Lower brule north shoreline stabilization and ecosystem restoration, element 2

Open Solicitation Posted

Solicitation number
W9128F27BA007
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Big Bend, Lower Brule, South Dakota 57548

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers, Engineering District Omaha, seeks construction services for the Lower Brule North Shoreline Stabilization and Ecosystem Restoration, Element 2, with proposals due December 3, 2026. The solicitation is set aside for Total Small Business.

Work is located in Lower Brule, South Dakota 57548, along the left and right descending banks of Lake Sharpe near the Lower Brule town site. Scope includes a 100-foot-wide riparian planting bench, a gravel maintenance path along the entire reach, and a riprap revetment protecting the shoreline and island from erosion. The project creates a 200-by-1,500-foot island constructed in water up to three feet deep. The sheltered open water between the island and shoreline is to develop into approximately 5.17 acres of emergent wetland, and the project creates approximately 32 acres of riparian habitat. Related tasks include earth moving, grading, bank shaping, rock installation, water management, fill, and topsoil placement.

The procurement is coded NAICS 237990, Other Heavy and Civil Engineering Construction, and PSC Y1PZ, Construction of Other Non-Building Facilities.

Notice text

2 versions

Update #2 · Latest ·

The project is located along the right descending bank of Lake Sharpe near the Lower Brule, SD town site. Lower Brule North Element 2 includes a 100-foot-wide riparian planting bench, a gravel maintenance path along the entire reach, a riprap revetment to protect the shoreline and island from erosion, and the creation of a 200-by-1,500-foot island constructed in water up to three feet deep. The sheltered open water area between the island and the shoreline will develop into approximately 5.17 acres of emergent wetland, and this will also create approximately 32 acres of riparian habitat. Related tasks include earth moving, grading, bank shaping, rock installation, water management, fill, and topsoil placement.

Update #1 ·

The project is located along the left descending bank of Lake Sharpe near the Lower Brule, SD town site. Lower Brule North Element 2 includes a 100-foot-wide riparian planting bench, a gravel maintenance path along the entire reach, a riprap revetment to protect the shoreline and island from erosion, and the creation of a 200-by-1,500-foot island constructed in water up to three feet deep. The sheltered open water area between the island and the shoreline will develop into approximately 5.17 acres of emergent wetland, and this will also create approximately 32 acres of riparian habitat. Related tasks include earth moving, grading, bank shaping, rock installation, water management, fill, and topsoil placement.

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Lower brule north shoreline stabilization and ecosystem restoration, element 2 Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
FY26 Clouter Creek Middle and Highway Cell Diking Charleston, SC 29403 · NAICS 237990 ENDIST Charleston Total Small Business
USACE SPK DBB Construction - LAR C3B South - Sacramento, CA NAICS 237990 ENDIST Sacramento Total Small Business
USACE SPK DBB Construction - LAR C3B North - Sacramento, CA NAICS 237990 ENDIST Sacramento Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors