Tule River/Success Lake Spillway Enlargement Phase 2 Solicitation

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W91238-21-B-0010
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Porterville, California, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers Engineering District Sacramento seeks to award a firm-fixed price construction contract to complete Phase 2 of the Tule River/Success Lake Spillway Enlargement Project. The scope of work includes constructing a 10 foot high 350 foot long curved reinforced concrete ogee weir across Success Lake spillway, as well as constructing side walls, a downstream apron, widening the spillway, excavating foundations using blasting and excavation, installing rock anchors, constructing trench drains, flood proofing recreation facilities, and raising and relocating existing wells and storage tanks. Bids are due by July 16, 2021 and the contract will be awarded based on lowest price technically acceptable. The deadline for questions is July 6, 2021.

This opportunity is set aside for small businesses and has a NAICS code of 237990 and size standard of $39.5 million. The estimated value of construction is between $25-100 million. The place of performance is Porterville, CA. Key work includes constructing a 350-foot long reinforced concrete weir to be completed within 24 months of award.

Notice text

4 versions

Update #4 · Latest ·

TULE RIVER / SUCCESS LAKE SPILLWAY ENLARGEMENT PHASE 2

****Amendnent 0001 extends proposal due date, updates site visit date, and confirms full and open competition.****

The Government anticipates issuing a Invitation for bid (IFB) with the intent of awarding a Firm-Fixed Price construction contract for W9123821B0010 / Tule River Phase 2

Project Description: The project generally consists of constructing a 10 foot high 350 foot long curved reinforced concrete ogee weir across Success lake spillway and constructing side walls and downstream Apron. The work will include widening of the spillway, excavating the Ogee weir and Apron foundation and weir slope embedment using blasting and/or excavation, and installation of rock anchors.

Additional project improvements include construction of trench drains at the main dam left abutments, flood proofing of existing recreation facilities, and raising and relocation of existing wells and storage tanks. Rock slope protection will be added to Frazier Dike and other areas around the lake.

In accordance with DFARS 236.204(ii) the estimated magnitude of construction is expected to be between $25,000,000 to $100,000,000. This prospective contract action will be conducted using NAICS Code is 237990 (Other Heavy and Civil Engineering Construction).

Product Service Code is Y1LC (Construction of Tunnels and Subsurface Structures).

The solicitation will proceed as a Full and Open and is estimated to be issued on or about 03 Jun 2021 with bids due tentatively on 08 Jul 2021. The IFB will be issued on the Government Point of Entry known as https://sam.gov and will establish a firm bid due date/time.

Site Visit scheduled:

When: Thursday, 17 Jun 2021

Time: 0900 – 1200 PST

Where: Tule River/Success Lake, 29330 Highway 190, Porterville, CA 93257

Please respond to POC NLT 1200 PST on Wednesday, 16 JUN 2021

Site Visit POC's:

Mr. Charlie Mauldin – Operations Park Manager, 559-784-0215
Mr. Calvin Foster – Southern Operations Branch Chief, 559-281-0684

  • Location 1:        Meet at the USACE office parking lot
  • Location 2:        Tule Spillway
  • Location 3:        Stockpile area and haul road
  • Location 4:        HWY 190 Recreation area
  • Location 5:        Frazier Dike
  • All attendees to sign in at location 1 the USACE office parking lot.
  • All attendees to observe CDC COVID requirements including wearing masks if required by CDC or local government.
  • Please try to carpool to limit the number of vehicles during the visit. Vehicles with high ground clearance are recommended.
  • Location 2 and 3 as listed above are currently a construction zone and have no public access the only time prospective bidder can visit that area is during this site visit. Please bring proper safety gear including hard hats, vests, ear & eye protection and steel toe boots.
  • USACE staff will not be answering questions during the visit. All questions to be submitted in writing and will be responded to in writing through ProjNet via the solicitation.
  • Photography will not be permitted.  Requested photos may be taken by authorized Government personnel and posted to SAM.gov. 

BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.

The only INTERESTED VENDORS LISTS (plan-holder's/bidder's list) is available via https://sam.gov.  Contractors are responsible for self-identifying as interested vendors and viewing other interested vendors.  Contractors should check https://sam.gov frequently for any changes to the interested vendors list and notice.

** FOR .PDF FILES OF (SITE VISIT LOCATION IMAGES, GDR APP - B AND GDR APP - F) PLEASE CONTACT THE POC: V. SIMPKINS FOR A DOD SAFE LINK THE FILES ARE TOO BIG FOR SAM.GOV **

Amendment 0005 issued 07/01/2021 updating the Bid Schedule

Update #3 ·

TULE RIVER / SUCCESS LAKE SPILLWAY ENLARGEMENT PHASE 2

****Amendnent 0001 extends proposal due date, updates site visit date, and confirms full and open competition.****

The Government anticipates issuing a Invitation for bid (IFB) with the intent of awarding a Firm-Fixed Price construction contract for W9123821B0010 / Tule River Phase 2

Project Description: The project generally consists of constructing a 10 foot high 350 foot long curved reinforced concrete ogee weir across Success lake spillway and constructing side walls and downstream Apron. The work will include widening of the spillway, excavating the Ogee weir and Apron foundation and weir slope embedment using blasting and/or excavation, and installation of rock anchors.

Additional project improvements include construction of trench drains at the main dam left abutments, flood proofing of existing recreation facilities, and raising and relocation of existing wells and storage tanks. Rock slope protection will be added to Frazier Dike and other areas around the lake.

In accordance with DFARS 236.204(ii) the estimated magnitude of construction is expected to be between $25,000,000 to $100,000,000. This prospective contract action will be conducted using NAICS Code is 237990 (Other Heavy and Civil Engineering Construction).

Product Service Code is Y1LC (Construction of Tunnels and Subsurface Structures).

The solicitation will proceed as a Full and Open and is estimated to be issued on or about 03 Jun 2021 with bids due tentatively on 08 Jul 2021. The IFB will be issued on the Government Point of Entry known as https://sam.gov and will establish a firm bid due date/time.

Site Visit scheduled:

When: Thursday, 17 Jun 2021

Time: 0900 – 1200 PST

Where: Tule River/Success Lake, 29330 Highway 190, Porterville, CA 93257

Please respond to POC NLT 1200 PST on Wednesday, 16 JUN 2021

Site Visit POC's:

Mr. Charlie Mauldin – Operations Park Manager, 559-784-0215
Mr. Calvin Foster – Southern Operations Branch Chief, 559-281-0684

  • Location 1:        Meet at the USACE office parking lot
  • Location 2:        Tule Spillway
  • Location 3:        Stockpile area and haul road
  • Location 4:        HWY 190 Recreation area
  • Location 5:        Frazier Dike
  • All attendees to sign in at location 1 the USACE office parking lot.
  • All attendees to observe CDC COVID requirements including wearing masks if required by CDC or local government.
  • Please try to carpool to limit the number of vehicles during the visit. Vehicles with high ground clearance are recommended.
  • Location 2 and 3 as listed above are currently a construction zone and have no public access the only time prospective bidder can visit that area is during this site visit. Please bring proper safety gear including hard hats, vests, ear & eye protection and steel toe boots.
  • USACE staff will not be answering questions during the visit. All questions to be submitted in writing and will be responded to in writing through ProjNet via the solicitation.
  • Photography will not be permitted.  Requested photos may be taken by authorized Government personnel and posted to SAM.gov. 

BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.

The only INTERESTED VENDORS LISTS (plan-holder's/bidder's list) is available via https://sam.gov.  Contractors are responsible for self-identifying as interested vendors and viewing other interested vendors.  Contractors should check https://sam.gov frequently for any changes to the interested vendors list and notice.

** FOR .PDF FILES OF (SITE VISIT LOCATION IMAGES, GDR APP - B AND GDR APP - F) PLEASE CONTACT THE POC: V. SIMPKINS FOR A DOD SAFE LINK THE FILES ARE TOO BIG FOR SAM.GOV **

Update #2 ·

TULE RIVER / SUCCESS LAKE SPILLWAY ENLARGEMENT PHASE 2

****Amendnent 0001 extends proposal due date, updates site visit date, and confirms full and open competition.****
 

The Government anticipates issuing a Invitation for bid (IFB) with the intent of awarding a Firm-Fixed Price construction contract for W9123821B0010 / Tule River Phase 2

Project Description: The project generally consists of constructing a 10 foot high 350 foot long curved reinforced concrete ogee weir across Success lake spillway and constructing side walls and downstream Apron. The work will include widening of the spillway, excavating the Ogee weir and Apron foundation and weir slope embedment using blasting and/or excavation, and installation of rock anchors.

Additional project improvements include construction of trench drains at the main dam left abutments, flood proofing of existing recreation facilities, and raising and relocation of existing wells and storage tanks. Rock slope protection will be added to Frazier Dike and other areas around the lake.

In accordance with DFARS 236.204(ii) the estimated magnitude of construction is expected to be between $25,000,000 to $100,000,000. This prospective contract action will be conducted using NAICS Code is 237990 (Other Heavy and Civil Engineering Construction).

Product Service Code is Y1LC (Construction of Tunnels and Subsurface Structures).

The solicitation will proceed as a Full and Open and is estimated to be issued on or about 03 Jun 2021 with bids due tentatively on 08 Jul 2021. The IFB will be issued on the Government Point of Entry known as https://sam.gov and will establish a firm bid due date/time.

Site Visit scheduled:

When: Thursday, 17 Jun 2021

Time: 0900 – 1200 PST

Where: Tule River/Success Lake, 29330 Highway 190, Porterville, CA 93257

Please respond to POC NLT 1200 PST on Wednesday, 16 JUN 2021

Site Visit POC's:

Mr. Charlie Mauldin – Operations Park Manager, 559-784-0215
Mr. Calvin Foster – Southern Operations Branch Chief, 559-281-0684

  • Location 1:        Meet at the USACE office parking lot
  • Location 2:        Tule Spillway
  • Location 3:        Stockpile area and haul road
  • Location 4:        HWY 190 Recreation area
  • Location 5:        Frazier Dike
  • All attendees to sign in at location 1 the USACE office parking lot.
  • All attendees to observe CDC COVID requirements including wearing masks if required by CDC or local government.
  • Please try to carpool to limit the number of vehicles during the visit. Vehicles with high ground clearance are recommended.
  • Location 2 and 3 as listed above are currently a construction zone and have no public access the only time prospective bidder can visit that area is during this site visit. Please bring proper safety gear including hard hats, vests, ear & eye protection and steel toe boots.
  • USACE staff will not be answering questions during the visit. All questions to be submitted in writing and will be responded to in writing through ProjNet via the solicitation.
  • Photography will not be permitted.  Requested photos may be taken by authorized Government personnel and posted to SAM.gov. 

BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.

The only INTERESTED VENDORS LISTS (plan-holder's/bidder's list) is available via https://sam.gov.  Contractors are responsible for self-identifying as interested vendors and viewing other interested vendors.  Contractors should check https://sam.gov frequently for any changes to the interested vendors list and notice.

** FOR .PDF FILES OF (SITE VISIT LOCATION IMAGES, GDR APP - B AND GDR APP - F) PLEASE CONTACT THE POC: V. SIMPKINS FOR A DOD SAFE LINK THE FILES ARE TOO BIG FOR SAM.GOV **

Update #1 ·

TULE RIVER / SUCCESS LAKE SPILLWAY ENLARGEMENT PHASE 2

The Government anticipates issuing a Invitation for bid (IFB) with the intent of awarding a Firm-Fixed Price construction contract for W9123821B0010 / Tule River Phase 2

Project Description: The project generally consists of constructing a 10 foot high 350 foot long curved reinforced concrete ogee weir across Success lake spillway and constructing side walls and downstream Apron. The work will include widening of the spillway, excavating the Ogee weir and Apron foundation and weir slope embedment using blasting and/or excavation, and installation of rock anchors.

