T-38 Structural Component Re-Engineering
Closed Pre-Solicitation Posted
- Solicitation number
- FA8220-19-R-0002
- Agency
-
AFLCMC Hill AFB
Lifecycle Management Center, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 541330 Engineering Services
- PSC
- Not on record
- Place of performance
- TBD, United States
Notice details come from SAM.gov. Updated .
Notice text
13 versions
Update #13 · Latest ·
10/3/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 10/3/2019. The proposal due date remains unchanged as 10/15/2019 at 2:00 PM MST.
9/26/2019:
The purpose of this announcement is to post Solicitation Amendment #0006. The proposal due date is being extended until 10/15/2019 at 2:00 PM.
9/23/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 9/23/2019. The proposal due date remains unchanged as 10/1/2019 at 2:00 PM MST.
9/9/2019:
The purpose of this announcement is to post Solicitation Amendment #0005. The proposal due date is being extended until 10/1/2019 at 2:00 PM.
9/05/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 9/05/2019, and to also post Solicitation Amendment #0004. The proposal due date is unchanged as 9/17/2019 at 2:00 PM.
8/19/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 8/19/2019, and to also post Solicitation Amendment #0003. The proposal due date is also being extended until 9/17/2019 at 2:00 PM.
8/1/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 8/1/2019 and to post Solicitation Amendment #0002. Please note the proposal due date remains unchanged.
7/25/2019:
The purpose of this announcement is to post Solicitation Amendment #0001. Please note the proposal due date remains unchanged.
7/25/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received to date.
7/3/2019:
The purpose of this announcement is to post the Final Request for Proposal (RFP). Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs. Please note the due date for proposals is 9/3/2019 at 2:00PM MST.
7/3/2019:
The purpose of this announcment is to post the Draft RFP Questions and Answers.
5/15/2019:
The purpose of this announcement is to post the Pre-Solicitation Synopsis for this effort.
5/2/2019:
The purpose of this announcement is to post the Draft - Request for Proposal (RFP) for the T-38 Structural Component Re-Engineering Program. The government is not requesting proposals at this time only feedback. Please note that requested industry feedback is due by 5/27/2019 at 2:00PM to the POC's identified in this announcement. Funds are not presently availaible for this effort. No award will be made under this solicitation until funds are available. The government reserves the right to cancel this solicitation, either before or after the closing date. In the event the government cancels this solicitation, the governemnt has no obligation to reimburse an offeror for any costs.
.
Update #12 ·
9/26/2019:
The purpose of this announcement is to post Solicitation Amendment #0006. The proposal due date is being extended until 10/15/2019 at 2:00 PM.
9/23/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 9/23/2019. The proposal due date remains unchanged as 10/1/2019 at 2:00 PM MST.
9/9/2019:
The purpose of this announcement is to post Solicitation Amendment #0005. The proposal due date is being extended until 10/1/2019 at 2:00 PM.
9/05/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 9/05/2019, and to also post Solicitation Amendment #0004. The proposal due date is unchanged as 9/17/2019 at 2:00 PM.
8/19/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 8/19/2019, and to also post Solicitation Amendment #0003. The proposal due date is also being extended until 9/17/2019 at 2:00 PM.
8/1/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 8/1/2019 and to post Solicitation Amendment #0002. Please note the proposal due date remains unchanged.
7/25/2019:
The purpose of this announcement is to post Solicitation Amendment #0001. Please note the proposal due date remains unchanged.
7/25/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received to date.
7/3/2019:
The purpose of this announcement is to post the Final Request for Proposal (RFP). Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs. Please note the due date for proposals is 9/3/2019 at 2:00PM MST.
7/3/2019:
The purpose of this announcment is to post the Draft RFP Questions and Answers.
5/15/2019:
The purpose of this announcement is to post the Pre-Solicitation Synopsis for this effort.
5/2/2019:
The purpose of this announcement is to post the Draft - Request for Proposal (RFP) for the T-38 Structural Component Re-Engineering Program. The government is not requesting proposals at this time only feedback. Please note that requested industry feedback is due by 5/27/2019 at 2:00PM to the POC's identified in this announcement. Funds are not presently availaible for this effort. No award will be made under this solicitation until funds are available. The government reserves the right to cancel this solicitation, either before or after the closing date. In the event the government cancels this solicitation, the governemnt has no obligation to reimburse an offeror for any costs.
.
Update #11 ·
9/23/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 9/23/2019. The proposal due date remains unchanged as 10/1/2019 at 2:00 PM MST.
9/9/2019:
The purpose of this announcement is to post Solicitation Amendment #0005. The proposal due date is being extended until 10/1/2019 at 2:00 PM.
9/05/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 9/05/2019, and to also post Solicitation Amendment #0004. The proposal due date is unchanged as 9/17/2019 at 2:00 PM.
8/19/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 8/19/2019, and to also post Solicitation Amendment #0003. The proposal due date is also being extended until 9/17/2019 at 2:00 PM.
8/1/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 8/1/2019 and to post Solicitation Amendment #0002. Please note the proposal due date remains unchanged.
7/25/2019:
The purpose of this announcement is to post Solicitation Amendment #0001. Please note the proposal due date remains unchanged.
7/25/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received to date.
7/3/2019:
The purpose of this announcement is to post the Final Request for Proposal (RFP). Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs. Please note the due date for proposals is 9/3/2019 at 2:00PM MST.
7/3/2019:
The purpose of this announcment is to post the Draft RFP Questions and Answers.
5/15/2019:
The purpose of this announcement is to post the Pre-Solicitation Synopsis for this effort.
5/2/2019:
The purpose of this announcement is to post the Draft - Request for Proposal (RFP) for the T-38 Structural Component Re-Engineering Program. The government is not requesting proposals at this time only feedback. Please note that requested industry feedback is due by 5/27/2019 at 2:00PM to the POC's identified in this announcement. Funds are not presently availaible for this effort. No award will be made under this solicitation until funds are available. The government reserves the right to cancel this solicitation, either before or after the closing date. In the event the government cancels this solicitation, the governemnt has no obligation to reimburse an offeror for any costs.
.
Update #10 ·
9/9/2019:
The purpose of this announcement is to post Solicitation Amendment #0005. The proposal due date is being extended until 10/1/2019 at 2:00 PM.
9/05/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 9/05/2019, and to also post Solicitation Amendment #0004. The proposal due date is unchanged as 9/17/2019 at 2:00 PM.
8/19/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 8/19/2019, and to also post Solicitation Amendment #0003. The proposal due date is also being extended until 9/17/2019 at 2:00 PM.
8/1/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 8/1/2019 and to post Solicitation Amendment #0002. Please note the proposal due date remains unchanged.
7/25/2019:
The purpose of this announcement is to post Solicitation Amendment #0001. Please note the proposal due date remains unchanged.
7/25/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received to date.
7/3/2019:
The purpose of this announcement is to post the Final Request for Proposal (RFP). Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs. Please note the due date for proposals is 9/3/2019 at 2:00PM MST.
7/3/2019:
The purpose of this announcment is to post the Draft RFP Questions and Answers.
5/15/2019:
The purpose of this announcement is to post the Pre-Solicitation Synopsis for this effort.
5/2/2019:
The purpose of this announcement is to post the Draft - Request for Proposal (RFP) for the T-38 Structural Component Re-Engineering Program. The government is not requesting proposals at this time only feedback. Please note that requested industry feedback is due by 5/27/2019 at 2:00PM to the POC's identified in this announcement. Funds are not presently availaible for this effort. No award will be made under this solicitation until funds are available. The government reserves the right to cancel this solicitation, either before or after the closing date. In the event the government cancels this solicitation, the governemnt has no obligation to reimburse an offeror for any costs.
.
Update #9 ·
9/05/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 9/05/2019, and to also post Solicitation Amendment #0004. The proposal due date is unchanged as 9/17/2019 at 2:00 PM.
8/19/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 8/19/2019, and to also post Solicitation Amendment #0003. The proposal due date is also being extended until 9/17/2019 at 2:00 PM.
8/1/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 8/1/2019 and to post Solicitation Amendment #0002. Please note the proposal due date remains unchanged.
7/25/2019:
The purpose of this announcement is to post Solicitation Amendment #0001. Please note the proposal due date remains unchanged.
7/25/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received to date.
7/3/2019:
The purpose of this announcement is to post the Final Request for Proposal (RFP). Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs. Please note the due date for proposals is 9/3/2019 at 2:00PM MST.
7/3/2019:
The purpose of this announcment is to post the Draft RFP Questions and Answers.
5/15/2019:
The purpose of this announcement is to post the Pre-Solicitation Synopsis for this effort.
5/2/2019:
The purpose of this announcement is to post the Draft - Request for Proposal (RFP) for the T-38 Structural Component Re-Engineering Program. The government is not requesting proposals at this time only feedback. Please note that requested industry feedback is due by 5/27/2019 at 2:00PM to the POC's identified in this announcement. Funds are not presently availaible for this effort. No award will be made under this solicitation until funds are available. The government reserves the right to cancel this solicitation, either before or after the closing date. In the event the government cancels this solicitation, the governemnt has no obligation to reimburse an offeror for any costs.
.
Update #8 ·
8/19/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 8/19/2019, and to also post Solicitation Amendment #0003. The proposal due date is also being extended until 9/17/2019 at 2:00 PM.
8/1/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 8/1/2019 and to post Solicitation Amendment #0002. Please note the proposal due date remains unchanged.
7/25/2019:
The purpose of this announcement is to post Solicitation Amendment #0001. Please note the proposal due date remains unchanged.
7/25/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received to date.
7/3/2019:
The purpose of this announcement is to post the Final Request for Proposal (RFP). Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs. Please note the due date for proposals is 9/3/2019 at 2:00PM MST.
7/3/2019:
The purpose of this announcment is to post the Draft RFP Questions and Answers.
5/15/2019:
The purpose of this announcement is to post the Pre-Solicitation Synopsis for this effort.
5/2/2019:
The purpose of this announcement is to post the Draft - Request for Proposal (RFP) for the T-38 Structural Component Re-Engineering Program. The government is not requesting proposals at this time only feedback. Please note that requested industry feedback is due by 5/27/2019 at 2:00PM to the POC's identified in this announcement. Funds are not presently availaible for this effort. No award will be made under this solicitation until funds are available. The government reserves the right to cancel this solicitation, either before or after the closing date. In the event the government cancels this solicitation, the governemnt has no obligation to reimburse an offeror for any costs.
.
Update #7 ·
8/1/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 8/1/2019 and to post Solicitation Amendment #0002. Please note the proposal due date remains unchanged.
7/25/2019:
The purpose of this announcement is to post Solicitation Amendment #0001. Please note the proposal due date remains unchanged.
7/25/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received to date.
7/3/2019:
The purpose of this announcement is to post the Final Request for Proposal (RFP). Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs. Please note the due date for proposals is 9/3/2019 at 2:00PM MST.
7/3/2019:
The purpose of this announcment is to post the Draft RFP Questions and Answers.
5/15/2019:
The purpose of this announcement is to post the Pre-Solicitation Synopsis for this effort.
5/2/2019:
The purpose of this announcement is to post the Draft - Request for Proposal (RFP) for the T-38 Structural Component Re-Engineering Program. The government is not requesting proposals at this time only feedback. Please note that requested industry feedback is due by 5/27/2019 at 2:00PM to the POC's identified in this announcement. Funds are not presently availaible for this effort. No award will be made under this solicitation until funds are available. The government reserves the right to cancel this solicitation, either before or after the closing date. In the event the government cancels this solicitation, the governemnt has no obligation to reimburse an offeror for any costs.
.
Update #6 ·
7/25/2019:
The purpose of this announcement is to post Solicitation Amendment #0001. Please note the proposal due date remains unchanged.
7/25/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received to date.
7/3/2019:
The purpose of this announcement is to post the Final Request for Proposal (RFP). Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs. Please note the due date for proposals is 9/3/2019 at 2:00PM MST.
7/3/2019:
The purpose of this announcment is to post the Draft RFP Questions and Answers.
5/15/2019:
The purpose of this announcement is to post the Pre-Solicitation Synopsis for this effort.
5/2/2019:
The purpose of this announcement is to post the Draft - Request for Proposal (RFP) for the T-38 Structural Component Re-Engineering Program. The government is not requesting proposals at this time only feedback. Please note that requested industry feedback is due by 5/27/2019 at 2:00PM to the POC's identified in this announcement. Funds are not presently availaible for this effort. No award will be made under this solicitation until funds are available. The government reserves the right to cancel this solicitation, either before or after the closing date. In the event the government cancels this solicitation, the governemnt has no obligation to reimburse an offeror for any costs.
.
Update #5 ·
7/25/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received to date.
7/3/2019:
The purpose of this announcement is to post the Final Request for Proposal (RFP). Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs. Please note the due date for proposals is 9/3/2019 at 2:00PM MST.
7/3/2019:
The purpose of this announcment is to post the Draft RFP Questions and Answers.
5/15/2019:
The purpose of this announcement is to post the Pre-Solicitation Synopsis for this effort.
5/2/2019:
The purpose of this announcement is to post the Draft - Request for Proposal (RFP) for the T-38 Structural Component Re-Engineering Program. The government is not requesting proposals at this time only feedback. Please note that requested industry feedback is due by 5/27/2019 at 2:00PM to the POC's identified in this announcement. Funds are not presently availaible for this effort. No award will be made under this solicitation until funds are available. The government reserves the right to cancel this solicitation, either before or after the closing date. In the event the government cancels this solicitation, the governemnt has no obligation to reimburse an offeror for any costs.
.
Update #4 ·
7/3/2019:
The purpose of this announcement is to post the Final Request for Proposal (RFP). Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs. Please note the due date for proposals is 9/3/2019 at 2:00PM MST.
7/3/2019:
The purpose of this announcment is to post the Draft RFP Questions and Answers.
5/15/2019:
The purpose of this announcement is to post the Pre-Solicitation Synopsis for this effort.
5/2/2019:
The purpose of this announcement is to post the Draft - Request for Proposal (RFP) for the T-38 Structural Component Re-Engineering Program. The government is not requesting proposals at this time only feedback. Please note that requested industry feedback is due by 5/27/2019 at 2:00PM to the POC's identified in this announcement. Funds are not presently availaible for this effort. No award will be made under this solicitation until funds are available. The government reserves the right to cancel this solicitation, either before or after the closing date. In the event the government cancels this solicitation, the governemnt has no obligation to reimburse an offeror for any costs.
.
Update #3 ·
7/3/2019:
The purpose of this announcment is to post the Draft RFP Questions and Answers.
5/15/2019:
The purpose of this announcement is to post the Pre-Solicitation Synopsis for this effort.
5/2/2019:
The purpose of this announcement is to post the Draft - Request for Proposal (RFP) for the T-38 Structural Component Re-Engineering Program. The government is not requesting proposals at this time only feedback. Please note that requested industry feedback is due by 5/27/2019 at 2:00PM to the POC's identified in this announcement. Funds are not presently availaible for this effort. No award will be made under this solicitation until funds are available. The government reserves the right to cancel this solicitation, either before or after the closing date. In the event the government cancels this solicitation, the governemnt has no obligation to reimburse an offeror for any costs.
.
Update #2 ·
5/15/2019:
The purpose of this announcement is to post the Pre-Solicitation Synopsis for this effort.
5/2/2019:
The purpose of this announcement is to post the Draft - Request for Proposal (RFP) for the T-38 Structural Component Re-Engineering Program. The government is not requesting proposals at this time only feedback. Please note that requested industry feedback is due by 5/27/2019 at 2:00PM to the POC's identified in this announcement. Funds are not presently availaible for this effort. No award will be made under this solicitation until funds are available. The government reserves the right to cancel this solicitation, either before or after the closing date. In the event the government cancels this solicitation, the governemnt has no obligation to reimburse an offeror for any costs.
.
Update #1 ·
5/2/2019:
The purpose of this announcement is to post the Draft - Request for Proposal (RFP) for the T-38 Structural Component Re-Engineering Program. The government is not requesting proposals at this time only feedback. Please note that requested industry feedback is due by 5/27/2019 at 2:00PM to the POC's identified in this announcement. Funds are not presently availaible for this effort. No award will be made under this solicitation until funds are available. The government reserves the right to cancel this solicitation, either before or after the closing date. In the event the government cancels this solicitation, the governemnt has no obligation to reimburse an offeror for any costs.
.
Files
Show all 43
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Pre-Solicitation | |
| T-38 Structural Component Re-Engineering | Special Notice | |
| Contractor Field Team | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity