Amendment 0002

View the file

Other files

File Type Posted
Attachment_20_-_Reissued_Specs_.pdf PDF
Amendment_0004.pdf PDF
Attachment__19_-__Re-issued_Drawings.pdf PDF
Attachment_17_Construction_Temporary_Utilities_Service_Point-of-Connection,_City_of_Stockton.pdf PDF
Attachment_18_-_Wage_Determination.pdf PDF
Attachment_15,_Re-issued_Drawings.pdf PDF
W91238-18-R-0056-_Amendment_0003.pdf PDF
W91238-18-R-0056_Conformed_Copy.pdf PDF
CBO-_CUP_-_Siemens_Brand_Name_J&A.pdf PDF
Attachment_16_-_Specifications_revised_and_new_issued.pdf PDF
Attachment_(13)_Re-Issued_Specifications_01_50_01,Revised_8Nov18(LT8Nov18).pdf PDF
W9123818R0056_Conformed_Copy_Amendment.pdf PDF
Attachment_14__Re-issued_Drawings.pdf PDF
Attachment_(12)_Specifications-working.pdf PDF
Attachment_(11)_Office_Complex_and_Contractor_Laydown_(05NOV).pdf PDF
A03.10_Final_Stockton_Phased_B_Combined_JA_for_posting_Redacted.pdf PDF
Attachment_(10)_RMS_Submittal_Register(5Nov18).xlsx XLSX spreadsheet
Attachment_(09)_AE_Drawing_Revisions_.pdf PDF
W9123818R0056_Amendment_0001.pdf PDF
Phase_B_Site_Visit_Sign-In_Sheets.pdf PDF
W9123818R0056_Stockton_CBOC_and_CUP_Solicitation.pdf PDF
ATTACHMENT_7_-_APPENDIX_B_-_EQUIPMENT_CUT_SHEETS.pdf PDF
ATTACHMENT_5_-_DRAWINGS_VOLUME_B3.pdf PDF
ATTACHMENT_1_-_STATEMENT_OF_WORK.pdf PDF
ATTACHMENT_3_-_DRAWINGS_VOLUME_B1.pdf PDF
ATTACHMENT_6_-_APPENDIX_A_-_GEOTECHNICAL_ENGINEERING_REPORT.pdf PDF
ATTACHMENT_2_-_SPECIFICATIONS.pdf PDF
ATTACHMENT_8_-_WAGE_DETERMINATION.pdf PDF
ATTACHMENT_4_-_DRAWINGS_VOLUME_B2.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

A) Provide a separate CLIN for the Resident Office Trailer.

B) Provide updated Draw ings and Specifications as annotated.

See Clarifications of Amendment attachments.

All other terms, conditions and provisions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Nov-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123818R0056

X 9B. DATED (SEE ITEM 11)

03-Oct-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Nov-2018

CODE

US ARMY CORPS OF ENGINEERS, SACRAMENTO

CONTRACTING DIVISION

1325 J STREET

SACRAMENTO CA 95814-2922

W91238 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9123818R00560002 2 (as of 8NOV)

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0002

Attachment 13 Specification

The Following Specifications are Re‐Issued with Revisions:

Specification Section

Specification Title

Date

01 45 29 TESTING LABORATORY SERVICES 05 NOV 18

01 50 01 RESIDENT ENGINEER OFFICE 05 NOV 18

01 70 00 EXECUTION AND CLOSEOUT REQUIREMENTS 05 NOV 18

01 91 00.15 TOTAL BUILDING COMMISSIONING 05 NOV 18

08 35 02 VERTICAL FOLDING OPERABLE WALL 05 NOV 18

28 13 00 PHYSICAL ACCESS CONTROL SYSTEM 05 NOV 18

28 23 00 VIDEO SURVEILLANCE 05 NOV 18

28 31 00 FIRE DETECTION AND ALARM 05 NOV 18

31 20 00 EARTHWORK 05 NOV 18

Attachment 14 Drawings

The Following Drawings are Re‐Issued with Revisions:

