GDR App A.pdf

PDF 419 KB Posted

Attached to
Tule River/Success Lake Spillway Enlargement Phase 2 Solicitation
Solicitation number
W91238-21-B-0010
Issued by

About this file

This solicitation is for a firm-fixed price construction contract for Phase 2 of the Tule River/Success Lake Spillway Enlargement Project. The scope of work includes constructing a 10 foot high 350 foot long curved reinforced concrete ogee weir across Success Lake spillway, constructing side walls and a downstream apron, widening the spillway, excavating the weir and apron foundations using blasting and excavation, and installing rock anchors. Additional improvements are flood proofing existing recreation facilities, raising and relocating wells and storage tanks, and adding rock slope protection to Frazier Dike and other areas around the lake. The estimated value of construction is between $25-100 million. The NAICS code is 237990 and size standard is $39.5 million. The solicitation will be issued on May 27, 2021 as a small business set aside, with bids due on June 25, 2021 via SAM.gov. The contracting agency is the Department of the Army Corps of Engineers Sacramento District.

View the file

Other files

File Type Posted
Bid Abstract 16July2021.pdf PDF
Amendment 0006 - Section 21 13 (update)Tule Bid Opening Call in Information.pdf PDF
SF30 - Amendment 0006 -Tule River - Bid Opening Call in Information.pdf PDF
Amendment 0005 - Exhibit A Bid List revised.pdf PDF
SF30 Amendment 0002 - Updated Option items Conformed.pdf PDF
Tule Phase Revised 2 Bid List_20210701.pdf PDF
Amendment 0005.pdf PDF
SF 30 Amendment 0004 - Include Drone policy.pdf PDF
Amendment 0004 - Section 31 23 16 (28 June 21).pdf PDF
Site Visit Check-in Sheets.pdf PDF
SF30 Amendment 0003 - Update section 01 22 00.pdf PDF
SF30 Amendment 0002 - Updated Option items.pdf PDF
Exhibit A - Revised Tule Bid List_ Plus added items.pdf PDF
PLANS Section 01 22 00 revised.pdf PDF
SF 30 AMD 01 Mod Solicitation Tule River.pdf PDF
SF 30 AMD 01 Conformed Solicitation Tule River.pdf PDF
SF 30 AMD 01 Solicitation Tule River.pdf PDF
Phase 2 Geotechnical Data Final Report 20210322.pdf PDF
GDR App H.pdf PDF
Attachment 1 -Tule River Spillway Enlargeemnt Phase 2 - Final Design Plans 20210408.pdf PDF
Attachment 2 - Tule River Success (Schafer) Dam 2 Spec Complete 20210408 .pdf PDF
Attachment 3 - Tulare County WD 2021.pdf PDF
GDR App D.pdf PDF
Exhibit A - Bid List.pdf PDF
GDR App C.pdf PDF
GDR App J.pdf PDF
GDR App E.pdf PDF
GDR App I.pdf PDF
SF 1442 Tule River 21B0010.pdf PDF
GDR App G.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Success Dam Spillway Enlargement Project Geotechnical Data Report

APPENDIX A – PROJECT PLAN VIEW

pete.nix Rectangle Success Dam Spillway Enlargement Project

Success Dam Design Documentation Report Tule River Spillway Enlargement Project – Phase I Porterville, California

Success Dam Location Map

GEOVision Report Success Dam Televiewer 19077-01 rev 3 Page 2 of 255 May 30, 2019 pete.nix Text Box Schafer Dam Location Map

File details come from the government source that posted it. Updated .