T-38 Structural Component Re-Engineering

Closed Pre-Solicitation Posted

Solicitation number
FA8220-19-R-0002
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
541330 Engineering Services
PSC
Not on record
Place of performance
TBD, United States

Notice details come from SAM.gov. Updated .

Notice text

13 versions

Update #13 · Latest ·

10/3/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 10/3/2019. The proposal due date remains unchanged as 10/15/2019 at 2:00 PM MST.
9/26/2019:
The purpose of this announcement is to post Solicitation Amendment #0006. The proposal due date is being extended until 10/15/2019 at 2:00 PM.
9/23/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 9/23/2019. The proposal due date remains unchanged as 10/1/2019 at 2:00 PM MST.
9/9/2019:
The purpose of this announcement is to post Solicitation Amendment #0005. The proposal due date is being extended until 10/1/2019 at 2:00 PM.
9/05/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 9/05/2019, and to also post Solicitation Amendment #0004. The proposal due date is unchanged as 9/17/2019 at 2:00 PM.
8/19/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 8/19/2019, and to also post Solicitation Amendment #0003. The proposal due date is also being extended until 9/17/2019 at 2:00 PM.
8/1/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 8/1/2019 and to post Solicitation Amendment #0002. Please note the proposal due date remains unchanged.
7/25/2019:
The purpose of this announcement is to post Solicitation Amendment #0001. Please note the proposal due date remains unchanged.
7/25/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received to date.
7/3/2019:
The purpose of this announcement is to post the Final Request for Proposal (RFP). Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs. Please note the due date for proposals is 9/3/2019 at 2:00PM MST.
7/3/2019:
The purpose of this announcment is to post the Draft RFP Questions and Answers.
5/15/2019:
The purpose of this announcement is to post the Pre-Solicitation Synopsis for this effort.
5/2/2019:
The purpose of this announcement is to post the Draft - Request for Proposal (RFP) for the T-38 Structural Component Re-Engineering Program. The government is not requesting proposals at this time only feedback. Please note that requested industry feedback is due by 5/27/2019 at 2:00PM to the POC's identified in this announcement. Funds are not presently availaible for this effort. No award will be made under this solicitation until funds are available. The government reserves the right to cancel this solicitation, either before or after the closing date. In the event the government cancels this solicitation, the governemnt has no obligation to reimburse an offeror for any costs.
.

Update #12 ·

9/26/2019:
The purpose of this announcement is to post Solicitation Amendment #0006. The proposal due date is being extended until 10/15/2019 at 2:00 PM.
9/23/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 9/23/2019. The proposal due date remains unchanged as 10/1/2019 at 2:00 PM MST.
9/9/2019:
The purpose of this announcement is to post Solicitation Amendment #0005. The proposal due date is being extended until 10/1/2019 at 2:00 PM.
9/05/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 9/05/2019, and to also post Solicitation Amendment #0004. The proposal due date is unchanged as 9/17/2019 at 2:00 PM.
8/19/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 8/19/2019, and to also post Solicitation Amendment #0003. The proposal due date is also being extended until 9/17/2019 at 2:00 PM.
8/1/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 8/1/2019 and to post Solicitation Amendment #0002. Please note the proposal due date remains unchanged.
7/25/2019:
The purpose of this announcement is to post Solicitation Amendment #0001. Please note the proposal due date remains unchanged.
7/25/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received to date.
7/3/2019:
The purpose of this announcement is to post the Final Request for Proposal (RFP). Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs. Please note the due date for proposals is 9/3/2019 at 2:00PM MST.
7/3/2019:
The purpose of this announcment is to post the Draft RFP Questions and Answers.
5/15/2019:
The purpose of this announcement is to post the Pre-Solicitation Synopsis for this effort.
5/2/2019:
The purpose of this announcement is to post the Draft - Request for Proposal (RFP) for the T-38 Structural Component Re-Engineering Program. The government is not requesting proposals at this time only feedback. Please note that requested industry feedback is due by 5/27/2019 at 2:00PM to the POC's identified in this announcement. Funds are not presently availaible for this effort. No award will be made under this solicitation until funds are available. The government reserves the right to cancel this solicitation, either before or after the closing date. In the event the government cancels this solicitation, the governemnt has no obligation to reimburse an offeror for any costs.
.

Update #11 ·

9/23/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 9/23/2019. The proposal due date remains unchanged as 10/1/2019 at 2:00 PM MST.
9/9/2019:
The purpose of this announcement is to post Solicitation Amendment #0005. The proposal due date is being extended until 10/1/2019 at 2:00 PM.
9/05/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 9/05/2019, and to also post Solicitation Amendment #0004. The proposal due date is unchanged as 9/17/2019 at 2:00 PM.
8/19/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 8/19/2019, and to also post Solicitation Amendment #0003. The proposal due date is also being extended until 9/17/2019 at 2:00 PM.
8/1/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 8/1/2019 and to post Solicitation Amendment #0002. Please note the proposal due date remains unchanged.
7/25/2019:
The purpose of this announcement is to post Solicitation Amendment #0001. Please note the proposal due date remains unchanged.
7/25/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received to date.
7/3/2019:
The purpose of this announcement is to post the Final Request for Proposal (RFP). Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs. Please note the due date for proposals is 9/3/2019 at 2:00PM MST.
7/3/2019:
The purpose of this announcment is to post the Draft RFP Questions and Answers.
5/15/2019:
The purpose of this announcement is to post the Pre-Solicitation Synopsis for this effort.
5/2/2019:
The purpose of this announcement is to post the Draft - Request for Proposal (RFP) for the T-38 Structural Component Re-Engineering Program. The government is not requesting proposals at this time only feedback. Please note that requested industry feedback is due by 5/27/2019 at 2:00PM to the POC's identified in this announcement. Funds are not presently availaible for this effort. No award will be made under this solicitation until funds are available. The government reserves the right to cancel this solicitation, either before or after the closing date. In the event the government cancels this solicitation, the governemnt has no obligation to reimburse an offeror for any costs.
.

Update #10 ·

9/9/2019:
The purpose of this announcement is to post Solicitation Amendment #0005. The proposal due date is being extended until 10/1/2019 at 2:00 PM.
9/05/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 9/05/2019, and to also post Solicitation Amendment #0004. The proposal due date is unchanged as 9/17/2019 at 2:00 PM.
8/19/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 8/19/2019, and to also post Solicitation Amendment #0003. The proposal due date is also being extended until 9/17/2019 at 2:00 PM.
8/1/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 8/1/2019 and to post Solicitation Amendment #0002. Please note the proposal due date remains unchanged.
7/25/2019:
The purpose of this announcement is to post Solicitation Amendment #0001. Please note the proposal due date remains unchanged.
7/25/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received to date.
7/3/2019:
The purpose of this announcement is to post the Final Request for Proposal (RFP). Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs. Please note the due date for proposals is 9/3/2019 at 2:00PM MST.
7/3/2019:
The purpose of this announcment is to post the Draft RFP Questions and Answers.
5/15/2019:
The purpose of this announcement is to post the Pre-Solicitation Synopsis for this effort.
5/2/2019:
The purpose of this announcement is to post the Draft - Request for Proposal (RFP) for the T-38 Structural Component Re-Engineering Program. The government is not requesting proposals at this time only feedback. Please note that requested industry feedback is due by 5/27/2019 at 2:00PM to the POC's identified in this announcement. Funds are not presently availaible for this effort. No award will be made under this solicitation until funds are available. The government reserves the right to cancel this solicitation, either before or after the closing date. In the event the government cancels this solicitation, the governemnt has no obligation to reimburse an offeror for any costs.
.

Update #9 ·

9/05/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 9/05/2019, and to also post Solicitation Amendment #0004. The proposal due date is unchanged as 9/17/2019 at 2:00 PM.
8/19/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 8/19/2019, and to also post Solicitation Amendment #0003. The proposal due date is also being extended until 9/17/2019 at 2:00 PM.
8/1/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 8/1/2019 and to post Solicitation Amendment #0002. Please note the proposal due date remains unchanged.
7/25/2019:
The purpose of this announcement is to post Solicitation Amendment #0001. Please note the proposal due date remains unchanged.
7/25/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received to date.
7/3/2019:
The purpose of this announcement is to post the Final Request for Proposal (RFP). Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs. Please note the due date for proposals is 9/3/2019 at 2:00PM MST.
7/3/2019:
The purpose of this announcment is to post the Draft RFP Questions and Answers.
5/15/2019:
The purpose of this announcement is to post the Pre-Solicitation Synopsis for this effort.
5/2/2019:
The purpose of this announcement is to post the Draft - Request for Proposal (RFP) for the T-38 Structural Component Re-Engineering Program. The government is not requesting proposals at this time only feedback. Please note that requested industry feedback is due by 5/27/2019 at 2:00PM to the POC's identified in this announcement. Funds are not presently availaible for this effort. No award will be made under this solicitation until funds are available. The government reserves the right to cancel this solicitation, either before or after the closing date. In the event the government cancels this solicitation, the governemnt has no obligation to reimburse an offeror for any costs.
.

Update #8 ·

8/19/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 8/19/2019, and to also post Solicitation Amendment #0003. The proposal due date is also being extended until 9/17/2019 at 2:00 PM.
8/1/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 8/1/2019 and to post Solicitation Amendment #0002. Please note the proposal due date remains unchanged.
7/25/2019:
The purpose of this announcement is to post Solicitation Amendment #0001. Please note the proposal due date remains unchanged.
7/25/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received to date.
7/3/2019:
The purpose of this announcement is to post the Final Request for Proposal (RFP). Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs. Please note the due date for proposals is 9/3/2019 at 2:00PM MST.
7/3/2019:
The purpose of this announcment is to post the Draft RFP Questions and Answers.
5/15/2019:
The purpose of this announcement is to post the Pre-Solicitation Synopsis for this effort.
5/2/2019:
The purpose of this announcement is to post the Draft - Request for Proposal (RFP) for the T-38 Structural Component Re-Engineering Program. The government is not requesting proposals at this time only feedback. Please note that requested industry feedback is due by 5/27/2019 at 2:00PM to the POC's identified in this announcement. Funds are not presently availaible for this effort. No award will be made under this solicitation until funds are available. The government reserves the right to cancel this solicitation, either before or after the closing date. In the event the government cancels this solicitation, the governemnt has no obligation to reimburse an offeror for any costs.
.

Update #7 ·

8/1/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received as of 8/1/2019 and to post Solicitation Amendment #0002. Please note the proposal due date remains unchanged.
7/25/2019:
The purpose of this announcement is to post Solicitation Amendment #0001. Please note the proposal due date remains unchanged.
7/25/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received to date.
7/3/2019:
The purpose of this announcement is to post the Final Request for Proposal (RFP). Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs. Please note the due date for proposals is 9/3/2019 at 2:00PM MST.
7/3/2019:
The purpose of this announcment is to post the Draft RFP Questions and Answers.
5/15/2019:
The purpose of this announcement is to post the Pre-Solicitation Synopsis for this effort.
5/2/2019:
The purpose of this announcement is to post the Draft - Request for Proposal (RFP) for the T-38 Structural Component Re-Engineering Program. The government is not requesting proposals at this time only feedback. Please note that requested industry feedback is due by 5/27/2019 at 2:00PM to the POC's identified in this announcement. Funds are not presently availaible for this effort. No award will be made under this solicitation until funds are available. The government reserves the right to cancel this solicitation, either before or after the closing date. In the event the government cancels this solicitation, the governemnt has no obligation to reimburse an offeror for any costs.
.

Update #6 ·

7/25/2019:
The purpose of this announcement is to post Solicitation Amendment #0001. Please note the proposal due date remains unchanged.
7/25/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received to date.
7/3/2019:
The purpose of this announcement is to post the Final Request for Proposal (RFP). Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs. Please note the due date for proposals is 9/3/2019 at 2:00PM MST.
7/3/2019:
The purpose of this announcment is to post the Draft RFP Questions and Answers.
5/15/2019:
The purpose of this announcement is to post the Pre-Solicitation Synopsis for this effort.
5/2/2019:
The purpose of this announcement is to post the Draft - Request for Proposal (RFP) for the T-38 Structural Component Re-Engineering Program. The government is not requesting proposals at this time only feedback. Please note that requested industry feedback is due by 5/27/2019 at 2:00PM to the POC's identified in this announcement. Funds are not presently availaible for this effort. No award will be made under this solicitation until funds are available. The government reserves the right to cancel this solicitation, either before or after the closing date. In the event the government cancels this solicitation, the governemnt has no obligation to reimburse an offeror for any costs.
.

Update #5 ·

7/25/2019:
The purpose of this announcement is to post the Final RFP Questions and Answers received to date.
7/3/2019:
The purpose of this announcement is to post the Final Request for Proposal (RFP). Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs. Please note the due date for proposals is 9/3/2019 at 2:00PM MST.
7/3/2019:
The purpose of this announcment is to post the Draft RFP Questions and Answers.
5/15/2019:
The purpose of this announcement is to post the Pre-Solicitation Synopsis for this effort.
5/2/2019:
The purpose of this announcement is to post the Draft - Request for Proposal (RFP) for the T-38 Structural Component Re-Engineering Program. The government is not requesting proposals at this time only feedback. Please note that requested industry feedback is due by 5/27/2019 at 2:00PM to the POC's identified in this announcement. Funds are not presently availaible for this effort. No award will be made under this solicitation until funds are available. The government reserves the right to cancel this solicitation, either before or after the closing date. In the event the government cancels this solicitation, the governemnt has no obligation to reimburse an offeror for any costs.
.

Update #4 ·

7/3/2019:
The purpose of this announcement is to post the Final Request for Proposal (RFP). Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs. Please note the due date for proposals is 9/3/2019 at 2:00PM MST.
7/3/2019:
The purpose of this announcment is to post the Draft RFP Questions and Answers.
5/15/2019:
The purpose of this announcement is to post the Pre-Solicitation Synopsis for this effort.
5/2/2019:
The purpose of this announcement is to post the Draft - Request for Proposal (RFP) for the T-38 Structural Component Re-Engineering Program. The government is not requesting proposals at this time only feedback. Please note that requested industry feedback is due by 5/27/2019 at 2:00PM to the POC's identified in this announcement. Funds are not presently availaible for this effort. No award will be made under this solicitation until funds are available. The government reserves the right to cancel this solicitation, either before or after the closing date. In the event the government cancels this solicitation, the governemnt has no obligation to reimburse an offeror for any costs.
.

Update #3 ·

7/3/2019:
The purpose of this announcment is to post the Draft RFP Questions and Answers.
5/15/2019:
The purpose of this announcement is to post the Pre-Solicitation Synopsis for this effort.
5/2/2019:
The purpose of this announcement is to post the Draft - Request for Proposal (RFP) for the T-38 Structural Component Re-Engineering Program. The government is not requesting proposals at this time only feedback. Please note that requested industry feedback is due by 5/27/2019 at 2:00PM to the POC's identified in this announcement. Funds are not presently availaible for this effort. No award will be made under this solicitation until funds are available. The government reserves the right to cancel this solicitation, either before or after the closing date. In the event the government cancels this solicitation, the governemnt has no obligation to reimburse an offeror for any costs.
.

Update #2 ·

5/15/2019:
The purpose of this announcement is to post the Pre-Solicitation Synopsis for this effort.
5/2/2019:
The purpose of this announcement is to post the Draft - Request for Proposal (RFP) for the T-38 Structural Component Re-Engineering Program. The government is not requesting proposals at this time only feedback. Please note that requested industry feedback is due by 5/27/2019 at 2:00PM to the POC's identified in this announcement. Funds are not presently availaible for this effort. No award will be made under this solicitation until funds are available. The government reserves the right to cancel this solicitation, either before or after the closing date. In the event the government cancels this solicitation, the governemnt has no obligation to reimburse an offeror for any costs.
.

Update #1 ·

5/2/2019:
The purpose of this announcement is to post the Draft - Request for Proposal (RFP) for the T-38 Structural Component Re-Engineering Program. The government is not requesting proposals at this time only feedback. Please note that requested industry feedback is due by 5/27/2019 at 2:00PM to the POC's identified in this announcement. Funds are not presently availaible for this effort. No award will be made under this solicitation until funds are available. The government reserves the right to cancel this solicitation, either before or after the closing date. In the event the government cancels this solicitation, the governemnt has no obligation to reimburse an offeror for any costs.
.

Files

File Type Posted
Final_RFP_Questions_and_Answers_03Oct19.xlsx XLSX spreadsheet
FA822019R0002_______0006.pdf PDF
Final_RFP_Questions_and_Answers_23Sep19.xlsx XLSX spreadsheet
FA822019R0002_______0005.pdf PDF
Final_RFP_Questions_and_Answers_05Sep19.xlsx XLSX spreadsheet
FINAL_RFP_Attachment_11_T-38_Structural_Components_Re-Engineering_PWSv23_05Sep19.pdf PDF
FINAL_RFP_Attachment_8_Section_L_05Sep19.pdf PDF
FINAL_RFP_Attachment_9_Section_M_05Sep19.pdf PDF
FA822019R0002_______0004.pdf PDF
Final_RFP_Questions_and_Answers_19Aug19.xlsx XLSX spreadsheet
FA822019R0002_______0003.pdf PDF
Final_RFP_Questions_and_Answers_1Aug19.xlsx XLSX spreadsheet
FA822019R0002_______0002.pdf PDF
FA822019R0002_______0001.pdf PDF
FINAL_RFP_Attachment_10_CDRLs_17Jul19.pdf PDF
FINAL_RFP_Attachment_7_PPI_Tool_23Jul19.accdb MDB file
Final_RFP_Questions_and_Answers_25Jul19.xlsx XLSX spreadsheet
FINAL_RFP_Attachment_9_Section_M_25Jun19.pdf PDF
FA822019R0002.pdf PDF
FINAL_RFP_Attachment_5_Client_Authorization_5Jun19.pdf PDF
FINAL_RFP_Attachment_6_Cross_Reference_Matrix_25Jun19.pdf PDF
FINAL_RFP_Attachment_8_Section_L_25Jun19.pdf PDF
FINAL_RFP_Attachment_4_Past_Performance_Questionnaire_5Jun19.pdf PDF
FINAL_RFP_Attachment_1_Past_Performance_Information_PPI_Instructions_5Jun19.pdf PDF
FINAL_RFP_Attachment_10_CDRLs_19Feb19.pdf PDF
FINAL_RFP_Attachment_2_Past_Performance_Information_Sheet_5Jun19.pdf PDF
FINAL_RFP_Attachment_7_PPI_Tool_5Jun19.accdb MDB file
FINAL_RFP_Attachment_11_T-38_Structural_Components_Re-Engineering_PWSv23_01Jul19.pdf PDF
FINAL_RFP_Attachment_3_Teaming_Partner_Consent_Letter_5Jun19.pdf PDF
Draft_RFP_Questions_and_Answers.pdf PDF
Pre-Solicitation_Synopsis_of_FA8220-19-R-0002_T-38_Structural_Component_Reverse_Engineering.docx DOCX document
DRAFT_RFP_Attachment_6_Cross_Reference_Matrix_29Apr19.pdf PDF
DRAFT_RFP_Attachment_5_Client_Authorization_29Apr19.pdf PDF
DRAFT_RFP_Attachment_1_Past_Performance_Information_PPI_Instructions_29Apr19.pdf PDF
DRAFT_RFP_Attachment_4_Past_Performance_Questionnaire_29Apr19.pdf PDF
DRAFT_RFP_Attachment_10_CDRLs_19Feb19.pdf PDF
DRAFT_RFP_Attachment_7_PPI_Tool_29Apr19.accdb MDB file
DRAFT_RFP_Attachment_3_Teaming_Partner_Consent_Letter_29Apr19.pdf PDF
DRAFT_RFP_Attachment_9_Section_M_29Apr19.pdf PDF
DRAFT_RFP_Attachment_11_T-38_Structural_Components_Re-Engineering_PWS_29Apr19.pdf PDF
DRAFT_RFP_Attachment_2_Past_Performance_Information_Sheet_29Apr19.pdf PDF
FA822019R0002.pdf PDF
DRAFT_RFP_Attachment_8_Section_L_29Apr19.pdf PDF
Show all 43

Notice history

Notice Type Posted
This notice Latest pre-solicitation Pre-Solicitation
T-38 Structural Component Re-Engineering Special Notice
Contractor Field Team Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity