TAFB MACC-BOA | Initial Site Visit for WWYK240146 - Design & Implement Monitoring & Control System for IWCS, Bldg. 62516
Closed Pre-Solicitation Posted
- Solicitation number
- FA8137R0039
- Agency
-
Air Force Sustainment Center
Air Force Materiel Command, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237110 Water and Sewer Line and Related Structures Construction
- Place of performance
- Tinker AFB, Oklahoma 73145, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Air Force Materiel Command Air Force Sustainment Center is conducting an initial site visit for design and implementation of a Monitoring & Control System for the Integrated Water and Chilled Water System (IWCS) in Building 62516 at Tinker Air Force Base, Oklahoma, with site visit proposals due June 1, 2026. This order proposal is exclusively available to current MACC-BOA (Multiple Award Construction Contract – Blanket Order Agreement) holders.
The contractor must furnish all materials, labor, equipment, testing services, quality control, and incidentals to deliver a complete, fully operational system. The contractor shall perform a site investigation to verify existing conditions, identify necessary logistical, architectural, and structural work elements, and provide any assemblies, frameworks, or fixtures not readily identified in project drawings or specifications. Government-provided floor plan layouts, dimensions, structural, mechanical, and electrical data, and utility locations are approximate and must be field-verified by the contractor. Additional as-built drawings are available from 72 ABW/CE Engineering Support in Building 400 at Tinker AFB.
All contractor personnel performing work on flight lines, runways, taxiways, parking ramps, or in aircraft hangars or maintenance areas must receive FOD (Foreign Object Debris) awareness training per Tinker AFBI 21-100. The project must comply with NIST Special Publication 800-171 cybersecurity requirements. Key personnel must include a Project Manager with minimum 10 years combined construction management experience plus 2 years as Project/Program Manager, a Quality Control Manager, a Site Safety and Health Officer, and a Project Superintendent with minimum 5 years construction experience and 2 years as superintendent on similar commercial projects. Award will be made using Lowest Priced Technically Acceptable (LPTA) source selection procedures to a single contractor whose proposal is technically acceptable and provides best value.
Notice text
2 versions
Update #2 · Latest ·
This order proposal request is only available to current MACC-BOA holders.
The work to be performed under the terms of this Order consists of furnishing all materials, labor, plant, tools, transportation, equipment, testing services, quality control, and incidentals required to accomplish the Design & Implement Monitoring & Control System For IWCS, B62516 at Tinker Air Force Base (AFB), Oklahoma (reference the project drawings for additional location information).
The Contractor shall perform a site investigation to verify existing conditions. If necessary, additional as-built drawings are available from 72 ABW/CE - Engineering Support, located in B400 on Tinker AFB.
The Contractor shall be responsible for identifying the necessary logistical, architectural, and structural work elements required to perform the work as described herein. Assemblies, framework, fixtures, or apparatus not readily identified on the project drawings, specifications, or the Statement of Work (SOW) shall be provided by the Contractor as required for a complete, fully operating, and functioning system or systems ready for use by the Government.
Information such as floor plan layouts and dimensions; structural, mechanical, and electrical data; and location of underground utilities provided by the Government for existing and new construction are based on available as-built documentation, field observation, and equipment selected as design basis by the Government. This information is to be considered approximate and shall be field verified by the Contractor.
This project will require contractor personnel to perform work and/or operate vehicles on flight lines, runways, taxiways, parking ramps, or in aircraft hangers or maintenance areas. As such, all contractor personnel will be required to receive FOD awareness training in accordance with Tinker Air Force Base Instruction (Tinker AFBI) 21-100.
IAW National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171, the requirement does not include CUI residing on or transiting through contractor and/or subcontractor systems.
Site visit attendance is mandatory to be considered eligible for submission of proposal. RSVP email confirmation of intent to attend the site visit to the primary and secondary points of contact with Entry Authorization List (EAL) information by 11:59 PM CST, Friday, May 22nd, 2026. If a Contractor/Subcontractor fails to meet this deadline, the site visit information will not be released to your organization. Order documents not able to be uploaded to SAM.gov will be provided to contractors who RSVP'd their intent to attend the initial site visit.
Attachments include an EAL spreadsheet. Please fill-in all information for individuals who will need/do not currently have Base access. Please ensure all information requested in the EAL is filled out accurately and full names matching state-issued IDs are utilized to assure Security Forces can process the requests for Base Access in a timely manner. If an individual has Base access, their name is all the information needed. Please try to limit your parties to seven attendees per Contractor.
The site visit is scheduled for June 1st, 2026 at 10:00 A.M. at the project performance site. More specific meeting details will be shared with contractors who have sent an RSVP.
This notice also serves as the formal Synopsis for the requirement.
Please contact the primary and secondary points of contact if you experience any difficulty downloading or accessing the Contractor CD documents.
Update #1 ·
This order proposal request is only available to current MACC-BOA holders.
The work to be performed under the terms of this Order consists of furnishing all materials, labor, plant, tools, transportation, equipment, testing services, quality control, and incidentals required to accomplish the Design & Implement Monitoring & Control System For IWCS, B62516 at Tinker Air Force Base (AFB), Oklahoma (reference the project drawings for additional location information).
The Contractor shall perform a site investigation to verify existing conditions. If necessary, additional as-built drawings are available from 72 ABW/CE - Engineering Support, located in B400 on Tinker AFB.
The Contractor shall be responsible for identifying the necessary logistical, architectural, and structural work elements required to perform the work as described herein. Assemblies, framework, fixtures, or apparatus not readily identified on the project drawings, specifications, or the Statement of Work (SOW) shall be provided by the Contractor as required for a complete, fully operating, and functioning system or systems ready for use by the Government.
Information such as floor plan layouts and dimensions; structural, mechanical, and electrical data; and location of underground utilities provided by the Government for existing and new construction are based on available as-built documentation, field observation, and equipment selected as design basis by the Government. This information is to be considered approximate and shall be field verified by the Contractor.
This project will require contractor personnel to perform work and/or operate vehicles on flight lines, runways, taxiways, parking ramps, or in aircraft hangers or maintenance areas. As such, all contractor personnel will be required to receive FOD awareness training in accordance with Tinker Air Force Base Instruction (Tinker AFBI) 21-100.
IAW National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171, the requirement does not include CUI residing on or transiting through contractor and/or subcontractor systems.
Site visit attendance is mandatory to be considered eligible for submission of proposal. RSVP email confirmation of intent to attend the site visit to the primary and secondary points of contact with Entry Authorization List (EAL) information by 11:59 PM CST, Friday, May 22nd, 2026. If a Contractor/Subcontractor fails to meet this deadline, the site visit information will not be released to your organization. Order documents not able to be uploaded to SAM.gov will be provided to contractors who RSVP'd their intent to attend the initial site visit.
Attachments include an EAL spreadsheet. Please fill-in all information for individuals who will need/do not currently have Base access. Please ensure all information requested in the EAL is filled out accurately and full names matching state-issued IDs are utilized to assure Security Forces can process the requests for Base Access in a timely manner. If an individual has Base access, their name is all the information needed. Please try to limit your parties to seven attendees per Contractor.
The site visit is scheduled for June 1st, 2026 at 10:00 A.M. at the project performance site. More specific meeting details will be shared with contractors who have sent an RSVP.
This notice also serves as the formal Synopsis for the requirement.
Files
| File | Type | Posted |
|---|---|---|
| CTR CD_CAD Drawings_Att 4.zip | ZIP file | |
| CTR CD_Base Facility Stds_Att 2.zip | ZIP file | |
| CTR CD_Large Files_Att 5.zip | ZIP file | |
| CTR CD_Project Docs_Att 1.zip | ZIP file | |
| CTR CD_As-Built Info_Att 3.zip | ZIP file | |
| EAL_CTR to Fill.xlsx | XLSX spreadsheet | |
| 240146_Drawings.pdf | ||
| 240146_SOW.pdf | ||
| FA813726R0039_Draft.pdf | ||
| 240146_Section L_Instructions to Offerors.pdf | ||
| 240146_Section M_Evaluation Factors for Award.pdf |
Show all 11
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| WWYK260004 - repair structural integrity, B1134, post 34 & north wall | Air Force Sustainment Center | Total Small Business | |
| WWYK240015 - Rehab Tanks 62501E & 62501W | Air Force Sustainment Center | No set-aside | |
| 2-STEP SEALED BID - TINKER AFB WWYK250019 Remove and Replace Fire Sprinkler in Plasma Booth Dust Collectors and Replace the Building F/A System, B3221 | Air Force Sustainment Center | Total Small Business | |
| WWYK250063 - install react VII facility, B9001, post V19 | Air Force Sustainment Center | Woman-Owned Small Business | |
| Cooling Tower, Roofing, and Structural Construction | Bureau of Engraving and Printing | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity