

ES-204

ES-205

ES-206

ES-207

ES-208

ES-209

ES-210

ES-211

ES-212

ES-213

ES-214

ES-215

ES-216

ES-217

ES-218

ES-219

ES-220

ES-221

ES-222

ES-223

ES-224

ES-225

ES-226

ES-227

ES-228

ES-229

ES-230

ES-231

ES-232

ES-233

ES-234

ES-235

ES-236

ES-237

ES-238

ES-239

ES-240

ES-241

E-301

E-302

E-303

E-304

E-305

E-306

E-307

E-308

E-309

ES-401

ES-402

ES-403

ES-404

ES-405

ES-406

ES-407

ES-408

ES-409

E-501

E-502

E-503

E-504

E-505

E-506

E-507

E-601

E-602

E-603

E-604

E-605

E-606

E-607

E-608

E-609

E-701

E-702

C-100

C-101

C-102

DWG #

19637

19638

19639

19640

19641

19642

19643

19644

19645

19646

19647

19648

19649

19650

19651

19652

19653

19654

19655

19656

19657

19658

19659

19660

19661

19662

19663

19664

19665

19666

19667

19668

19669

19670

19671

19672

19673

19674

19675

19676

19677

19678

19679

19680

19681

19682

19683

19684

19685

19686

19687

19688

19689

19690

19691

19692

19693

19694

19695

19696

19697

19698

19699

19700

19701

19702

19703

19704

19705

19706

19707

19708

19709

19710

19711

19712

19713

19714

19715

19716

19717

19718

19719

19720

19721

19722

19723

19724

19725

19726

19727

19728

19729

19730

19731

19732

19733

19734

19735

19736

19737

19738

19739

19740

19741

19742

19743

19744

19745

19746

19747

19748

19749

19750

19751

19752

19753

19754

19755

19756

19757

19758

19759

19760

19761

SHEET TITLE

COVER SHEET

SYMBOLS AND ABBREVIATIONS

GENERAL NOTES, SAFETY NOTES & CONTACTS

SITE KEY MAP

ELECTRICAL SITE PLAN - DEMOLITION - AREA A3

ELECTRICAL SITE PLAN - DEMOLITION - AREA A4

ELECTRICAL SITE PLAN - DEMOLITION - AREA A5

ELECTRICAL SITE PLAN - DEMOLITION - AREA B3

ELECTRICAL SITE PLAN - DEMOLITION - AREA B4

ELECTRICAL SITE PLAN - DEMOLITION - AREA B5

ELECTRICAL SITE PLAN - DEMOLITION - AREA B6

ELECTRICAL SITE PLAN - DEMOLITION - AREA C3

ELECTRICAL SITE PLAN - DEMOLITION - AREA C4

NOT USED

ELECTRICAL SITE PLAN - DEMOLITION - AREA C6

ELECTRICAL SITE PLAN - DEMOLITION - AREA D3

ELECTRICAL SITE PLAN - DEMOLITION - AREA D6

ELECTRICAL SITE PLAN - DEMOLITION - AREA D7

ELECTRICAL SITE PLAN - DEMOLITION - AREA D8

ELECTRICAL SITE PLAN - DEMOLITION - AREA E2

ELECTRICAL SITE PLAN - DEMOLITION - AREA E3

ELECTRICAL SITE PLAN - DEMOLITION - AREA E4

ELECTRICAL SITE PLAN - DEMOLITION - AREA E5

ELECTRICAL SITE PLAN - DEMOLITION - AREA E6

ELECTRICAL SITE PLAN - DEMOLITION - AREA E7

ELECTRICAL SITE PLAN - DEMOLITION - AREA F2

ELECTRICAL SITE PLAN - DEMOLITION - AREA F3

ELECTRICAL SITE PLAN - DEMOLITION - AREA F4

ELECTRICAL SITE PLAN - DEMOLITION - AREA F5

ELECTRICAL SITE PLAN - DEMOLITION - AREA F6

ELECTRICAL SITE PLAN - DEMOLITION - AREA G3

ELECTRICAL SITE PLAN - DEMOLITION - AREA G4

ELECTRICAL SITE PLAN - DEMOLITION - AREA G5

ELECTRICAL SITE PLAN - DEMOLITION - AREA H3

ELECTRICAL SITE PLAN - DEMOLITION - AREA H4

ELECTRICAL SITE PLAN - DEMOLITION - AREA H5

ELECTRICAL SITE PLAN - DEMOLITION - AREA I4

ELECTRICAL SITE PLAN - DEMOLITION - AREA J3

ELECTRICAL SITE PLAN - DEMOLITION - AREA J4

ELECTRICAL SITE PLAN - DEMOLITION - AREA J5

ELECTRICAL SITE PLAN - DEMOLITION - AREA K4

ELECTRICAL SITE PLAN - DEMOLITION - AREA L4

ELECTRICAL SITE PLAN - DEMOLITION - AREA L5

ELECTRICAL SITE PLAN - DEMOLITION - AREA M3

ELECTRICAL SITE PLAN - DEMOLITION - AREA M4

ELECTRICAL SITE PLAN - NEW WORK - AREA A3

ELECTRICAL SITE PLAN - NEW WORK - AREA A4

ELECTRICAL SITE PLAN - NEW WORK - AREA A5

ELECTRICAL SITE PLAN - NEW WORK - AREA B3

ELECTRICAL SITE PLAN - NEW WORK - AREA B4

ELECTRICAL SITE PLAN - NEW WORK - AREA B5

ELECTRICAL SITE PLAN - NEW WORK - AREA B6

ELECTRICAL SITE PLAN - NEW WORK - AREA C3

ELECTRICAL SITE PLAN - NEW WORK - AREA C4

ELECTRICAL SITE PLAN - NEW WORK - AREA C5

ELECTRICAL SITE PLAN - NEW WORK - AREA C6

ELECTRICAL SITE PLAN - NEW WORK - AREA D3

ELECTRICAL SITE PLAN - NEW WORK - AREA D6

ELECTRICAL SITE PLAN - NEW WORK - AREA D7

ELECTRICAL SITE PLAN - NEW WORK - AREA D8

ELECTRICAL SITE PLAN - NEW WORK - AREA E2

ELECTRICAL SITE PLAN - NEW WORK - AREA E3

ELECTRICAL SITE PLAN - NEW WORK - AREA E4

ELECTRICAL SITE PLAN - NEW WORK - AREA E5

ELECTRICAL SITE PLAN - NEW WORK - AREA E6

ELECTRICAL SITE PLAN - NEW WORK - AREA E7

ELECTRICAL SITE PLAN - NEW WORK - AREA F2

ELECTRICAL SITE PLAN - NEW WORK - AREA F3

ELECTRICAL SITE PLAN - NEW WORK - AREA F4

ELECTRICAL SITE PLAN - NEW WORK - AREA F5

ELECTRICAL SITE PLAN - NEW WORK - AREA F6

ELECTRICAL SITE PLAN - NEW WORK - AREA G3

ELECTRICAL SITE PLAN - NEW WORK - AREA G4

ELECTRICAL SITE PLAN - NEW WORK - AREA G5

ELECTRICAL SITE PLAN - NEW WORK - AREA H3

ELECTRICAL SITE PLAN - NEW WORK - AREA H4

ELECTRICAL SITE PLAN - NEW WORK - AREA H5

ELECTRICAL SITE PLAN - NEW WORK - AREA I4

ELECTRICAL SITE PLAN - NEW WORK - AREA J3

ELECTRICAL SITE PLAN - NEW WORK - AREA J4

ELECTRICAL SITE PLAN - NEW WORK - AREA J5

ELECTRICAL SITE PLAN - NEW WORK - AREA K4

ELECTRICAL SITE PLAN - NEW WORK - AREA L4

ELECTRICAL SITE PLAN - NEW WORK - AREA L5

ELECTRICAL SITE PLAN - NEW WORK - AREA M3

ELECTRICAL SITE PLAN - NEW WORK - AREA M4

FLOOR PLANS AND DIAGRAMS - ELECTRICAL - BUILDING A-41

FLOOR PLANS AND DIAGRAMS - ELECTRICAL - BUILDING C-94

FLOOR PLANS AND DIAGRAMS - ELECTRICAL - BUILDING E-104

FLOOR PLANS AND DIAGRAMS - ELECTRICAL - BUILDING E-105

FLOOR PLANS AND DIAGRAMS - ELECTRICAL - BUILDING E-106

FLOOR PLANS AND DIAGRAMS - ELECTRICAL - BUILDING E-107

FLOOR PLANS AND DIAGRAMS - ELECTRICAL - BUILDING F-010

FLOOR PLANS AND DIAGRAMS - ELECTRICAL - BUILDING N-169

FLOOR PLANS AND DIAGRAMS - ELECTRICAL - BUILDING N-175

PARTIAL ELECTRICAL SITE PLAN - NEW WORK - AREA C3

PARTIAL ELECTRICAL SITE PLAN - NEW WORK - AREA E5

PARTIAL ELECTRICAL SITE PLAN - NEW WORK - AREA E6

PARTIAL ELECTRICAL SITE PLAN - NEW WORK - AREA F3

PARTIAL ELECTRICAL SITE PLAN - NEW WORK - AREA F5

PARTIAL ELECTRICAL SITE PLAN - NEW WORK - AREA H4

PARTIAL ELECTRICAL SITE PLAN - NEW WORK - AREA J4

PARTIAL ELECTRICAL SITE PLAN - NEW WORK - AREA K4

PARTIAL ELECTRICAL SITE PLAN - NEW WORK - AREA L4

SINGLE LINE DIAGRAM - ELECTRICAL - DEMOLITION

SINGLE LINE DIAGRAM - ELECTRICAL - DEMOLITION

SINGLE LINE DIAGRAM - ELECTRICAL - NEW WORK

SINGLE LINE DIAGRAM - ELECTRICAL - NEW WORK

SINGLE LINE DIAGRAM - ELECTRICAL - NEW WORK

MANHOLE SCHEMATIC - ELECTRICAL - NEW WORK

MANHOLE SCHEMATIC - ELECTRICAL - NEW WORK

DETAILS - ELECTRICAL

DETAILS - ELECTRICAL

DETAILS - ELECTRICAL

DETAILS - ELECTRICAL

DETAILS - ELECTRICAL

DETAILS - ELECTRICAL

DETAILS - ELECTRICAL

DETAILS - ELECTRICAL

DETAILS - ELECTRICAL

SCHEDULES - ELECTRICAL

SCHEDULES - ELECTRICAL

EROSION SEDIMENTATION CONTROL DETAILS AND NOTES

EROSION SEDIMENTATION CONTROL DETAILS AND NOTES

EROSION SEDIMENTATION CONTROL DETAILS AND NOTES

SHEET NO.

NOT USED

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

OF

H.F. LENZ

COMPANY

Engineering

1407 Scalp Avenue Phone: 814.269.9300 Johnstown, PA 15904 www.hflenz.com

Headquarters:

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

VA PRIMARY HWY RT 175

AutoCAD SHX Text

LAUNCH FAC.

AutoCAD SHX Text

AND STORAGE

AutoCAD SHX Text

MAIN GATE

AutoCAD SHX Text F-10

AutoCAD SHX Text

VA PRIMARY HWY RT 175

AutoCAD SHX Text

AREA

AutoCAD SHX Text

ROCKET INSPECTION

AutoCAD SHX Text

VIS. CENTER

AutoCAD SHX Text

TO

AutoCAD SHX Text

ISLAND &

AutoCAD SHX Text

MAINLAND

AutoCAD SHX Text

RUNWAY 04-22

AutoCAD SHX Text

RUNWAY 10-28

AutoCAD SHX Text

HARPOLL STREET

AutoCAD SHX Text

JENSEN STREET

AutoCAD SHX Text

O'REILLY STREET

AutoCAD SHX Text

STUBBS BOULEVARD

AutoCAD SHX Text

RUNWAY 10-28

AutoCAD SHX Text

RUNWAY 10-28

AutoCAD SHX Text

BOND STREET

AutoCAD SHX Text

BLISS STREET

AutoCAD SHX Text

RUNWAY 10-28

AutoCAD SHX Text

RUNWAY 10-28

AutoCAD SHX Text

BOND STREET

AutoCAD SHX Text

WORMHOUDT ROAD

AutoCAD SHX Text

N-161 ROAD

AutoCAD SHX Text

N-162 ROAD

AutoCAD SHX Text

REHOR ROAD

AutoCAD SHX Text

MUNSON CIRCLE

AutoCAD SHX Text

MILL DAM ROAD

AutoCAD SHX Text

REHOR ROAD

AutoCAD SHX Text

REHOR ROAD

AutoCAD SHX Text

REHOR ROAD

AutoCAD SHX Text

REHOR ROAD

AutoCAD SHX Text

REHOR ROAD

AutoCAD SHX Text

REHOR ROAD

AutoCAD SHX Text

REHOR ROAD

AutoCAD SHX Text

REHOR ROAD

AutoCAD SHX Text

REHOR ROAD

AutoCAD SHX Text

REHOR ROAD

AutoCAD SHX Text

REHOR ROAD

AutoCAD SHX Text

REHOR ROAD

AutoCAD SHX Text

REHOR ROAD

AutoCAD SHX Text

REHOR ROAD

AutoCAD SHX Text

REEDER ROAD

AutoCAD SHX Text

REEDER ROAD

AutoCAD SHX Text

REEDER ROAD

AutoCAD SHX Text

KNEELAND ROAD

AutoCAD SHX Text

REEDER ROAD

AutoCAD SHX Text

BLOUGH ROAD

AutoCAD SHX Text

BLOUGH ROAD

AutoCAD SHX Text

WORMHOUDT ROAD

AutoCAD SHX Text

WORMHOUDT STREET

AutoCAD SHX Text

WORMHOUDT STREET

AutoCAD SHX Text

WORMHOUDT STREET

AutoCAD SHX Text

BOND STREET

AutoCAD SHX Text

BOND STREET

AutoCAD SHX Text

BLISS STREET

AutoCAD SHX Text

BLISS STREET

AutoCAD SHX Text

BLISS STREET

AutoCAD SHX Text

KLINE STREET

AutoCAD SHX Text

AVERY STREET

AutoCAD SHX Text

AVERY STREET

AutoCAD SHX Text

AVERY STREET

AutoCAD SHX Text

STUBBS BOULEVARD

AutoCAD SHX Text

STUBBS BOULEVARD

AutoCAD SHX Text

STUBBS BOULEVARD

AutoCAD SHX Text

STUBBS BOULEVARD

AutoCAD SHX Text

STUBBS BOULEVARD

AutoCAD SHX Text

STUBBS BOULEVARD

AutoCAD SHX Text

STUBBS BOULEVARD

AutoCAD SHX Text

STUBBS BOULEVARD

AutoCAD SHX Text

ANDERSON STREET

AutoCAD SHX Text

ANDERSON STREET

AutoCAD SHX Text

ANDERSON STREET

AutoCAD SHX Text

ANDERSON STREET

AutoCAD SHX Text

O'REILLY STREET

AutoCAD SHX Text

O'REILLY STREET

AutoCAD SHX Text

RICKETTE STREET

AutoCAD SHX Text

RICKETTE STREET

AutoCAD SHX Text

PIERCE STREET

AutoCAD SHX Text

ODUM COURT

AutoCAD SHX Text

ODUM COURT

AutoCAD SHX Text

ODUM COURT

AutoCAD SHX Text

ODUM COURT

AutoCAD SHX Text

ODUM COURT

AutoCAD SHX Text

ODUM COURT

AutoCAD SHX Text

MILL DAM ROAD

AutoCAD SHX Text

MILL DAM ROAD

AutoCAD SHX Text

MILL DAM ROAD

AutoCAD SHX Text

ATLANTIC ROAD

AutoCAD SHX Text

FULTON STREET

AutoCAD SHX Text

FULTON STREET

AutoCAD SHX Text

FULTON STREET

AutoCAD SHX Text

FULTON STREET

AutoCAD SHX Text

FULTON STREET

AutoCAD SHX Text

FULTON STREET

AutoCAD SHX Text

CHINCOTEAGUE ROAD

AutoCAD SHX Text

CHINCOTEAGUE ROAD

AutoCAD SHX Text

CHINCOTEAGUE ROAD

AutoCAD SHX Text

CHINCOTEAGUE ROAD

AutoCAD SHX Text

CHINCOTEAGUE ROAD

AutoCAD SHX Text

CHINCOTEAGUE ROAD

AutoCAD SHX Text

CHINCOTEAGUE ROAD

AutoCAD SHX Text

CHINCOTEAGUE ROAD

AutoCAD SHX Text

CHINCOTEAGUE ROAD

AutoCAD SHX Text

CHINCOTEAGUE ROAD

AutoCAD SHX Text

CHINCOTEAGUE ROAD

AutoCAD SHX Text

CHINCOTEAGUE ROAD

AutoCAD SHX Text

CHINCOTEAGUE ROAD

AutoCAD SHX Text

CHINCOTEAGUE ROAD

AutoCAD SHX Text

CHINCOTEAGUE ROAD

AutoCAD SHX Text

CHINCOTEAGUE ROAD

AutoCAD SHX Text

CHINCOTEAGUE ROAD

AutoCAD SHX Text

CHINCOTEAGUE ROAD

AutoCAD SHX Text

CHINCOTEAGUE ROAD

AutoCAD SHX Text

CHINCOTEAGUE ROAD

AutoCAD SHX Text

CHINCOTEAGUE ROAD

AutoCAD SHX Text

CHINCOTEAGUE ROAD

AutoCAD SHX Text

CHINCOTEAGUE ROAD

AutoCAD SHX Text

CHINCOTEAGUE ROAD

AutoCAD SHX Text

CHINCOTEAGUE ROAD

AutoCAD SHX Text

CHINCOTEAGUE ROAD

AutoCAD SHX Text

CHINCOTEAGUE ROAD

AutoCAD SHX Text

CHINCOTEAGUE ROAD

AutoCAD SHX Text

CHINCOTEAGUE ROAD

AutoCAD SHX Text

ATLANTIC ROAD

AutoCAD SHX Text

ATLANTIC ROAD

AutoCAD SHX Text

ATLANTIC ROAD

AutoCAD SHX Text

ATLANTIC ROAD

AutoCAD SHX Text

ATLANTIC ROAD

AutoCAD SHX Text

ATLANTIC ROAD

AutoCAD SHX Text

ATLANTIC ROAD

AutoCAD SHX Text

ATLANTIC ROAD

AutoCAD SHX Text

BLADES CIRCLE

AutoCAD SHX Text

BLADES CIRCLE

AutoCAD SHX Text

BLADES CIRCLE

AutoCAD SHX Text

BLADES CIRCLE

AutoCAD SHX Text

REHOR ROAD

AutoCAD SHX Text

REHOR ROAD

AutoCAD SHX Text

ENTERPRISE STREET

AutoCAD SHX Text

KEARSAGE CIRCLE

AutoCAD SHX Text

YORK TOWN DRIVE

AutoCAD SHX Text

YORK TOWN DRIVE

AutoCAD SHX Text

KEARSAGE CIRCLE

AutoCAD SHX Text

KEARSAGE CIRCLE

AutoCAD SHX Text

KEARSAGE CIRCLE

AutoCAD SHX Text

ENTERPRISE STREET

AutoCAD SHX Text F-11

AutoCAD SHX Text Q-29

AutoCAD SHX Text Q-30

AutoCAD SHX Text R-20

AutoCAD SHX Text R-10

AutoCAD SHX Text G-44

AutoCAD SHX Text F-9

AutoCAD SHX Text E-105

AutoCAD SHX Text E-5

AutoCAD SHX Text N-181

AutoCAD SHX Text N-167

AutoCAD SHX Text N-177

AutoCAD SHX Text N-169C

AutoCAD SHX Text N-169

AutoCAD SHX Text

TRAILER

AutoCAD SHX Text R-22

AutoCAD SHX Text R-25

AutoCAD SHX Text N-222

AutoCAD SHX Text N-174A

AutoCAD SHX Text N-174B

AutoCAD SHX Text N-180

AutoCAD SHX Text N-162

AutoCAD SHX Text N-128

AutoCAD SHX Text N-127

AutoCAD SHX Text F-10

AutoCAD SHX Text F10A

AutoCAD SHX Text F10B

AutoCAD SHX Text F-157

AutoCAD SHX Text F-19

AutoCAD SHX Text N-134

AutoCAD SHX Text F-167

AutoCAD SHX Text N-133

AutoCAD SHX Text F-14

AutoCAD SHX Text F-7

AutoCAD SHX Text N-159

AutoCAD SHX Text N-161

AutoCAD SHX Text N-179

AutoCAD SHX Text N-175

AutoCAD SHX Text N-166

AutoCAD SHX Text N-157

AutoCAD SHX Text N-163

AutoCAD SHX Text 812N

AutoCAD SHX Text F-161

AutoCAD SHX Text F-160

AutoCAD SHX Text F-162

AutoCAD SHX Text F-164

AutoCAD SHX Text F-163

AutoCAD SHX Text F-6

AutoCAD SHX Text F-1

AutoCAD SHX Text F-2

AutoCAD SHX Text F-5

AutoCAD SHX Text F-4

AutoCAD SHX Text F-3

AutoCAD SHX Text F-36

AutoCAD SHX Text E-144

AutoCAD SHX Text E-135

AutoCAD SHX Text E-134

AutoCAD SHX Text D-10

AutoCAD SHX Text E-6

AutoCAD SHX Text E-107

AutoCAD SHX Text E-106

AutoCAD SHX Text E-108

AutoCAD SHX Text E-2

AutoCAD SHX Text E-132

AutoCAD SHX Text N-116

AutoCAD SHX Text N-117

AutoCAD SHX Text E-7

AutoCAD SHX Text E-4

AutoCAD SHX Text E-104

AutoCAD SHX Text B-30

AutoCAD SHX Text E-8

AutoCAD SHX Text H-30

AutoCAD SHX Text F-23

AutoCAD SHX Text F-26

AutoCAD SHX Text F-25

AutoCAD SHX Text F-24

AutoCAD SHX Text F-21

AutoCAD SHX Text F-16

AutoCAD SHX Text F-170

AutoCAD SHX Text F-44

AutoCAD SHX Text F-17

AutoCAD SHX Text M-1

AutoCAD SHX Text M-21

AutoCAD SHX Text M-18

AutoCAD SHX Text M-20

AutoCAD SHX Text M-184

AutoCAD SHX Text D-35

AutoCAD SHX Text D-4

AutoCAD SHX Text D-137

AutoCAD SHX Text D-4A

AutoCAD SHX Text D-49

AutoCAD SHX Text D-2

AutoCAD SHX Text D-102

AutoCAD SHX Text D-39

AutoCAD SHX Text D-1

AutoCAD SHX Text D-101

AutoCAD SHX Text D-8

AutoCAD SHX Text M-22

AutoCAD SHX Text M-22A

AutoCAD SHX Text M-15

AutoCAD SHX Text M-183

AutoCAD SHX Text M-25

AutoCAD SHX Text N-180

AutoCAD SHX Text M-17

AutoCAD SHX Text M-19

AutoCAD SHX Text C-15

AutoCAD SHX Text C-94

AutoCAD SHX Text A-40

AutoCAD SHX Text A-38

AutoCAD SHX Text B-129

AutoCAD SHX Text B-31

AutoCAD SHX Text A-3

AutoCAD SHX Text A-1

AutoCAD SHX Text A-27

AutoCAD SHX Text A-41

AutoCAD SHX Text A-41A

AutoCAD SHX Text A-131

AutoCAD SHX Text J-17

AutoCAD SHX Text J-219

AutoCAD SHX Text D-50

AutoCAD SHX Text M-11

AutoCAD SHX Text M-14

AutoCAD SHX Text M-16

AutoCAD SHX Text M-9

AutoCAD SHX Text M-10

AutoCAD SHX Text M-12

AutoCAD SHX Text M-183

AutoCAD SHX Text D-12

AutoCAD SHX Text F-20

AutoCAD SHX Text M-8

AutoCAD SHX Text B-29

AutoCAD SHX Text F-22

AutoCAD SHX Text D-36

AutoCAD SHX Text D-95

AutoCAD SHX Text N-174

AutoCAD SHX Text J-20

AutoCAD SHX Text J-93

AutoCAD SHX Text D-53

AutoCAD SHX Text N-165

AutoCAD SHX Text F-13

AutoCAD SHX Text F-12

AutoCAD SHX Text

PICNIC CANOPY

AutoCAD SHX Text N-172

AutoCAD SHX Text Q-39

AutoCAD SHX Text Q-41

AutoCAD SHX Text Q-36

AutoCAD SHX Text Q-38

AutoCAD SHX Text Q-35

AutoCAD SHX Text Q-37

AutoCAD SHX Text Q-31

AutoCAD SHX Text Q-33

AutoCAD SHX Text Q-34

AutoCAD SHX Text Q-32

AutoCAD SHX Text Q-42

AutoCAD SHX Text Q-40

AutoCAD SHX Text Q-44

AutoCAD SHX Text Q-46

AutoCAD SHX Text Q-51

AutoCAD SHX Text Q-53

AutoCAD SHX Text Q-47

AutoCAD SHX Text Q-43

AutoCAD SHX Text Q-45

AutoCAD SHX Text Q-49

AutoCAD SHX Text E-109

AutoCAD SHX Text E-100

AutoCAD SHX Text H-100

AutoCAD SHX Text A-46

AutoCAD SHX Text D-051

AutoCAD SHX Text D-052

AutoCAD SHX Text D-054

AutoCAD SHX Text D-98A

AutoCAD SHX Text D-98

AutoCAD SHX Text D-12D

AutoCAD SHX Text D-97

AutoCAD SHX Text D-97

AutoCAD SHX Text D-12B

AutoCAD SHX Text D-12A

AutoCAD SHX Text D-12F

AutoCAD SHX Text D-12E

AutoCAD SHX Text D-99

AutoCAD SHX Text D-100

AutoCAD SHX Text D-12G

AutoCAD SHX Text D-96

AutoCAD SHX Text D-12J

AutoCAD SHX Text M-24

AutoCAD SHX Text D-23

AutoCAD SHX Text F-224

AutoCAD SHX Text F-15

AutoCAD SHX Text E-10

AutoCAD SHX Text R-1

AutoCAD SHX Text R-2

AutoCAD SHX Text G-45

AutoCAD SHX Text G-46

AutoCAD SHX Text G-47

AutoCAD SHX Text G-48

AutoCAD SHX Text G-37

AutoCAD SHX Text G-38

AutoCAD SHX Text G-24

AutoCAD SHX Text G-25

AutoCAD SHX Text G-26

AutoCAD SHX Text G-20

AutoCAD SHX Text G-19

AutoCAD SHX Text

NOAA

AutoCAD SHX Text

NOAA

AutoCAD SHX Text

NOAA

AutoCAD SHX Text

NOAA

AutoCAD SHX Text

NOAA

AutoCAD SHX Text

NOAA

AutoCAD SHX Text

NOAA

AutoCAD SHX Text

NOAA

AutoCAD SHX Text

NOAA

AutoCAD SHX Text

NOAA

AutoCAD SHX Text

NOAA

AutoCAD SHX Text

NOAA

AutoCAD SHX Text

NOAA

AutoCAD SHX Text

NOAA

AutoCAD SHX Text

NOAA

AutoCAD SHX Text

NOAA GUARDSHACK

AutoCAD SHX Text E-106B

AutoCAD SHX Text N-159F

AutoCAD SHX Text N-175B

AutoCAD SHX Text N-175A

AutoCAD SHX Text N-223

AutoCAD SHX Text F-33

AutoCAD SHX Text G-36

AutoCAD SHX Text G-35

AutoCAD SHX Text N-125

AutoCAD SHX Text N-132

AutoCAD SHX Text G-18

AutoCAD SHX Text G-17

AutoCAD SHX Text G-16

AutoCAD SHX Text G-29

AutoCAD SHX Text G-28

AutoCAD SHX Text G-1

AutoCAD SHX Text G-34

AutoCAD SHX Text G-33

AutoCAD SHX Text G-30

AutoCAD SHX Text G-31

AutoCAD SHX Text G-15

AutoCAD SHX Text G-14

AutoCAD SHX Text G-13

AutoCAD SHX Text G-8

AutoCAD SHX Text Q-2

AutoCAD SHX Text Q-1

AutoCAD SHX Text Q-21

AutoCAD SHX Text Q-20

AutoCAD SHX Text Q-19

AutoCAD SHX Text Q-18

AutoCAD SHX Text Q-17

AutoCAD SHX Text Q-16

AutoCAD SHX Text Q-15

AutoCAD SHX Text Q-14

AutoCAD SHX Text Q-13

AutoCAD SHX Text Q-12

AutoCAD SHX Text Q-11

AutoCAD SHX Text Q-10

AutoCAD SHX Text Q-9

AutoCAD SHX Text Q-8

AutoCAD SHX Text Q-7

AutoCAD SHX Text Q-6

AutoCAD SHX Text Q-5

AutoCAD SHX Text Q-4

AutoCAD SHX Text Q-3

AutoCAD SHX Text Q-28

AutoCAD SHX Text Q-27

AutoCAD SHX Text Q-26

AutoCAD SHX Text Q-25

AutoCAD SHX Text Q-24

AutoCAD SHX Text Q-23

AutoCAD SHX Text Q-22

AutoCAD SHX Text N-162B

AutoCAD SHX Text N-173

AutoCAD SHX Text N-162A

AutoCAD SHX Text N-164

AutoCAD SHX Text N-169A

AutoCAD SHX Text Q-302

AutoCAD SHX Text Q-304

AutoCAD SHX Text Q-303

AutoCAD SHX Text Q-301

AutoCAD SHX Text Q-305

AutoCAD SHX Text Q-307

AutoCAD SHX Text Q-309

AutoCAD SHX Text Q-311

AutoCAD SHX Text Q-313

AutoCAD SHX Text Q-315

AutoCAD SHX Text Q-317

AutoCAD SHX Text Q-319

AutoCAD SHX Text Q-321

AutoCAD SHX Text Q-323

AutoCAD SHX Text Q-325

AutoCAD SHX Text Q-327

AutoCAD SHX Text Q-329

AutoCAD SHX Text Q-331

AutoCAD SHX Text Q-333

AutoCAD SHX Text Q-335

AutoCAD SHX Text Q-335

AutoCAD SHX Text Q-337

AutoCAD SHX Text Q-318

AutoCAD SHX Text Q-314

AutoCAD SHX Text

Q-CG

AutoCAD SHX Text Q-312

AutoCAD SHX Text Q-310

AutoCAD SHX Text Q-308

AutoCAD SHX Text Q-306

AutoCAD SHX Text N-182

AutoCAD SHX Text N-160

AutoCAD SHX Text N-158A

AutoCAD SHX Text N-158B

AutoCAD SHX Text

WORK SITE

AutoCAD SHX Text

AutoCAD SHX Text

WASHINGTON

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

DOVER

AutoCAD SHX Text

MD.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SALISBURY

AutoCAD SHX Text

DEL.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

VA.

AutoCAD SHX Text

AutoCAD SHX Text

CAMBRIDGE

AutoCAD SHX Text

MD.

AutoCAD SHX Text

ANNAPOLIS

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FREDERICKSBURG

AutoCAD SHX Text

AutoCAD SHX Text

EASTERN SHORE

AutoCAD SHX Text

VIRGINIA'S

AutoCAD SHX Text

ATLANTIC OCEAN

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

HAMPTON

AutoCAD SHX Text

NORFOLK

AutoCAD SHX Text

NEWPORT

AutoCAD SHX Text

NEWS

AutoCAD SHX Text

VIRGINIA

AutoCAD SHX Text

BEACH

AutoCAD SHX Text

CHESAPEAKE BAY

AutoCAD SHX Text

AutoCAD SHX Text

RICHMOND

AutoCAD SHX Text

PETERSBURG

AutoCAD SHX Text

FLIGHT FACILITY-

AutoCAD SHX Text

NASA-WALLOPS

AutoCAD SHX Text

MAINBASE

AutoCAD SHX Text

FLIGHT FACILITY-

AutoCAD SHX Text

NASA-WALLOPS

AutoCAD SHX Text

ISLAND

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

VICINITY MAP

AutoCAD SHX Text

LOCATION MAP

AutoCAD SHX Text

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION

AutoCAD SHX Text

WALLOPS ISLAND, VIRGINIA

AutoCAD SHX Text

GODDARD SPACE FLIGHT CENTER

AutoCAD SHX Text

WALLOPS FLIGHT FACILITY

AutoCAD SHX Text

RESTORATION OF MAIN BASE ELECTRICAL INFRASTRUCTURE

AutoCAD SHX Text

DRAWING INDEX

AutoCAD SHX Text

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION

AutoCAD SHX Text

GODDARD SPACE FLIGHT CENTER

AutoCAD SHX Text

WALLOPS FLIGHT FACILITY

AutoCAD SHX Text

WALLOPS ISLAND, VIRGINIA 23337

AutoCAD SHX Text

ENGINEERING GROUP LEADER

AutoCAD SHX Text

ENGINEERING APPROVAL

AutoCAD SHX Text

BRANCH HEAD

AutoCAD SHX Text

BRANCH APPROVAL

AutoCAD SHX Text

PROJECT MANAGER

AutoCAD SHX Text

NASA SAFETY

AutoCAD SHX Text

FIRE PROTECTION

AutoCAD SHX Text

PROJECT ENGINEER

AutoCAD SHX Text

SUBMITTED BY

AutoCAD SHX Text

DATE :

AutoCAD SHX Text

DATE :

AutoCAD SHX Text

REVISED:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE

AutoCAD SHX Text

LET.

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text

CK.

AutoCAD SHX Text

AP.

AutoCAD SHX Text

FILE NAME:

AutoCAD SHX Text

GRAPHIC SCALE

AutoCAD SHX Text

PROJECT NUMBER:

AutoCAD SHX Text

DR.

AutoCAD SHX Text

CK.

AutoCAD SHX Text

SCALE

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

AUTOCAD - RELEASE 2018

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

DATE :

AutoCAD SHX Text

DATE :

AutoCAD SHX Text

DATE :

AutoCAD SHX Text

DATE :

AutoCAD SHX Text

DATE :

AutoCAD SHX Text O & M

AutoCAD SHX Text

CONSTRUCTION MANAGEMENT

AutoCAD SHX Text

DATE :

AutoCAD SHX Text 7/31/20

AutoCAD SHX Text

RESTORATION OF MAIN BASE

AutoCAD SHX Text

ELECTRICAL INFRASTRUCTURE

AutoCAD SHX Text

80GRC019D004

AutoCAD SHX Text

AutoCAD SHX Text

CONSTRUCTION DOCUMENTS

AutoCAD SHX Text

THOMAS F. DETER

AutoCAD SHX Text 7/31/20

AutoCAD SHX Text

BRIAN D. SCHMIDT

AutoCAD SHX Text 7/31/20

AutoCAD SHX Text

CS-001

AutoCAD SHX Text

COVER SHEET

AutoCAD SHX Text 19637

AutoCAD SHX Text

BDS

AutoCAD SHX Text

TFD

AutoCAD SHX Text

AutoCAD SHX Text

NTS

AutoCAD SHX Text

190460-EECS-001.DWG

AutoCAD SHX Text

NOT TO SCALE

AMP TRIP OR AMP TAP

AMERICAN WIRE GAGE

BELOW FINISHED GRADE

CIRCUIT BREAKER

AUXILIARY

CENTERLINE

CURRENT LIMITING FUSE

CURRENT LIMITING

CEILING EXHAUST FAN

CLOSED CIRCUIT TV

COMMUNICATION SYSTEM

DIAMETER

CABINET UNIT HEATER

CONTROL SWITCH

CURRENT TRANSFORMER

DIRECT CURRENT

DIRECT BURIAL / DECIBEL

BOLTED PRESSURE SWITCH

AUTOMATIC TEMPERATURE CONTROL

AUTOMATIC TRANSFER SWITCH

AMP SWITCH OR AMMETER SWITCH

COMPUTER CONTROLLED BUSINESS

CABINET

CU

DB

CUH

DIA

DC

DEMO DISCONNECT AND REMOVE ELECTRICAL EQUIPMENT

COPPER

CKT

CL

CLF

CS

CLG

CT

CEILING

C

CIRCUIT

C

CB

CAB

BPS

CBX

CEF

CCTV

CONDUIT

AS

AT

ATC

AUX

BFG

AWG

ATS

AT

ABOVE FINISHED FLOOR

AMP FRAME, AMP FUSE

AIR HANDLING UNIT

ABOVE FINISHED GRADE

ALTERNATING CURRENT

APPROXIMATELY

ALTERNATE

AMPLITUDE MODULATION

ABOVE COUNTER

AMERICANS W/DISABILITIES ACT

AUTOMATIC GAIN CONTROL

AFF

AFG

AHU

AGC

AM

ALT

APPROX

A

AC

AF

ADA

AB

AMPERE

L

OVERCURRENT PROTECTIVE DEVICE

MOTOR OPERATED DAMPER

MAIN DISTRIBUTION PANEL

MANHOLE OR METAL HALIDE

MAIN DISTRIBUTION SWITCHBOARD

THOUSAND CIRCULAR MILS

PRIVATE BRANCH EXCHANGE

NATIONAL ELECTRICAL CODE

OHD OVERHEAD DOOR

PILOT LIGHT

PANELBOARD

PRIMARY

POWER PANEL

PRI

PR PAIR

PNL

PP

PL

PLUMBING CONTRACTOR

POLE(S) OR PILOT

PULLBOX

OVERLOAD ELEMENT

POST INDICATOR VALVE

POWER FACTORPF

PIV

PBX

PC

P

PB

OL

OUTSIDE DIAMETER

NOT IN CONTRACT

OVERHEAD

ON CENTER

NORMALLY OPEN

NOT TO SCALE

OC

OD

OH

OCP

NTS

N.O.

NIC

MOUNTED

NORMAL EMERGENCY

NORMALLY CLOSED

NON FUSED

NEUTRAL

NON FUSED SWITCHNFS

NF

NEUT

NEC

N.C.

NE

MOD

MTD

MULTIOUTLET ASSEMBLY

MAIN LUGS ONLY

MISCELLANEOUS

MINIMUM

MICROPHONE

MINERAL INSULATED

MIN

MLO

MOA

MISC

MIC

MH

MI

MAIN CIRCUIT BREAKER

MOTOR CONTROL CENTERMCC

MDS

MDP

MCM

MCB

KILOVOLT AMPERES

KILOVOLT

KILOWATT

MAXIMUM

LOCAL AREA NETWORK

CLAD CABLE

KILOWATT HOURS

MECHANICAL CONTRACTOR / METALMC

MAX

KV

KVA

KW

KVAR

LAN

KWH

KILOVAR

EXHAUST FAN

EMERGENCY LIGHTING UNIT

ELECTRICAL CONTRACTOR

FAN COIL UNIT

EMERGENCY

EXISTING TO REMAIN

END OF LINE RESISTOR

GENERAL CONTRACTOR

FREQUENCY MODULATION

FUSIBLE SWITCH

GENERATOR

HORSEPOWER

HEATING CONTRACTOR

HIGH PRESSURE SODIUM

JUNCTION BOX

FOOD SERVICE EQUIPMENT CONTRACTOR

GROUND FAULT INTERRUPTER

FIRE EXTINGUISHER CABINET

ELECTRICAL METALLIC TUBING

EXISTING (EXIST)

FIRE ALARM / FEEDER AMPLIFIER

HIGH INTENSITY DISCHARGE

FREQUENCY IN CYCLES PER SECOND

THOUSAND CIRCULAR MILS

HID

HP

HPS

HZ

JB

KCMIL

FM

GEN

GC

FU

GRD

HC

GFI

GROUND

FUSE

ETR

FA

EX

FCU

FEC

FDR

FSC

FS

FEEDER

EC

EF

ELU

EA

EM

ELR

EMT

EACH

DRAWINGDWG

DN DOWN

UNLESS NOTED OTHERWISE

UNINTERRUPTIBLE POWER SUPPLY

W WIRE

TRANSFORMER

WEATHERPROOF

EXPLOSION PROOFXP

XFMR

WP

W/ WITH

ULTRA HIGH FREQUENCY

VERY HIGH FREQUENCYVHF

V VOLT

UPS

UHF

UNO

TEMPERATURE CONTROL PANEL

SINGLE POLE DOUBLE THROW

TELEPHONE TERMINAL CABINET

TEMPERATURE CONTROL VALVE

PVC POLYVINYL CHLORIDE

UNDERGROUND

TELEVISION

TEMPORARY

TYPICAL

TWISTED SHIELDED PAIR

TYP

UG

TSP

TV

TTC

TEMP

SWITCHBOARD

SWITCHGEAR

SWITCH

STARTER

TELEPHONE

SWGR

TCV

TEL

TCP

SW

SWBD

STR

SPECIFICATIONS

RIGHT OF WAY

ROOF TOP UNIT

SECONDARY

SPECS

STL

SPDT

STEEL

SHT

SEC

R/W

RTU

SHEET

POTENTIAL TRANSFORMER

REQUIRED

RECEPTACLE

REMOTE CONTROL

REVISION

REHEAT COIL

RECP

REV

RHC

REQ'D

R

RC

PT

RELAY

POWER ROOF VENTILATORPRV

TYPICAL ABBREVIATIONS

THIS SCHEDULE IS A STANDARD SCHEDULE. CERTAIN SYMBOLS & ABBREVIATIONS INDICATED ON THIS SCHEDULE MAY NOT

APPEAR ON THE DRAWINGS. EQUIPMENT SYMBOLS SHOWN DASHED ON THE DRAWINGS INDICATE EXISTING EQUIPMENT.

SYMBOLS AND ABBREVIATIONS SCHEDULE

FLR FLOOR

SINGLE LINE DIAGRAM SYMBOLSPOWER SYMBOL LEGEND

HOMERUN TO PANELBOARD - 3 #12-1/2"C UNO

TRANSFORMER - SIZE AND VOLTAGE AS NOTED

COMBINATION DISCONNECT SWITCH AND STARTER-RATING AS NOTED

FINAL CONNECTION BY EC TO EQUIPMENT

EXISTING WIRING

SWITCHED CIRCUIT

BRANCH CIRCUIT

SWITCH LEG

CABLE TRAY 4"x 12" UNO

INDICATES NOTES ELSEWHERE

BUSWAY

PHASE

Ø

T

CT

EX

1200N FEEDER SIZE (REFER TO RISER DIAGRAM SHEETS)

Y

TRANSFORMER

FUSED SWITCH

CIRCUIT BREAKER OR PROTECTED WAY RELAY

DEVICE W/ SWITCH

SWITCH OR SWITCHED WAY

DETAIL NUMBER

DRAWING NUMBER WHERE DRAWN

SECTION NUMBER

EX.X

X

EX.X

X

NEW CONNECTION TO EXISTING

DISCONNECT EXISTING EQUIPMENT

1=DETAIL DESIGNATION / E6.01 = DRAWING

NUMBER DETAIL IS SHOWN ON

1/E6.01

DRAWING NUMBER WHERE DRAWN

ELECTRICAL PANELBOARD - SURFACE MOUNTED

SITE WORK POWER SYMBOL LEGEND

EU

x

EUD

AEU

AUD

EDB

EUP

EPD EPD

EUS EUS

CROSSHATCHING INDICATES EQUIPMENT, CONDUIT/CONDUCTORS AND

ASSOCIATED DISCONNECTING MEANS TO BE RENDERED DEAD AND REMOVED

UNDER DEMOLITION WORK BACK TO THE SOURCE OR DESTINATION UNLESS

NOTED OR SHOWN OTHERWISE

EXISTING PRIMARY VOLTAGE UNDERGROUND ELECTRICAL FEEDER IN

DUCT BANK

EXISTING PRIMARY VOLTAGE DIRECT BURIED ELECTRICAL FEEDER

ABANDONED UNDERGROUND ELECTRICAL FEEDER IN DUCT BANK

ABANDONED PRIMARY VOLTAGE DIRECT BURIED ELECTRICAL FEEDER

PRIMARY VOLTAGE UNDERGROUND DIRECTIONAL BORED

UNDERGROUND ELECTRICAL FEEDER

PRIMARY VOLTAGE UNDERGROUND ELECTRICAL FEEDER IN EXISTING

DUCT BANK

PRIMARY VOLTAGE UNDERGROUND ELECTRICAL FEEDER IN DUCT BANK

SECONDARY VOLTAGE UNDERGROUND ELECTRICAL FEEDER IN DUCT

BANK

J

EXISTING ABOVE GROUND SECTIONALIZING JUNCTION CABINET

J

600A ABOVE GROUND SECTIONALIZING JUNCTION CABINET, UNO

EXISTING ELECTRICAL MANHOLE

EXISTING TRANSFORMER - RATING AS INDICATED

ELECTRICAL MANHOLE

TRANSFORMER - RATING AS INDICATED

DM

DIGITAL DEMAND METER WITH CURRENT TRANSFORMERS AND

POTENTIAL TRANSFORMERS. BASIS OF DESIGN VERIS MODEL

E50H2A W/ #AH04 FUSE KIT, #E683D502 CTS, AND #AE012 NEMA

4X ENCLOSURE, COORDINATE CT RATIO W/ SERVICE SIZE.

S

EXISTING AIR INSULATED PAD MOUNTED MV SWITCHGEAR

G

EXISTING GAS (SF6) INSULATED PAD MOUNTED MV SWITCHGEAR

GAS (SF6) INSULATED PAD MOUNTED MV SWITCHGEAR - RATING AS

INDICATED

G

SECTIONALIZINGSECT

ABOVE GROUND SECTIONALIZING JUNCTION CABINET RATED

600A UNO.

52 MEDIUM VOLTAGE DRAWOUT CIRCUIT BREAKER W/ RELAY

OR G

DIESEL FIRED GENERATOR SET - RATING AS INDICATED

IN ITS ENTIRETY. EXISTING FEEDERS TO REMAIN UNO.

M OR

OR

SPD

SURGE PROTECTION DEVICE, COORDINATE VOLTAGE WITH

SERVICE VOLTAGE, REFER TO SPECIFICATIONS FOR VOLTAGE

AND kA RATINGS.

X

EX.XX

SECTION NUMBER

DRAWING NUMBER WHERE DRAWN

H.F. LENZ

COMPANY

Engineering

1407 Scalp Avenue Phone: 814.269.9300

Johnstown, PA 15904 www.hflenz.com

Headquarters:

AutoCAD SHX Text

%%USECTION MARKS

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION

AutoCAD SHX Text

GODDARD SPACE FLIGHT CENTER

AutoCAD SHX Text

WALLOPS FLIGHT FACILITY

AutoCAD SHX Text

WALLOPS ISLAND, VIRGINIA 23337

AutoCAD SHX Text

ENGINEERING GROUP LEADER

AutoCAD SHX Text

ENGINEERING APPROVAL

AutoCAD SHX Text

BRANCH HEAD

AutoCAD SHX Text

BRANCH APPROVAL

AutoCAD SHX Text

PROJECT MANAGER

AutoCAD SHX Text

NASA SAFETY

AutoCAD SHX Text

FIRE PROTECTION

AutoCAD SHX Text

PROJECT ENGINEER

AutoCAD SHX Text

SUBMITTED BY

AutoCAD SHX Text

DATE :

AutoCAD SHX Text

DATE :

AutoCAD SHX Text

REVISED:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE

AutoCAD SHX Text

LET.

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text

CK.

AutoCAD SHX Text

AP.

AutoCAD SHX Text

FILE NAME:

AutoCAD SHX Text

GRAPHIC SCALE

AutoCAD SHX Text

PROJECT NUMBER:

AutoCAD SHX Text

DR.

AutoCAD SHX Text

CK.

AutoCAD SHX Text

SCALE

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

AUTOCAD - RELEASE 2018

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

DATE :

AutoCAD SHX Text

DATE :

AutoCAD SHX Text

DATE :

AutoCAD SHX Text

DATE :

AutoCAD SHX Text

DATE :

AutoCAD SHX Text O & M

AutoCAD SHX Text

CONSTRUCTION MANAGEMENT

AutoCAD SHX Text

DATE :

AutoCAD SHX Text 7/31/20

AutoCAD SHX Text

RESTORATION OF MAIN BASE

AutoCAD SHX Text

ELECTRICAL INFRASTRUCTURE

AutoCAD SHX Text

80GRC019D004

AutoCAD SHX Text

AutoCAD SHX Text

CONSTRUCTION DOCUMENTS

AutoCAD SHX Text

THOMAS F. DETER

AutoCAD SHX Text 7/31/20

AutoCAD SHX Text

BRIAN D. SCHMIDT

AutoCAD SHX Text 7/31/20

AutoCAD SHX Text E-001

AutoCAD SHX Text

SYMBOLS AND ABBREVIATIONS

AutoCAD SHX Text 19638

AutoCAD SHX Text

BDS

AutoCAD SHX Text

TFD

AutoCAD SHX Text

AutoCAD SHX Text

NTS

AutoCAD SHX Text

190460-EEGI-001.DWG

1. The work consists of the installation of new underground electrical distribution facilities and removal, rearrangement, or modification of existing underground electrical distribution facilities, all within the area of the Goddard Space Flight Facility Wallops Flight Facility in the northeast portion of Virginia.

2. Work on this project involves working over, under, near, around, and on 12.47kV/7.2 kV underground electric distribution facilities owned by NASA. The project work includes the installation of new precast concrete manholes, SF6 switchgear, junction enclosures, 3-phase transformers, directional boring of HDPE conduit, copper conductors, and all associated hardware and equipment. The work also includes the removal of existing SF6 switchgear, 3-phase transformers, copper conductors all as detailed in the project plans and drawings.

3. Work on the project will be performed using a segmented or phased installation in order to maintain electric service to existing facilities, maintain existing electric system operation and coordinate the work with other projects in the area.

4. Base facility plans used for the design base of this work were furnished by NASA-Wallops

Flight Facility. Work to be performed under this contract was added by H.F. Lenz Co. and shall be used solely for work on this project.

5. All existing overhead and underground facilities shown on the base plans are diagrammatic in nature and for informational purpose only. Actual locations shall be field verified and documented prior to excavation or execution of the work. Additionally, the contractor shall be responsible for the field verification of the accuracy of all as-built documents used in the process of the work. All redlines and notes of offering construction or field conditions shall be reported and supplied to the NASA Project Manager for incorporation into the record drawings.

6. Contractor shall locate and mark all electrical circuits and underground utilities in the area of construction prior to any excavation. The contractor shall physically verify the location and elevation of the existing utilities indicated prior to the starting construction. Obtain digging/excavation permissions prior to the start of excavation by contacting the NASA project manager or representative.

7. Notify the NASA project manager or representative at least 7 days prior to starting excavation work. Contact the Government utility locate department system 48 hours prior to excavating.

8. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing facilities which are to remain. Repair or replace portions of any existing facility which has been altered during construction operations to match existing or adjoining work as approved by the NASA project manager. At the completion of construction, existing facilities shall be in a condition equal to or better than that which existed before new work started.

9. Permission to interrupt any base roads, parking lots and /or utility service shall be requested in writing a minimum of 15 days prior to the desired date of interruption.

10. All work around/involving roadways, to include roadway excavations and utility crossings, will be conducted in accordance with the Manual of Uniform Traffic Control Devices

(MUTCD) and the NASA General Safety Program Requirements (NPR 8715.3C).

Contractors shall provide and ensure appropriate road closure and detour signs are established as necessary for motor traffic management.

11. In order to minimize interruption to Wallops Flight Facility roadways, the contractor shall coordinate and schedule road crossing construction and closings per work phase to accomplish as many crossing as possible within the scheduled closing time frame.

12. Utility cutovers and interruptions should be scheduled after normal working hours or on

Saturday, Sunday, and government holidays. Contractor shall conform to procedures required in notes 13 and 14.

13. Regular working hours can consist of up to an 9.5 hour period between 7 a.m. and 4:30 p.m., Monday through Friday, excluding Government holidays.

14. Work outside the regular working hours shall be arranged in advance with the NASA project manager.

15. The contractor will be working around existing buildings which are occupied. Do not enter the buildings without prior approval of the NASA project manager.

16. Operation of installation utilities: The contractor shall not operate nor disturb the setting of the control devices on the base utilities system, including water, sewer, electrical, and communication services. Base personal will operate the control devices as required for normal conduct of the work

17. Personnel and Vehicle Access and Cell Phone Usage.

a. The contractor shall be required to obtain contractor tradesman passes for all personnel to access the installation and government property. Provide a list of employees (prime and subcontractors) on company letterhead for clearance into the project work area. The list shall be provided to the NASA project manager a minimum of 5 work days prior to scheduled work to be performed. Additionally, the list shall be maintained and updated a minimum of 5 working days prior to the time new employees need access to the jobsite.

b. Cell phone usage on Wallops Flight Facility while driving is strictly prohibited and violators will be ticketed. The contractor shall make sure all employees and those of subcontractors are aware of this restriction.

18. The contractor shall make every effort to cause as little disturbance as possible and protect the natural environment and resources of the base during the course of the work.

19. The contractor is responsible for the installation and maintenance of erosion control devices to control run off from the construction site for the duration of the contract. The contractor shall install approved erosion control devices as necessary to protect drainage course including temporary protection on side and back slopes as soon as rough grading is complete.

20. All excess soil, excavation, waste and debris shall be removed from the site as soon as practical during the course of the work. Soil and excavation materials should be removed from the Base and not stock piled unless they are to be reused.

21. The finish elevation of pad-mounted or ground sleeve mounted equipment should be a minimum of 24" above surrounding grade or adjacent roadways or as approved by the NASA project manager. Equipment is not to be installed within drainage control areas, areas subject to flooding or water holding areas.

22. Cable tags shall be provided for all underground circuitry, including medium and low voltage system cabling. Tags shall be provided at all accessible locations within the circuit.

Identification markings shall include the circuit designation, phase, source (from) and feed

(to) locations. For example, tags at the first handhole on an exterior lighting circuit would include, circuit designation (MDP-1), source (MDP ckt 1), feed (Lighting Pole 1). Tags at a transformer would include, source (Primary Riser Pole #xxxx) feed (Transformer #2). All cable identification tag information shall be identified and approved by the Public Works

Engineer prior to installation.

23. Single-phase fault indicators shall be provided on all incoming and outgoing conductors located within the medium voltage equipment enclosures. This includes all pad mounted enclosures for medium voltage equipment, such as transformers, sectionalizing cabinets, medium voltage switches, etc. Individually fireproof medium voltage conductors in all underground structures.

24. All conduits installed will include pulling lines/cables for installation of conductors.

25. Contractor is responsible for keeping one clean set of drawings for as-built markups. These markups will bereturned to the engineer for completion of a final set of as-built drawings to be presented to NASA Wallops Flight Facility as record drawings.

26. The contractor shall divert at least 50% of Construction and Demolition materials and debris through recycling. The contractor shall keep track of the weight (in pounds or tons) diverted and provide the data in a brief report upon completion of the project.

27. Contractor shall contact Chad Combs with NASA Safety, Code 803, for MEC Awareness

Training. There is a low likelihood that the contractor will come into contact with munitions and explosive constituents. Contractor to schedule MEC Awareness Training through the

COTR. Contractor shall contact NASA airfield Operations Center for training on airfield procedures prior to starting any construction on or near the airfield. Contractor to complete briefing on processes and regulations for conducting work in the Magazine Storage Area due to the ongoing explosive operations.

28. Contractor is responsible for providing a complete arc flash analysis for all ELECTRICAL

EQUIPMENT installations for the project. Contractor shall supply and affix arc flash hazard labels in accordance with NFPA 70E.

29. Contractor shall provide means for de-watering of open pits for the installation of junction cabinets, switchgear, and transformers before installing stone base if necessary.

30. All electrical work shall be installed in accordance with the 2017 National Electrical Code and all applicable federal, state and local codes. All electrical work, wiring, connections and associated equipment within the area of work shall be as per applicable articles of the

National Electrical Code. Coordinate with specifications for device requirements.

31. It is called to the contractors attention that the entire installation must be grounded in compliance with the National Electrical Code.

32. All wire, conduit, connectors, boxes, etc. necessary to achieve a complete electrical installation, where an electrical device is required by code but not shown shall be furnished and installed as though fully shown and specified.

33. Wallops Flight Facility is currently supporting various airfield operations and launch mission activities from the facilities in which work will be performed. It is the contractor's responsibility to schedule work so as to not interfere with airfield operations and launch mission activities in the area.

34. NASA reserves first right of refusal for all equipment demolished under this contract.

Coordinate removal of demolished equipment with NASA project manager, and deliver all equipment identified by NASA project manager to be salvaged to the on-site location directed by the NASA project manager. The contractor shall be responsible for the disposal of all demolished equipment refused by the NASA project manager.

35. It is called to the contractors attention that all circuit breakers with adjustable instantaneous feature and all circuit breakers with electronic trip circuit breakers with LSI or LSIG trip functions shall be adjusted by the contractor in accordance with the coordination and arc-flash study performed as part of this contract.

36. It is called to the contractor's attention that if any item indicated on the document conflicts with field conditions or conflicts with information indicated on the construction documents, the contractor shall immediately submit an RFI to the NASA project manager. Should no RFI be submitted for clarification the contractor shall include in his bid the more expensive option of the conflicting information.

1. Refer to the approved safety plan for detailed safety information and requirements.

2. All contractors must comply with Federal, State, and Local regulations pertaining to the environment. Additionally all work must comply with the approved project safety plan, as well as OSHA requirements and standards.

3. The contractor is responsible for safety of on-site personnel. If safety department personnel observe an unsafe condition, work will be stopped without contract extension until the unsafe condition(s) is/are remedied. Accident report forms (OSHA Form 301 or

300) will be submitted for each reportable occupational injury, illness, or lost time accident.

The contractor is responsible for notifying OSHA in the event of a serious employee illness or injury. Provide a copy of the accident report to the safety office.

4. All conductors and equipment shall be considered “Energized” unless checked, tagged, grounded, and checked again.

5. The contractor shall conduct daily “Tailgate” safety meetings covering the following items:

a. Proper wearing/use of personal protective equipment (PPE) and training to properly

DON/DOFF all PPE.

b. Control access to the job site and cleanliness of the jobsite.

c. Electrical safety on the jobsite.

d. Recognition of potential hazards at the jobsite and establishing abatement procedures to minimize them.

e. As required during work performance, abide by all excavation and trenching regulations.

6. Materials with "Environmental Conditions" or hazardous substances will be the government's responsibility for proper handling and disposal. The term “Environmental

Conditions” shall, without limitation, include the presence of or condition involving any pollutant, hazardous or solid waste, hazardous material or hazardous or condition involving any pollutant, hazardous or solid waste, hazardous material or hazardous or toxic substance regulated under any federal, state, or local law (including, without limitation, common law), regulation or ordinance or any substance (including, without limitation mold or other myotoxins) which may create an unsafe condition or pose any threat to health or safety (collectively "Hazardous Substances").

7. The Contractor shall conduct the fueling and lubricating of equipment and motor vehicles in a manner that protects against spills and evaporation. All used oil generated on site will be managed in accordance with 40 CFR 279. The Contractor will determine if any used oil generated while on-site exhibits a characteristic of hazardous waste. In addition, used oil containing 1000 parts per million of solvents will be considered a hazardous waste and disposed of at Contractor's expense. Used oil mixed with a hazardous waste will also be considered a hazardous waste. All hazardous waste will be managed with the approved

Environmental Protection Plan.

8. The Contractor shall take precautions to prevent releases/spills of oil and hazardous materials. In the event of any releases of oil and hazardous materials, chemicals, or gases;

immediately (within 15 minutes) notify the Base or Activity Fire Department, and the NASA

Project Manager. The Base Environmental Office shall make verbal and written notifications as required by the federal 40 CFR 355, State, local regulations and NASA Instructions. Spill response shall be in accordance with 40 CFR 300 and applicable State and local regulations.

Contain and clean up these spills without cost to the Government. If Government assistance is requested or required, the Contractor shall reimburse the Government for such assistance.

9. In addition to the requirements of the approved safety plan for this project the Contractor shall comply with the following:

a. Confined space work shall conform to OSHA 29 CFR 1910.146 and GPR 1700.6A

b. Any potential for a hazard in a confined space requires a permit system to be used.

c. Entry Procedures. Prohibit entry into confined space by personnel for any purpose until the qualified person has conducted appropriate tests to ensure the confined or enclosed space is safe for the work intended and that all potential hazards are controlled or eliminated and documented.

d. Forced air ventilation is required for all confined space entry operations and the minimum air exchange requirements must be maintained to ensure exposure to any hazardous atmosphere is kept below its' action level.

e. Workers shall have confined space safety training and be trained and knowledgeable in the proper use of confined space atmospheric monitoring equipment.

10. Contractor must maintain a copy of “Material Safety Data Sheet” (MSDS) for all chemical products or hazardous material that is required to perform the job. No lead, lead based, or

Chromium products will be allowed on Wallops Flight Facility.

GENERAL NOTES: SAFETY NOTES:

H.F. LENZ

COMPANY

Engineering

1407 Scalp Avenue Phone: 814.269.9300

Johnstown, PA 15904 www.hflenz.com

Headquarters:

AutoCAD SHX Text

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION

AutoCAD SHX Text

GODDARD SPACE FLIGHT CENTER

AutoCAD SHX Text

WALLOPS FLIGHT FACILITY

AutoCAD SHX Text

WALLOPS ISLAND, VIRGINIA 23337

AutoCAD SHX Text

ENGINEERING GROUP LEADER

AutoCAD SHX Text

ENGINEERING APPROVAL

AutoCAD SHX Text

BRANCH HEAD

AutoCAD SHX Text

BRANCH APPROVAL

AutoCAD SHX Text

PROJECT MANAGER

AutoCAD SHX Text

NASA SAFETY

AutoCAD SHX Text

FIRE PROTECTION

AutoCAD SHX Text

PROJECT ENGINEER

AutoCAD SHX Text

SUBMITTED BY

AutoCAD SHX Text

DATE :

AutoCAD SHX Text

DATE :

AutoCAD SHX Text

REVISED:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE

AutoCAD SHX Text

LET.

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text

CK.

AutoCAD SHX Text

AP.

AutoCAD SHX Text

FILE NAME:

AutoCAD SHX Text

GRAPHIC SCALE

AutoCAD SHX Text

PROJECT NUMBER:

AutoCAD SHX Text

DR.

AutoCAD SHX Text

CK.

AutoCAD SHX Text

SCALE

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

AUTOCAD - RELEASE 2018

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

DATE :

AutoCAD SHX Text

DATE :

AutoCAD SHX Text

DATE :

AutoCAD SHX Text

DATE :

AutoCAD SHX Text

DATE :

AutoCAD SHX Text O & M

AutoCAD SHX Text

CONSTRUCTION MANAGEMENT

AutoCAD SHX Text

DATE :

AutoCAD SHX Text 7/31/20

AutoCAD SHX Text

RESTORATION OF MAIN BASE

AutoCAD SHX Text

ELECTRICAL INFRASTRUCTURE

AutoCAD SHX Text

80GRC019D004

AutoCAD SHX Text

AutoCAD SHX Text

CONSTRUCTION DOCUMENTS

AutoCAD SHX Text

THOMAS F. DETER

AutoCAD SHX Text 7/31/20

AutoCAD SHX Text

BRIAN D. SCHMIDT

AutoCAD SHX Text 7/31/20

AutoCAD SHX Text E-002

AutoCAD SHX Text

GENERAL NOTES, SAFETY NOTES

AutoCAD SHX Text

& CONTACTS

AutoCAD SHX Text 19639

AutoCAD SHX Text

BDS

AutoCAD SHX Text

TFD

AutoCAD SHX Text

AutoCAD SHX Text

NTS

AutoCAD SHX Text

190460-EEGI-001.DWG

1. The work consists of the installation of new underground electrical distribution facilities and removal, rearrangement, or modification of existing underground electrical distribution facilities, all within the area of the Goddard Space Flight Facility Wallops Flight Facility in the northeast portion of Virginia.

2. Work on this project involves working over, under, near, around, and on 12.47kV/7.2 kV underground electric distribution facilities owned by NASA. The project work includes the installation of new precast concrete manholes, SF6 switchgear, junction enclosures, 3-phase transformers, directional boring of HDPE conduit, copper conductors, and all associated hardware and equipment. The work also includes the removal of existing SF6 switchgear, 3-phase transformers, copper conductors all as detailed in the project plans and drawings.

3. Work on the project will be performed using a segmented or phased installation in order to maintain electric service to existing facilities, maintain existing electric system operation and coordinate the work with other projects in the area.

4. Base facility plans used for the design base of this work were furnished by NASA-Wallops

Flight Facility. Work to be performed under this contract was added by H.F. Lenz Co. and shall be used solely for work on this project.

5. All existing overhead and underground facilities shown on the base plans are diagrammatic in nature and for informational purpose only. Actual locations shall be field verified and documented prior to excavation or execution of the work. Additionally, the contractor shall be responsible for the field verification of the accuracy of all as-built documents used in the process of the work. All redlines and notes of offering construction or field conditions shall be reported and supplied to the NASA Project Manager for incorporation into the record drawings.

6. Contractor shall locate and mark all electrical circuits and underground utilities in the area of construction prior to any excavation. The contractor shall physically verify the location and elevation of the existing utilities indicated prior to the starting construction. Obtain digging/excavation permissions prior to the start of excavation by contacting the NASA project manager or representative.

7. Notify the NASA project manager or representative at least 7 days prior to starting excavation work. Contact the Government utility locate department system 48 hours prior to excavating.

8. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing facilities which are to remain. Repair or replace portions of any existing facility which has been altered during construction operations to match existing or adjoining work as approved by the NASA project manager. At the completion of construction, existing facilities shall be in a condition equal to or better than that which existed before new work started.

9. Permission to interrupt any base roads, parking lots and /or utility service shall be requested in writing a minimum of 15 days prior to the desired date of interruption.

10. All work around/involving roadways, to include roadway excavations and utility crossings, will be conducted in accordance with the Manual of Uniform Traffic Control Devices

(MUTCD) and the NASA General Safety Program Requirements (NPR 8715.3C).

Contractors shall provide and ensure appropriate road closure and detour signs are established as necessary for motor traffic management.

11. In order to minimize interruption to Wallops Flight…