AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
A) Provide a separate CLIN for the Resident Office Trailer.
B) Provide updated Draw ings and Specifications as annotated.
See Clarifications of Amendment attachments.
All other terms, conditions and provisions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 09-Nov-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123818R0056
X 9B. DATED (SEE ITEM 11)
03-Oct-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Nov-2018
CODE
US ARMY CORPS OF ENGINEERS, SACRAMENTO
CONTRACTING DIVISION
1325 J STREET
SACRAMENTO CA 95814-2922
W91238 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9123818R00560002 2 (as of 8NOV)
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0002
Attachment 13 Specification
The Following Specifications are Re‐Issued with Revisions:
Specification Section
Specification Title
Date
01 45 29 TESTING LABORATORY SERVICES 05 NOV 18
01 50 01 RESIDENT ENGINEER OFFICE 05 NOV 18
01 70 00 EXECUTION AND CLOSEOUT REQUIREMENTS 05 NOV 18
01 91 00.15 TOTAL BUILDING COMMISSIONING 05 NOV 18
08 35 02 VERTICAL FOLDING OPERABLE WALL 05 NOV 18
28 13 00 PHYSICAL ACCESS CONTROL SYSTEM 05 NOV 18
28 23 00 VIDEO SURVEILLANCE 05 NOV 18
28 31 00 FIRE DETECTION AND ALARM 05 NOV 18
31 20 00 EARTHWORK 05 NOV 18
Attachment 14 Drawings
The Following Drawings are Re‐Issued with Revisions:
Sheet Number
Sheet Name
Revision Number
Date
CG000 OVERALL SITE AND HORIZONTAL CONTROL PLAN 1 05 NOV 18
CG006 SITE AND HORIZONTAL CONTROL PLANS 1 05 NOV 18
CG007 SITE AND HORIZONTAL CONTROL PLAN 1 05 NOV 18
CG008 SITE AND HORIZONTAL CONTROL PLAN 1 05 NOV 18
CU101 UTILITY PLAN 1 05 NOV 18
CU103 UTILITY PLAN 1 05 NOV 18
CU105 UTILITY PLAN 2 05 NOV 18
CU106 UTILITY PLAN 1 05 NOV 18
CU107 UTILITY PLAN 2 05 NOV 18
CU108 UTILITY PLAN 1 05 NOV 18
CK103 CIVIL CONSTRUCTION DETAILS ‐ UTILITY 1 05 NOV 18
LS101‐H HARDSCAPE PLAN 1 05 NOV 18
A‐104‐A LEVEL 4 AREA A‐ ARCHITECTURAL PLAN 1 05 NOV 18
A‐104‐A1 LEVEL 4 AREA A‐ DIMENSION PLAN 1 05 NOV 18
A‐409 ENLARGED PLANS 1 05 NOV 18
A‐410 ENLARGED PLANS 1 05 NOV 18
QH404‐A2 LEVEL 4 AREA A2 EQUIPMENT PLAN 1 05 NOV 18
AJ604‐B WAYFINDING – INTERIOR MESSAGE SCHEDULE LEVELS 4 & 5 1 05 NOV 18
EX105 LIGHTNING PROTECTION PLANS CBOC AND CUP 1 05 NOV 18
FX‐101 LEVEL 1 FIRE SPRINKLER PLAN ‐ OVERALL 1 05 NOV 18
FX‐101‐A LEVEL 1 FIRE SPRINKLER PLAN ‐ AREA A 1 05 NOV 18
FX‐101‐C LEVEL 1 FIRE SPRINKLER PLAN ‐ AREA C 1 05 NOV 18
FX‐105 ROOF LEVEL FIRE SPRINKLER PLAN 1 05 NOV 18
The Following Drawings are revised by Narrative below:
Sheet Number Narrative Revision
EP101‐A2 Blood Specimen Collection, Room 1A106A, change branch circuit home run
800‐LN1ED‐8,12 to read 800‐LN1ED‐8, 10, 12.
EP402 Electrical busway shall be mounted at 18” above the top of the equipment racks to bottom of busway. Typical for electrical busways indicated on plans 1/EP402, 2/EP402, 3/EP402, 4/EP402 and 5/EP402.
E‐605 Transformer TC1A and Transformer TS1A percent impedance shall be 4.5%.
The Following Room Designations shall be changed as described below:
The Following Room Names shall be changed as indicated.
Current Room Number / Name New Room Number / Name
4A115E; OPERATORY GEN 4A115E; EXAM / CONSULT
4A115F; OPERATORY GEN 4A115F; EXAM / CONSULT
4A115G; OPERATORY GEN 4A115G; EXAM / CONSULT
4A115S; OPERATORY GEN 4A115S; EXAM / CONSULT
4A115T; OPERATORY GEN 4A115T; EXAM / CONSULT
4A115U; OPERATORY GEN 4A115U; EXAM / CONSULT
This change is effective throughout the project documents, and applies wherever applicable. This list of drawings affected includes, but is not limited to:
ALT‐AI6; FJ‐104; FJ‐204; A‐001; A‐104‐A; A‐104‐A‐1; A‐409; A‐410; A‐613; A‐704‐A; AI104‐A; AI604; QH404‐ A2; QH404‐A3; AJ104‐B; MH104‐A1; MH104‐A4; MH114; MP104‐A1; MP104‐A4; PP104‐A1; PP601; EL104‐ A1;
EP104; EP104‐A1; E712; ET104‐A; EY104‐A; FA‐104; FX‐104
Current Room Number / Name New Room Number / Name
4A116A; THERAPY AUDIOLOGY OFFICE 4A116A; CONSULT / EXAM
4A116C; THERAPY AUDIOLOGY OFFICE 4A116C; CONSULT / EXAM
4A116D; THERAPY AUDIOLOGY OFFICE 4A116D; CONSULT / EXAM
4A116E; THERAPY AUDIOLOGY OFFICE 4A116E; CONSULT / EXAM
4A116J; SPEECH PATHO OFFICE 4A116J; CONSULT / EXAM
4A116H; SPEECH PATHO OFFICE 4A116H; CONSULT / EXAM
This change is effective throughout the project documents, and applies wherever applicable. This list of drawings affected includes, but is not limited to:
ALT‐AI6; FJ‐104; FJ‐204; A‐001; AI104‐A; AI604; AJ‐104B; MH104‐A1; MH104‐A4; MP104‐A1; MP104‐A4;
PP104‐A1; PP104‐A4; EP104; EP104‐A1; EP104‐A4; FA104; FX104
Current Room Number / Name / CODE New Room Number / Name
1A149B; OFF CHIEF; OFA02 1A149B; OFF CHIEF; OFA03
This change is effective throughout the project documents, and applies wherever applicable. This list of drawings affected includes, but is not limited to:
A‐011; A‐101‐A;QH401‐A3; AJ101‐B; PP101‐A2; EP101‐A2
W9123818R0056
SECTION 00 01 10 - TABLE OF CONTENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 09 Attachment 9 AE
Drawing Revisions
15 26-OCT-2018
Attachment 10 Attachment 10 RMS Submittal Register
100 01-NOV-2018
Attachment 11 Attachment 11 Office Complex Laydown
1 26-OCT-2018
Attachment 12 Attachment 12 Specifications
26 29-OCT-2018
to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 09 Attachment 9 AE
Drawing Revisions
15 26-OCT-2018
Attachment 10 Attachment 10 RMS Submittal Register
100 01-NOV-2018
Attachment 11 Attachment 11 Office Complex Laydown
1 26-OCT-2018
Attachment 12 Attachment 12 Specifications
26 29-OCT-2018
Attachment 13 Attachment 13 Specifications Amendment 0002
251 05-NOV-2018
Attachment 14 Attachment 14 Drawings Amendment 0002
23 02-NOV-2018
SECTION 00 10 00 - SOLICITATION
CLIN 0006 is added as follows:
W9123818R0056
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0006 1 Job Resident Office
FFP
Construct Temporary Resident Office Complex in accordance with Statement of work, specifications, drawings and plans.
FOB: Destination
NET AMT
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following Acceptance/Inspection Schedule was added for CLIN 0006:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
Destination Government Destination Government