VA Livermore Phase B, Construct Community Based Outpatient Clinic, and Central Utility Plant, Stockton, CA

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W91238-18-R-0056
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

PSC
Not on record
Place of performance
Stockton Ca Usa

Notice details come from SAM.gov. Updated .

Notice text

The Sacramento District of the U.S. Army Corps of Engineers has an upcoming project for the Department of Veterans Affairs Livermore Phase B, Construct Community Based Outpatient Clinic, and Central Utility Plant, Stockton, CA. The acquisition will proceed using a best-value tradeoff source selection scheme and will result in a design-bid-build, firm-fixed-price construction contract with a period of performance of 1095 calendar days after the receipt of Notice to Proceed.


This project is to construct a 158,000 SF Community Based Outpatient Clinic (CBOC) and 3,300 SF Central Utility Plant (CUP), San Joaquin County, Stockton, CA. The CBOC will include Primary and Specialty Clinics, Diagnostic and Rehabilitation, and Support Services. Requirements for the CBOC include construction of the CBOC and CUP facility infrastructure as well as site development work for the Stockton Campus including: both on-site utilities and connecting to off-site utilities, constructing roads, sidewalks, parking; site raise for flood plain mitigation, and landscaping. The project is part of an overall phased campus construction project over multiple years. Portions of the Stockton Campus not included in this project, but impact the CUP portion of this project and are to be fully integrated into the Stockton Campus are: (1) a Community Living Center (CLC) for a bed Nursing Home Care Unit (NHCU) and (2) Engineering & Logistics Building.

The NAICS code associated with this project is 236220, Commercial and Institutional Building Construction. The size standard is $36.5 million.

In accordance with DFARS 236.204(iii), the estimated value of the resulting construction contract is expected to be between $100 million and $250 million.

BONDS: All offerors will be required to submit a bid bond for 20% of their total proposed price or $3,000,000, whichever is less. The successful offeror shall be required to provide performance and payment bonds for 100% of the contract award price.

Anticipated issue date for the solicitation is on/about July 13, 2018 and can be accessed at the Federal Business Opportunities (FBO) website at www.fbo.gov. The proposal due date will be specified in the solicitation when it is issued.
The site visit/pre-proposal conference date, time and location will be identified in the solicitation.

This solicitation will be advertised on an unrestricted basis. All prospective contractors must be registered in the System for Award Management (SAM) database at http://www.sam/gov/ before award of contract; failure to register in the SAM database will cause your firm to be ineligible for any future award.

OFFERORS ARE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.

Ordering Solicitation: Plans and specification will NOT be provided in hard paper copy or CD format. The solicitation and all amendments for this acquisition will be posted on a secure Government website known as FedBizOpps (www.fbo.gov) once the Request for Proposal (RFP) is issued. To register, click on the Register Now button in the Vendor Block and follow the instructions. For further information, please click on the FedBizOpps homepage link and the Vendor User Guide.

The only PLAN-HOLDER'S/BIDDER'S LIST now available is via FedBizOpps. When viewing the Synopsis/Pre-solicitation Notice, you will click on the "ADD ME TO INTERESTED VENDORS' to enter your information. This function does not, however, allow you to identify yourself as a Prime or Sub. It is recommended that you identify your category in parentheses at either the beginning or end of your company name. For example: XYZ Construction (Prime/Sub). IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK FEDBIZOPPS FREQUENTLY FOR ANY AMENDMENTS OR CHANGES TO T HE SOLICITATION.

Files

File Type Posted
Attachment__19_-__Re-issued_Drawings.pdf PDF
Amendment_0004.pdf PDF
Attachment_20_-_Reissued_Specs_.pdf PDF
Attachment_16_-_Specifications_revised_and_new_issued.pdf PDF
CBO-_CUP_-_Siemens_Brand_Name_J&A.pdf PDF
Attachment_17_Construction_Temporary_Utilities_Service_Point-of-Connection,_City_of_Stockton.pdf PDF
Attachment_18_-_Wage_Determination.pdf PDF
Attachment_15,_Re-issued_Drawings.pdf PDF
W91238-18-R-0056-_Amendment_0003.pdf PDF
W91238-18-R-0056_Conformed_Copy.pdf PDF
W9123818R0056_Conformed_Copy_Amendment.pdf PDF
Attachment_14__Re-issued_Drawings.pdf PDF
W9123818R0056_Amendment_0002.pdf PDF
Attachment_(13)_Re-Issued_Specifications_01_50_01,Revised_8Nov18(LT8Nov18).pdf PDF
Attachment_(10)_RMS_Submittal_Register(5Nov18).xlsx XLSX spreadsheet
Attachment_(12)_Specifications-working.pdf PDF
Attachment_(09)_AE_Drawing_Revisions_.pdf PDF
A03.10_Final_Stockton_Phased_B_Combined_JA_for_posting_Redacted.pdf PDF
W9123818R0056_Amendment_0001.pdf PDF
Attachment_(11)_Office_Complex_and_Contractor_Laydown_(05NOV).pdf PDF
Phase_B_Site_Visit_Sign-In_Sheets.pdf PDF
ATTACHMENT_7_-_APPENDIX_B_-_EQUIPMENT_CUT_SHEETS.pdf PDF
ATTACHMENT_4_-_DRAWINGS_VOLUME_B2.pdf PDF
ATTACHMENT_8_-_WAGE_DETERMINATION.pdf PDF
ATTACHMENT_1_-_STATEMENT_OF_WORK.pdf PDF
ATTACHMENT_3_-_DRAWINGS_VOLUME_B1.pdf PDF
ATTACHMENT_2_-_SPECIFICATIONS.pdf PDF
ATTACHMENT_6_-_APPENDIX_A_-_GEOTECHNICAL_ENGINEERING_REPORT.pdf PDF
ATTACHMENT_5_-_DRAWINGS_VOLUME_B3.pdf PDF
W9123818R0056_Stockton_CBOC_and_CUP_Solicitation.pdf PDF
Show all 30

Notice history

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors