This document provides details on a federal contract solicitation for the Tule River/Success Lake Spillway Enlargement Phase 2 project. The solicitation will be for a firm-fixed price construction contract issued by the Department of the Army Corps of Engineers Sacramento District. The project scope involves constructing a 350-foot long curved reinforced concrete ogee weir and associated structures to enlarge the existing spillway. The construction value is estimated between $25-100 million. The solicitation is designated as a small business set-aside and will be issued on or around May 27, 2021 via SAM.gov, with bids due on June 25, 2021. The solicitation will establish a firm bid deadline. An optional site visit may be scheduled prior to proposal submission. This is an active procurement that may be delayed, cancelled or revised during the solicitation and award process.

View the file

Other files

File Type Posted
Bid Abstract 16July2021.pdf PDF
Amendment 0006 - Section 21 13 (update)Tule Bid Opening Call in Information.pdf PDF
SF30 - Amendment 0006 -Tule River - Bid Opening Call in Information.pdf PDF
Amendment 0005 - Exhibit A Bid List revised.pdf PDF
SF30 Amendment 0002 - Updated Option items Conformed.pdf PDF
Tule Phase Revised 2 Bid List_20210701.pdf PDF
Amendment 0005.pdf PDF
SF 30 Amendment 0004 - Include Drone policy.pdf PDF
Amendment 0004 - Section 31 23 16 (28 June 21).pdf PDF
Site Visit Check-in Sheets.pdf PDF
SF30 Amendment 0003 - Update section 01 22 00.pdf PDF
SF30 Amendment 0002 - Updated Option items.pdf PDF
Exhibit A - Revised Tule Bid List_ Plus added items.pdf PDF
PLANS Section 01 22 00 revised.pdf PDF
SF 30 AMD 01 Mod Solicitation Tule River.pdf PDF
SF 30 AMD 01 Conformed Solicitation Tule River.pdf PDF
SF 30 AMD 01 Solicitation Tule River.pdf PDF
Phase 2 Geotechnical Data Final Report 20210322.pdf PDF
GDR App H.pdf PDF
Attachment 1 -Tule River Spillway Enlargeemnt Phase 2 - Final Design Plans 20210408.pdf PDF
Attachment 2 - Tule River Success (Schafer) Dam 2 Spec Complete 20210408 .pdf PDF
Attachment 3 - Tulare County WD 2021.pdf PDF
GDR App D.pdf PDF
Exhibit A - Bid List.pdf PDF
GDR App C.pdf PDF
GDR App E.pdf PDF
GDR App I.pdf PDF
SF 1442 Tule River 21B0010.pdf PDF
GDR App G.pdf PDF
GDR App A.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schafer Dam Spillway Enlargement Project Geotechnical Data Report

APPENDIX J – BOAT RAMP AND PARKING LOT TEST PITS AND LAB

TESTING RESULTS

Project: Success/Tule R. Stream: Contractor: USACE Date:-5-Jan-21

High Pool Boat Ramp Operator: Equipment: Deere 310SK Inspector: L. Addarich

Location: 4F-21-11 Wall Mapped: Trench Bearing: 051 Elevation Reference: NAVD88

TRENCH LOG

0’ 2’ 4’ 6’ 8’

0’ 10’

COORDINATE INFORMATION

ELEV NORTHING EASTING

20’ 30’

36.073523 -118.921826

1. Fat clay (CH), 20% coarse to fine sand, 10% coarse to fine subangular gravel, yellowish brown.

2. Quartzite, very hard, intensely fracture, slightly weathered, dark gray.Draft

Project: Success/Tule R. Stream: Contractor: USACE Date: 5-Jan-2021

Location: 4F-21-12 Wall Mapped: Trench Bearing: 094 Elevation Reference: NAVD88

TRENCH LOG

0’ 2’ 4’ 6’ 8’

0’ 10’

COORDINATE INFORMATION

ELEV NORTHING EASTING

20’ 30’

36.074572 -118.920817

1. Fat clay (CH), 20% coarse to fine sand, 5% coarse to fine subangular gravel, 5% boulders (granodiorite), yellowish brown.

2. Meta-basalt (?), moderately hard, high to intensely fracture, dark gray.Draft

Project: Success/Tule R. Stream: Contractor:USACE Date: 5 Jan-2021

Location: 4F-21-13 Wall Mapped: Trench Bearing: 065 Elevation Reference: NAVD88

TRENCH LOG

0’ 2’ 4’ 6’ 8’

0’ 10’

COORDINATE INFORMATION

ELEV NORTHING EASTING

20’ 30’

1. Lean clay (CL), 15% coarse to fine sand, 5% coarse to fine subangular gravel, yellowish brown.

2. Coarse to fine sand, 25% low plastic fine, 25% coarse to fine gravel (granodiorite), yellowish red.

3. Quartzite, highly fracture, moderately weathered, very hard, dark gray.

36.075410, -118.920652

Draft

Project: Success/Tule R. Stream: Contractor: Date: 5-Jan-2021 5-Jan-20215-

High Pool Boat Ramp Operator: Equipment: Deere 310SK Inspector: L. Addarich

Location: 4F-21-14 Wall Mapped: Trench Bearing: 265 Elevation Reference: NAVD88

TRENCH LOG

0’ 2’ 4’ 6’ 8’

