Sustainment, Modification, and Installation Program in support of P-3 Aircraft (all T/M/S)
Award Notice Posted
- Solicitation number
- N00019-09-R-0216
- Agency
-
Naval Air Warfare Center
Naval Air Systems Command, Department of Defense
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- N00019-11-D-0017 Federal IDV award
- NAICS code
- 336411 Aircraft Manufacturing
- PSC
- Not on record
- Place of performance
- TBD, United States
Notice details come from SAM.gov. Updated .
Notice text
45 versions
Update #45 · Latest ·
Awarded Vendors: L-3 Communications Integrated Systems. Contract Award Dollar Amount: $525,462,193.00. Contract Award Date: 2011-05-25.
Update #44 ·
Q & A of 22 September 2009:
Question: Does the Government have a preference on the validity period, or do we simply premise award in April 2011?
Answer: The modified proposals due 30 September 2010 shall be valid to 29 April 2011. Amendment to follow..
Update #43 ·
Q&A of 22 September 2009:
Question: Does the Government have a preference on the validity period, or do we simply premise award in April 2011?
Answer: The modified proposals due 30 September 2010 shall be valid to 29 April 2011. Amendment to follow.
Update #42 ·
The purpose of this Amendment is to provide AMENDMENT 0005 to RFP N00019-09-R-0216. The purpose of Amendment 0005 is to 1) Modify parts of Section B, C, F, H, I , J, K and L; 2) Replace Attachments (1), (18), and (20); and 3) Replace Apendices A through V, to reflect a change in the Navy's requirement in min/max quantity, period of performance, SOW, updated clauses provisions, and proposal instructions.
MODIFIED PROPOSALS MUST BE RECEIVED AT THE NAVAL AIR SYSTEMS COMMAND, BLDG. 2272, Room 155, BY 2:00 PM EST on 23 SEPTEMBER 2010.
Important new SPECIAL NOTICES are provided in Section L which require a written response..
Update #41 ·
The purpose of this Amendment is to provide AMENDMENT 0005 to RFP N00019-09-R-0216. The purpose of Amendment 0005 is to 1) Modify parts of Section B, C, F, H, I , J, K and L; 2) Replace Attachments (1), (18), and (20); and 3) Replace Apendices A through V, to reflect a change in the Navy's requirement in min/max quantity, period of performance, SOW, updated clauses provisions, and proposal instructions.
MODIFIED PROPOSALS MUST BE RECEIVED AT THE NAVAL AIR SYSTEMS COMMAND, BLDG. 2272, Room 155, BY 2:00 PM EST on 23 SEPTEMBER 2010.
Important new SPECIAL NOTICES are provided in Section L which require a written response.
Update #40 ·
******************************************************************************************************************
AMENDMENT 17 - 23 March 2010
The purpose of this Amendment is to provide Amendment 0004 to RFP N00019-09-R-0216. The Amendment file is entitled "N00019-09-R-0216-0004.pdf". This Amendment also updates Attachment 20. The Attachment file is entitled "Attch (20) Pricing Worksheet_dtd_23Mar10.xls"..
Update #39 ·
******************************************************************************************************************
AMENDMENT 17 - 23 March 2010
The purpose of this Amendment is to provide Amendment 0004 to RFP N00019-09-R-0216. The Amendment file is entitled "N00019-09-R-0216-0004.pdf". This Amendment also updates Attachment 20. The Attachment file is entitled "Attch (20) Pricing Worksheet_dtd_23Mar10.xls".
Update #38 ·
AMENDMENT 16 - 19 March 2010
The purpose of this Amendment is to provide Question & Answer (Q & A) #107 - 159). The file is entitled "Q & As posted 19 Mar 2010.pdf."
In addition, the file entitled "Changes to SOW Appendicies 19 Mar 10.doc" is provided to assist Industry in the review of the updated Attachment 1 Appendices provided via Amendment 0003. Please note, that this file is for informational purposes only. This file is not incorporated into formal RFP N00019-09-R-0216 and does not alter any aspect of formal RFP N00019-09-R-0216.
.
Update #37 ·
AMENDMENT 16 - 19 March 2010
The purpose of this Amendment is to provide Question & Answer (Q&A) #107 - 159). The file is entitled "Q&As posted 19 Mar 2010.pdf."
In addition, the file entitled "Changes to SOW Appendicies 19 Mar 10.doc" is provided to assist Industry in the review of the updated Attachment 1 Appendices provided via Amendment 0003. Please note, that this file is for informational purposes only. This file is not incorporated into formal RFP N00019-09-R-0216 and does not alter any aspect of formal RFP N00019-09-R-0216.
Update #36 ·
******************************************************************************************************************
AMENDMENT 15 - 19 March 2010
The purpose of this Amendment is to provide Amendment 0003 to RFP N00019-09-R-0216. The Amendment file is entitled "N00019-09-R-0216-0003.pdf". This Amendment also updates Exhibit A, Attachment 1 (including multiple Appendices to Attachment 1), and Attachment 5. The updated files are entitled as follows: "Exhibit (A) - CDRLs 17 March 2010.doc", Attch (1) SOW for P-3 Aircraft Sustainment dtd 17 Mar 2010.pdf" and "Attach (5) P-3 FST Repair and Analysis Philosophy Requirements dtd 18 March 2010.pdf"..
Update #35 ·
******************************************************************************************************************
AMENDMENT 15 - 19 March 2010
The purpose of this Amendment is to provide Amendment 0003 to RFP N00019-09-R-0216. The Amendment file is entitled "N00019-09-R-0216-0003.pdf". This Amendment also updates Exhibit A, Attachment 1 (including multiple Appendices to Attachment 1), and Attachment 5. The updated files are entitled as follows: "Exhibit (A) - CDRLs 17 March 2010.doc", Attch (1) SOW for P-3 Aircraft Sustainment dtd 17 Mar 2010.pdf" and "Attach (5) P-3 FST Repair and Analysis Philosophy Requirements dtd 18 March 2010.pdf".
Update #34 ·
******************************************************************************************************************
AMENDMENT 14 - 09 March 2010
The purpose of this Amendment is to provide Question & Answer (Q & A) #106. The file is entitled "Q & A posted 9 Mar 2010.pdf." The response includes a reference to an attached document which is provided via the file entitled "Draft P-3 Fleet Induct Requirements_FY10-15.pdf"
The Government is continuing to research additional Q & A's and will provide answers shortly.
.
Update #33 ·
******************************************************************************************************************
AMENDMENT 14 - 09 March 2010
The purpose of this Amendment is to provide Question & Answer (Q&A) #106. The file is entitled "Q&A posted 9 Mar 2010.pdf." The response includes a reference to an attached document which is provided via the file entitled "Draft P-3 Fleet Induct Requirements_FY10-15.pdf"
The Government is continuing to research additional Q&A's and will provide answers shortly.
Update #32 ·
******************************************************************************************************************
AMENDMENT 13 - 05 March 2010
The purpose of this Amendment is to provide Amendment 0002 to RFP N00019-09-R-0216. The Amendment file is entitled "N00019-09-R-0216-0002.pdf". This Amendment also updates Attachment 1 and Attachment 18. The updated files are entitled as follows: "Attch (1) SOW for P-3 Aircraft Sustainment dtd 01 Mar 2010.pdf" and "Attch (18) Notional Aircraft Induct Scenario_25 Feb 2010.xls".
.
Update #31 ·
******************************************************************************************************************
AMENDMENT 13 - 05 March 2010
The purpose of this Amendment is to provide Amendment 0002 to RFP N00019-09-R-0216. The Amendment file is entitled "N00019-09-R-0216-0002.pdf". This Amendment also updates Attachment 1 and Attachment 18. The updated files are entitled as follows: "Attch (1) SOW for P-3 Aircraft Sustainment dtd 01 Mar 2010.pdf" and "Attch (18) Notional Aircraft Induct Scenario_25 Feb 2010.xls".
Update #30 ·
******************************************************************************************************************
Amendment 12 - 25 February 2010
The purpose of this Amendment is to provide Questions & Answers (Q & A's) #89 - 105. The file is entitled "Q & As posted 25 Feb 2010.pdf."
The Government is continuing to research additional Q & A's and will provide answers shortly..
Update #29 ·
******************************************************************************************************************
Amendment 12 - 25 February 2010
The purpose of this Amendment is to provide Questions & Answers (Q&A's) #89 - 105. The file is entitled "Q&As posted 25 Feb 2010.pdf."
The Government is continuing to research additional Q&A's and will provide answers shortly.
Update #28 ·
******************************************************************************************************************
AMENDMENT 11 - 19 February 2010
The purpose of this Amendment is to provide Questions & Answers (Q & A's). The file is entitled "Q & As posted 19 Feb 2010.pdf."
The Government is continuing to research additional Q & A's and will provide answers shortly..
Update #27 ·
******************************************************************************************************************
AMENDMENT 11 - 19 February 2010
The purpose of this Amendment is to provide Questions & Answers (Q&A's). The file is entitled "Q&As posted 19 Feb 2010.pdf."
The Government is continuing to research additional Q&A's and will provide answers shortly.
Update #26 ·
******************************************************************************************************************
AMENDMENT 10 - 16 February 2019
The purpose of this Amendment is to provide Amendment 0001 to RFP N00019-09-R-0216. The file is entitled "N00019-09-R-0216-0001.pdf"
.
Update #25 ·
******************************************************************************************************************
AMENDMENT 10 - 16 February 2019
The purpose of this Amendment is to provide Amendment 0001 to RFP N00019-09-R-0216. The file is entitled "N00019-09-R-0216-0001.pdf"
Update #24 ·
*****************************************************************************************************************
AMENDMENT 08 - 16 DECEMBER 2009
The purpose of this Amendment is to announce that the final solicitation will be posted to this site in January 2010. Added: Jan 29, 2010 12:16 pm Modified: Feb 16, 2010 4:03 pmTrack Changes ******************************************************************************************************************
AMENDMENT 09 - 29 JANUARY 2010
The purpose of this Amendment is to post the Formal RFP, entitled "N00019-09-R-0216_ Final_RFP_29JAN10". All attachments, exhibits, and appendices have been re-posted to capture the latest versions.
Due to limitations in how FBO Attachments are posted and maintained, the following clarifications are provided:
A. The Formal RFP has been posted in the cabinet entitled "Amendment 3" dated Jan 29, 2010.
B. Attachments (with the exception of Attachment 11) and Exhibits to the Formal RFP have been posted in the cabinet entitled "Amendment 2" dated Jan 29, 2010.
C. Attachment 11 has been posted to the cabinet entitled "Amendment 1" dated Jan 29, 2010.
D. Appendices to Attachment 1, Statement of Work, have been posted in the cabinet entitled "Amendment 1" dated Jan 29, 2010.
.
Update #23 ·
*****************************************************************************************************************
AMENDMENT 08 - 16 DECEMBER 2009
The purpose of this Amendment is to announce that the final solicitation will be posted to this site in January 2010.
******************************************************************************************************************
AMENDMENT 09 - 29 JANUARY 2010
The purpose of this Amendment is to post the Formal RFP, entitled "N00019-09-R-0216_ Final_RFP_29JAN10". All attachments, exhibits, and appendices have been re-posted to capture the latest versions.
Due to limitations in how FBO Attachments are posted and maintained, the following clarifications are provided:
A. The Formal RFP has been posted in the cabinet entitled "Amendment 3" dated Jan 29, 2010.
B. Attachments (with the exception of Attachment 11) and Exhibits to the Formal RFP have been posted in the cabinet entitled "Amendment 2" dated Jan 29, 2010.
C. Attachment 11 has been posted to the cabinet entitled "Amendment 1" dated Jan 29, 2010.
D. Appendices to Attachment 1, Statement of Work, have been posted in the cabinet entitled "Amendment 1" dated Jan 29, 2010.
Update #22 ·
The purpose of this Amendment is to post the Final RFP, entitled "N00019-09-R-0216_ Final_RFP_29JAN10". All attachments, exhibits and appendices have been re-posted to capture the latest versions..
Update #21 ·
The purpose of this Amendment is to post the Final RFP, entitled "N00019-09-R-0216_ Final_RFP_29JAN10". All attachments, exhibits and appendices have been re-posted to capture the latest versions.
Update #20 ·
******************************************************************
AMENDMENT 08 - 16 DECEMBER 2009
The purpose of this Amendment is to announce that the final solicitation will be posted to this site in January 2010..
Update #19 ·
******************************************************************
AMENDMENT 08 - 16 DECEMBER 2009
The purpose of this Amendment is to announce that the final solicitation will be posted to this site in January 2010.
Update #18 ·
*****************************************************************************************************************
AMENDMENT 07 - 09 DECEMBER 2009
The purpose of this Amendment is to post an updated Draft RFP, entitled "N00019-09-R-0216_ Draft RFP_9 Dec 09" for Industry review and comment. Please see the attached file entitled "RFP Summary of Changes_9DEC09" for an overview of the most significant revisions to this Draft RFP. Updates to Attachment (1), Attachment (18), and Exhibit (A) have also been posted. The remaining Attachments are unchanged at this time.
Please provide feedback and questions regarding this Draft RFP by 5:00pm Eastern Standard Time on 16 December 2009..
Update #17 ·
*****************************************************************************************************************
AMENDMENT 07 - 09 DECEMBER 2009
The purpose of this Amendment is to post an updated Draft RFP, entitled "N00019-09-R-0216_ Draft RFP_9 Dec 09" for Industry review and comment. Please see the attached file entitled "RFP Summary of Changes_9DEC09" for an overview of the most significant revisions to this Draft RFP. Updates to Attachment (1), Attachment (18), and Exhibit (A) have also been posted. The remaining Attachments are unchanged at this time.
Please provide feedback and questions regarding this Draft RFP by 5:00pm Eastern Standard Time on 16 December 2009.
Update #16 ·
****************************************************************************************************************
AMENDMENT 06 - 20 NOVEMBER 2009
The purpose of this Amendment is to announce that a revised Draft RFP will be posted to this site in early-mid December for Industry review and comment. In addition, the secondary Point of Contact (POC) for this procurement has been updated to Ms. Amy Beckman..
Update #15 ·
****************************************************************************************************************
AMENDMENT 06 - 20 NOVEMBER 2009
The purpose of this Amendment is to announce that a revised Draft RFP will be posted to this site in early-mid December for Industry review and comment. In addition, the secondary Point of Contact (POC) for this procurement has been updated to Ms. Amy Beckman.
Update #14 ·
******************************************************************************************************************
AMENDMENT 05 - 24 SEPTEMBER 2009
The purpose of this Amendment is to provide the appendices to the Attachment 1, Statement of Work. Appendices B, C, and K have not been provided. Please note, some appendices consist of many technical drawings which are only available through the process of requesting access to the online P-3 SMIP Technical Library (as detailed in the RFP). For access to the P-3 SMIP Technical Library, please send an e-mail to Susan Supplee at susan.supplee@navy.mil..
Update #13 ·
******************************************************************************************************************
AMENDMENT 05 - 24 SEPTEMBER 2009
The purpose of this Amendment is to provide the appendices to the Attachment 1, Statement of Work. Appendices B, C, and K have not been provided. Please note, some appendices consist of many technical drawings which are only available through the process of requesting access to the online P-3 SMIP Technical Library (as detailed in the RFP). For access to the P-3 SMIP Technical Library, please send an e-mail to Susan Supplee at susan.supplee@navy.mil.
Update #12 ·
******************************************************************************************************************
AMENDMENT 04 - 21 SEPTEMBER 2009
The purpose of this Amendment is to provide the details for Industry Day.
The Naval Air Systems Command is sponsoring an unclassified Industry Day pertaining to the upcoming competitive requirement for the Sustainment, Modification, and Installation Program (SMIP) in support of depot level maintenance and airframe structural modifications on P-3 aircraft (all T/M/S). The purpose of the event is to provide a general overview of P-3 depot requirements, further articulate the competition timeline, and provide a forum for Question & Answer/networking opportunities. The Government will also be available for one-on-one discussions with potential Prime Contractors, along with their anticipated subcontractor team, provided prior coordination with the Government is established. The intent of the one-on-one session is only to answer specific questions regarding the solicitation that the potential Prime Contractor did not otherwise want to share in the general open session. The length of the one-on-one sessions will be limited to no more than 60 minutes.
The General Session will be held from 8:00-10:00 on Thursday, October 8th, at RBC located at 46579 Expedition Drive, Suite 200, Lexington Park, MD. The one-on-one discussions will be held at Johns Hopkins Applied Physics Lab (JHU APL), located in Suite 300 of the same building. One-on-one session times will be provided directly to the requesting contractor via separate correspondence.
The current draft solicitation is posted to at: https://www.fbo.gov/spg/DON/NAVAIR/N00421/N00019-09-R-0216/listing.html . This Industry Day is intended to give Industry partners the opportunity to provide questions and feedback regarding the draft solicitation. To make this meeting as productive as possible, Industry partners are requested to submit specific questions and feedback regarding the draft solicitation via e-mail to Susan Supplee at susan.supplee@navy.mil no later than 1600 on 5 October 2009.
This announcement is not a contract, request for proposal, a promise to contract, or a commitment of any kind on the part of the Government. The Navy will not assume liability for costs incurred by an attendee or for travel expenses or marketing efforts; therefore, attendee cost in response to this notice is not considered an allowable direct charge to the Government.
Industry Day Registration: Pre-Registration is REQUIRED; doors will open at 0730 EST, 8 October 2009. This is a no-fee event and seating is limited. Attendees are required to complete the Registration Form posted with this announcement. Registration forms must be submitted by 5:00PM EST, Monday, September 28th via email to Susan Supplee at susan.supplee@navy.mil and cc: Cindy Norris at cynthia.norris.ctr@navy.mil and Ava Chandler at ava.chandler@navy.mil. A confirmation email will be sent upon verification of CAGE code. Attendee substitution requests may be submitted to the same points of contact by 5:00PM EST, Friday, October 2, 2009. Potential Prime contractors who are interested in participating in one-on-one discussions must fill out the one-on-one discussion registration form found on the second page of the Registration Form.
IMPORTANT: Attendees will be required to present a CURRENT government issued photo ID (drivers license, military ID, or passport) matching the information provided above upon check-in. Please allow sufficient time for the check-in/verification process. Late registration and walk-in requests will not be permitted.
All questions regarding Industry Day shall be submitted via e-mail to the registration points of contact.
.
Update #11 ·
******************************************************************************************************************
AMENDMENT 04 - 21 SEPTEMBER 2009
The purpose of this Amendment is to provide the details for Industry Day.
The Naval Air Systems Command is sponsoring an unclassified Industry Day pertaining to the upcoming competitive requirement for the Sustainment, Modification, and Installation Program (SMIP) in support of depot level maintenance and airframe structural modifications on P-3 aircraft (all T/M/S). The purpose of the event is to provide a general overview of P-3 depot requirements, further articulate the competition timeline, and provide a forum for Question & Answer/networking opportunities. The Government will also be available for one-on-one discussions with potential Prime Contractors, along with their anticipated subcontractor team, provided prior coordination with the Government is established. The intent of the one-on-one session is only to answer specific questions regarding the solicitation that the potential Prime Contractor did not otherwise want to share in the general open session. The length of the one-on-one sessions will be limited to no more than 60 minutes.
The General Session will be held from 8:00-10:00 on Thursday, October 8th, at RBC located at 46579 Expedition Drive, Suite 200, Lexington Park, MD. The one-on-one discussions will be held at Johns Hopkins Applied Physics Lab (JHU APL), located in Suite 300 of the same building. One-on-one session times will be provided directly to the requesting contractor via separate correspondence.
The current draft solicitation is posted to at: https://www.fbo.gov/spg/DON/NAVAIR/N00421/N00019-09-R-0216/listing.html . This Industry Day is intended to give Industry partners the opportunity to provide questions and feedback regarding the draft solicitation. To make this meeting as productive as possible, Industry partners are requested to submit specific questions and feedback regarding the draft solicitation via e-mail to Susan Supplee at susan.supplee@navy.mil no later than 1600 on 5 October 2009.
This announcement is not a contract, request for proposal, a promise to contract, or a commitment of any kind on the part of the Government. The Navy will not assume liability for costs incurred by an attendee or for travel expenses or marketing efforts; therefore, attendee cost in response to this notice is not considered an allowable direct charge to the Government.
Industry Day Registration: Pre-Registration is REQUIRED; doors will open at 0730 EST, 8 October 2009. This is a no-fee event and seating is limited. Attendees are required to complete the Registration Form posted with this announcement. Registration forms must be submitted by 5:00PM EST, Monday, September 28th via email to Susan Supplee at susan.supplee@navy.mil and cc: Cindy Norris at cynthia.norris.ctr@navy.mil and Ava Chandler at ava.chandler@navy.mil. A confirmation email will be sent upon verification of CAGE code. Attendee substitution requests may be submitted to the same points of contact by 5:00PM EST, Friday, October 2, 2009. Potential Prime contractors who are interested in participating in one-on-one discussions must fill out the one-on-one discussion registration form found on the second page of the Registration Form.
IMPORTANT: Attendees will be required to present a CURRENT government issued photo ID (drivers license, military ID, or passport) matching the information provided above upon check-in. Please allow sufficient time for the check-in/verification process. Late registration and walk-in requests will not be permitted.
All questions regarding Industry Day shall be submitted via e-mail to the registration points of contact.
Update #10 ·
****************************************************************************************************************
AMENDMENT 03 - 17 SEPTEMBER 2009
The purpose of this Amendment is to post the draft Solicitation. Industry Day is tentatively scheduled for Thursday, October 8th in Patuxent River, MD. A special notice regarding Industry Day will be posted in the next few days.
Please note: Attachments 8 and 11 have not been posted at this time..
Update #9 ·
****************************************************************************************************************
AMENDMENT 03 - 17 SEPTEMBER 2009
The purpose of this Amendment is to post the draft Solicitation. Industry Day is tentatively scheduled for Thursday, October 8th in Patuxent River, MD. A special notice regarding Industry Day will be posted in the next few days.
Please note: Attachments 8 and 11 have not been posted at this time.
Update #8 ·
******************************************************************************************************************
AMENDMENT 02 - 15 AUGUST 2009
The purpose of this Amendment is to update the contract strategy description and to revise the expected release date for the draft solicitation.
The Naval Air Systems Command anticipates an Indefinite Delivery/Indefinite Quantity contract with a base period and four (4) option periods. A single award is anticipated, however, the Government reserves the right to make multiple awards if it is determined to be most advantageous based on the capabilities and overall evaluation of the proposals received.
A draft of the solicitation will be released in early September 2009 and may be accessed via the Naval Air Systems Command (NAVAIR) home page at http://www.navair.navy.mil/doing_business/open_solicitations/. The Naval Air Systems Command, PMA-290, Patuxent River, MD, intends to hold an Industry Day Conference approximately 3 weeks after the release of the draft solicitation. The goal of the conference will be to gather potential industry feedback in regards to the P-3 Airframe Sustainment Program. Details regarding the date, time, and location of the Industry Day Conference will be posted at a later date. Any questions or comments regarding this synopsis shall be submitted VIA EMAIL to susan.supplee@navy.mil.
.
Update #7 ·
******************************************************************************************************************
AMENDMENT 02 - 15 AUGUST 2009
The purpose of this Amendment is to update the contract strategy description and to revise the expected release date for the draft solicitation.
The Naval Air Systems Command anticipates an Indefinite Delivery/Indefinite Quantity contract with a base period and four (4) option periods. A single award is anticipated, however, the Government reserves the right to make multiple awards if it is determined to be most advantageous based on the capabilities and overall evaluation of the proposals received.
A draft of the solicitation will be released in early September 2009 and may be accessed via the Naval Air Systems Command (NAVAIR) home page at http://www.navair.navy.mil/doing_business/open_solicitations/. The Naval Air Systems Command, PMA-290, Patuxent River, MD, intends to hold an Industry Day Conference approximately 3 weeks after the release of the draft solicitation. The goal of the conference will be to gather potential industry feedback in regards to the P-3 Airframe Sustainment Program. Details regarding the date, time, and location of the Industry Day Conference will be posted at a later date. Any questions or comments regarding this synopsis shall be submitted VIA EMAIL to susan.supplee@navy.mil.
Update #6 ·
******************************************************************************************************************
AMENDMENT 01 - 17 APRIL 2009
The purpose of this Amendment is to update the contract strategy description and to revise the expected release date for the draft solicitation.
The Naval Air Systems Command anticipates a Firm Fixed Price (FFP) contract with a base year and four (4) option periods. The Government reserves the right to make multiple awards if it is determined to be most advantageous based on the capabilities and overall evaluation of the proposals received.
A draft of the solicitation will be released in late July 2009 and may be accessed via the Naval Air Systems Command (NAVAIR) home page at http://www.navair.navy.mil/doing_business/open_solicitations/. The Naval Air Systems Command, PMA-290, Patuxent River, MD, intends to hold an Industry Day Conference in August 2009. The goal of the conference will be to gather potential industry feedback in regards to the P-3 Airframe Sustainment Program. Details regarding the date, time, and location of the Industry Day Conference will be posted at a later date. Any questions or comments regarding this synopsis shall be submitted VIA EMAIL to susan.supplee@navy.mil.
.
Update #5 ·
******************************************************************************************************************
AMENDMENT 01 - 17 APRIL 2009
The purpose of this Amendment is to update the contract strategy description and to revise the expected release date for the draft solicitation.
The Naval Air Systems Command anticipates a Firm Fixed Price (FFP) contract with a base year and four (4) option periods. The Government reserves the right to make multiple awards if it is determined to be most advantageous based on the capabilities and overall evaluation of the proposals received.
A draft of the solicitation will be released in late July 2009 and may be accessed via the Naval Air Systems Command (NAVAIR) home page at http://www.navair.navy.mil/doing_business/open_solicitations/. The Naval Air Systems Command, PMA-290, Patuxent River, MD, intends to hold an Industry Day Conference in August 2009. The goal of the conference will be to gather potential industry feedback in regards to the P-3 Airframe Sustainment Program. Details regarding the date, time, and location of the Industry Day Conference will be posted at a later date. Any questions or comments regarding this synopsis shall be submitted VIA EMAIL to susan.supplee@navy.mil.
Update #4 ·
******************************************************************************************************************
AMENDMENT 01 - 17 APRIL 2009
The purpose of this Amendment is to revise the expected release date for the draft solicitation. A draft of the solicitation will be released in late July 2009 and may be accessed via the Naval Air Systems Command (NAVAIR) home page at http://www.navair.navy.mil/doing_business/open_solicitations/. The Naval Air Systems Command, PMA-290, Patuxent River, MD, intends to hold an Industry Day Conference in August 2009. The goal of the conference will be to gather potential industry feedback in regards to the P-3 Airframe Sustainment Program. Details regarding the date, time, and location of the Industry Day Conference will be posted at a later date. Any questions or comments regarding this synopsis shall be submitted VIA EMAIL to susan.supplee@navy.mil.
.
Update #3 ·
******************************************************************************************************************
AMENDMENT 01 - 17 APRIL 2009
The purpose of this Amendment is to revise the expected release date for the draft solicitation. A draft of the solicitation will be released in late July 2009 and may be accessed via the Naval Air Systems Command (NAVAIR) home page at http://www.navair.navy.mil/doing_business/open_solicitations/. The Naval Air Systems Command, PMA-290, Patuxent River, MD, intends to hold an Industry Day Conference in August 2009. The goal of the conference will be to gather potential industry feedback in regards to the P-3 Airframe Sustainment Program. Details regarding the date, time, and location of the Industry Day Conference will be posted at a later date. Any questions or comments regarding this synopsis shall be submitted VIA EMAIL to susan.supplee@navy.mil.
Update #2 ·
The Naval Air Systems Command is issuing this synopsis for a follow-on requirement for maintenance, repair, and modification of the Navys P-3 aircraft (all T/M/S) under NAICS Code 336411, Aircraft Manufacturing. The prospective contract will procure Planned Maintenance Interval efforts, and Special Structural Inspection-Kit, Center Wing Assembly, and Zone 5 installations. The Contractor will provide facilities, labor, material, and arrange for outside services, as required, to return aircraft to a safe and airworthy condition. These requirements are currently being obtained under Contract N00019-05-D-0008 with L-3 Communications in Waco, Texas, and Contract N00019-05-D-0013 with Lockheed Martin in Greenville, South Carolina. The Naval Air Systems Command anticipates an Indefinite Delivery/Indefinite Quantity contract with a base year and four (4) option periods. The Government reserves the right to make multiple awards if it is determined to be most advantageous based on the capabilities and overall evaluation of the proposals received. A draft of the solicitation will be released in late April 2009 and may be accessed via the Naval Air Systems Command (NAVAIR) home page at http://www.navair.navy.mil/doing_business/open_solicitations/. The Naval Air Systems Command, PMA-290, Patuxent River, MD, intends to hold an Industry Day Conference in May 2009. The goal of the conference will be to gather potential industry feedback in regards to the P-3 Airframe Sustainment Program. Details regarding the date, time, and location of the Industry Day Conference will be posted at a later date..
Update #1 ·
The Naval Air Systems Command is issuing this synopsis for a follow-on requirement for maintenance, repair, and modification of the Navys P-3 aircraft (all T/M/S) under NAICS Code 336411, Aircraft Manufacturing. The prospective contract will procure Planned Maintenance Interval efforts, and Special Structural Inspection-Kit, Center Wing Assembly, and Zone 5 installations. The Contractor will provide facilities, labor, material, and arrange for outside services, as required, to return aircraft to a safe and airworthy condition. These requirements are currently being obtained under Contract N00019-05-D-0008 with L-3 Communications in Waco, Texas, and Contract N00019-05-D-0013 with Lockheed Martin in Greenville, South Carolina. The Naval Air Systems Command anticipates an Indefinite Delivery/Indefinite Quantity contract with a base year and four (4) option periods. The Government reserves the right to make multiple awards if it is determined to be most advantageous based on the capabilities and overall evaluation of the proposals received. A draft of the solicitation will be released in late April 2009 and may be accessed via the Naval Air Systems Command (NAVAIR) home page at http://www.navair.navy.mil/doing_business/open_solicitations/. The Naval Air Systems Command, PMA-290, Patuxent River, MD, intends to hold an Industry Day Conference in May 2009. The goal of the conference will be to gather potential industry feedback in regards to the P-3 Airframe Sustainment Program. Details regarding the date, time, and location of the Industry Day Conference will be posted at a later date.
Files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity