This document is a Notice to Prospective Bidders for a bridge replacement project in Mount Rainier National Park, issued by the Western Federal Lands Highway Division. The project involves replacing the Fryingpan Creek Bridge along the Sunrise Park Road, approximately 4.3 miles west of State Route 410. The scope of work includes constructing a 218.5-foot long single-span steel plate girder bridge with a cast-in-place concrete deck, founded on drilled shaft abutments, as well as roadway realignment, parking lot construction, minor pipe culvert replacement, and stone masonry work.

Solicitation documents will be available during the winter of 2026, with prospective bidders advised to monitor the SAM.gov website for the exact release date. Due to seasonal road closures between October and May, potential offerors are encouraged to view the project site during fall as conditions permit. Technical questions should be submitted via email to wfl.plansspec@dot.gov, while general inquiries can be directed to wfl.contracts@dot.gov or by phone at 360-619-7520. The project's solicitation number is 69056726B000001, and no Federal Highway Administration personnel will be available for site tours.

View the file

Other files

File Type Posted
QA_2-20-2026.pdf PDF
PROJECT DESCRIPTION_WA NP MORA 11(1).pdf PDF
mora11-1_Plans_Pre-Ad.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Western Federal Lands Highway Division 610 E. Fifth Street

Vancouver, WA 98661 Phone 360-619-7700

Fax 360-619-7846

NOTICE TO PROSPECTIVE BIDDERS

RE: WA NP MORA 11(1), Fryingpan Creek Bridge

Solicitation No. 69056726B000001

The attached preliminary plans are being furnished to aid prospective Bidders in identifying the location and type of work for this project. The project will be advertised during a period when viewing of the project may not be possible due to snow and seasonal road closures between

October and May. Therefore, prospective Offerors are encouraged to view the project during fall as conditions permit. Current road closures status can be found at the Mount Rainer website here https://www.nps.gov/mora/planyourvisit/road-status.htm

No Federal Highway Administration personnel will be available for show-me tours.

Project Location and Type of Work - Fryingpan Creek Bridge is located along the Sunrise

Park Road over Fryingpan Creek within the Mount Rainier National Park. The bridge is located approximately 4.3 miles west of State Route 410 and approximately 2,300 feet southwest of the confluence of Fryingpan Creek with White River.

The work consists of: Bridge replacement, roadway realignment, parking lot, minor pipe culvert replacement, stone masonry.

The bridge project includes construction of a single span, 218.5-foot long steel plate girder bridge with cast-in-place concrete deck. Abutments are founded on deep foundation (drilled shafts). The work includes demolition of the existing steel arch girder bridge upon completion of the new structure.

The stone masonry work includes removing and salvaging, constructing, and pointing stone masonry. Construct stone masonry that matches the character of existing historic masonry where remove and reset work is to occur. Supplement rock salvaged from the existing structures to be removed or constructed with government provided source of raw, unprocessed rock to be obtained from avalanche chute on Stevens Canyon Road.

Technical Questions – All technical questions must be submitted by email wfl.plans-spec@dot.gov .

General Questions - Contact our office at wfl.contracts@dot.gov or at 360-619-7520.

09/18/2025 https://www.nps.gov/mora/planyourvisit/road-status.htm mailto:plans-spec@dot.gov mailto:plans-spec@dot.gov mailto:wfl.contracts@dot.gov

Preliminary Plans letter

Solicitation documents - Documents will be available during the winter of 2026. Please monitor the SAM site (www.sam.gov) for actual date of solicitation release. To receive automatic notification through SAM, you must be logged in and select the “Follow” feature. For more information go to How do I follow items on SAM.gov?.

Thank you for your interest in this project.