Space Power and Reactor Capabilities (SPARC) - Draft Request for Proposals (DRFP)
Closed Pre-Solicitation Posted
Not the latest version. See the latest pre-solicitation from .
- Solicitation number
- 80GRC026R0009
- Agency
-
Glenn Research Center
National Aeronautics and Space Administration
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 541715 Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
- Place of performance
- Cleveland, Ohio 44135, United States
Notice details come from SAM.gov. Updated .
About this opportunity
NASA Glenn Research Center anticipates releasing the Final Request for Proposals on or about November 20, 2026, for the Space Power and Reactor Capabilities (SPARC) multiple-award IDIQ, a full and open competition with no set-aside, to design, develop, test, and sustain space nuclear systems. The Lunar Reactor-1 (LR-1) Phase 1 firm-fixed-price task order is the awardable sample task order (ASTO), and NASA states that declining to respond to it will likely result in proposal unacceptability during initial acceptability review; only SPARC prime contractors compete for subsequent task orders. Proposals are due approximately 30 calendar days after Final RFP release, superseding the posted September 28, 2026 due date, and contract award is anticipated April 15, 2027.
Place of performance includes contractor facilities, NASA Glenn, other NASA Centers, Federal Government facilities, or other locations as proposed and agreed upon, with physical LR-1 deliveries directed to NASA Glenn in Cleveland, Ohio. The ASTO requires a PDR-level design, an electrically heated Engineering Test Unit, and component radiation testing for a system of no less than 20 kWe, operating continuously for five years at the lunar south pole. NASA's November 16, 2026 Q&A states HALEU fuel is not required during Phase 1, although the September 25 Industry Day presentation specified HALEU. Offerors must maintain non-federal system certifications to NIST SP 800-171 or equivalent (ISO 27001 or CMMC Level 2), comply with ITAR and EAR, and meet NSPM-20 and DOE standards.
The ordering period runs April 15, 2027 through December 31, 2031, with an estimated $350 million ceiling and a $30,000 minimum order. The ASTO period of performance is estimated April 15, 2027 through October 14, 2028, subject to change based on actual award date. The ASTO is firm-fixed-price without Earned Value Management, and business systems are not required for ASTO award. Mission Suitability carries 1,000 points: SPARC Management Approach (200), Small Business Participation (100), and ASTO Approach (700), alongside relevant experience and past performance, cost/price reasonableness, and business factors.
Amendment 3, posted November 16, 2026, added draft attachments including the GTA form, ASTO Model Task Order, price volume template, past performance questionnaire, and draft DRFP Q&A, with points of contact still being finalized. Client-completed past performance questionnaires are due December 21, 2026.
Notice text
4 versions
Update #4 · Latest ·
Amendment 3: November 16, 2026
The Space Power and Reactor Capabilities (SPARC) Draft Request for Proposals (DRFP) is hereby amended to add the following attachments:
- Attachment J.1-5 - Government Task Agreement (GTA) Form - Draft provided for review by interested parties prior to Final RFP release
- Attachment J.2-1 - Instructions for Setting Up a Box Account - Draft provided for review by interested parties prior to Final RFP release
- Attachment J.2-4 - LR-1 Phase 1 ASTO Model TO - Draft provided for review by interested parties prior to Final RFP release
- Attachment J.2-9 - Past Performance Questionnaire - Instructions and Template - Draft provided for review by interested parties prior to Final RFP release.
- Attachment J.2-10 - Price Volume Template - Draft provided for review by interested parties prior to Final RFP release
- Attachment J.2-11 - GTA Instructions - Draft provided for review by interested parties prior to Final RFP release. Points of contact (POCs) are still being finalized. NASA intends to post these prior to the release of the Final RFP if possible.
- Draft RFP Questions/Comments and Responses - Provided for review by interested parties prior to Final RFP release. NASA would like to thank all interested parties that provided questions and comments. All submissions have been considered. Responses which resulted in a change to the Final RFP are noted as "Please review the final RFP". Questions and comments were reviewed for repetition and were only addressed once. Responses to any submissions with markings such as "proprietary", "internal use only", or similar will not be posted.
In the event of a discrepancy between any document posted and the Final RFP, the Final RFP takes precedence.
As noted in the SPARC Presolicitation Synopsis posted on October 27, 2026, NASA intends to post the SPARC Final RFP on or around November 20, 2026.
The solicitation number for the Final RFP may be different than that of the DRFP (80GRC026R0009) due to the Final RFP being released in Government Fiscal Year 2027.
Amendment 2: September 25, 2026
The Space Power and Reactor Capabilities (SPARC) Draft Request for Proposals (DRFP) is hereby amended to add the SPARC Industry Day Presentation and the SPARC Industry Day Questions and Answers (Q&A) as attachments.
Amendment 1: September 1, 2026
The SPARC DRFP is hereby amended to update the SPARC DRFP Cover Letter and add the SPARC Industry Day Information attachment.
Original: August 30, 2026
The SPARC DRFP is hereby issued. Potential offerors are encouraged to review all attached documents beginning with the attachment titled SPARC Draft Request For Proposal (DRFP) Cover Letter which provides summary information regarding this posting.
Update #3 ·
Amendment 2: September 25, 2026
The Space Power and Reactor Capabilities (SPARC) Draft Request for Proposals (DRFP) is hereby amended to add the SPARC Industry Day Presentation and the SPARC Industry Day Questions and Answers (Q&A) as attachments.
Amendment 1: September 1, 2026
The SPARC DRFP is hereby amended to update the SPARC DRFP Cover Letter and add the SPARC Industry Day Information attachment.
Original: August 30, 2026
The SPARC DRFP is hereby issued. Potential offerors are encouraged to review all attached documents beginning with the attachment titled SPARC Draft Request For Proposal (DRFP) Cover Letter which provides summary information regarding this posting.
Update #2 ·
Amendment 1: September 1, 2026
The Space Power and Reactor Capabilities (SPARC) Draft Request for Proposals (DRFP) is hereby amended to update the SPARC DRFP Cover Letter and add the SPARC Industry Day Information attachment.
Original: August 30, 2026
The Space Power and Reactor Capabilities (SPARC) Draft Request for Proposals (DRFP) is hereby issued. Potential offerors are encouraged to review all attached documents beginning with the attachment titled SPARC Draft Request For Proposal (DRFP) Cover Letter which provides summary information regarding this posting.
Update #1 ·
The Space Power and Reactor Capabilities (SPARC) Draft Request for Proposals (DRFP) is hereby issued. Potential offerors are encouraged to review all attached documents beginning with the attachment titled SPARC Draft Request For Proposal (DRFP) Cover Letter which provides summary information regarding this posting.
Files
Show all 27
Notice history
| Notice | Type | Posted |
|---|---|---|
| Space Power and Reactor Capabilities (SPARC) - Presolicitation Synopsis | Pre-Solicitation | |
| This notice | Pre-Solicitation | |
| Space Power and Reactor Capabilities (SPARC) - Sources Sought Notice | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity