W9123818R0056_Stockton_CBOC_and_CUP_Solicitation.pdf

PDF 1 MB Posted

Attached to
VA Livermore Phase B, Construct Community Based Outpatient Clinic, and Central Utility Plant, Stockton, CA
Solicitation number
W91238-18-R-0056
Issued by

About this file

Solicitation Number W91238-18-R-0056

View the file

Other files

File Type Posted
Attachment_20_-_Reissued_Specs_.pdf PDF
Amendment_0004.pdf PDF
Attachment__19_-__Re-issued_Drawings.pdf PDF
Attachment_17_Construction_Temporary_Utilities_Service_Point-of-Connection,_City_of_Stockton.pdf PDF
Attachment_18_-_Wage_Determination.pdf PDF
Attachment_15,_Re-issued_Drawings.pdf PDF
W91238-18-R-0056-_Amendment_0003.pdf PDF
W91238-18-R-0056_Conformed_Copy.pdf PDF
CBO-_CUP_-_Siemens_Brand_Name_J&A.pdf PDF
Attachment_16_-_Specifications_revised_and_new_issued.pdf PDF
Attachment_(13)_Re-Issued_Specifications_01_50_01,Revised_8Nov18(LT8Nov18).pdf PDF
W9123818R0056_Amendment_0002.pdf PDF
W9123818R0056_Conformed_Copy_Amendment.pdf PDF
Attachment_14__Re-issued_Drawings.pdf PDF
Attachment_(12)_Specifications-working.pdf PDF
Attachment_(11)_Office_Complex_and_Contractor_Laydown_(05NOV).pdf PDF
A03.10_Final_Stockton_Phased_B_Combined_JA_for_posting_Redacted.pdf PDF
Attachment_(10)_RMS_Submittal_Register(5Nov18).xlsx XLSX spreadsheet
Attachment_(09)_AE_Drawing_Revisions_.pdf PDF
W9123818R0056_Amendment_0001.pdf PDF
Phase_B_Site_Visit_Sign-In_Sheets.pdf PDF
ATTACHMENT_7_-_APPENDIX_B_-_EQUIPMENT_CUT_SHEETS.pdf PDF
ATTACHMENT_5_-_DRAWINGS_VOLUME_B3.pdf PDF
ATTACHMENT_1_-_STATEMENT_OF_WORK.pdf PDF
ATTACHMENT_3_-_DRAWINGS_VOLUME_B1.pdf PDF
ATTACHMENT_6_-_APPENDIX_A_-_GEOTECHNICAL_ENGINEERING_REPORT.pdf PDF
ATTACHMENT_2_-_SPECIFICATIONS.pdf PDF
ATTACHMENT_8_-_WAGE_DETERMINATION.pdf PDF
ATTACHMENT_4_-_DRAWINGS_VOLUME_B2.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Title: Department of Veterans Affairs (DVA) Palo Alto Health Care System, Phase B – Construct a 158,000 SF Community Base Outpatient

Clinic (CBOC) and 3,300 SF Central Utility Plant (CUP), Stockton, California

A. This solicitation is proceeding as an unrestricted, full and open competition.

B. In accordance w ith DFARS 236.204(iii), the disclosure of magnitude is betw een $100,000,000 and $250,000,000. The NAICS Code is

236220, and the size standard is $36.5million.

C. Per FAR 3.101, 15.201(f) and 15.303(c), to preserve procurement integrity, all contacts shall go to either the Contracting Officer and/or

Contract Specialist. Contacts to others regarding this solicitation may result in the disqualif ication of the offeror or cancellation of the solicitation. Disqualif ication w ill be the result of any communication that explicitly or implicitly, intentionally or unintentionally gives one prospective offeror a competitive advantage or the mere appearance of a competitive advantage over that of another.

***Funds are not presently available but have been appropriated for this acquisition. No contract aw ard w ill be made until appropriated funds are disbursed and made available.***

MARY CHONG 916-557-6884

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

03-Oct-2018

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________960 calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________11 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________19 Nov 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______180 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

USACE SACRAMENTO DISTRICT

ATTN: CONTRACTING DIVISION

1325 J STREET

SACRAMENTO CA 95814-2922

W91238

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

10:00 AM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W9123818R0056 88

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued)

(Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

Section 00 00 00 - Procurement and Contracting Requirements

SECTION 00 00 00

CONTINUATION OF STANDARD FORM 1442

BLOCK 20D:

(1) IF THE OFFEROR IS A JOINT VENTURE, EACH PARTICIPANT IN THE JOINT VENTURE

MUST COMPLETE THE FOLLOWING:

Company Name Signature Title

NOTE: If a corporation is participating as a member of a Joint Venture, the certificate below must also be completed and signed.

CORPORATION AUTHORIZATION TO PARTICIPATE IN JOINT VENTURE CERTIFICATE

I, _______________________, certify that I am the Secretary of the corporation

(name) named as a participant in a Joint Venture on this offer; that

_____________________, who signed said offer on behalf of the corporation, was

(name) then ______________________ of said corporation; that the signature thereto is

(title) genuine; that said contract was duly signed, sealed and attested for and in behalf of said corporation by authority of its governing body; and that the corporation is authorized to participate in the Joint Venture on this offer.

(Name of Corporation)

(Secretary)

(2) IF THE OFFEROR IS A PARTNERSHIP, LIST FULL NAME OF ALL PARTNERS BELOW.

SIGNATURES BY ALL PARTNERS HERE SIGNIFY THAT THE INDIVIDUAL WHO SIGNED THE

OFFER IN BLOCK 20B HAS THE AUTHORITY TO BIND THE PARTNERSHIP.

Name Signature

(3) IF THE OFFEROR IS A CORPORATION, THE OFFER SHALL BE SIGNED IN THE

CORPORATE NAME FOLLOWED BY THE WORD "BY" AND THE SIGNATURE OF THE PERSON

AUTHORIZED TO SIGN THE OFFER IN BLOCK 20B. PROVIDE PROOF THAT THE PERSON

SIGNING FOR THE CORPORATION HAS THE AUTHORITY TO BIND THE CORPORATION BY

COMPLETING THE FOLLOWING CERTIFICATE:

CONTINUATION OF STANDARD FORM 1442

CORPORATION AUTHORIZATION CERTIFICATE

I, ___________________________________, certify that I am the Secretary of the

(name) corporation named as offeror in the within offer; that

(name) who signed said offer on behalf of the corporation, was then

_____________________________________ of said corporation, that the signature

(title) thereto is genuine; that said contract was duly signed, sealed and attested for in behalf of said corporation by authority of its governing body.

(Name of Corporation)

(Secretary)

(4) IF THE OFFEROR IS AN INDIVIDUAL DOING BUSINESS AS A FIRM, THE OFFER

SHALL BE SIGNED BY THAT INDIVIDUAL IN BLOCK 20B FOLLOWED BY THE WORDS "AN

INDIVIDUAL DOING BUSINESS AS _____________________________________ (INSERT

NAME OF FIRM).

(5) WHEN AN AGENT SIGNS THE OFFER, PROVIDE PROOF OF THE AGENT'S AUTHORITY TO

BIND THE PRINCIPAL.

Section 00 01 10 - Table of Contents

EXHIBIT/ATTACHMENT TABLE OF CONTENTS

Exhibit/Attachment Table of Contents

DOCUMENT DESCRIPTION PAGES DATE

Attachment 01 Statement of Work 1 14-JUN-2018

Attachment 02 Specifications 4368 03-JUL-2018

Attachment 03 Drawings Volume B1 305 03-JUL-2018

Attachment 04 Drawings Volume B2 277 03-JUL-2018

Attachment 05 Drawings Volume B3 186 03-JUL-2018

Attachment 06 Appendix A – Geotechnical Engineer Report

65 11-DEC-2015

Attachment 07 Appendix B – Equipment 1000 09-FEB-2018 Cut Attachment 08 Wage Determination 80 28-SEP-2018

Section 00 10 00 - Solicitation

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Construct CBOC

FFP

Construct Community Based Outpatient Clinic (CBOC), San Joaquin County in accordance with Statement of Work, specifications, drawings, and plans

FOB: Destination

NET AMT

0002 1 Job Construct CUP

FFP

Construct Central Utility Plant (CUP), San Joaquin County in accordance with

Statement of Work, specifications, drawings, and plans.

0003 1 Job Asbestos Removal

FFP

Remove asbestos in accordance with the Statement of Work, specifications, drawings, and plans.

0004 1 Job Hazardous Waste Removal

FFP

Remove hazardous waste in accordance with the Statement of Work, specifications, drawings, and plans.

0005 1 Job Deductive Alternates

FFP

Provide the price for each deductive alternate in accordance with the pricing schedule below.

ITEM(S) 0005 - CLIN 0005 DEDUCTIVE ALTERNATE

ATTACHMENT TO CLIN 0005 - PRICING SCHEDULE FOR DEDUCTIVE ALTERNATE ITEMS:

PROVIDE A BREAKDOWN OF THE ADMINISTRATIVE AND PROCEDURAL REQUIREMENTS FOR

EACH OF THE BELOW DEDUCTIVE ALTERNATE ITEMS.

Deductive

Alternates

Description

Amount

Reference

1 SITE IMPROVEMENTS: ALL COMPONENTS,

EQUIPMENT, MATERIALS AND LABOR TO

ELIMINATE PORTION OF THE RING ROAD

AS INDICATED ON THE ALT- SERIES OF

DRAWINGS. THIS INCLUDES, BUT IS NOT

LIMITED TO AC PAVING, CURB AND

GUTTER, AGGREGATE BASE COURSE,

FINAL SITE COMPACTION OF THE

ROADWAY AREA, LIGHTING, AND

ELECTRICAL. PROVIDE ADJACENT

LANDSCAPE SURFACE FOR ENTIRE AREA.

Drawing Number

ALT-CG1, ALT-E1

Reference Sheet CG-

001 and CG-005

ES102

2 SITE IMPROVEMENTS: ALL COMPONENTS,

EQUIPMENT, MATERIALS AND LABOR TO

ELIMINATE THE TREES AND ASSOCIATED

IRRIGATION IN THE PARKING LOTS AS

INDICATED ON THE ALT- SERIES OF

DRAWINGS.

ALT-LI1, ALT-LP1,

3 SIGNAGE: ALL COMPONENTS,

EQUIPMENT, MATERIALS AND LABOR TO

ELIMINATE THE PARKING LOT ID SIGNS

AS INDICATED ON THE ALT- SERIES OF

ALT-AJ1

LAYOUT SHOWN ON

SHEET AJ712

SIGN LOCATION

PLAN ON AJ111

SIGN MESSAGE

SCHEDULE ON

AJ715

4 BALCONIES: ALL COMPONENTS,

ELIMINATE BALCONIES AS INDICATED ON

THE ALT- SERIES OF DRAWINGS. THIS

INCLUDES, BUT IS NOT LIMITED TO

STRUCTURE, WALLS, FLOORING, SOFFITS,

CEILINGS, PLUMBING ELECTRICAL AND

FIRE PROTECTION ELEMENTS. PROVIDE

WALLS AND WINDOW SYSTEMS AS

INIDICATED ON THE ALT- SERIES OF

ALT-A1, ALT-S1,

ALT-P1, ALT-E3,

ALT-Fx-102

Reference Sheet A-203, AE-102, AE-103, AE-

104, AE-105, A622

EL102-A4, EL103-A4,

EL104-A4

EL102-A3, EL103-A3,

EL104-A3

PP101-A3, PP102-A3,

PP103-A3, PP104-A3

PP101-A4, PP102-A4,

PP103-A4, PP104-A4

5 SITE IMPROVEMENTS: ALL

COMPONENTS, EQUIPMENT, MATERIALS

AND LABOR TO ELIMINATE THE PORTION

OF THE PARKING LOT AS INDICATED ON

THE ALT- SERIES OF DRAWINGS. THIS

INCLUDES, BUT IS NOT LIMTED TO AC

PAVING, CURB AND GUTTER, AGGREGATE

BASE COURSE, FINAL SITE COMPACTION

OF THE DELETED PARKING AREA. EXTEND

CURBING AS INDICATED AND PROVIDE

ADJACENT LANDSCAPE SURFACE FOR

ENTIRE AREA.

ALT-CG2, ALT-E2

ES102

6 VERTICALLY OPERABLE WALL SYSTEMS:

ALL COMPONENTS, EQUIPMENT,

MATERIALS FOR THE ACQUISITION OF

THE VERTICALLY OPERABLE WALL

SYSTEM AS INDICATED ON THE ALT-

SERIES OF DRAWINGS. THIS IS A BRAND

NAME ITEM.

ALT-A2

Reference Sheet A-611, A-612, A-613

7 VERTICALLY OPERABLE WALL SYSTEMS:

ALL COMPONENTS, EQUIPMENT,

MATERIALS FOR THE ACQUISITION OF

THE VERTICALLY OPERABLE WALL

SYSTEM AS INDICATED ON THE ALT-

SERIES OF DRAWINGS. THIS IS A BRAND

NAME ITEM.

Reference Sheet A-610

8 SITE IMPROVEMENTS: ALL COMPONENTS,

EQUIPMENT, MATERIALS AND LABOR TO

ELIMINATE THE SIDEWALKS NOT

SERVING AS EGRESS OR TO ACCESSIBLE

STALLS (SIDEWALK IN PARKING LOTS AS

INDICATED ON THE ALT- SERIES OF

DRAWINGS). INFILL AREA WITH

ADJACENT LANDSCAPE MATERIAL AS

INDICATED.

ALT-CG3 , ALT-CG4

002, CG-003

SITE IMPROVEMENTS: ALL COMPONENTS,

ELIMINATE THE ACCESSIBLE PARKING

STALLS AS INDICATED ON THE ALT-

SERIES OF DRAWINGS. EXTEND CURBING

AND INFILL ENLARGED ISLANDS WITH

ADJACENT LANDSCAPE MATERIAL AS

INDICATED.

ALT-CG5

FINISHES ALL COMPONENTS, EQUIPMENT,

MATERIALS AND LABOR TO SUBSTITUTE

PORCELAIN TILE FOR TERRAZZO.

ALT-AI2, ALT-AI3.

ALT-AI4, ALT-AI5,

ALT-AI6

SITE IMPROVEMENTS: ALL COMPONENTS,

ELIMINATE THE GRAVEL COVER AND

EDGING ON THE ACCESS ROAD AROUND

THE RETENTION AREA AS INDICATED ON

THE ALT- SERIES OF DRAWINGS.

ALT-LS1

ELIMINATE THE METAL PANEL AT THE

BACKSIDE OF PARAPETS AT THE LEVEL

ONE ROOF AS SHOWN. WRAPROOF

MATERIAL FLASHING SHEETS UP

PARAPET BACKSIDE AND UNDER COPING

CAP

ALT-A4

Reference Sheet A-309, A-824

13 SIGNAGE: ALL COMPONENTS,

EQUIPMENT, MATERIALS AND LABOR TO

SUBSTITUTE NON ILLUMINATED POST

AND PANEL SIGNS FOR SELECTED

INTERNALLY ILLUMINATED SIGNS AS

ALT-AJ1

LAYOUT SHOWN ON

SHEET AJ709

SIGN LOCATION

PLAN ON AJ111

SIGN MESSAGE

SCHEDULE ON

AJ715

14 LAMINATED GLASS AT ENTRY CANOPY:

ALL COMPONENTS, EQUIPMENT,

MATERIALS TO ELIMINATE THE

LAMINATED GLASS AT THE ENTRY

CANOPY ROOF AS INDICATED ON THE

ALT- SERIES OF DRAWINGS. PROVIDE

STANDING SEAM ROOFING AND METAL

SOFFIT PANELS TO MATCH REMAINDER

OF CANOPY.

ALT-A3

Reference Sheet A-

101F, A-201, A-822

15 SITE IMPROVEMENTS: ALL COMPONENTS,

EQUIPMENT, MATERIALS AND LABOR TO

ELIMINATE THE CONCRETE SITE PAVING

AS INDICATED ON THE ALT- SERIES OF

DRAWINGS. INFILL AREAS WITH

ADJACENT LANDSCAPE MATERIAL.

ALT-LS2

16 FINISHES: ALL COMPONENTS,

SUBSTITUTE THE MATERIAL DEFINITION

OF THE WOOD ACCENT CEILING PANELSS

AS INDICATED ON THE ALT- SERIES OF

Reference Sheet AI-600

17 FINISHES: ALL COMPONENTS,

EQUIPMENT, MATERIALS AND LABOR TO

ELIMINATE THE TILE FINISH ON

SELECTED RESTROOM WALLS AS

INDICATED ON THE ALT- SERIES OF

DRAWINGS. GYPSUM BOARD PREP

REQUIRED FOR THE INDICATED PAINT

FINISH IS REQUIRED AT THESE

LOCATIONS.

Reference Sheet

AI-601 , AI-601A,

AI-602, AI-603, AI-604

18 FINISHES: ALL COMPONENTS,

ELIMINATE THE HPL PANELLING ON

WALLS AND CEILING AS INDICATED ON

THE ALT- SERIES OF DRAWINGS.

INTERIOR

ELEVATIONS,

SHEETS: A-220 A-221

A-222

DETAILS, SHEET A-

512.

REFLECTED

CEILING PLANS: A-

701-A, A702-A, A703-

A, A704-A

FINISH PLANS:

AI101-A, AI102-A,

AI103-A, AI104-A

19 MECHANICAL: ALL COMPONENTS,

EQUIPMENT, MATERIALS AND LABOR TO

SUBSTITUTE MATERIAL REQUIREMENTS

FOR SELECTED EXHAUST DUCTS AS

ALT-AM1

MH101-B1, MH101-

C1, MH101-C2

20 FINISHES: ALL COMPONENTS,

EQUIPMENT, MATERIALS AND LABOR TO

SUBSTITUTE THE PORCELAIN FLOOR TILE

WITH A COMBINATION OF RESILIENT

FLOORING AND CARPETING AS

ALT-AI1

AI-601, AI-601A,

AI-602, AI-603, AI-

604, AI-600

Total

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 960 dys. ANP 1 USACE SACRAMENTO DISTRICT

LEAH CALDWELL

ATTN: CONTRACTING DIVISION

1325 J STREET

SACRAMENTO CA 95814-2922

916-557-7467

W91238

0002 960 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0003 960 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0004 960 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

0005 960 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

Section 00 21 00 - Instructions

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2016

52.204-16 Commercial and Government Entity Code Reporting JUL 2016

52.204-18 Commercial and Government Entity Code Maintenance JUL 2016

52.211-6 Brand Name or Equal AUG 1999

52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017

52.215-1 Alt I Instructions to Offerors--Competitive Acquisition (Jan 2017) -

Alternate I

OCT 1997

252.204-7008 Compliance With Safeguarding Covered Defense Information

Controls

OCT 2016

252.236-7008 Contract Prices-Bidding Schedules DEC 1991

CLAUSES INCORPORATED BY FULL TEXT

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.

(End of provision)

52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY

2014)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting

Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

52.225-11 BUY AMERICAN--CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (OCT

2016)

(a) Definitions. As used in this clause--

Caribbean Basin country construction material means a construction material that--

(1) Is wholly the growth, product, or manufacture of a Caribbean Basin country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a Caribbean Basin country into a new and different construction material distinct from the materials from which it was transformed.

Commercially available off-the-shelf (COTS) item—

(1) Means any item of supply (including construction material) that is--

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4)such as agricultural products and petroleum products.

Component means an article, material, or supply incorporated directly into a construction material.

Construction material means an article, material, or supply brought to the construction site by the Contractor or subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.

Materials purchased directly by the Government are supplies, not construction material.

Cost of components means--

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Designated country means any of the following countries:

(1) A World Trade Organization Government Procurement Agreement (WTO GPA) country (Armenia, Aruba, Austria, Belgium, Bulgaria, Canada, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hong Kong, Hungary, Iceland, Ireland, Israel, Italy, Japan, Korea (Republic of), Latvia, Liechtenstein, Lithuania, Luxembourg, Malta, Moldova, Montenegro, Netherlands, New Zealand, Norway, Poland, Portugal, Romania, Singapore, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Taiwan, Ukraine, or United

Kingdom);

(2) A Free Trade Agreement (FTA) country (Australia, Bahrain, Canada, Chile, Colombia, Costa Rica, Dominican

Republic, El Salvador, Guatemala, Honduras, Korea (Republic of), Mexico, Morocco, Nicaragua, Oman, Panama, Peru, or Singapore);

(3) A least developed country (Afghanistan, Angola, Bangladesh, Benin, Bhutan, Burkina Faso, Burundi, Cambodia, Central African Republic, Chad, Comoros, Democratic Republic of Congo, Djibouti, Equatorial Guinea, Eritrea, Ethiopia, Gambia, Guinea, Guinea-Bissau, Haiti, Kiribati, Laos, Lesotho, Liberia, Madagascar, Malawi, Mali, Mauritania, Mozambique, Nepal, Niger, Rwanda, Samoa, Sao Tome and Principe, Senegal, Sierra Leone, Solomon

Islands, Somalia, South Sudan, Tanzania, Timor-Leste, Togo, Tuvalu, Uganda, Vanuatu, Yemen, or Zambia); or

(4) A Caribbean Basin country (Antigua and Barbuda, Aruba, Bahamas, Barbados, Belize, Bonaire, British Virgin

Islands, Curacao, Dominica, Grenada, Guyana, Haiti, Jamaica, Montserrat, Saba, St. Kitts and Nevis, St. Lucia, St.

Vincent and the Grenadines, Sint Eustatius, Sint Maarten, or Trinidad and Tobago).

Designated country construction material means a construction material that is a WTO GPA country construction material, an FTA country construction material, a least developed country construction material, or a Caribbean

Basin country construction material.

Domestic construction material means--

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if--

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

Foreign construction material means a construction material other than a domestic construction material.

Least developed country construction material means a construction material that--

(1) Is wholly the growth, product, or manufacture of a least developed country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a least developed country into a new and different construction material distinct from

“Free Trade Agreement country construction material” means a construction material that—

(1) Is wholly the growth, product, or manufacture of a Free Trade Agreement (FTA) country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a FTA country into a new and different construction material distinct from the materials from which it was transformed.

“Least developed country construction material” means a construction material that—

(1) Is wholly the growth, product, or manufacture of a least developed country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a least developed country into a new and different construction material distinct from

United States means the 50 States, the District of Columbia, and outlying areas.

WTO GPA country construction material means a construction material that--

(1) Is wholly the growth, product, or manufacture of a WTO GPA country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a WTO GPA country into a new and different construction material distinct from the materials from which it was transformed.

(b) Construction materials.

(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). In addition, the Contracting

Officer has determined that the WTO GPA and Free Trade Agreements (FTAs) apply to this acquisition. Therefore, the Buy American restrictions are waived for designated country construction materials.

(2) The Contractor shall use only domestic or designated country construction material in performing this contract, except as provided in paragraphs (b)(3) and (b)(4) of this clause.

(3) The requirement in paragraph (b)(2) of this clause does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:

NONE

(4) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(3) of this clause if the Government determines that--

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the restrictions of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute.

(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(4) of this clause shall include adequate information for Government evaluation of the request, including--

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph

(b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the

Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(4)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the

Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison

Construction material description Unit of measure Quantity Price (dollars) \1\

Item 1:

Foreign construction material

Domestic construction material

Item 2:

Foreign construction material

Domestic construction material

\1\ Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).

List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.

Include other applicable supporting information.

(End of clause)

52.225-12 NOTICE OF BUY AMERICAN ACT REQUIREMENT-- CONSTRUCTION MATERIALS (MAY

2014) - ALTERNATE I (MAY 2014)

(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American-- Construction Materials Under Trade

Agreements” (Federal Acquisition Regulation (FAR) clause 52.225-11).

(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute or Balance shall submit the request with its offer, including the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11.

(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the

Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph

(b)(4)(i) of FAR clause 52.225-11.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers. (1) When an offer includes foreign construction material, other than designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause

52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction material. An offer based on use of the foreign construction material for which an exception was requested--

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from

U.S. Army Corps of Engineers, Sacramento District

ATTN: Construction Contracting Officer, Room 878

1325 J Street

Sacramento, California 95814

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for--

12 October 2018 at 10:00 AM (PST)

(c) Participants will meet at--

The northern parking lot of San Joaquin Hospital:

San Joaquin General Hospital

500 W. Hospital Rd

French Camp, CA 95231

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any Department of Defense FAR Supplement (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

252.211-7002 AVAILABILITY FOR EXAMINATION OF SPECIFICATIONS, STANDARDS, PLANS,

DRAWINGS, DATA ITEM DESCRIPTIONS, AND OTHER PERTINENT DOCUMENTS (DEC. 1991)

The specifications, standards, plans, drawings, data item descriptions, and other pertinent documents cited in this solicitation are not available for distribution but may be examined at the following location:

See Table of Contents

252.215-7008 ONLY ONE OFFER (OCT 2013)

(a) After initial submission of offers, the Offeror agrees to submit any subsequently requested additional cost or pricing data if the Contracting Officer notifies the Offeror that--

(1) Only one offer was received; and

(2) Additional cost or pricing data is required in order to determine whether the price is fair and reasonable or to comply with the statutory requirement for certified cost or pricing data (10 U.S.C. 2306a and FAR 15.403-3).

(b) Requirement for submission of additional cost or pricing data. Except as provided in paragraph (c) of this provision, the Offeror shall submit additional cost or pricing data as follows:

(1) If the Contracting Officer notifies the Offeror that additional cost or pricing data are required in accordance with paragraph (a) of this clause, the data shall be certified unless an exception applies (FAR 15.403-1(b)).

(2) Exceptions from certified cost or pricing data. In lieu of submitting certified cost or pricing data, the Offeror may submit a written request for exception by submitting the information described in the following paragraphs. The

Contracting Officer may require additional supporting information, but only to the extent necessary to determine whether an exception should be granted, and whether the price is fair and reasonable.

(i) Identification of the law or regulation establishing the price offered. If the price is controlled under law by periodic rulings, reviews, or similar actions of a governmental body, attach a copy of the controlling document, unless it was previously submitted to the contracting office.

(ii) Commercial item exception. For a commercial item exception, the Offeror shall submit, at a minimum, information on prices at which the same item or/similar items have previously been sold in the commercial market that is adequate for evaluating the reasonableness of the price for this acquisition. Such information may include—

(A) For catalog items, a copy of or identification of the catalog and its date, or the appropriate pages for the offered items, or a statement that the catalog is on file in the buying office to which the proposal is being submitted. Provide a copy or describe current discount policies and price lists (published or unpublished), e.g., wholesale, original equipment manufacturer, or reseller. Also explain the basis of each offered price and its relationship to the established catalog price, including how the proposed price relates to the price of recent sales in quantities similar to the proposed quantities;

(B) For market-priced items, the source and date or period of the market quotation or other basis for market price, the base amount, and applicable discounts. In addition, describe the nature of the market; or

(C) For items included on an active Federal Supply Service Multiple Award Schedule contract, proof that an exception has been granted for the schedule item.

(3) The Offeror grants the Contracting Officer or an authorized representative the right to examine, at any time before award, books, records, documents, or other directly pertinent records to verify any request for an exception under this provision, and the reasonableness of price. For items priced using catalog or market prices, or law or regulation, access does not extend to cost or profit information or other data relevant solely to the Offeror's determination of the prices to be offered in the catalog or marketplace.

(4) Requirements for certified cost or pricing data. If the Offeror is not granted an exception from the requirement to submit certified cost or pricing data, the following applies:

(i) The Offeror shall prepare and submit certified cost or pricing data and supporting attachments in accordance with the instructions contained in Table 15-2 of FAR 15.408, which is incorporated by reference with the same force and effect as though it were inserted here in full text. The instructions in Table 15-2 are incorporated as a mandatory format to be used, unless the Contracting Officer and the Offeror agree to a different format.

(ii) As soon as practicable after agreement on price, but before contract award (except for unpriced actions such as letter contracts), the offeror shall submit a Certificate of Current Cost or Pricing Data, as prescribed by FAR 15.406-

2.

(c) If the Offeror is the Canadian Commercial Corporation, certified cost or pricing data are not required. If the

Contracting Officer notifies the Canadian Commercial Corporation that additional data other than certified cost or pricing data are required in accordance with 225.870-4(c), the Canadian Commercial Corporation shall obtain and provide the following:

(1) Profit rate or fee (as applicable).

(2) Analysis provided by Public Works and Government Services Canada to the Canadian Commercial Corporation to determine a fair and reasonable price (comparable to the analysis required at FAR

15.404-1).

(3) Data other than certified cost or pricing data necessary to permit a determination by the U.S. Contracting Officer that the proposed price is fair and reasonable [U.S. Contracting Officer to provide description of the data required in accordance with FAR 15.403-3(a)(1) with the notification].

(4) As specified in FAR 15.403-3(a)(4), an offeror who does not comply with a requirement to submit data that the

U.S. Contracting Officer has deemed necessary to determine price reasonableness or cost realism is ineligible for award unless the head of the contracting activity determines that it is in the best interest of the Government to make the award to that offeror.

(d) If negotiations are conducted, the negotiated price should not exceed the offered price.

252.219-7000 ADVANCING SMALL BUSINESS GROWTH (SEP 2016)

(a) This provision implements 10 U.S.C. 2419.

(b) The Offeror acknowledges by submission of its offer that by acceptance of the contract resulting from this olicitation, the Offeror may exceed the applicable small business size standard of the North American Industry

Classification System (NAICS) code assigned to the contract and would no longer qualify as a small business concern for that NAICS code. (Small business size standards matched to industry NAICS codes are published by the

Small Business Administration and are available at http://www.sba.gov/content/table-small-business-size-standards.) The Offeror is therefore encouraged to develop the capabilities and characteristics typically desired in contractors that are competitive as other-than-small contractors in this industry.

(c) For procurement technical assistance, the Offeror may contact the nearest Procurement Technical Assistance

Center (PTAC). PTAC locations are available at http://www.dla.mil/HQ/SmallBusiness/PTAC.aspx.

http://www.sba.gov/content/table-small-business-size-standards http://www.sba.gov/content/table-small-business-size-standards http://www.dla.mil/HQ/SmallBusiness/PTAC.aspx

Section 00 21 16 - Instructions to Proposers

INSTRUCTIONS TO OFFERORS

SUBMITTAL INFORMATION FOR OFFERORS:

The following documents must be returned with your offer.

--The completed Standard Form 1442 with continuation pages, duly executed with an original signature by an official authorized to bind the company. Ensure that the firm’s DUNS or DUNS+4 Number is entered in the block with its name and address.

--Your acknowledgement of any and all Amendments to the solicitation in accordance with the instructions on the Standard Form 30 Amendment.

Note: If the SF 1442 and/or the pricing schedule was changed by amendment, be sure to use the amended pages when submitting your offer.

--The completed CLIN Schedule with your proposed contract line item prices inserted in the appropriate spaces. Prices must be proposed for all contract line items. Unit prices are to be extended to the actual

“dollar and cents” amounts (i.e., to two decimal places). Do not round off extended prices to the nearest dollar. Check your pricing submission very carefully for mathematical and clerical errors prior to submission.

--Your completed Representations, Certifications, and Other Statements of Bidders/Offerors (Section

00 45 00).

--Your Offer Guarantee (e.g., Standard Form 24, “Bid Bond”)

INQUIRIES:

Prospective offerors should submit inquiries related to this solicitation in accordance with the following (collect calls will not be accepted):

a. For information related to amendments, and the dates set for receipt of proposals, please check http://www.fedbizopps.gov

b. Contractual and Technical inquiries and questions relating to proposal procedures are to be submitted via Bidder

Inquiry in ProjNet at https://www.projnet.org/projnet.

1. To submit and review bid inquiry items, offerors will need to be a current registered user or self-register into the system. To self-register go to the aforementioned web page and click on the QUICK ADD link. Select agency as USACE, and enter the Bidder Inquiry Key for this solicitation listed below, your e-mail address, and then click continue. Fill in all required information and click Add User.

2. From this page you may view all bidder inquiries or add an inquiry.

3. Bidders will receive an acknowledgement of their question via e-mail, followed by an answer to their question after it has been processed.

4. Solicitation Number is: W91238-18-R-0056

The Bidder Inquiry Key is: 8ZJDEW-J372NB

The point of contact for this solicitation is:

Mary Chong, Contract Specialist

Telephone: (916) 557-6884

Email: mary.chong@usace.army.mil http://www.fedbizopps.gov/ https://www.projnet.org/projnet

c. The Bidder Inquiry System will be unavailable for new inquiries 10 days prior to proposal submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.

d. Offerors are requested to review the specification in its entirety, and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

e. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

f. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.

g. The point of contact for this solicitation is:

Contract Specialist: Mary Chong

E-MAIL: mary.chong@usace.army.mil

CONTRACTOR RESPONSIBILITY, PREAWARD SURVEY:

In order to determine a contractor's responsibility for purposes of contract award in accordance with FAR Part 9, the contractor is required to provide a statement regarding previous experience and past performance in performing comparable work, information related to the business organization, financial resources, and/or plant to be used in performing the work (see Section 00 22 00). All offerors will complete and return the Preaward Survey as part of the Price proposal. Failure to submit the Preaward Survey in conjunction with the price proposal will not of itself render the offer unacceptable.

Determination of Contractor Responsibility will be completed in accordance with FAR 9.104-1.

If the contractor or subcontractor does not already have sufficient resources demonstrated in the completed Preaward

Survey, acceptable evidence of "the ability to obtain" the required, adequate resources (all of the resources discussed in FAR 9.104-1) normally consists of a commitment or explicit arrangement that will be in existence at the time of contract award to rent, purchase or otherwise acquire the needed facilities, equipment, other resources, or personnel.

The Preaward Survey as a tool used by the Government in determining responsibility of the offeror is submitted as part of the Price proposal and is separate from the technical proposal's response to the technical evaluation criteria found later in this section. Some of the information required from the offeror for completion of the Preaward

Survey and the technical proposal may be duplicative but it is necessary that the information be provided in full in both places and that the Price proposal and the Technical proposal be separate documents. DO NOT state, for example, in the Technical proposal, "See Price proposal for past performance information".

AVAILABILITY OF CORPS OF ENGINEERS PUBLICATIONS DESCRIPTIONS:

a. The internet URL for Corps of Engineers publications is:

http://www.publications.usace.army.mil/

b. Construction Criteria Base (CCB). The Construction Criteria Base (CCB) system available through the

National Institute of Building Sciences includes copies of Corps of Engineers methods and specifications.

Information about the CCB can be obtained from:

http://www.wbdg.org/ccb/ccb.php

FACSIMILE BIDS/OFFERS:

http://www.publications.usace.army.mil/ http://www.wbdg.org/ccb/ccb.php

Facsimile bids/offers, modifications thereto, or cancellations of bids/offers will not be accepted.

PERFORMANCE AND PAYMENT BONDS:

The bidder/offeror whose bid/offer is accepted will, within the time established in the contract, furnish performance and payment bonds in accordance with FAR 52.228-15.

INDIVIDUAL SURETIES IN SUPPORT OF BID BONDS:

Bidders/offerors utilizing individual sureties in support of a bid bond shall include a Standard Form (SF) 28

(Affidavit of Individual Surety), accompanied by a pledge of acceptable assets from each person acting as an individual surety, and include these with the SF 24 (Bid Bond), and the bid itself (see clause titled "Pledges of

Assets," FAR 52.228-11).

Pledges of acceptable assets shall be in the form of (1) evidence of an escrow account and/or (2) a recorded lien on real estate.

ACCEPTANCE OF OFFERS:

A written award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party.

System for Award Management (SAM) Registration:

It is a requirement that any and all contractors that intend to do business with the government must be registered in the System for Award Management (SAM) database. No contract may be awarded by the government to any contractor who is not registered in SAM. If your company is not registered in SAM, you must register in order to be eligible for any government award.

The following link provides access to the SAM website:

https://www.sam.gov/portal/public/SAM/

If you have difficulties with or questions regarding the SAM registration, the following link has been set up by the

Defense Logistics Agency (DLA) to assist contractors registering for CAGE codes for enrollment and navigation within SAM:

https://www.logisticsinformationservice.dla.mil/CAGETier3/

CLAUSES INCORPORATED BY REFERENCE

52.215-1 Alt I Instructions to Offerors--Competitive Acquisition (Jan 2017) -

Alternate I

OCT 1997

https://www.sam.gov/portal/public/SAM/ https://www.logisticsinformationservice.dla.mil/CAGETier3/

Section 00 22 00 - Supplementary Instructions

SUPPLEMENTARY INSTRUCTIONS

Section 00 22 00 – Supplementary Instructions

PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS,

BASIS OF AWARD, AND EVALUATION CRITERIA

A. BASIS FOR AWARD

The award will be made based on the best overall (i.e., best value) proposal that is determined to be the most beneficial and advantageous to the Government, with appropriate consideration given to five (5) evaluation factors as follows:

(1) Company Experience (Non-Price Technical Factor)

(2) Company Capability (Non-Price Technical Factor)

(3) Past Performance (Non-Price Technical Factor)

(4) Small Business Participation (Non-Price Technical Factor)

(5) Pricing…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.