Sheet Number

Sheet Name

Revision Number

Date

CG000 OVERALL SITE AND HORIZONTAL CONTROL PLAN 1 05 NOV 18

CG006 SITE AND HORIZONTAL CONTROL PLANS 1 05 NOV 18

CG007 SITE AND HORIZONTAL CONTROL PLAN 1 05 NOV 18

CG008 SITE AND HORIZONTAL CONTROL PLAN 1 05 NOV 18

CU101 UTILITY PLAN 1 05 NOV 18

CU103 UTILITY PLAN 1 05 NOV 18

CU105 UTILITY PLAN 2 05 NOV 18

CU106 UTILITY PLAN 1 05 NOV 18

CU107 UTILITY PLAN 2 05 NOV 18

CU108 UTILITY PLAN 1 05 NOV 18

CK103 CIVIL CONSTRUCTION DETAILS ‐ UTILITY 1 05 NOV 18

LS101‐H HARDSCAPE PLAN 1 05 NOV 18

A‐104‐A LEVEL 4 AREA A‐ ARCHITECTURAL PLAN 1 05 NOV 18

A‐104‐A1 LEVEL 4 AREA A‐ DIMENSION PLAN 1 05 NOV 18

A‐409 ENLARGED PLANS 1 05 NOV 18

A‐410 ENLARGED PLANS 1 05 NOV 18

QH404‐A2 LEVEL 4 AREA A2 EQUIPMENT PLAN 1 05 NOV 18

AJ604‐B WAYFINDING – INTERIOR MESSAGE SCHEDULE LEVELS 4 & 5 1 05 NOV 18

EX105 LIGHTNING PROTECTION PLANS CBOC AND CUP 1 05 NOV 18

FX‐101 LEVEL 1 FIRE SPRINKLER PLAN ‐ OVERALL 1 05 NOV 18

FX‐101‐A LEVEL 1 FIRE SPRINKLER PLAN ‐ AREA A 1 05 NOV 18

FX‐101‐C LEVEL 1 FIRE SPRINKLER PLAN ‐ AREA C 1 05 NOV 18

FX‐105 ROOF LEVEL FIRE SPRINKLER PLAN 1 05 NOV 18

The Following Drawings are revised by Narrative below:

Sheet Number Narrative Revision

EP101‐A2 Blood Specimen Collection, Room 1A106A, change branch circuit home run

800‐LN1ED‐8,12 to read 800‐LN1ED‐8, 10, 12.

EP402 Electrical busway shall be mounted at 18” above the top of the equipment racks to bottom of busway. Typical for electrical busways indicated on plans 1/EP402, 2/EP402, 3/EP402, 4/EP402 and 5/EP402.

E‐605 Transformer TC1A and Transformer TS1A percent impedance shall be 4.5%.

The Following Room Designations shall be changed as described below:

The Following Room Names shall be changed as indicated.

Current Room Number / Name New Room Number / Name

4A115E; OPERATORY GEN 4A115E; EXAM / CONSULT

4A115F; OPERATORY GEN 4A115F; EXAM / CONSULT

4A115G; OPERATORY GEN 4A115G; EXAM / CONSULT

4A115S; OPERATORY GEN 4A115S; EXAM / CONSULT

4A115T; OPERATORY GEN 4A115T; EXAM / CONSULT

4A115U; OPERATORY GEN 4A115U; EXAM / CONSULT

This change is effective throughout the project documents, and applies wherever applicable. This list of drawings affected includes, but is not limited to:

ALT‐AI6; FJ‐104; FJ‐204; A‐001; A‐104‐A; A‐104‐A‐1; A‐409; A‐410; A‐613; A‐704‐A; AI104‐A; AI604; QH404‐ A2; QH404‐A3; AJ104‐B; MH104‐A1; MH104‐A4; MH114; MP104‐A1; MP104‐A4; PP104‐A1; PP601; EL104‐ A1;

EP104; EP104‐A1; E712; ET104‐A; EY104‐A; FA‐104; FX‐104

Current Room Number / Name New Room Number / Name

4A116A; THERAPY AUDIOLOGY OFFICE 4A116A; CONSULT / EXAM

4A116C; THERAPY AUDIOLOGY OFFICE 4A116C; CONSULT / EXAM

4A116D; THERAPY AUDIOLOGY OFFICE 4A116D; CONSULT / EXAM

4A116E; THERAPY AUDIOLOGY OFFICE 4A116E; CONSULT / EXAM

4A116J; SPEECH PATHO OFFICE 4A116J; CONSULT / EXAM

4A116H; SPEECH PATHO OFFICE 4A116H; CONSULT / EXAM

This change is effective throughout the project documents, and applies wherever applicable. This list of drawings affected includes, but is not limited to:

ALT‐AI6; FJ‐104; FJ‐204; A‐001; AI104‐A; AI604; AJ‐104B; MH104‐A1; MH104‐A4; MP104‐A1; MP104‐A4;

PP104‐A1; PP104‐A4; EP104; EP104‐A1; EP104‐A4; FA104; FX104

Current Room Number / Name / CODE New Room Number / Name

1A149B; OFF CHIEF; OFA02 1A149B; OFF CHIEF; OFA03

This change is effective throughout the project documents, and applies wherever applicable. This list of drawings affected includes, but is not limited to:

A‐011; A‐101‐A;QH401‐A3; AJ101‐B; PP101‐A2; EP101‐A2

W9123818R0056

SECTION 00 01 10 - TABLE OF CONTENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 09 Attachment 9 AE

Drawing Revisions

15 26-OCT-2018

Attachment 10 Attachment 10 RMS Submittal Register

100 01-NOV-2018

Attachment 11 Attachment 11 Office Complex Laydown

1 26-OCT-2018

Attachment 12 Attachment 12 Specifications

26 29-OCT-2018

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 09 Attachment 9 AE

Drawing Revisions

15 26-OCT-2018

Attachment 10 Attachment 10 RMS Submittal Register

100 01-NOV-2018

Attachment 11 Attachment 11 Office Complex Laydown

1 26-OCT-2018

Attachment 12 Attachment 12 Specifications

26 29-OCT-2018

Attachment 13 Attachment 13 Specifications Amendment 0002

251 05-NOV-2018

Attachment 14 Attachment 14 Drawings Amendment 0002

23 02-NOV-2018

SECTION 00 10 00 - SOLICITATION

CLIN 0006 is added as follows:

W9123818R0056

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0006 1 Job Resident Office

FFP

Construct Temporary Resident Office Complex in accordance with Statement of work, specifications, drawings and plans.

FOB: Destination

NET AMT

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following Acceptance/Inspection Schedule was added for CLIN 0006:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

Destination Government Destination Government

(End of Summary of Changes)