Lower brule north shoreline stabilization and ecosystem restoration, element 2
Open Solicitation Posted
- Solicitation number
- W9128F27BA007
- Agency
-
ENDIST Omaha
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Big Bend, Lower Brule, South Dakota 57548
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, Engineering District Omaha, seeks construction services for the Lower Brule North Shoreline Stabilization and Ecosystem Restoration, Element 2, with proposals due December 3, 2026. The solicitation is set aside for Total Small Business.
Work is located in Lower Brule, South Dakota 57548, along the left and right descending banks of Lake Sharpe near the Lower Brule town site. Scope includes a 100-foot-wide riparian planting bench, a gravel maintenance path along the entire reach, and a riprap revetment protecting the shoreline and island from erosion. The project creates a 200-by-1,500-foot island constructed in water up to three feet deep. The sheltered open water between the island and shoreline is to develop into approximately 5.17 acres of emergent wetland, and the project creates approximately 32 acres of riparian habitat. Related tasks include earth moving, grading, bank shaping, rock installation, water management, fill, and topsoil placement.
The procurement is coded NAICS 237990, Other Heavy and Civil Engineering Construction, and PSC Y1PZ, Construction of Other Non-Building Facilities.
Notice text
2 versions
Update #2 · Latest ·
The project is located along the right descending bank of Lake Sharpe near the Lower Brule, SD town site. Lower Brule North Element 2 includes a 100-foot-wide riparian planting bench, a gravel maintenance path along the entire reach, a riprap revetment to protect the shoreline and island from erosion, and the creation of a 200-by-1,500-foot island constructed in water up to three feet deep. The sheltered open water area between the island and the shoreline will develop into approximately 5.17 acres of emergent wetland, and this will also create approximately 32 acres of riparian habitat. Related tasks include earth moving, grading, bank shaping, rock installation, water management, fill, and topsoil placement.
Update #1 ·
The project is located along the left descending bank of Lake Sharpe near the Lower Brule, SD town site. Lower Brule North Element 2 includes a 100-foot-wide riparian planting bench, a gravel maintenance path along the entire reach, a riprap revetment to protect the shoreline and island from erosion, and the creation of a 200-by-1,500-foot island constructed in water up to three feet deep. The sheltered open water area between the island and the shoreline will develop into approximately 5.17 acres of emergent wetland, and this will also create approximately 32 acres of riparian habitat. Related tasks include earth moving, grading, bank shaping, rock installation, water management, fill, and topsoil placement.
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Lower brule north shoreline stabilization and ecosystem restoration, element 2 | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| FY26 Clouter Creek Middle and Highway Cell Diking | ENDIST Charleston | Total Small Business | |
| USACE SPK DBB Construction - LAR C3B South - Sacramento, CA | ENDIST Sacramento | Total Small Business | |
| USACE SPK DBB Construction - LAR C3B North - Sacramento, CA | ENDIST Sacramento | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity