Q A 176 for FedBizOps 9-22-2010.doc

DOC document 20 KB Posted

Attached to
Sustainment, Modification, and Installation Program in support of P-3 Aircraft (all T/M/S)
Solicitation number
N00019-09-R-0216
Issued by

About this file

Q A number 176.

View the file

Other files

File Type Posted
09R0216-Amend0011-3of9.PDF PDF
09R0216-Amend0011-4of9.PDF PDF
09R0216-Amend0011-8of9.PDF PDF
09R0216-Amend0011-6of9.PDF PDF
09R0216-Amend0011-9of9.PDF PDF
09R0216-Amend0011-1of9.PDF PDF
09R0216-Amend0011-2of9.PDF PDF
09R0216-Amend0011-7of9.PDF PDF
09R0216-Amend0011-5of9.PDF PDF
N00019-09-R-0216-0010.PDF PDF
N0001909R0216 Amend 0009.PDF PDF
Amendment 0009 - Released.doc DOC document
N0001909R0216-Amend0008.PDF PDF
Appendix M - Outer Wing Installation Drawings dated 09 September 2010.xls XLS spreadsheet
Appendix B - SSI-K —
Appendix D - SSI-K —
Attch_(1)_SOW_for_P-3_Aircraft_Sustainment_dtd_09_Sept_2010.doc DOC document
Attch —
Appendix L - CWA BOM 09 September 2010.xls XLS spreadsheet
Amendment 0007.pdf PDF
Legal Reviewed Q As 160 - 175 for FebBizOps 9-9-10.doc DOC document
Appendix U -ALD-9 Reqs 25 October 2009.xls XLS spreadsheet
Appendix T - P-3 A S Template 25 October 2009.xls XLS spreadsheet
Appendix B - SSI-K Drawings 09 June 2010.xls XLS spreadsheet
Appendix A - Acronyms 25 October 2009.doc DOC document
Appendix V - P-3 IDP 25 October 2009.pdf PDF
Appendix G - SSI-K Zone 5 BOM 09 June 2010.xls XLS spreadsheet
Appendix E - SSI-K BOM 09 June 2010.xls XLS spreadsheet
Attch —
Appendix C - Zone 5 Drawings 09 June 2010.xls XLS spreadsheet
Appendix R - Misc BOM 16 Mar 2010.xls XLS spreadsheet
Appendix Q - Misc Drawings 09 June 2010.xls XLS spreadsheet
Appendix L - CWA BOM 16 Mar 2010.xls XLS spreadsheet
Appendix H - DIMPLE Ch 2 19 July 2010.pdf PDF
Appendix D - SSI-K Zone 5 Drawings 09 June 2010.xls XLS spreadsheet
Amendment 0005.PDF PDF
Appendix F - Zone 5 BOM 09 June 2010.xls XLS spreadsheet
Attch —
Appendix M - OW Drawings 09 June 2010.xls XLS spreadsheet
Appendix J - FCP 25 October 2009.xls XLS spreadsheet
Appendix P - BMUP BOM 25 October 2009.xls XLS spreadsheet
Appendix I - GFP 25 October 2009.xls XLS spreadsheet
Appendix K - CWSR Drawings 09 June 2010.xls XLS spreadsheet
Appendix S - P-3 Shoring Guide 25 October 2009.xls XLS spreadsheet
Attch —
Attch —
N00019-09-R-0216-0004.pdf PDF
Q As posted 19 Mar 2010.pdf PDF
Changes to SOW Appendicies 19 Mar 10.doc DOC document
Exhibit —
Show 40 more

Latest 50 of 175 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP N00019-09-R-0216

Question and Answer

22 Sept 2010

Question #176: Does the Government have a preference on the validity period for the revised proposal, or do we simply premise award in April 2011?

ANSWER: The modified proposals shall be valid until 29 April 2011. The date for receipt of modified proposals is not extended as a result of this Q&A. Amendment to follow.

File details come from the government source that posted it. Updated .