About this file

W91238-18-R-0056 Amendment 0004

View the file

Other files

File Type Posted
Attachment_20_-_Reissued_Specs_.pdf PDF
Attachment__19_-__Re-issued_Drawings.pdf PDF
Attachment_17_Construction_Temporary_Utilities_Service_Point-of-Connection,_City_of_Stockton.pdf PDF
Attachment_18_-_Wage_Determination.pdf PDF
Attachment_15,_Re-issued_Drawings.pdf PDF
W91238-18-R-0056-_Amendment_0003.pdf PDF
W91238-18-R-0056_Conformed_Copy.pdf PDF
CBO-_CUP_-_Siemens_Brand_Name_J&A.pdf PDF
Attachment_16_-_Specifications_revised_and_new_issued.pdf PDF
Attachment_(13)_Re-Issued_Specifications_01_50_01,Revised_8Nov18(LT8Nov18).pdf PDF
W9123818R0056_Amendment_0002.pdf PDF
W9123818R0056_Conformed_Copy_Amendment.pdf PDF
Attachment_14__Re-issued_Drawings.pdf PDF
Attachment_(12)_Specifications-working.pdf PDF
Attachment_(11)_Office_Complex_and_Contractor_Laydown_(05NOV).pdf PDF
A03.10_Final_Stockton_Phased_B_Combined_JA_for_posting_Redacted.pdf PDF
Attachment_(10)_RMS_Submittal_Register(5Nov18).xlsx XLSX spreadsheet
Attachment_(09)_AE_Drawing_Revisions_.pdf PDF
W9123818R0056_Amendment_0001.pdf PDF
Phase_B_Site_Visit_Sign-In_Sheets.pdf PDF
W9123818R0056_Stockton_CBOC_and_CUP_Solicitation.pdf PDF
ATTACHMENT_7_-_APPENDIX_B_-_EQUIPMENT_CUT_SHEETS.pdf PDF
ATTACHMENT_5_-_DRAWINGS_VOLUME_B3.pdf PDF
ATTACHMENT_1_-_STATEMENT_OF_WORK.pdf PDF
ATTACHMENT_3_-_DRAWINGS_VOLUME_B1.pdf PDF
ATTACHMENT_6_-_APPENDIX_A_-_GEOTECHNICAL_ENGINEERING_REPORT.pdf PDF
ATTACHMENT_2_-_SPECIFICATIONS.pdf PDF
ATTACHMENT_8_-_WAGE_DETERMINATION.pdf PDF
ATTACHMENT_4_-_DRAWINGS_VOLUME_B2.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

a. The purpose of the amendment is to provide revised specif ications and revised draw ings, and to extend the closing date from 3 Dec

2018 to 7 Dec 2018; 4 p.m. Pacif ic Standard Time.

b. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 29-Nov-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123818R0056

X 9B. DATED (SEE ITEM 11)

03-Oct-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Nov-2018

CODE

USACE SACRAMENTO DISTRICT

ATTN: CONTRACTING DIVISION

1325 J STREET

SACRAMENTO CA 95814-2922

W91238 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9123818R0056

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0004

Attachment 19 – Reissued Drawings:

The Following Drawings are Re‐Issued with Revisions:

Sheet Number

Sheet Name

Revision

Date

MP101‐A3

LEVEL 1 AREA

A3 PLAN ‐

PIPING 1 23

NOV 18

LEVEL 1 AREA A3 PLAN ‐ PIPING 1 23 NOV 18 1 23 NOV 18

MP102‐A3

LEVEL 2 AREA

A3 PLAN ‐

PIPING 1 23

NOV 18

LEVEL 2 AREA A3 PLAN ‐ PIPING 1 23 NOV 18 1 23 NOV 18

MP103‐A3

LEVEL 3 AREA

A3 PLAN ‐

PIPING 1 23

NOV 18

LEVEL 3 AREA A3 PLAN ‐ PIPING 1 23 NOV 18 1 23 NOV 18

MP104‐A3

LEVEL 4 AREA

A3 PLAN ‐

PIPING 1 23

NOV 18

LEVEL 4 AREA A3 PLAN ‐ PIPING 1 23 NOV 18 1 23 NOV 18

PL100‐A3

UNDERGROUND

AREA A3 PLAN ‐

PLUMBING 1 23

NOV 18

UNDERGROUND AREA A3 PLAN ‐ PLUMBING 1 23 NOV 18 1 23 NOV 18

PL401

UNDERGROUND

CUP CENTRAL

UTILITY PLANT 1

23 NOV 18

UNDERGROUND CUP CENTRAL UTILITY PLANT 1 23 NOV 18 1 23 NOV 18

PP102‐A3 LEVEL

2 AREA A3 PLAN

‐ PLUMBING 1

23 NOV 18

LEVEL 2 AREA A3 PLAN ‐ PLUMBING 1 23 NOV 18 1 23 NOV 18

PP104‐A3 LEVEL

4 AREA A3 PLAN

‐ PLUMBING 1

23 NOV 18

LEVEL 4 AREA A3 PLAN ‐ PLUMBING 1 23 NOV 18 1 23 NOV 18

PP201

PENTHOUSE 1

23 NOV 18

PENTHOUSE 1 23 NOV 18 1 23 NOV 18

PP306

PLUMBING

DOMESTIC HOT

WATER RISER

DIAGRAMS 1 23

NOV 18

PLUMBING DOMESTIC HOT WATER RISER DIAGRAMS 1 23 NOV

1 23 NOV 18

PP402 LEVEL 1

CUP CENTRAL

UTILITY PLANT 1

23 NOV 18

LEVEL 1 CUP CENTRAL UTILITY PLANT 1 23 NOV 18 1 23 NOV 18

PP601

PLUMBING

SYSTEM

DIAGRAMS 1 23

NOV 18

PLUMBING SYSTEM DIAGRAMS 1 23 NOV 18 1 23 NOV 18

PP602

PLUMBING

SYSTEM

DIAGRAMS 1 23

NOV 18

PLUMBING SYSTEM DIAGRAMS 1 23 NOV 18 1 23 NOV 18

PP604

PLUMBING

DETAILS 1 23

NOV 18

PLUMBING DETAILS 1 23 NOV 18 1 23 NOV 18

The Following Drawings are revised by Narrative below:

Sheet

Narrative Revision

LD101‐B Detail 3 notes shall be modified as follows:

a. 4” – 14 GUAGE SPUN ALUMINUM BALL. GOLD ANODIZED FINIAL BALL PER

SPECIFICATIONS

b. 3” CAST ALUMINUM STATIONARY TRUCK CAST ALUMINUM TRUCK PER

SPECIFICATIONS

c. 1 SET OF HALYARD, #10 POLY HALYARDS PER SPECIFICATIONS

d. 1 – 9” CAST ALUMINUM CLEATS ALUMINUM CLEATS PER SPECIFICATIONS

Attachment 20 – Reissued Specifications:

The Following Specifications are Re‐Issued with Revisions:

Specification Section

Specification Title

Date

011219 Interface with others 23 NOV 18

013100 Project Management 23 NOV 18

013201.00 10 Schedule 23 NOV 18

015001 Resident Engineer Office revised 23 NOV 18

230510 Common Work Results for Boiler Plant and Steam Generation

23 NOV 18

230811 Demonstrations and Tests for Boiler Plant 23 NOV 18

231000 Facility Fuel Systems 23 NOV 18

231123 Facility Natural‐Gas Piping 23 NOV 18

232111 Boiler Plant Piping Systems 23 NOV 18

232113 Hydronic Piping 23 NOV 18

251010 Advanced Utility Metering System 23 NOV 18

275223 Nurse Call System 23 NOV 18

SECTION 00 01 10 - TABLE OF CONTENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 01 Attachment 1 Statement of Work

1 14-JUN-2018

Attachment 02 Attachment 2

Specifications

4368 03-JUL-2018

Attachment 03 Attachment 3 Drawings

Volume B1

305 03-JUL-2018

Attachment 04 Attachment 4 Drawings

Volume B2

273 03-JUL-2018

Attachment 05 Attachment 5 Drawings

Volume B3

186 03-JUL-2018

Attachment 06 Attachment 6 Appendix A

- Geotechnical

Engineering Report

65 11-DEC-2015

Attachment 07 Attachment 7 Appendix B

Equipment Cut Sheets

1000 09-FEB-2018

Attachment 08 Attachment 8 Wage

Determination

80 28-SEP-2018

Attachment 09 Attachment 9 AE

Drawing Revisions

15 26-OCT-2018

Attachment 10 Attachment 10 RMS

Submittal Register

100 01-NOV-2018

Attachment 11 Attachment 11 Office

Complex Laydown

1 26-OCT-2018

Attachment 12 Attachment 12

Specifications

26 29-OCT-2018

Attachment 13 Attachment 13

Specifications

Amendment 0002

251 05-NOV-2018

Attachment 14 Attachment 14 Drawings

Amendment 0002

23 02-NOV-2018

Attachment 15 Attachment 17 Drawing -

Construction Temporary

Utilities Svc

1 19-NOV-2018

Attachment 16 Attachment 16

Specifications New and

Revisions

143 21-NOV-2018

Attachment 17 Attachment 15 Re-issued

Drawings

29 19-NOV-2018

Attachment 18 Attachment 18 Wage

Determination

156 02-NOV-2018

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 01 Attachment 1 Statement of Work

1 14-JUN-2018

Attachment 02 Attachment 2

Specifications

4368 03-JUL-2018

Attachment 03 Attachment 3 Drawings

Volume B1

305 03-JUL-2018

Attachment 04 Attachment 4 Drawings

Volume B2

273 03-JUL-2018

Attachment 05 Attachment 5 Drawings

Volume B3

186 03-JUL-2018

Attachment 06 Attachment 6 Appendix A

- Geotechnical

Engineering Report

65 11-DEC-2015

Attachment 07 Attachment 7 Appendix B

Equipment Cut Sheets

1000 09-FEB-2018

Attachment 08 Attachment 8 Wage

Determination

80 28-SEP-2018

Attachment 09 Attachment 9 AE

Drawing Revisions

15 26-OCT-2018

Attachment 10 Attachment 10 RMS

Submittal Register

100 01-NOV-2018

Attachment 11 Attachment 11 Office

Complex Laydown

1 26-OCT-2018

Attachment 12 Attachment 12

Specifications

26 29-OCT-2018

Attachment 13 Attachment 13

Specifications

Amendment 0002

251 05-NOV-2018

Attachment 14 Attachment 14 Drawings

Amendment 0002

23 02-NOV-2018

Attachment 15 Attachment 17 Drawing -

Construction Temporary

Utilities Svc

1 19-NOV-2018

Attachment 16 Attachment 16

Specifications New and

Revisions

143 21-NOV-2018

Attachment 17 Attachment 15 Re-issued

Drawings

29 19-NOV-2018

Attachment 18 Attachment 18 Wage

Determination

156 02-NOV-2018

Attachment 19 Attachment 19 - Re-issued Drawings

297 27-NOV-2018

Attachment 20 Attachment 20 - Re-issued Specifications

14 27-NOV-2018

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 03-Dec-2018 04:00 PM to 07-Dec-2018 04:00 PM.

(End of Summary of Changes)

File details come from the government source that posted it.