Attachment__19_-__Re-issued_Drawings.pdf

PDF 13 MB Posted

Attached to
VA Livermore Phase B, Construct Community Based Outpatient Clinic, and Central Utility Plant, Stockton, CA
Solicitation number
W91238-18-R-0056
Issued by

About this file

Attachment 19 Re-issued Drawings

View the file

Other files

File Type Posted
Attachment_20_-_Reissued_Specs_.pdf PDF
Amendment_0004.pdf PDF
Attachment_17_Construction_Temporary_Utilities_Service_Point-of-Connection,_City_of_Stockton.pdf PDF
Attachment_18_-_Wage_Determination.pdf PDF
Attachment_15,_Re-issued_Drawings.pdf PDF
W91238-18-R-0056-_Amendment_0003.pdf PDF
W91238-18-R-0056_Conformed_Copy.pdf PDF
CBO-_CUP_-_Siemens_Brand_Name_J&A.pdf PDF
Attachment_16_-_Specifications_revised_and_new_issued.pdf PDF
Attachment_(13)_Re-Issued_Specifications_01_50_01,Revised_8Nov18(LT8Nov18).pdf PDF
W9123818R0056_Amendment_0002.pdf PDF
W9123818R0056_Conformed_Copy_Amendment.pdf PDF
Attachment_14__Re-issued_Drawings.pdf PDF
Attachment_(12)_Specifications-working.pdf PDF
Attachment_(11)_Office_Complex_and_Contractor_Laydown_(05NOV).pdf PDF
A03.10_Final_Stockton_Phased_B_Combined_JA_for_posting_Redacted.pdf PDF
Attachment_(10)_RMS_Submittal_Register(5Nov18).xlsx XLSX spreadsheet
Attachment_(09)_AE_Drawing_Revisions_.pdf PDF
W9123818R0056_Amendment_0001.pdf PDF
Phase_B_Site_Visit_Sign-In_Sheets.pdf PDF
W9123818R0056_Stockton_CBOC_and_CUP_Solicitation.pdf PDF
ATTACHMENT_7_-_APPENDIX_B_-_EQUIPMENT_CUT_SHEETS.pdf PDF
ATTACHMENT_5_-_DRAWINGS_VOLUME_B3.pdf PDF
ATTACHMENT_1_-_STATEMENT_OF_WORK.pdf PDF
ATTACHMENT_3_-_DRAWINGS_VOLUME_B1.pdf PDF
ATTACHMENT_6_-_APPENDIX_A_-_GEOTECHNICAL_ENGINEERING_REPORT.pdf PDF
ATTACHMENT_2_-_SPECIFICATIONS.pdf PDF
ATTACHMENT_8_-_WAGE_DETERMINATION.pdf PDF
ATTACHMENT_4_-_DRAWINGS_VOLUME_B2.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

TT

T

T

T

1A106H

SRS01

190 SF

STOR,

BULK

1A115

134 SF

TR

1A106B

LMCH3

1095 SF

HEMATOLOGY

LAB

1A106D

SRS04

76 SF

STOR

PHLEBOTOMY

1A112

ITNT1

434 SF

MDF RM

1S002

233 SF

STAIR 2

1A107M

UCCL1

115 SF

CLEAN

UTIL

1A107H

XDR01

325 SF

RADIOLOGY

1A110

USCL1

114 SF

SOILED

UTIL

1A107H.3

DR001

65 SF

DRESSING

RM

1A107H.1

OFDR1

129 SF

OFFICE

1A109

621 SF

ELEC RM

1A111

404 SF

Dental Vacuum

1A106J

TLTU1

74 SF

ST TLT

1A106F

SRR02

34 SF

DI WATER

1A108

351 SF

EMERGENCY

ELEC RM

1A114

JANC1

41 SF

HAC

C1111

289 SF

CORR

1A113

OFA03

330 SF

OFF,

SHARED

1A113E

ITWR1

183 SF

COMPUTER

REP/ STOR

1A113B

TEDR1

139 SF

SW RM

1A113D

SRE01

150 SF

SUPPLY

STOR

1A105G

PHOD2

256 SF

RECEIVING

BREAKDWN

1A105F

SL001

362 SF

ST LKRS,

LOUNGE

1A105C

563 SF

CIRCULATION

1A107H.2

185 SF

VEST

1A107G.4

CMP01

142 SF

CONTROL/

TECH

WORKRM

1A107J

XDM01

182 SF

MAMMOGRAPHY

1A107L

WRC01, WRF01

55 SF

MAMMO

WAIT

1A107K

DR001

51 SF

MAMMO

DRESSING

S-1

115 SF

ELEV S-1

C1103

1670 SF

CORR

C1104

324 SF

CORR

1A111A

48 SF

SECURITY

CLOS

1A112

ITNT1

434 SF

MDF RM

C1112

51 SF

CORR

1A106E

LMBB1

154 SF

BLOOD

BANK

75 SF

BOOSTER

PUMP RM

H J K L L.6 L.7 M

C20

H.7 J.7

2"ø HHWS/R

4"ø CHWS/R

3"ø HHWS/R

3"ø CHWS/R AND 3"ø HHWS/R

STUB-OUT WITH SOV FOR

FUTURE EXPANSION

SHHWP

SHHWP

SCHWP

SCHWP

6"ø CHWS/R 4"ø HHWS/R

4"ø HHWS/R

6"ø CHWS/R

6" HHWS AND

8" CHWS/R UP

THROUGH

UTILITY CHASE

4"ø HHWS/R 6"ø CHWS/R

H.2

3-107

VAV

3-105

VAV

4-108

VAV

4-110

VAV

3-106

VAV

15A

FC

15B

FC

1-117

VAV

FC13

FC

FC

FC

2-108

VAV

2-107

VAV

1"ø HHWS

1"ø HHWR

1 1/2"ø CHWS 1 1/2"ø CHWR

1 1/2"ø CHWS

1 1/2"ø CHWR

8"ø CHWS/R

6"ø HHWS/R

3"ø HHWS/R

4"ø CHWS/R

4-109

VAV

1"ø CHWR

1"ø CHWS

6"ø CHWS/R 4"ø HHWS/R

2"ø CHWS/R

1"ø CHWS

1 1/2"ø HHWS 1 1/2"ø HHWR

1 1/2"ø CHWR

1 1/2"ø CHWS

1"ø CHWS 1"ø CHWR

3"ø CHWS/R

3"ø HHWS/R

1"ø CHWR

1"ø CHWS

1 1/2"ø HHWR 1 1/2"ø HHWS

2-105

VAV

2-109

VAV

2-110

VAV

/1 MP101-A2

M P

-A

VAV-3-101

VAV-2-103

VAV-2-107

VAV-2-105

VAV-2-108

VAV-2-109

VAV-2-110

FC-18

VAV-1-118

FC-17

VAV-1-117

FC-15A

FC-15B

FC-16

1-116

VAV

VAV-1-116

FC-13

VAV-3-106

VAV-3-105

VAV-3-107

VAV-4-110

VAV-4-109

FC-14

1-118

VAV

FC

1-119

VAV

3/4"ø CD

3/4"ø CD

1"ø CD

1"ø CHWR

3/4"ø CD

3/4"ø CD

3/4"ø CD 1"ø CD

3/4"ø CD

1"ø HHWS 1"ø HHWR

3/4"ø CD

FC-62

8"ø CHWS/R AND 6"ø HHWS/R

FROM CUP, REFER TO MS002

FOR CONTINUATION

2-106

VAV

3-108

VAV

1"ø HHWR

1"ø HHWS

VAV-2-106

VAV-3-108

V A

V -4

-1

VAV-1-119

FLOOR SHUT-OFF

VALVE, TYP.

GENERAL NOTES:

1. REFER TO MP101-A1 FOR GENERAL NOTES AND

APPLICABLE SHEET NOTES DESCRIPTION.

E

G

No.M024435E R

A NC H

S T

ETA

C AFO

M E

I AI

N

L I F OR

C

LA

RE

S

IS

T

ESOF

R

L O

D P

ER

E ENSH

I

EN

H

AL

YU

NO

GIN

U

Exp. 09-30-2020

0 2'-0" 4'-0" 8'-0"

PLAN

NORTH

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

Drawing number

Drawn

Location

Project Title

Date Checked by

Drawing Title

1 2 3 4 5 6

A

B

C

D

E

F

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

CONSULTANTS: ARCHITECTS/ENGINEERS: Office of Construction and Facilities Management

7 8 9

MECHANICAL/ELECTRICAL/

PLUMBING:

Gayner Engineers 1133 Post Street San Francisco,CA 94109

STRUCTURAL:

Degenkolb Engineers 375 Beale Street Suite 500 San Francisco, CA 94105

CIVIL / SURVEYOR:

Sandis 636 9th Street Oakland, CA 94607

ARCHITECTURE/

INTERIOR DESIGN/

SECURITY/SIGNAGE/

COMMUNICATIONS/ MEDICAL

EQUIPMENT/ MASTER PLAN

LANDSCAPE/

ENVIRONMENTAL

ASSESSMENT:

HDR Architecture, Inc.

201 California Street Suite 1500 San Francisco, CA 94111

FULLY SPRINKLERED

FIRE PROTECTION:

Jensen Hughes Inc.

2950 Buskirk Avenue, Ste. 225 Walnut Creek, CA 94597

CONSULTANT:

GEOTECHNICAL:

Allegiance Group 4321 SW Corbett #200 Portland, OR 97239

COST ESTIMATING:

AECOM

300 California Street, Suite 400 San Francisco, CA 94104

Station Number Project Number

640 640-423

Building Number

U.S. Department of Veterans Affairs

D1

D2

B1

C2

C1 A1

A4

A2

A3

MP101-A3

LEVEL 1 AREA A3 PLAN - PIPING

SL SO03 JULY 2018

VA Livermore Realignment and Closure - Part B CBOC

Stockton (French Camp) San Joaquin County, CA

800 (CBOC), 803 (CUP)

NO REVISIONS DATE

1 DESIGN REVISIONS 23 NOV. 18

AM-0004

TT

T

T

T

T

T

T

T

T

T

T

T

T

T T

T

T

T

C O

C O

C O

T

C O

T

EXT TEAM

AREA

2A112K

PROCEDURE

RM

2A111G

RTCA1

CONSULT/

EXAM

2A112N

EXPA1

CONSULT/

EXAM

2A111K

OFDC2

CONSULT/

EXAM

2A112M

EXPA1

CONSULT/

EXAM

2A112D

EXPA1

ST TLT

2A126

TLTU1

CONSULT/

EXAM

2A112G

EXPA1

CONSULT/

EXAM

2A113C

EXPA1

ST TLT

2A132

TLTU1

PAT TLT

2A138

TLTU1

CONSULT/

EXAM

2A111F

EXPA1

CONSULT/

EXAM

2A113F

EXPA1

CONSULT/

EXAM

2A112Q

EXPA1

PROCEDURE

RM

2A113G

TRPR1

CONSULT/

EXAM

2A111L

EXPA1

CONSULT/

EXAM

2A111N

EXPA1

HAC

2A122

JANC1

CONSULT/

EXAM

2A112L

EXPA1

SHAFT

SH004

SHAFT

SH003

MED

2A112P

RCA02

MED

2A111M

RCA02

SOILED

2A111D

USCL1

SCALE

ALCOVE

2A135

ST

LOUNGE

2A133

SL001

CONF RM

2A127

CRA01

CORR

C2101

CORR

C2102

CORR

C2103

TLT GEN

2A136

TLTU1

SOILED

2A113D

USCL1

SCALE

ALCOVE

2A139

BMER1

SOILED

2A112E

USCL1

STOR, MED

EQUIP

2A128

SRE01

PROC TLT

2A113G.1

TLTB1

ELEC

2A129

TR

2A124

CONSULT/

EXAM

2A111J

OFDC2

SCALE

ALCOVE

2A137

SHARED

DOC AREA

2A112F

WRTM1

SHARED

DOC AREA

2A111E

WRTM1

CUBICLE

2A111H

OFA02

PROC TLT

2A111G.1

TLTB1

BALCONY

2A133A

CORR

C2106

CORR

2A125

ELEV S-1

S-1 STAIR 2

2S002

SECURITY

CLOS

2A135A

2A111C.1

TLTU1

59 SF

TLT WH

2A111H.1

22 SF

ALCOVE

2A112H

RTCA1

185 SF

PROCEDURE

RM

2A112H.1

TLTB1

54 SF

PROC TLT

2A130

CRA01

200 SF

CONF RM

H J K L L.6 L.7 M

C20

H.7 J.7

6" HHWS/R AND

8" CHWS/R UP/DN

3"ø HHWS/R 3"ø CHWS/R

2"ø HHWS/R 2"ø CHWS/R

3"ø HHWS/R 3"ø CHWS/R

H.2

10-209

VAV9-205

VAV

FC

8-205

VAV

10-210

VAV

10-204

VAV

10-203

VAV

10-202

VAV

10-212

VAV

10-211

VAV

10-213

VAV

10-214

VAV

10-215

VAV

10-216

VAV

10-217

VAV

9-207

VAV

9-206

VAV

9-208

VAV

1"ø CHWS

1"ø CHWR

2"ø HHWR

2"ø HHWS

1"ø HHWR 1"ø HHWS

1 1/2"ø HHWR

1 1/2"ø HHWS

2"ø HHWR

2"ø HHWS

1"ø HHWS

1"ø HHWR

1"ø CHWR

1"ø CHWS

1"ø CHWS/R

/1 MP102-A2

M P

-A

/1 MP102-A1

VAV-10-209VAV-9-204

VAV-10-210

VAV-10-217

VAV-10-215

VAV-10-216

FC-23

VAV-10-214

VAV-10-213

T

VAV-10-211

VAV-10-212

VAV-10-202

VAV-10-203

VAV-10-204

VAV-8-205

FC-22

VAV-9-206

VAV-9-208

VAV-9-214

VAV-9-215

VAV-8-204

FC

VAV-9-207

3"ø CHWS/R AND 3"ø HHWS/R

STUB-OUT WITH SOV FOR

FUTURE EXPANSION

3/4"ø CD 3/4"ø CD

3/4"ø CD

3/4"ø CD

M P

-A

M P

-A

FLOOR SHUT-OFF

VALVE, TYP.

GENERAL NOTES:

1. REFER TO MP102-A1 FOR GENERAL NOTE AND

APPLICABLE SHEET NOTE DESCRIPTION.

E

G

No.M024435E R

A NC H

S T

ETA

C AFO

M E

I AI

N

L I F OR

C

LA

RE

S

IS

T

ESOF

R

L O

D P

ER

E ENSH

I

EN

H

AL

YU

NO

GIN

U

Exp. 09-30-2020

0 2'-0" 4'-0" 8'-0"

PLAN

NORTH

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

Drawing number

Drawn

Location

Project Title

Date Checked by

Drawing Title

1 2 3 4 5 6

A

B

C

D

E

F

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

CONSULTANTS: ARCHITECTS/ENGINEERS: Office of Construction and Facilities Management

7 8 9

MECHANICAL/ELECTRICAL/

PLUMBING:

Gayner Engineers 1133 Post Street San Francisco,CA 94109

STRUCTURAL:

Degenkolb Engineers 375 Beale Street Suite 500 San Francisco, CA 94105

CIVIL / SURVEYOR:

Sandis 636 9th Street Oakland, CA 94607

ARCHITECTURE/

INTERIOR DESIGN/

SECURITY/SIGNAGE/

COMMUNICATIONS/ MEDICAL

EQUIPMENT/ MASTER PLAN

LANDSCAPE/

ENVIRONMENTAL

ASSESSMENT:

HDR Architecture, Inc.

201 California Street Suite 1500 San Francisco, CA 94111

FULLY SPRINKLERED

FIRE PROTECTION:

Jensen Hughes Inc.

2950 Buskirk Avenue, Ste. 225 Walnut Creek, CA 94597

CONSULTANT:

GEOTECHNICAL:

Allegiance Group 4321 SW Corbett #200 Portland, OR 97239

COST ESTIMATING:

AECOM

300 California Street, Suite 400 San Francisco, CA 94104

Station Number Project Number

640 640-423

Building Number

U.S. Department of Veterans Affairs

A1

A4

A2

A3C

MP102-A3

LEVEL 2 AREA A3 PLAN - PIPING

SL SO03 JULY 2018

VA Livermore Realignment and Closure - Part B CBOC

Stockton (French Camp) San Joaquin County, CA

800 (CBOC), 803 (CUP)

NO REVISIONS DATE

1 DESIGN REVISIONS 23 NOV. 18

T

T

T

TTC

O

T

T

T

T

T

T

T T

T

C O

T

C O

T T

C O

T

T

3A111H

TRPR1

188 SF

PROCEDURE

RM

3A111P

OFDC2

127 SF

CONSULT/

EXAM

3A111K

OFDC2

127 SF

CONSULT/

EXAM

3A111N

RCA02

58 SF

MED

3A132

TLTU1

51 SF

STAFF TLT

3A111D

EXPA1

127 SF

CONSULT/

EXAM

3A112G

EXPA1

126 SF

CONSULT/

EXAM

3A112N

EXPA1

127 SF

CONSULT/

EXAM

3A113J

TRPR1

179 SF

PROCEDURE

RM

3A129

152 SF

ELEC

3A133

SL001

229 SF

STAFF

LOUNGE

3A138

TLTU1

56 SF

PAT TLT

3A113E

EXPA1

127 SF

CONSULT/

EXAM

3A112D

EXPA1

126 SF

CONSULT/

EXAM

3A135

35 SF

SCALE

ALCOVE

3A112Q

EXPA1

127 SF

CONSULT/

EXAM

3A112M

EXPA1

127 SF

CONSULT/

EXAM

3A127

CRA01

181 SF

CONF RM

3A112K

112 SF

EXT. TEAM

AREA

3A113H

EXPA1

127 SF

CONSULT/

EXAM

C3102

473 SF

CORR

3A137

BMER1

27 SF

SCALE

ALCOVE

3A139

35 SF

SCALE

ALCOVE

3A128

SRE01

143 SF

STOR, MED

EQUIP

3A112F

USCL1

72 SF

SOILED

3A126

TLTU1

50 SF

ST TLT

3A111G

EXPA1

127 SF

CONSULT/

EXAM

3A113J.1

TLTB1

54 SF

PROC TLT

3A122

JANC1

52 SF

HAC

3A112L

EXPA1

119 SF

CONSULT/

EXAM

3A124

115 SF

TR

3A111M

OFDC2

127 SF

CONSULT/

EXAM

3A111L

OFDC2

127 SF

CONSULT/

EXAM

3A134

9 SF

E. CLO

3A136

TLTU1

56 SF

TLT GEN

3A112E

WRTM1

272 SF

SHARED

DOC AREA

3A111E

WRTM1

210 SF

SHARED

DOC AREA

3A111J

592 SF

EXT TEAM

AREA

3A112P

RCA02

55 SF

MED

3A111F

USCL1

71 SF

SOILED

3A113G

USCL1

69 SF

SOILED

C3107

1363 SF

CORR

3S002

222 SF

STAIR 2

3A125

229 SF

CORR

BALCONY

3A133A

S-1

115 SF

ELEV S-1

SH003

56 SF

SHAFT

SH004

56 SF

SHAFT

3A111H.1

TLTB1

51 SF

PROC TLT

SH007

22 SF

SHAFT

3A125A

27 SF

SECURITY

CLOSET

3A130

CRA01

200 SF

CONF RM

3A111J.1

22 SF

ALCOVE

3A112K.1

21 SF

ALCOVE

3A112H

RTCA1

183 SF

PROCEDURE

RM

3A112H.1

TLTB1

54 SF

PROC TLT

3A134A

6 SF

F.A. CLO.

3A135A

9 SF

E. CLO

H J K L L.6 L.7 M

C20

H.7 J.7

6" HHWS/R AND

8" CHWS/R UP/DN

3"ø HHWS/R

3"ø CHWS/R

3"ø CHWS/R AND 3"ø HHWS/R

STUB-OUT WITH SOV FOR

FUTURE EXPANSION

H.2

8-305

VAV

10-309

VAV

10-311

VAV

10-310

VAV

10-312

VAV

10-313

VAV

10-314

VAV

10-316

VAV

9-307

VAV

9-305

VAV

9-306

VAV

9-308

VAV

10-315

VAV

10-302

VAV

10-303

VAV

10-304

VAV

FC

/1 MP103-A2

M P

-A

/1 MP103-A1

3"ø HHWS/R

3"ø CHWS/R

2"ø HHWS/R 2"ø CHWS/R

3"ø HHWS/R 3"ø CHWS/R

1"ø CHWS

1"ø CHWR

2"ø HHWR

2"ø HHWS

1"ø HHWR 1"ø HHWS

1 1/2"ø HHWR

1 1/2"ø HHWS

2"ø HHWR

2"ø HHWS

1"ø HHWS

1"ø HHWR

1"ø CHWR

1"ø CHWS

1"ø CHWS/R

VAV-10-309

VAV-10-316

VAV-10-314

VAV-10-315

FC-33

VAV-10-313

VAV-10-312

T

VAV-10-310

VAV-10-311

VAV-10-302

VAV-10-304

VAV-10-303

VAV-8-305

FC-32

VAV-9-306

VAV-9-308

VAV-9-314

VAV-9-315

VAV-8-304

FC

VAV-9-307

VAV-9-305

3/4"ø CD 3/4"ø CD

3/4"ø CD

3/4"ø CD

/1 MP103-A4

/1 MP103-A2

3FLOOR SHUT-OFF

VALVE, TYP.

GENERAL NOTES:

1. REFER TO MP103-A1 FOR GENERAL NOTE AND

APPLICABLE SHEET NOTE DESCRIPTION.

E

G

No.M024435E R

A NC H

S T

ETA

C AFO

M E

I AI

N

L I F OR

C

LA

RE

S

IS

T

ESOF

R

L O

D P

ER

E ENSH

I

EN

H

AL

YU

NO

GIN

U

Exp. 09-30-2020

0 2'-0" 4'-0" 8'-0"

PLAN

NORTH

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

Drawing number

Drawn

Location

Project Title

Date Checked by

Drawing Title

1 2 3 4 5 6

A

B

C

D

E

F

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

CONSULTANTS: ARCHITECTS/ENGINEERS: Office of Construction and Facilities Management

7 8 9

MECHANICAL/ELECTRICAL/

PLUMBING:

Gayner Engineers 1133 Post Street San Francisco,CA 94109

STRUCTURAL:

Degenkolb Engineers 375 Beale Street Suite 500 San Francisco, CA 94105

CIVIL / SURVEYOR:

Sandis 636 9th Street Oakland, CA 94607

ARCHITECTURE/

INTERIOR DESIGN/

SECURITY/SIGNAGE/

COMMUNICATIONS/ MEDICAL

EQUIPMENT/ MASTER PLAN

LANDSCAPE/

ENVIRONMENTAL

ASSESSMENT:

HDR Architecture, Inc.

201 California Street Suite 1500 San Francisco, CA 94111

FULLY SPRINKLERED

FIRE PROTECTION:

Jensen Hughes Inc.

2950 Buskirk Avenue, Ste. 225 Walnut Creek, CA 94597

CONSULTANT:

GEOTECHNICAL:

Allegiance Group 4321 SW Corbett #200 Portland, OR 97239

COST ESTIMATING:

AECOM

300 California Street, Suite 400 San Francisco, CA 94104

Station Number Project Number

640 640-423

Building Number

U.S. Department of Veterans Affairs

A1

A4

A2

A3

MP103-A3

LEVEL 3 AREA A3 PLAN - PIPING

SL SO03 JULY 2018

VA Livermore Realignment and Closure - Part B CBOC

Stockton (French Camp) San Joaquin County, CA

800 (CBOC), 803 (CUP)

NO REVISIONS DATE

1 DESIGN REVISIONS 23 NOV. 18

TT

T

C O

T

T

T

T

T

T

TT

C

O

T

T

T T

C O

C

O

T

T T CO2T

ELECTRICAL

4A139

152 SF

TELECOMMUNICATIONS

4A134

115 SF

EXAM /

TREATMENT

4A114L

TREY1

134 SF

TESTING,

ANTERIOR

4A114J

TREY1

192 SF

LASER

TREATMENT

4A114H

TREY2

189 SF

LOW

VISION

EXAM

4A114F

EYOT2

189 SF

SCALE

ALCOVE

4A146

35 SF

ORAL

SURGERY

ROOM

4A115J

DNTS1

151 SF

HAC

4A133

JANC1

52 SF

SCALE

ALCOVE

4A144

28 SF

LINEN /

CLEAN

SPD

4A115K

LCCL1

100 SF

MED.

4A114K

MEDP1

56 SF

PAT.

TLT.

4A145

TLTU1

57 SF

STAFF

TOILET

4A138

TLTU1

49 SF

SHAFT

SH004

56 SF

SHAFT

SH003

56 SF

EYE

PROCEDURE

4A114E

EYOT2

192 SF

CIRCULATION

4A110

735 SF

EXAM/CONSULT.

4A115G

DNTG1

127 SF

EQUIPMENT

STORAGE

4A137

SRS02

143 SF

SOILED

4A114D

USCL1

74 SF

STAFF

TOILET

4A110K

TLTU1

56 SF

SOILED

SPD

HOLDING

4A115L

LCSL1

128 SF

DRESSING

4A115H

DR001

70 SF

CUBICLES

4A114G

OFA03

606 SF

ELEC.CLOSET

4A143

6 SF

TBD.

STAFF

LOUNGE

4A142

SL001

235 SF

OFFICE

EYE

CARE

PROVIDERS

4A114

OFD03

224 SF

CONFERENCE

ROOM

4A136

CRA01

181 SF

WORKROOM

4A140

WKTM1

111 SF

TBD.

LOCKERS

4A141

LR004

79 SF

OFFICE

SECRETARY

AND

WAITING

4A110M

SEC01

119 SF

DOCUMENT

CONTROL

4A110L

SRSE1

116 SF

CONFERENCE

ROOM

4A110J

CRA01

195 SF

CONFERENCE

ROOM

4A110H

CRA01

193 SF

OFFICE

MED

ADMIN

4A110A

OFA02

108 SF

OFFICE

HOTELING

4A110B

OFA02

109 SF

OFFICE

SITE

MANAGER

4A110C

OFA01

110 SF

HR

4A110E

OFA02

55 SF

ADMIN

OFFICER

4A110G

OFA02

55 SF

NURSING

ADMIN

4A110F

OFA02

55 SF

SUPPORT

STAFF

4A110D

OFA02

273 SF

STAIR 2

4S002

222 SF

CORR

C4101

601 SF

BALCONY

4A142A

Not Enclosed

CORRIDOR

4A135

229 SF

CORR

C4102

491 SF

CORR

C4104

473 SF

CORR

C4109

974 SF

ELEV

S-1

115 SF

SHAFT

SH007

22 SF

SECURITY

CLOSET

4A135A

27 SF

H J K L L.6 L.7 M

C20

H.7 J.7

6" HHWS/R AND

8" CHWS/R

2"ø HHWS/R 3"ø CHWS/R

3"ø CHWS/R AND 3"ø HHWS/R

STUB-OUT WITH SOV FOR

FUTURE EXPANSION

4"ø HHWS/R

8"ø CHWS/R

4"ø HHWS/R

H.2

8-407

VAV

9-419

VAV

9-418

VAV

9-420

VAV

9-415

VAV

10-402

VAV

10-403

VAV

10-404

VAV

10-406

VAV

10-411

VAV10-412

VAV

10-413

VAV

10-415

VAV

10-414

VAV

10-417

VAV

10-407

VAV

9-417

VAV

10-416

VAV

/1 MP104-A2

M P

-A

FC10-405

VAV

9-416

VAV

FC

VAV-10-402

VAV-10-403

VAV-10-404

T

VAV-10-411

VAV-10-414

VAV-10-415

VAV-10-416VAV-10-417FC-43VAV-10-405

VAV-10-406

VAV-10-407

VAV-9-418

VAV-9-416

VAV-9-420

VAV-9-419

VAV-9-417

T

VAV-9-415

VAV-8-407

FC-42

VAV-9-407

VAV-10-412

VAV-10-413

1"ø HHWR

1"ø HHWS

1"ø CHWS

1"ø CHWR

1 1/2"ø HHWS 1 1/2"ø HHWR

3"ø CHWS/R

3"ø HHWS/R

8"ø CHWS/R

6"ø HHWS/R

1 1/2"ø CHWS 1 1/2"ø CHWR

1-1/2"ø CHWS/R

1"ø HHWS/R

1"ø HHWS 1"ø HHWR

1-1/2"ø CHWS/R

6"ø CHWS/R

3"ø HHWS/R

6"ø CHWS/R TO

AHU-06

2-1/2"ø HHWS/R

TO AHU-06

2 1/2"ø HHWS

2 1/2"ø HHWR

6"ø CHWR

6"ø CHWS

4"ø CHWS/R

TO AHU-09

4"ø CHWR 4"ø CHWS

2"ø HHWS 2"ø HHWR

2"ø HHWS/R

TO AHU-09

1 1/2"ø HHWR 1 1/2"ø HHWS

2-1/2"ø CHWS/R

TO AHU-03

1-1/2"ø HHWS/R

TO AHU-03

2 1/2"ø CHWS 2 1/2"ø CHWR

6"ø CHWR 6"ø CHWS

2-1/2"ø CHWS/R

TO AHU-02

2 1/2"ø CHWS 2 1/2"ø CHWR

1-1/2"ø HHWS/R

TO AHU-02

4"ø CHWS 4"ø CHWR

1 1/2"ø HHWS

1 1/2"ø HHWR

2 1/2"ø HHWR 2 1/2"ø HHWS

4"ø CHWS/R

TO AHU-10

2-1/2"ø HHWS/R

TO AHU-10

1 1/2"ø HHWR 1 1/2"ø HHWS

1"ø HHWS

1"ø HHWR

1"ø HHWS

1"ø HHWR

3/4"ø HHWS 3/4"ø HHWR

2"ø HHWS 2"ø HHWR

8"ø CHWS/R

6"ø HHWS/R

1"ø HHWR 1"ø HHWS

T

1"ø CD

1 1/2"ø CD

1"ø CD

3/4"ø CD

1"ø CD

1 1/2"ø CD

2"ø CD

/1 MP104-A4

/1 MP104-A1

2"ø CD FROM

AHU-06

1-1/2"ø CD

FROM AHU-09

3/4"ø CD (HOT) 3/4"ø CD (HOT)

FROM SH-01

1 1/2"ø HHWR

3/4"ø CD (HOT)

FROM AHU-03

1 1/2"ø HHWS 3/4"ø CD (HOT) 1 1/2"ø CD (HOT)

1"ø CD FROM

AHU-03

1"ø CD

2"ø TO

DRAIN

3"ø HHWS/R

1"ø CD FROM

AHU-02

1-1/2"ø CD

FROM AHU-10

1"ø CD 1 1/2"ø CD

1-1/2"ø CHWS/R 1"ø HHWS/R 1"ø CD

1"ø CHWS/R

1"ø CD

/1 MP104-A2

4FLOOR SHUT-OFF

VALVE, TYP.

GENERAL NOTES:

1. REFER TO MP104-A1 FOR GENERAL NOTE AND

APPLICABLE SHEET NOTE DESCRIPTION.

E

G

No.M024435E R

A NC H

S T

ETA

C AFO

M E

I AI

N

L I F OR

C

LA

RE

S

IS

T

ESOF

R

L O

D P

ER

E ENSH

I

EN

H

AL

YU

NO

GIN

U

Exp. 09-30-2020

0 2'-0" 4'-0" 8'-0"

PLAN

NORTH

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

Drawing number

Drawn

Location

Project Title

Date Checked by

Drawing Title

1 2 3 4 5 6

A

B

C

D

E

F

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

CONSULTANTS: ARCHITECTS/ENGINEERS: Office of Construction and Facilities Management

7 8 9

MECHANICAL/ELECTRICAL/

PLUMBING:

Gayner Engineers 1133 Post Street San Francisco,CA 94109

STRUCTURAL:

Degenkolb Engineers 375 Beale Street Suite 500 San Francisco, CA 94105

CIVIL / SURVEYOR:

Sandis 636 9th Street Oakland, CA 94607

ARCHITECTURE/

INTERIOR DESIGN/

SECURITY/SIGNAGE/

COMMUNICATIONS/ MEDICAL

EQUIPMENT/ MASTER PLAN

LANDSCAPE/

ENVIRONMENTAL

ASSESSMENT:

HDR Architecture, Inc.

201 California Street Suite 1500 San Francisco, CA 94111

FULLY SPRINKLERED

FIRE PROTECTION:

Jensen Hughes Inc.

2950 Buskirk Avenue, Ste. 225 Walnut Creek, CA 94597

CONSULTANT:

GEOTECHNICAL:

Allegiance Group 4321 SW Corbett #200 Portland, OR 97239

COST ESTIMATING:

AECOM

300 California Street, Suite 400 San Francisco, CA 94104

Station Number Project Number

640 640-423

Building Number

U.S. Department of Veterans Affairs

A1

A4

A2

A3

MP104-A3

LEVEL 4 AREA A3 PLAN - PIPING

SL SO03 JULY 2018

VA Livermore Realignment and Closure - Part B CBOC

Stockton (French Camp) San Joaquin County, CA

800 (CBOC), 803 (CUP)

NO REVISIONS DATE

1 DESIGN REVISIONS 23 NOV. 18

N

N

NN

N

H J K L L.6 L.7 M

C20

12" SS

4" SS

16" SS

3 4" SS

4" DCWHP

1295 WSFU

IE = (-3.00)

12" SV

TYP 2

1 4" DCWHP

2" SS 3

12" SS

S S

14" SS

1 2" SS

4" SS4" SS

1 4" SS

24" SS

1 2" SV

S S

P L

-A

/1 PL100-A2

/1 PL100-A2/1 PL100-A1

P L

-A

/1 PL100-A1

S S

3" S S

12" SS

62.5" MPG

IE = (-3.00)

S S

S S

3 4" SS

S S

S S

4" SS

3" SS

S S

4" SS

GCO

4"SS

IE=-3.00

4" SS4" SS6" SS

6"SS 570 DFU

IE=-6.356

2" SV

TYP (3)

IE=-2.68

IE=-4.51

IE=-5.56

S S

1 2" SS

2" SS 3 2"

12" SS

4" SS 1 2" SS 1 2" SS

2 4"

2 3"

2 3"

2 3"

1 2" SS

4"

S S

IE=-5.88

3"SS

IE=-6.1 6

S S

IE=-4.10

S S

3GCO

23" SS

7 1/2"TYP(4)

3 4"

24" SS

FCO

4"

12" SS

3" SS

12" SS

12" SV

12" SV

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

Drawing number

Drawn

Location

Project Title

Date Checked by

Drawing Title

1 2 3 4 5 6

A

B

C

D

E

F

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

CONSULTANTS: ARCHITECTS/ENGINEERS: Office of Construction and Facilities Management

7 8 9

MECHANICAL/ELECTRICAL/

PLUMBING:

Gayner Engineers 1133 Post Street San Francisco, CA 94109

STRUCTURAL:

Degenkolb Engineers 375 Beale Street, Suite 500 San Francisco, CA 94105

CIVIL / SURVEYOR:

Sandis 636 9th Street Oakland, CA 94607

ARCHITECTURE/

INTERIOR DESIGN/

SECURITY/SIGNAGE/

COMMUNICATIONS/ MEDICAL

EQUIPMENT/ MASTER PLAN

LANDSCAPE/

ENVIRONMENTAL

ASSESSMENT:

HDR Architecture, Inc.

201 California Street San Francisco, CA 94111

FULLY SPRINKLERED

FIRE PROTECTION:

Jensen Hughes 2950 Buskirk Avenue, Suite 225 Walnut Creek, CA 94597

CONSULTANT:

GEOTECHNICAL:

Allegiance Group 4321 SW Corbett #200 Portland, OR 97239

COST ESTIMATING:

AECOM

300 California Street, Suite 400 San Francisco, CA 94104

Station Number Project Number

640 640-423

Building Number

U.S. Department of Veterans Affairs

D1

D2

B1

C2

C1 A1

A4

A2

A3

1133 POST STREET

SAN FRANCISCO, CA 94109

TELEPHONE (415) 474-9500

FAX (415) 474-1363

GAYNER

ENGINEERS

C :\U se rs

\k el le y\

D oc um en ts \R ev it

P ro je ct s\

-P -B

_C B

O C

_v

_k el le y.

rv t

/2

1/

:4 1:

P

M

PL100-A3

UNDERGROUND AREA A3 PLAN - PLUMBING

JSY AM26 OCT 2018

VA Livermore Realignment and Closure - Part B - CBOC

Stockton (French Camp) San Joaquin County, CA

800 (CBOC), 803 (CUP)

RISER THRU SLAB.

PIPING UP TO DRAIN.

RISER UP TO CLEANOUT.

WCO ON RISER +16", UON.

PIPING ABOVE FOUNDATION.

FOR CONT. SEE SITE PLAN AND CIVIL

ENGINEERING DRAWINGS.

PIPING DOWN FROM TRAP PRIMER.

SHEET NOTES:

NO REVISION DATE

1 23 NOV. 18DESIGN REVISIONS

6" SS (20)

IE=(-4.50)

4" SS (11)

IE=(-4.00)

GCO

GCO

GAS LINE GO TO CLC AND NHs 3

6"

52"

4" SS

4" SS 4" SS

S S

6" SS1

4"

10 4"MPG

10 2 1/2"MPG

6"DCWHP

10 6"MPG

44"

6 3"

7 5 2"SV (2)

6 4"

63"FCO

4"

9 1/2"TP(4)

63"3"

42"

1 2

5 2"SV5 2"SV

42"

4 3"

6FCO

52"SV

72"SS

4"

4 6"

63"

3"

3" 3"

63" 63"

9 1/2"TP(4)

5 1 1/2"SV

4"

62"FD-B

5 2"SV (TYP 2)5 2"SS

4"4

2"

6 4"

8 4"

DCWHP TO ELB3

DCW FROM WATER MAIN3

106"DCW

103"DCWHP

6FCO

63"

6 3"

3"4

91/2"TP(3)

52"SV, TYP(3)

3"

6FCO

4"4

6 3"

3"

4" SS

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

Drawing number

Drawn

Location

Project Title

Date Checked by

Drawing Title

1 2 3 4 5 6

A

B

C

D

E

F

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

CONSULTANTS: ARCHITECTS/ENGINEERS: Office of Construction and Facilities Management

7 8 9

MECHANICAL/ELECTRICAL/

PLUMBING:

Gayner Engineers 1133 Post Street San Francisco, CA 94109

STRUCTURAL:

Degenkolb Engineers 375 Beale Street, Suite 500 San Francisco, CA 94105

CIVIL / SURVEYOR:

Sandis 636 9th Street Oakland, CA 94607

ARCHITECTURE/

INTERIOR DESIGN/

SECURITY/SIGNAGE/

COMMUNICATIONS/ MEDICAL

EQUIPMENT/ MASTER PLAN

LANDSCAPE/

ENVIRONMENTAL

ASSESSMENT:

HDR Architecture, Inc.

201 California Street San Francisco, CA 94111

FULLY SPRINKLERED

FIRE PROTECTION:

Jensen Hughes 2950 Buskirk Avenue, Suite 225 Walnut Creek, CA 94597

CONSULTANT:

GEOTECHNICAL:

Allegiance Group 4321 SW Corbett #200 Portland, OR 97239

COST ESTIMATING:

AECOM

300 California Street, Suite 400 San Francisco, CA 94104

Station Number Project Number

640 640-423

Building Number

U.S. Department of Veterans Affairs

1133 POST STREET

SAN FRANCISCO, CA 94109

TELEPHONE (415) 474-9500

FAX (415) 474-1363

GAYNER

ENGINEERS

C :\U se rs

\k el le y\

D oc um en ts \R ev it

P ro je ct s\

-P -B

_C B

O C

_v

_k el le y.

rv t

/2

7/

:4 3:

P

M

PL401

UNDERGROUND CUP, Central Utility Plant

JSY TC26 OCT 2018

VA Livermore Realignment and Closure - Part B - CBOC

Stockton (French Camp) San Joaquin County, CA

800 (CBOC), 803 (CUP)

PIPING UNDERGROUND.

FOR CONT, SEE CIVIL ENGINEER DWG.

FOR CONT, SEE SITE PLAN PS100.

PIPING UNDERSLAB.

SV UP FROM BELOW.

RISER UP TO CLEANOUT/DRAIN.

PIPING ABOVE FOUNDATION.

SS CONNECT TO SUMP FOR COOLING TOWER DRAIN.

1/2"TP DOWN TRAP PRIMER VALVE.

RISER FROM PIPING ABOVE GRADE.

6" STANDPIPE FOR SPRINKLER DRAIN.

SHEET NOTES

NO REVISION DATE

23 NOV. 18DESIGN REVISIONS

D

D

D

J K L L.6 L.7 M

C20

2" SS3

34" SS

8 2" SS

8 1-1/2" SV

2" SS

P-114

P-420

P-114

P-420

P-114 P-421

P-114

P-420

P-114

P-420

8 1-1/2" SV

1/2" DCWHP

1/2" DHW

1/2" DCWHP

2" DCWHP

1/2" DCWHP

1/2" DHW

1/2" DCWHP

1/2" DHW

1/2" DCWHP

1/2" DHW

4" DCWHP

3" GAS

1" DCWHP

1" DHWR

2-1/2" DHW

P-114 P-421

3" OFD

3" RD

(600 SF)

2-1/2" DCWHP

1-1/2" DHW

2-1/2" DCWHP

1-1/2" DHW

3/4" DHWR

/2

D

H W

R

D C

W H

P

D C

W H

P

D C

W H

P

D C

W H

P

-1

/4

D H

W

D C

W H

P

-1

/4

D H

W

/4

D

C W

H P

D H

W

8 3" DCWLP

3/4" DHWR

2" DHW

2" DCWHP

1-1/2" DHW

1-1/4" DHW

P-533

P-531

P-533

P-531

2" SS8

8 2" SV

4 2"

2" SS8

8 1-1/2" SV

1/2" DCWHP

1/2" DHW

8 2" SV

4 2"

2" SS

1/2" DCWHP

1/2" DHW

2" SS8

8 1-1/2" SV

1/2" DCWHP

1/2" DHW

2" SS8

8 1-1/2" SV

1/2" DCWHP

1/2" DHW

2" SS8

8 1-1/2" SV 6

1/2" DCWHP

1/2" DHW

2" SS 8 3

1-1/2" SV

1/2" DCWHP

1/2" DHW

2" SS 8 3

1-1/2" SV

1/2" DCWHP

1/2" DHW

2" SS 8

81-1/2" SV

1/2" DCWHP

1/2" DHW

2" SS 8

81-1/2" SV

61-1/4" DCWHP

42" SV

1/2" DCWHP

1/2" DHW

1/2" DCWHP

1/2" DHW

8 1-1/2" SV

32" SS 8

61-1/4" DCWHP

34" SS

82" SV

1-1/2" DHW

-1

/2

D H

W

/2

D

C W

H P

-1

/2

D H

W

/4

D

H W

/2

D

H W

R

1-1/2" SV

P-609

P-528

1/2" DCWHP

1/2" DHW

2" SS 8

81-1/2" SV

P P

-A

/1 PP102-A2/1 PP102-A2

P P

-A

P P

-A

4 2"

74" SS

8 2" SV

34" SS

84 2"

3 4" SS

61-1/4" DCWHP

4" SS

P-114

P-537

8 9

/4

D

C W

H P

D C

W H

P

-1

/2

D H

W

D C

W H

P

-1

/2

D H

W

2"AD-2

2"AD-1

8 2"SV 1-1/4"DCWHP

P-537

P-537

P-537

P-537

P-537

2" SS

P-537

P-537

P-537

P-537

D C

W H

P

D C

W H

P

D C

W H

P

D C

W H

P

-1

/4

D H

W

D C

W H

P

-1

/4

D H

W -1

/4

D H

W

D C

W H

P

/4

D

H W

2-1/2" DCWHP

1-1/2" DHW

/1 PP102-A1

3" HVE

EXHAUST

2" VTR

2"DCA

INTAKE

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

Drawing number

Drawn

Location

Project Title

Date Checked by

Drawing Title

1 2 3 4 5 6

A

B

C

D

E

F

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

CONSULTANTS: ARCHITECTS/ENGINEERS: Office of Construction and Facilities Management

7 8 9

MECHANICAL/ELECTRICAL/

PLUMBING:

Gayner Engineers 1133 Post Street San Francisco, CA 94109

STRUCTURAL:

Degenkolb Engineers 375 Beale Street, Suite 500 San Francisco, CA 94105

CIVIL / SURVEYOR:

Sandis 636 9th Street Oakland, CA 94607

ARCHITECTURE/

INTERIOR DESIGN/

SECURITY/SIGNAGE/

COMMUNICATIONS/ MEDICAL

EQUIPMENT/ MASTER PLAN

LANDSCAPE/

ENVIRONMENTAL

ASSESSMENT:

HDR Architecture, Inc.

201 California Street San Francisco, CA 94111

FULLY SPRINKLERED

FIRE PROTECTION:

Jensen Hughes 2950 Buskirk Avenue, Suite 225 Walnut Creek, CA 94597

CONSULTANT:

GEOTECHNICAL:

Allegiance Group 4321 SW Corbett #200 Portland, OR 97239

COST ESTIMATING:

AECOM

300 California Street, Suite 400 San Francisco, CA 94104

Station Number Project Number

640 640-423

Building Number

U.S. Department of Veterans Affairs

A1

A4

A2

A3C

1133 POST STREET

SAN FRANCISCO, CA 94109

TELEPHONE (415) 474-9500

FAX (415) 474-1363

GAYNER

ENGINEERS

C :\U se rs

\k el le y\

D oc um en ts \R ev it

P ro je ct s\

-P -B

_C B

O C

_v

_k el le y.

rv t

/2

1/

:4 1:

P

M

PP102-A3

LEVEL 2 AREA A3 PLAN - PLUMBING

JSY AM26 OCT 2018

VA Livermore Realignment and Closure - Part B - CBOC

Stockton (French Camp) San Joaquin County, CA

800 (CBOC), 803 (CUP)

4" RWL DOWN FROM FLOOR ABOVE AND GO TO

FLOOR BELOW, UON.

4" OFD DOWN FROM FLOOR ABOVE AND GO TO

FLOOR BELOW, UON.

PIPING DOWN TO FLOOR BELOW.

SV UP FROM FLOOR BELOW.

PIPING IN CEILING SPACE.

PIPING TO FIXTURES.

PIPING DOWN FROM DRAIN ABOVE.

RISER(S) TO FLOOR ABOVE.

UTILITIES UP IN SHAFT SPACE: 3/4"DW, 1-1/2"DV,

1"DCA, 3"MPG.

VALVE WITH CAPPED OUTLET ON DHW & DHWR

FOR LEGIONELLA MITIGATION

SHEET NOTES:

NO REVISION DATE

UPUP

J K L L.6 L.7 M

C20

2 1

34" OFD

3 4" RWL

P-420

P-114

P-531

32" SS

P-420

P-114

3 2" SS31-1/2" SV

3 2" SS

3 1-1/2" SV

P-420

P-114

42" VTR

1/2" DCWHP

1/2" DHW

1/2" DCWHP

3" DCWHP

1" DHWR

2-1/2" DHW

1/2" DCWHP

1/2" DHW

4 1-1/2" VTR

32" SV TYP (3)

61-1/4" DCWHP 3 1-1/2" SV

3 2" SS

1/2" DCWHP

1/2" DHW

/1 PP104-A2

/1 PP104-A2

P P

-A

P P

-A

P-52831-1/2" SV

32" SS

1/2" DCWHP

1/2" DHW

1-1/4" DHW

2" DCWHP

1-1/4" DHW

1-1/4" DHW

31-1/2" SV

32" SS

1/2" DCWHP

1/2" DHW

3 2" SV TYP (3)

6 1-1/4" DCWHP6

/4

D

H W

R

S V

S V

S V

P-533

P-609

/4

D

H W

D C

W H

P

D C

W H

P

D C

W H

P

D C

W H

P

3/4" DCWHP

D H

W -1

/4

D H

W

1-1/2" DHW

2" AD-2

2" AD-1

3/4" DHWR

2-1/2" DCWHP

3/4" DHWR

/4

D

H W

R

3" DCWHP

1" DHWR

2-1/2" DHW

3 2" SS

3 1-1/2" SV

6 1/2" DCWHP

1/2" DHW

3 2" SS

3 1-1/2" SV

1/2" DCWHP

1/2" DHW

3 3" MG

D C

W H

P

P-537

1-1/2" DHW

1-1/4" DHWR

3" DCWHP

4" RWL

4" OFD

4" RWL

4" OFD

P-537

P-537

P-537

1-1/2" DCWHP

1" SCW

S C

W

4 1" SCW

8 FND-1

8 FND-1

ELECTRICAL

4A1394A139

TESTING,

ANTERIOR

4A114J4A114J

LASER

TREATMENT

4A114H4A114H

LOW VISION

EXAM

4A114F4A114F

SCALE

ALCOVE

4A1444A144

MED.

4A114K4A114KPAT. TLT.

4A1454A145

STAFF

TOILET

4A1384A138

EYE

PROCEDURE

4A114E4A114E

CIRCULATION

4A1104A110

EQUIPMENT

STORAGE

4A1374A137

SOILED

4A114D4A114D

STAFF

TOILET

4A110K4A110K

CUBICLES

4A114G4A114G

TBD. STAFF

LOUNGE

4A1424A142

OFFICE EYE

CARE

PROVIDERS

4A1144A114

CONFERENCE

ROOM

4A1364A136

WORKROOM

4A1404A140

TBD.

LOCKERS

4A1414A141

OFFICE

SECRETARY

AND

WAITING

4A110M4A110M

CONFERENCE

ROOM

4A110J4A110J

CONFERENCE

ROOM

4A110H4A110H

OFFICE

MED ADMIN

4A110A4A110A

OFFICE

HOTELING

4A110B4A110B

OFFICE

SITE

MANAGER

4A110C4A110C

HR

4A110E4A110E

ADMIN

OFFICER

4A110G4A110G

NURSING

ADMIN

4A110F4A110F

SUPPORT

STAFF

4A110D4A110D

CORR

C4101C4101

STAIR 2

4S0024S002

BALCONY

4A142A4A142A

CORRIDOR

4A1354A135

CORR

C4102C4102

CORR

C4104C4104

CORR

C4109C4109

SHAFT

SH003SH003

SHAFT

SH004SH004

SECURITY

CLOSET

4A135A

ALCOVE

4A114G.14A114G.1

F.A.

CLOSET

4A143A4A143A

ELEC.CLOSET

4A141DD4A141DD

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

Drawing number

Drawn

Location

Project Title

Date Checked by

Drawing Title

1 2 3 4 5 6

A

B

C

D

E

F

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

CONSULTANTS: ARCHITECTS/ENGINEERS: Office of Construction and Facilities Management

7 8 9

MECHANICAL/ELECTRICAL/

PLUMBING:

Gayner Engineers 1133 Post Street San Francisco, CA 94109

STRUCTURAL:

Degenkolb Engineers 375 Beale Street, Suite 500 San Francisco, CA 94105

CIVIL / SURVEYOR:

Sandis 636 9th Street Oakland, CA 94607

ARCHITECTURE/

INTERIOR DESIGN/

SECURITY/SIGNAGE/

COMMUNICATIONS/ MEDICAL

EQUIPMENT/ MASTER PLAN

LANDSCAPE/

ENVIRONMENTAL

ASSESSMENT:

HDR Architecture, Inc.

201 California Street San Francisco, CA 94111

FULLY SPRINKLERED

FIRE PROTECTION:

Jensen Hughes 2950 Buskirk Avenue, Suite 225 Walnut Creek, CA 94597

CONSULTANT:

GEOTECHNICAL:

Allegiance Group 4321 SW Corbett #200 Portland, OR 97239

COST ESTIMATING:

AECOM

300 California Street, Suite 400 San Francisco, CA 94104

Station Number Project Number

640 640-423

Building Number

U.S. Department of Veterans Affairs

A1

A4

A2

A3

1133 POST STREET

SAN FRANCISCO, CA 94109

TELEPHONE (415) 474-9500

FAX (415) 474-1363

GAYNER

ENGINEERS

C :\U se rs

\k el le y\

D oc um en ts \R ev it

P ro je ct s\

-P -B

_C B

O C

_v

_k el le y.

rv t

/2

1/

:4 1:

P

M

PP104-A3

LEVEL 4 AREA A3 PLAN - PLUMBING

JSY AM26 OCT 2018

VA Livermore Realignment and Closure - Part B - CBOC

Stockton (French Camp) San Joaquin County, CA

800 (CBOC), 803 (CUP)

SHEET NOTES:

4" RWL DOWN FROM ABOVE, UON.

4" OFD DOWN FROM ABOVE, UON.

PIPING DOWN TO FLOOR BELOW.

PIPING TO ROOF.

PIPING IN CEILING SPACE.

PIPING TO FIXTURE(S).

VALVE WITH CAPPED OUTLET ON DHW AND DHWR FOR LEGIONELLA

MITIGATION.

2" SS, 1-1/2" SV UP IN WALL SPACE. 1/2" DCW TO TP-2. SEE DETAIL

12/PP603, SIMILAR.

NO REVISION DATE

UP

H J

1 2" SV

2 2" VTR

12" SV

12" SV

FD-O

FD-O

2 3" VTR

13" SV

WATER SOFTENER

1-1/4" DHWR

D H

W

3" DCWHP

1-1/4" DHWR

2-1/2" DHW

3" GAS

EXPANSION TANK

6" WH INTAKE

FRESH AIR

TYP (3)

6" WH EXHUST

TYP (3)

4 TYP (3)

FD-B

P-707

MV MV2

-1

/2

D H

W

WH-1

WH-2

WH-3

WS-1

CP-1

CP-2

MV-1

GPRV-2

ET-1

2-1/2 "MPG

2-1/2"MPG DN

THROUGH

ROOF

1 1" SCW

3"SCW

"S

C W

3" DCWHP

2"SCW

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

Drawing number

Drawn

Location

Project Title

Date Checked by

Drawing Title

1 2 3 4 5 6

A

B

C

D

E

F

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

CONSULTANTS: ARCHITECTS/ENGINEERS: Office of Construction and Facilities Management

7 8 9

MECHANICAL/ELECTRICAL/

PLUMBING:

Gayner Engineers 1133 Post Street San Francisco, CA 94109

STRUCTURAL:

Degenkolb Engineers 375 Beale Street, Suite 500 San Francisco, CA 94105

CIVIL / SURVEYOR:

Sandis 636 9th Street Oakland, CA 94607

ARCHITECTURE/

INTERIOR DESIGN/

SECURITY/SIGNAGE/

COMMUNICATIONS/ MEDICAL

EQUIPMENT/ MASTER PLAN

LANDSCAPE/

ENVIRONMENTAL

ASSESSMENT:

HDR Architecture, Inc.

201 California Street San Francisco, CA 94111

FULLY SPRINKLERED

FIRE PROTECTION:

Jensen Hughes 2950 Buskirk Avenue, Suite 225 Walnut Creek, CA 94597

CONSULTANT:

GEOTECHNICAL:

Allegiance Group 4321 SW Corbett #200 Portland, OR 97239

COST ESTIMATING:

AECOM

300 California Street, Suite 400 San Francisco, CA 94104

Station Number Project Number

640 640-423

Building Number

U.S. Department of Veterans Affairs

1133 POST STREET

SAN FRANCISCO, CA 94109

TELEPHONE (415) 474-9500

FAX (415) 474-1363

GAYNER

ENGINEERS

C :\U se rs

\k el le y\

D oc um en ts \R ev it

P ro je ct s\

-P -B

_C B

O C

_v

_k el le y.

rv t

/2

1/

:4 1:

P

M

PP201

PENTHOUSE

JSY AM26 OCT 2018

VA Livermore Realignment and Closure - Part B - CBOC

Stockton (French Camp) San Joaquin County, CA

800 (CBOC), 803 (CUP)

PIPING DOWN TO FLOOR BELOW.

PIPING TO HIGH-ROOF.

1-1/4" DCW DOWN TO ESH.

1-1/4" GAS, 2" DCW, 2" DHW CONNECTED TO WH.

1" DCW DOWN TO ET-1.

NOT USED.

NOT USED.

NOT USED.

TEE FOR GAS PRESSURE SENSOR. SEE DIVISION 23.

SUPPORT PIPING ON ROOF.

MOTORIZED GAS VALVE.

3/4" DCW DN TO TP-1, +36".

4" THICK CONCRETE PAD.

SHUT OFF VALVE, +72".

SHEET NOTES:

NO REVISION DATE

23 NOV. 18DESIGN REVISIONS1

P-801

P-801

WATER

SOFTENER

CUP GAS METER

16000 CFH

PART B GAS METER

4503 CFH

PART A GAS METER

15793 CFH

2-1/2" CW FOR

COOLING TOWERS

3" FD-B 3" FD-B 3" FD-B

6" MPG

3" FD-B 3" FD-B

4" MPG3" MPG

6" DCWHP5

3" FD-B

3" FCO

3" FD-B

3" FCO

2" SV (3)

1-1/4"DCWHP DN

2" VTR 5

2" SS DN, 1-1/2" V UP

FCO

2" SV

2" SV

3" FD-R

/2

D C

W H

P

4" FD-O

4" FCO

3" FCO 3" FD-B

MAP-A2

MAP-B2

MAP-C2

MEDICAL GAS

MASTER ALARM

PANELS

10 4" MPG

10 2 1/2" MPG

GM-2

GM-3

GM-1

6" DCWHP

P-801

10 6" DCWHP1

10 9

1126"

122"

2"SV (2)

WS-2

GCO

6" DCWHP

2 1/2" DCWHP

BFP-1

SOV+72"

PRV

WM-5

15TYP(5)

6"

12 2" SVTR

122" SVTR

P-114

P-418

EWH-1

2" SV11

BP-3

BP-2

BP-1

D C

W

D C

W

GCO

3"DCWHP

6"DCW

12 3"

2"SV

GCO

2"FD-B

2 2 1/2"

3 1/2"DCWHP

EWH-2

11 2"SV(2)

122"

2"SS,

WCO +16

2 1/2" DCWHP

12 3"

BFP-2

WM-1

BFP

3" FD-B

WM

BFP

WM

MDA-1

FS

ET-2

Ø30"

P-534

P-707

3" OFD 21 3" RWL20

3" OFD 23 3" RWL

69 GPM

3" OFD 21

3" RWL 20

3" OFD 23

3" RWL

69 GPM

3" OFD21

3" RWL20

3" OFD23

3" RWL

69 GPM

3" OFD

203" RWL

3" OFD

3" RWL

69 GPM

2 6"

WM-3

5' - 0"

SHEET NOTES

1. 3/4" DCWHP DOWN WITH SOV +72" FOR P-801.

2. PIPING AT CEILING ABOVE.

3. 3/4"DCWHP DOWN TO TP-2.

4. 3" DCWHP DOWN TO PRV-2 AND WM-5, +48".

5. 1-1/4" DCWHP AND 1" DHW DOWN TO P-707.

6. 2-1/2" DCWHP DOWN AND TURN OUT THRU WALL TO WM AND

BFP +24".

7. PIPING DOWN TO BOOSTER PUMP.

8. BOOSTER PUMP ON 4" HIGH CONCRETE PAD.

9. GAS METER AND GAS PRV STATION. SEE 2/PP602.

10. RISER TO UNDERGROUND, SEE PL-401.

11. RISER THRU SLAB.

12. SV UP TO ROOF VTR.

13. 1/2" DCWHP, 1/2" DHW DOWN TO SINK.

14. 1/2" DCWHP DOWN TO TP-1 +48" FOR STANDPIPE.

15. 3" MPG DOWN TO BOILER WITH GAS SOV +36".

16. INSULATE DCW PIPING OUTSIDE ABOVE GROUND IN 1" THICK

INSULATION JACKET. INSULATION TO TERMINATE INSIDE

BUILDING AFTER WALL PENETRATION.

17. TEE FOR GAS PRESSURE SENSOR.

18. REMOTE MOUNTED BOOSTER PUMP CONTROL PANEL

19. COOLING TOWER DRAIN WATER METER. SEE MECH DWG.

20. 3" RWL DOWN FROM ABOVE, UON.

21. 3" OFD DOWN FROM ABOVE, UON.

22. RWL SPILL TO GRADE WITH DOWNSPOUT NOZZLE +12".

23. OFD SPILL TO GRADE WITH DOWNSPOUT NOZZLE +12".

24. WM-3 ON VERTICAL 6"DCW RISER IN ROOM.

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

Drawing number

Drawn

Location

Project Title

Date Checked by

Drawing Title

1 2 3 4 5 6

A

B

C

D

E

F

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

CONSULTANTS: ARCHITECTS/ENGINEERS: Office of Construction and Facilities Management

7 8 9

MECHANICAL/ELECTRICAL/

PLUMBING:

Gayner Engineers 1133 Post Street San Francisco, CA 94109

STRUCTURAL:

Degenkolb Engineers 375 Beale Street, Suite 500 San Francisco, CA 94105

CIVIL / SURVEYOR:

Sandis 636 9th Street Oakland, CA 94607

ARCHITECTURE/

INTERIOR DESIGN/

SECURITY/SIGNAGE/

COMMUNICATIONS/ MEDICAL

EQUIPMENT/ MASTER PLAN

LANDSCAPE/

ENVIRONMENTAL

ASSESSMENT:

HDR Architecture, Inc.

201 California Street San Francisco, CA 94111

FULLY SPRINKLERED

FIRE PROTECTION:

Jensen Hughes 2950 Buskirk Avenue, Suite 225 Walnut Creek, CA 94597

CONSULTANT:

GEOTECHNICAL:

Allegiance Group 4321 SW Corbett #200 Portland, OR 97239

COST ESTIMATING:

AECOM

300 California Street, Suite 400 San Francisco, CA 94104

Station Number Project Number

640 640-423

Building Number

U.S. Department of Veterans Affairs

D1

D2

B1

C2

C1 A1

A4

A2

A3

1133 POST STREET

SAN FRANCISCO, CA 94109

TELEPHONE (415) 474-9500

FAX (415) 474-1363

GAYNER

ENGINEERS

C :\U se rs

\k el le y\

D oc um en ts \R ev it

P ro je ct s\

-P -B

_C B

O C

_v

_k el le y.

rv t

/2

7/

:4 3:

P

M

PP402

LEVEL 1 CUP, Central Utility Plant

JSY AM26 OCT 2018

VA Livermore Realignment and Closure - Part B - CBOC

Stockton (French Camp) San Joaquin County, CA

800 (CBOC), 803 (CUP)

NO REVISION DATE

DESIGN REVISIONS 23 NOV. 18

MP101-A3 - LEVEL 1 AREA A3 PLAN - PIPING
MP102-A3 - LEVEL 2 AREA A3 PLAN - PIPING
MP103-A3 - LEVEL 3 AREA A3 PLAN - PIPING
MP104-A3 - LEVEL 4 AREA A3 PLAN - PIPING
PL100-A3 - UNDERGROUND AREA A3 PLAN - PLUMBING
195116-P-B_CBOC_v2015_kelley
PL100-A3 - UNDERGROUND AREA A3 PLAN - PLUMBING
PL401 - UNDERGROUND CUP, CENTRAL UTILITY PLANT
195116-P-B_CBOC_v2015_kelley
PL401 - UNDERGROUND CUP, Central Utility Plant
PP102-A3 - LEVEL 2 AREA A3 PLAN - PLUMBING
195116-P-B_CBOC_v2015_kelley
PP102-A3 - LEVEL 2 AREA A3 PLAN - PLUMBING
PP104-A3 - LEVEL 4 AREA A3 PLAN - PLUMBING
195116-P-B_CBOC_v2015_kelley
PP104-A3 - LEVEL 4 AREA A3 PLAN - PLUMBING
PP201 - PENTHOUSE
195116-P-B_CBOC_v2015_kelley
PP201 - PENTHOUSE
PP306 - PLUMBING DOMESTIC HOT WATER RISER DIAGRAMS
PP402 - LEVEL 1 CUP CENTRAL UTILITY PLANT
195116-P-B_CBOC_v2015_kelley
PP402 - LEVEL 1 CUP, Central Utility Plant
PP601 - PLUMBING SYSTEM DIAGRAMS
PP602 - PLUMBING SYSTEM DIAGRAMS
PP604 - PLUMBING DETAILS