Additional project improvements include construction of trench drains at the main dam left abutments, flood proofing of existing recreation facilities, and raising and relocation of existing wells and storage tanks. Rock slope protection will be added to Frazier Dike and other areas around the lake.

In accordance with DFARS 236.204(ii) the estimated magnitude of construction is expected to be between $25,000,000 to $100,000,000. This prospective contract action will be conducted using NAICS Code is 237990 (Other Heavy and Civil Engineering Construction).

The size standard is $39,500,000.  

Product Service Code is Y1LC (Construction of Tunnels and Subsurface Structures).

The solicitation will proceed as a Small Business set aside and is estimated to be issued on or about 27 May 2021 with bids due tentatively on 25 Jun 2021. The IFB will be issued on the Government Point of Entry known as https://sam.gov and will establish a firm bid due date/time.

If applicable, the site visit date, time and location will be identified in the solicitation.

BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.

The only INTERESTED VENDORS LISTS (plan-holder's/bidder's list) is available via https://sam.gov.  Contractors are responsible for self-identifying as interested vendors and viewing other interested vendors.  Contractors should check https://sam.gov frequently for any changes to the interested vendors list and notice.

** FOR .PDF FILES OF (GDR APP - B AND GDR APP - F) PLEASE CONTACT THE POC: V. SIMPKINS FOR A DOD SAFE LINK THE FILES ARE TOO BIG FOR SAM.GOV **

Files

File Type Posted
Bid Abstract 16July2021.pdf PDF
SF30 - Amendment 0006 -Tule River - Bid Opening Call in Information.pdf PDF
Amendment 0006 - Section 21 13 (update)Tule Bid Opening Call in Information.pdf PDF
Amendment 0005 - Exhibit A Bid List revised.pdf PDF
SF30 Amendment 0002 - Updated Option items Conformed.pdf PDF
Tule Phase Revised 2 Bid List_20210701.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004 - Section 31 23 16 (28 June 21).pdf PDF
SF 30 Amendment 0004 - Include Drone policy.pdf PDF
Site Visit Check-in Sheets.pdf PDF
SF30 Amendment 0003 - Update section 01 22 00.pdf PDF
SF30 Amendment 0002 - Updated Option items.pdf PDF
PLANS Section 01 22 00 revised.pdf PDF
Exhibit A - Revised Tule Bid List_ Plus added items.pdf PDF
SF 30 AMD 01 Mod Solicitation Tule River.pdf PDF
SF 30 AMD 01 Conformed Solicitation Tule River.pdf PDF
Phase 2 Geotechnical Data Final Report 20210322.pdf PDF
SF 30 AMD 01 Solicitation Tule River.pdf PDF
GDR App D.pdf PDF
Exhibit A - Bid List.pdf PDF
SF 1442 Tule River 21B0010.pdf PDF
GDR App I.pdf PDF
GDR App H.pdf PDF
GDR App G.pdf PDF
GDR App C.pdf PDF
Attachment 1 -Tule River Spillway Enlargeemnt Phase 2 - Final Design Plans 20210408.pdf PDF
GDR App J.pdf PDF
GDR App E.pdf PDF
GDR App A.pdf PDF
Attachment 3 - Tulare County WD 2021.pdf PDF
Attachment 2 - Tule River Success (Schafer) Dam 2 Spec Complete 20210408 .pdf PDF
Show all 31

Notice history

Notice Type Posted
USACE SPK Tule River/Success Lake Spillway Enlargement Phase 2 Award Award Notice
This notice Latest solicitation Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
USACE SPK DB Construction - Natomas NPP Named Pumping Plants - Sacramento, CA Sacramento, California 95837 · NAICS 237990 ENDIST Sacramento No set-aside
East canal efficiency improvements NAICS 237110 Bureau of Reclamation Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors