Steamboat Rock State Park Shoreline Stabilization
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 140R1026B0001
- Agency
-
Bureau of Reclamation
Department of the Interior
- Responses due
- Set-aside
- Indian Small Business Economic Enterprise
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- 51052 WA-155 Electric City, Washington 99123, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Interior Bureau of Reclamation seeks shoreline stabilization construction at Steamboat Rock State Park, Electric City, Washington, with proposals due July 22, 2026 at 11:00 AM MDT. The procurement is an Indian Small Business Economic Enterprise (ISBEE) set-aside, foreclosing competition outside that pool.
Place of performance is 51052 WA-155, Electric City, WA 99123, approximately 975 linear feet of shoreline along Banks Lake below elevation 1572.00 feet. The work includes furnishing and placing compacted fill (2,277 cubic yards), erosion control blanket (5,497 square yards), riprap (3,660 tons), topsoil (976 cubic yards), plant plugs, and seeding with soil supplements. Onsite construction is restricted to October 1, 2026 through May 1, 2027, with work hours limited to 7 a.m. to 7 p.m., Monday through Friday. The contractor must maintain public access to a portion of the existing boat ramp and dock at all times and open and secure the log boom daily. Access to the site is restricted to the reservoir side only; no temporary structures are permitted within the drawdown zone (elevations 1565–1570 feet). The contract period of performance runs August 3, 2026 through July 3, 2027.
Prevailing wage rates apply per Department of Labor Wage Determination WA20260045 (May 18, 2026), ranging from $14.67 to $61.62 per hour plus fringe benefits. All construction equipment must be cleaned to prevent invasive species introduction. Performance and payment bonds are required within 10 calendar days after award. An independent testing agency accredited under ASTM standards must perform required sampling and testing. The contractor must develop a web-based Contract Document Management System with comprehensive submittal tracking and cost management. Liquidated damages are assessed at $2,368.45 per calendar day of delay.
Sealed bids are firm-fixed price. The NAICS code is 237990, Other Heavy and Civil Engineering Construction; PSC is Y1PZ, Construction of Other Non-Building Facilities. Government evaluation applies price reasonableness under FAR 14.408-2, comparing bid prices to each other and the Government estimate. A mandatory pre-bid site visit occurred June 16, 2026. Bid guarantees and Standard Form 24 are required. Questions were due June 22, 2026; final Q&A as of June 23, 2026 is provided with no additional Q&A period. Amendment 0002, effective July 6, 2026, extended the deadline from July 8 and revised Sections 01 51 00, 01 57 30, 32 92 15, and 32 92 20 of the specifications.
Notice text
The General intent of this work is to protect the existing bank slopes from further erosion.
Files
Show all 12
Notice history
| Notice | Type | Posted |
|---|---|---|
| Steamboat Rock State Park Shoreline Stabilization, Columbia Basin Project, Washington | Award Notice | |
| This notice | Solicitation | |
| Steamboat Rock State Park Shoreline Stabilization Columbia Basin Project, Washi | Pre-Solicitation | |
| Steamboat Rock State Park Shoreline Stabilization Columbia Basin Project, Washi | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Jennifer Brown (COW) | Indian Health Service | Total Small Business | |
| Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement | ENDIST Portland | Total Small Business | |
| WA NP OLYM 12(8), Hurricane Ridge Rockfall Mitigation MP 9. 4 | Federal Highway Administration | Total Small Business | |
| 4 GAOA Flaming Gorge Water System Buckboard in Ashley NF, Wyoming | Forest Service | Total Small Business | |
| Camp wooten/starbuck levee rehab | ENDIST Walla Walla | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity