AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
a. The purpose of the amendment is to provide revised specif ications and revised draw ings, and to extend the closing date from 3 Dec
2018 to 7 Dec 2018; 4 p.m. Pacif ic Standard Time.
b. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 29-Nov-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123818R0056
X 9B. DATED (SEE ITEM 11)
03-Oct-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
29-Nov-2018
CODE
USACE SACRAMENTO DISTRICT
ATTN: CONTRACTING DIVISION
1325 J STREET
SACRAMENTO CA 95814-2922
W91238 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9123818R0056
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0004
Attachment 19 – Reissued Drawings:
The Following Drawings are Re‐Issued with Revisions:
Sheet Number
Sheet Name
Revision
Date
MP101‐A3
LEVEL 1 AREA
A3 PLAN ‐
PIPING 1 23
NOV 18
LEVEL 1 AREA A3 PLAN ‐ PIPING 1 23 NOV 18 1 23 NOV 18
MP102‐A3
LEVEL 2 AREA
A3 PLAN ‐
PIPING 1 23
NOV 18
LEVEL 2 AREA A3 PLAN ‐ PIPING 1 23 NOV 18 1 23 NOV 18
MP103‐A3
LEVEL 3 AREA
A3 PLAN ‐
PIPING 1 23
NOV 18
LEVEL 3 AREA A3 PLAN ‐ PIPING 1 23 NOV 18 1 23 NOV 18
MP104‐A3
LEVEL 4 AREA
A3 PLAN ‐
PIPING 1 23
NOV 18
LEVEL 4 AREA A3 PLAN ‐ PIPING 1 23 NOV 18 1 23 NOV 18
PL100‐A3
UNDERGROUND
AREA A3 PLAN ‐
PLUMBING 1 23
NOV 18
UNDERGROUND AREA A3 PLAN ‐ PLUMBING 1 23 NOV 18 1 23 NOV 18
PL401
UNDERGROUND
CUP CENTRAL
UTILITY PLANT 1
23 NOV 18
UNDERGROUND CUP CENTRAL UTILITY PLANT 1 23 NOV 18 1 23 NOV 18
PP102‐A3 LEVEL
2 AREA A3 PLAN
‐ PLUMBING 1
23 NOV 18
LEVEL 2 AREA A3 PLAN ‐ PLUMBING 1 23 NOV 18 1 23 NOV 18
PP104‐A3 LEVEL
4 AREA A3 PLAN
‐ PLUMBING 1
23 NOV 18
LEVEL 4 AREA A3 PLAN ‐ PLUMBING 1 23 NOV 18 1 23 NOV 18
PP201
PENTHOUSE 1
23 NOV 18
PENTHOUSE 1 23 NOV 18 1 23 NOV 18
PP306
PLUMBING
DOMESTIC HOT
WATER RISER
DIAGRAMS 1 23
NOV 18
PLUMBING DOMESTIC HOT WATER RISER DIAGRAMS 1 23 NOV
1 23 NOV 18
PP402 LEVEL 1
CUP CENTRAL
UTILITY PLANT 1
23 NOV 18
LEVEL 1 CUP CENTRAL UTILITY PLANT 1 23 NOV 18 1 23 NOV 18
PP601
PLUMBING
SYSTEM
DIAGRAMS 1 23
NOV 18
PLUMBING SYSTEM DIAGRAMS 1 23 NOV 18 1 23 NOV 18
PP602
PLUMBING
SYSTEM
DIAGRAMS 1 23
NOV 18
PLUMBING SYSTEM DIAGRAMS 1 23 NOV 18 1 23 NOV 18
PP604
PLUMBING
DETAILS 1 23
NOV 18
PLUMBING DETAILS 1 23 NOV 18 1 23 NOV 18
The Following Drawings are revised by Narrative below:
Sheet
Narrative Revision
LD101‐B Detail 3 notes shall be modified as follows:
a. 4” – 14 GUAGE SPUN ALUMINUM BALL. GOLD ANODIZED FINIAL BALL PER
SPECIFICATIONS
b. 3” CAST ALUMINUM STATIONARY TRUCK CAST ALUMINUM TRUCK PER
SPECIFICATIONS
c. 1 SET OF HALYARD, #10 POLY HALYARDS PER SPECIFICATIONS
d. 1 – 9” CAST ALUMINUM CLEATS ALUMINUM CLEATS PER SPECIFICATIONS
Attachment 20 – Reissued Specifications:
The Following Specifications are Re‐Issued with Revisions:
Specification Section
Specification Title
Date
011219 Interface with others 23 NOV 18
013100 Project Management 23 NOV 18
013201.00 10 Schedule 23 NOV 18
015001 Resident Engineer Office revised 23 NOV 18
230510 Common Work Results for Boiler Plant and Steam Generation
23 NOV 18
230811 Demonstrations and Tests for Boiler Plant 23 NOV 18
231000 Facility Fuel Systems 23 NOV 18
231123 Facility Natural‐Gas Piping 23 NOV 18
232111 Boiler Plant Piping Systems 23 NOV 18
232113 Hydronic Piping 23 NOV 18
251010 Advanced Utility Metering System 23 NOV 18
275223 Nurse Call System 23 NOV 18
SECTION 00 01 10 - TABLE OF CONTENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 01 Attachment 1 Statement of Work
1 14-JUN-2018
Attachment 02 Attachment 2
Specifications
4368 03-JUL-2018
Attachment 03 Attachment 3 Drawings
Volume B1
305 03-JUL-2018
Attachment 04 Attachment 4 Drawings
Volume B2
273 03-JUL-2018
Attachment 05 Attachment 5 Drawings
Volume B3
186 03-JUL-2018
Attachment 06 Attachment 6 Appendix A
- Geotechnical
Engineering Report
65 11-DEC-2015
Attachment 07 Attachment 7 Appendix B
Equipment Cut Sheets
1000 09-FEB-2018
Attachment 08 Attachment 8 Wage
Determination
80 28-SEP-2018
Attachment 09 Attachment 9 AE
Drawing Revisions
15 26-OCT-2018
Attachment 10 Attachment 10 RMS
Submittal Register
100 01-NOV-2018
Attachment 11 Attachment 11 Office
Complex Laydown
1 26-OCT-2018
Attachment 12 Attachment 12
Specifications
26 29-OCT-2018
Attachment 13 Attachment 13
Specifications
Amendment 0002
251 05-NOV-2018
Attachment 14 Attachment 14 Drawings
Amendment 0002
23 02-NOV-2018
Attachment 15 Attachment 17 Drawing -
Construction Temporary
Utilities Svc
1 19-NOV-2018
Attachment 16 Attachment 16
Specifications New and
Revisions
143 21-NOV-2018
Attachment 17 Attachment 15 Re-issued
Drawings
29 19-NOV-2018
Attachment 18 Attachment 18 Wage
Determination
156 02-NOV-2018
to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 01 Attachment 1 Statement of Work
1 14-JUN-2018
Attachment 02 Attachment 2
Specifications
4368 03-JUL-2018
Attachment 03 Attachment 3 Drawings
Volume B1
305 03-JUL-2018
Attachment 04 Attachment 4 Drawings
Volume B2
273 03-JUL-2018
Attachment 05 Attachment 5 Drawings
Volume B3
186 03-JUL-2018
Attachment 06 Attachment 6 Appendix A
- Geotechnical
Engineering Report
65 11-DEC-2015
Attachment 07 Attachment 7 Appendix B
Equipment Cut Sheets
1000 09-FEB-2018
Attachment 08 Attachment 8 Wage
Determination
80 28-SEP-2018
Attachment 09 Attachment 9 AE
Drawing Revisions
15 26-OCT-2018
Attachment 10 Attachment 10 RMS
Submittal Register
100 01-NOV-2018
Attachment 11 Attachment 11 Office
Complex Laydown
1 26-OCT-2018
Attachment 12 Attachment 12
Specifications
26 29-OCT-2018
Attachment 13 Attachment 13
Specifications
Amendment 0002
251 05-NOV-2018
Attachment 14 Attachment 14 Drawings
Amendment 0002
23 02-NOV-2018
Attachment 15 Attachment 17 Drawing -
Construction Temporary
Utilities Svc
1 19-NOV-2018
Attachment 16 Attachment 16
Specifications New and
Revisions
143 21-NOV-2018
Attachment 17 Attachment 15 Re-issued
Drawings
29 19-NOV-2018
Attachment 18 Attachment 18 Wage
Determination
156 02-NOV-2018
Attachment 19 Attachment 19 - Re-issued Drawings
297 27-NOV-2018
Attachment 20 Attachment 20 - Re-issued Specifications
14 27-NOV-2018
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 03-Dec-2018 04:00 PM to 07-Dec-2018 04:00 PM.
(End of Summary of Changes)