0’ 10’

COORDINATE INFORMATION

ELEV NORTHING EASTING

20’ 30’

36.076170, -118.919986

1. Lean clay (CL), 15% coarse to fine sand, 5% coarse to fine subangular gravel, reddish brown.

2. Coarse to fine sand, 25% low plastic fines, 15% coarse to fine subangular gravel (quartzite), yellowish red.

3. Quartzite, very hard, slightly weathered, highly fracture, light gray.

Draft

UNIFIED SOIL CLASSIFICATION

Sieve Dia. %

No. mm Finer

3" 75.0 100.0

2" 50.0 100.0

1.5" 37.5 100.0

1" 25.0 100.0

3/4" 19.00 94.8

1/2" 12.50 87.8

3/8" 9.50 84.0

#4 4.75 71.0

#10 2.00 58.0

#20 0.850 47.0

#40 0.425 38.0

#60 0.250 30.0

#100 0.150 24.0

#140 0.106 19.0

#200 0.075 16.0

D60

D30

D10

Location Sample No. Depth (ft) SYMBOL Wn (%) LL PI % 2 µm Description and Classification Cu

4F-21-11 01052021-02 7 ~ 8.5 14.2 --- --- --- Cc

PROJECT NAME: Tule River / Success Dam PARTICLE-SIZE

DISTRIBUTION CURVE

2.285

H yd ro m et er

A na ly si s

% Cobbles % Gravel % Sand % Fines

0.250

#N/A

Light olive brown silty Sand with gravel (SM) ---

50 5 0.5 0.05 0.005

#2003" 2" 1" 3/4" 3/8" #4 #10 #20 #40 #60 #100

0.0010.010.1110100

PE

R

C

EN

T

PA

SS

IN

G B

Y W

EI

G

H T

GRAIN SIZE IN MILLIMETERS

U. S. STANDARD SIEVE SIZES

C O B B L E S

GRAVEL SAND SILT AND CLAY

COARSE FINE COARSE FINEMEDIUM

HYDROMETER

C:\Laboratory\Projects\Tule River\PSD Tule River 4F-21-11 01052021-02.xlsx USACE

No. mm Finer

3" 75.0 100.0

2" 50.0 100.0

1.5" 37.5 100.0

1" 25.0 100.0

3/4" 19.00 97.8

1/2" 12.50 92.0

3/8" 9.50 89.2

#4 4.75 81.0

#10 2.00 71.0

#20 0.850 64.0

#40 0.425 58.0

#60 0.250 52.0

#100 0.150 47.0

#140 0.106 42.0

#200 0.075 38.0

D60

D30

D10

Location Sample No. Depth (ft) SYMBOL Wn (%) LL PI % 2 µm Description and Classification Cu

4F-21-12 01052021-04 8 ~ 10 16.1 --- --- --- Cc

PROJECT NAME: Tule River / Success Dam PARTICLE-SIZE

DISTRIBUTION CURVE

0.535

H yd ro m et er

A na ly si s

% Cobbles % Gravel % Sand % Fines

#N/A

#N/A

Grayish brown clayey Sand with gravel (SC) ---

50 5 0.5 0.05 0.005

#2003" 2" 1" 3/4" 3/8" #4 #10 #20 #40 #60 #100

0.0010.010.1110100

PE

R

C

EN

T

PA

SS

IN

G B

Y W

EI

G

H T

GRAIN SIZE IN MILLIMETERS

U. S. STANDARD SIEVE SIZES

C O B B L E S

GRAVEL SAND SILT AND CLAY

COARSE FINE COARSE FINEMEDIUM

C:\Laboratory\Projects\Tule River\PSD Tule River 4F-21-12 01052021-04.xlsx USACE

No. mm Finer

3" 75.0 100.0

2" 50.0 100.0

1.5" 37.5 95.0

1" 25.0 93.4

3/4" 19.00 84.1

1/2" 12.50 73.8

3/8" 9.50 70.3

#4 4.75 63.0

#10 2.00 57.0

#20 0.850 49.0

#40 0.425 39.0

#60 0.250 30.0

#100 0.150 21.0

#140 0.106 15.0

#200 0.075 12.0

D60

D30

D10

Location Sample No. Depth (ft) SYMBOL Wn (%) LL PI % 2 µm Description and Classification Cu

4F-21-13 01052021-06 6.0 7.6 --- --- --- Cc

PROJECT NAME: Tule River / Success Dam PARTICLE-SIZE

DISTRIBUTION CURVE

3.082

H yd ro m et er

A na ly si s

% Cobbles % Gravel % Sand % Fines

0.250

0.0550

56.0

Pale olive poorly graded Sand with silt and gravel (SP-SM) 0.4

50 5 0.5 0.05 0.005

#2003" 2" 1" 3/4" 3/8" #4 #10 #20 #40 #60 #100

0.0010.010.1110100

PE

R

C

EN

T

PA

SS

IN

G B

Y W

EI

G

H T

GRAIN SIZE IN MILLIMETERS

U. S. STANDARD SIEVE SIZES

C O B B L E S

GRAVEL SAND SILT AND CLAY

COARSE FINE COARSE FINEMEDIUM

C:\Laboratory\Projects\Tule River\PSD Tule River 4F-21-13 01052021-06.xlsx USACE

No. mm Finer

3" 75.0 100.0

2" 50.0 100.0

1.5" 37.5 100.0

1" 25.0 100.0

3/4" 19.00 100.0

1/2" 12.50 95.3

3/8" 9.50 94.2

#4 4.75 88.0

#10 2.00 78.0

#20 0.850 66.0

#40 0.425 55.0

#60 0.250 47.0

#100 0.150 39.0

#140 0.106 33.0

#200 0.075 28.0

D60

D30

D10

Location Sample No. Depth (ft) SYMBOL Wn (%) LL PI % 2 mm Description and Classification Cu

4F-21-14 01052021-08 6 ~ 11 l 16.9 --- --- --- Cc

PROJECT NAME: Tule River / Success Dam PARTICLE-SIZE

DISTRIBUTION CURVE

0.561

H y d ro m e te r

A n a ly s is

% Cobbles

% Gravel

% Sand

% Fines

0.088

#N/A

Olive yellow silty Sand (SM) ---

50 5 0.5 0.05 0.005

#2003" 2" 1" 3/4" 3/8" #4 #10 #20 #40 #60 #100

0.0010.010.1110100

P E

R C

E N

T P

A S

S

IN

G B

Y W

E

IG

H T

GRAIN SIZE IN MILLIMETERS

U. S. STANDARD SIEVE SIZES

C

O

B

B

L

E

S

GRAVEL SAND SILT AND CLAY

COARSE FINE COARSE FINEMEDIUM

E:\spl\Laboratory Projects\Success Lake - Tule River 2020\test results\test pits 2021\PSD Tule River 4F-21-14 01052021-08.xlsx USACE

DESCRIPTION / CLASSIFICATION

Project Name:

PLASTICITY CHART

PILocation Sample Number Depth (ft) Water Content (%) LL

Dark brown Clay with sand (CH)

Tule River / Success Dam

4F-21-11 01052021-01 0 ~ 1.5 12.8 64 43

CL-ML

CL or OL CH or OH

ML or OL MH or OH

0 10 20 30 40 50 60 70 80 90 100 110

PL

AS

TI

C

IT

Y

IN

D

EX

LIQUID LIMIT (%)

Limits Tule River 4F-21-11 01052021-01.xlsx USACE

PILocation Sample Number Depth (ft) Water

Content (%)

LL

Dark yellowish brown Clay with sand

(CH)

Tule River / Success Dam

4F-21-12 01052021-03 0 ~ 3 17.6 61 38

CL-ML

CL or OL CH or OH

ML or OL MH or OH

0 10 20 30 40 50 60 70 80 90 100 110

P L

A S

T

IC

IT

Y

I N

D E

X

Limits Tule River 4F-21-12 01052021-03.xlsx USACE

PILocation Sample Number Depth (ft) Water Content (%) LL

Very dark brown clayey Sand (SC)

Tule River / Success Dam

4F-21-13 01052021-05 0 ~ 1 5.9 36 12

CL-ML

CL or OL CH or OH

ML or OL MH or OH

0 10 20 30 40 50 60 70 80 90 100 110

PL

AS

TI

C

IT

Y

IN

D

EX

Limits Tule River 4F-21-13 01052021-05.xlsx USACE

Brown Clay with sand (CH)

Tule River / Success Dam

4F-21-14 01052021-07 2 ~ 2.5 14.8 63 38

PILocation Sample Number Depth (ft) Water Content (%) LL

CL-ML

CL or OL CH or OH

ML or OL MH or OH

0 10 20 30 40 50 60 70 80 90 100 110

PL

AS

TI

C

IT

Y

IN

D

EX

Limits Tule River 4F-21-14 01052021-07.xlsx USACE

Boat Ramp Test Pits.pdf
4F-21-11
Slide Number 1
4F-21-12
Slide Number 1
4F-21-13
Slide Number 1
4F-21-14
Slide Number 1
Gradations.pdf
PSD Tule River 4F-21-11 01052021-02
PSD plot
PSD Tule River 4F-21-12 01052021-04
PSD plot
PSD Tule River 4F-21-13 01052021-06
PSD plot

PSD Tule River 4F-21-14 01052021-08

Atterberg limit test results.pdf
Limits Tule River 4F-21-11 01052021-01
PI_PLOT
Limits Tule River 4F-21-12 01052021-03