Summary of Lunar Reactor-1 (LR-1) Phase 1 Awardable Sample Task Order

This is an Awardable Sample Task Order (ASTO) under the Space Power and Reactor Capabilities (SPARC) Multiple Award Indefinite Delivery/Indefinite Quantity (MAIDIQ) contract administered by NASA. The model task order requires offerors to complete all designated Offeror Fill-Ins (OFIs) and return it as part of their Volume IV: Business proposal. Upon award of the LR-1 Phase 1 Task Order, the contracting officer will bilaterally sign the cover page and this document becomes an executed task order under the contractor's SPARC contract.

The task order encompasses five contract line items (CLINs) with firm-fixed-price terms: Task Order Project Management (CLIN 0001); PDR Level LR-1 Design (CLIN 0002); Engineering Test Unit Hardware (CLIN 0003), designated as a likely NASA capital asset and high-value item; Engineering Test Unit Design and Testing (CLIN 0004); and Component Hardware and Radiation Test Campaign (CLIN 0005). The estimated period of performance runs from April 15, 2027 through October 14, 2028 (subject to change based on actual award date). Offerors must propose firm prices for each CLIN and identify performance-based payments (PBPs), performance incentives, and delivery incentives aligned with specific objective acceptance events and criteria. Performance and delivery incentive payments are held until task order completion and are subject to contracting officer approval and evidence substantiation. The task order includes capital asset reporting requirements per NASA Form 533 if the ETU Hardware is determined to be a capital asset, IT purchase authorization through the OCIO's Commercial IT Request application, limitation of funds provisions, performance-based payment terms, and standard FAR and NASA contracting clauses. All physical deliveries must be directed to NASA Glenn Research Center in Cleveland, Ohio. Contractors must identify any limited rights data or restricted computer software to be delivered and provide place of performance information for any facilities used outside the contractor's primary location.

View the file

Other files

File Type Posted
11.16.26 Att J.2-1 - Instructions for Setting up a Box Account.pdf PDF
11.16.26 SPARC DRFP Questions.Comments and Responses.xlsx XLSX spreadsheet
11.16.26 Att J.2-11 - GTA Instructions.pdf PDF
11.16.26 Att J.2-10 Price Volume Template.xlsx XLSX spreadsheet
11.16.26 Att J.1-5 - Government Task Agreement (GTA) Form.pdf PDF
11.16.26 Att J.2-9 - Past Performance Questionnaire - Instructions and Template.pdf PDF
SPARC Industry Day Q.A.pdf PDF
SPARC Industry Day Presentation.pdf PDF
SPARC Draft Request For Proposal (DRFP) Cover Letter - Amend 1.pdf PDF
SPARC Industry Day Information.pdf PDF
SPARC Draft Request For Proposal (DRFP) Cover Letter.pdf PDF
Att J.1-7 - NF533Q Template.xlsx XLSX spreadsheet
Att J.2-9 - PPQ - I&T.pdf PDF
Att J.2-8 - OCI Assertions Related to ASTO.pdf PDF
Att J.2-10 - ASTO Price Volume Template.pdf PDF
Att J.2-3 - SPARC Small Business Participation - I&T.pdf PDF
Att J.1-1 - SPARC Statement of Work.pdf PDF
Att J.2-2 - SPARC OCI Plan - I&T.pdf PDF
Att J.1-5 - GTAs - I&T.pdf PDF
Att J.2-5 - LR-1 Phase 1 ASTO SOW.pdf PDF
SPARC Draft RFP- 80GRC026R0009.pdf PDF
Att J.2-7 - Offeror R&I Regarding Business Systems.pdf PDF
Att J.2-6 - LR-1 Phase 1 ASTO DPD.pdf PDF
Att J.1-6 - NF533M Template.xlsx XLSX spreadsheet
Att J.2-1 - SPARC Security Requirements for Unclassified IT Resources - I&T.pdf PDF
Att J.2-4 - LR-1 Phase 1 ASTO Model TO.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Space Power and Reactor Capabilities (SPARC)

Multiple Award Indefinite Delivery/Indefinite Quantity (MAIDIQ) Contract

Attachment J.2-4

Lunar Reactor – 1 (LR-1) Awardable Sample Task Order (ASTO)

Model TO

Information for Offerors –

Offerors are required to complete all Offeror Fill-Ins (OFIs) designated herein, sign the cover page, and return this Model Task Order as part of Volume IV: Business. If an offeror is awarded the LR-1 Phase 1 Task Order, this page will be removed, the Contracting Officer will bilaterally sign the cover page, and this Model Task Order will become an awarded task order under the Offeror’s awarded SPARC contact.

Draf t

This page is reserved for the SF26.

Section A – Solicitation/Contract Form

Section is intentionally left blank

(End of Section)

Section B – Supplies or Services and Prices/Cost

Item Supplies/Service Dates Qty/Unit Unit Price Amount 0001 Task Order Project Management

Product Service Code: AR12 Firm-Fixed-Price

Period of Performance*

From April 15, 2027

To [OFI, No Later than 10/14/2028]

1.0 US

Dollar

USD [OFI] Firm Price

USD [OFI]

Funded Amount

USD [TBD,

filled in by Government at Award]

0002 PDR Level LR-1 Design

Product Service Code: AR12 Firm-Fixed-Price

See CLIN 0001 Period of Performance

1.0 US

Dollar

USD [OFI] Firm Price

USD [OFI]

Funded Amount

USD [TBD,

filled in by Government at Award]

0003 Engineering Test Unit (Hardware)

Product Service Code: AR12 Firm-Fixed-Price Likely NASA Capital Asset (See Section G of this document) High-Value Item

See CLIN 0001 Period of Performance

1.0 US

Dollar

USD [OFI] Firm Price

USD [OFI]

Funded Amount

USD [TBD,

filled in by Government at Award]

0004 Engineering Test Unit (Design and Testing)

Product Service Code: AR12 Firm-Fixed-Price

See CLIN 0001 Period of Performance

1.0 US

Dollar

USD [OFI] Firm Price

USD [OFI]

Funded Amount

USD [TBD,

filled in by Government at Award]

0005 Component Hardware and Radiation Test Campaign

Product Service Code: AR12 Firm-Fixed-Price

See CLIN 0001 Period of Performance

1.0 US

Dollar

USD [OFI] Firm Price

USD [OFI]

Funded Amount

USD [TBD,

filled in by Government at Award]

*Estimated Period of Performance. Subject to change based on actual contract award date.

Performance-Based Payment (PBP) Schedule

(a) PBP terms and conditions are defined in Section I of this task order under clause 52.232-32 Performance-Based Payments.

(b) The PBP Schedule defined in paragraph (c) of this clause defines the PBP identification number, planned completion date, objective Acceptance Event/Evidence, and payment amounts for each PBP allowed under this task order. Requests for PBPs that do correspond to an item in the table in paragraph (c), do not provide sufficient evidence of meeting the associated objective completion event, do not align with the associated price amount, or otherwise are considered unallowable in accordance with 52.232-32 will be rejected.

(c) PBP Schedule:

PBP Identification Number

(CLIN-PBP Number

Planned Completion Date Acceptance Event/Evidence Price

Example: PBP 003-001 August 1, 2028 Contractor delivery and NASA acceptance of all ETU hardware required under

CLIN 003.

$1,000,000

[OFI] [OFI] [OFI] [OFI]

[OFI] [OFI] [OFI] [OFI]

NOTE: Offerors shall add additional rows to the table above if necessary to document all Performance-Based Payments. As described in the Performance and Delivery Incentives clause below, each proposed incentive shall have an associated PBP in the table above. This note will be removed at task order award.

(End of Clause)

Performance and Delivery Incentives

(a) The total amount paid to the contractor for meeting all Performance and Delivery Incentives shall not exceed $[OFI, total dollar amount of all performance and incentives].

(b) Performance Incentives (1) Performance incentives are associated with a specific, objective performance criteria for an item or design delivered under this task order against a standard performance requirement. The conditions of each Performance Incentive are identified in the table below. The Contractor earns a separate positive incentive amount for each item meeting the associated objective criteria identified below.

(2) Each individual Performance Incentive included in the table below must correspond to a specific Performance-Based Payment documented in the PBP Schedule.

(3) Performance Incentive Schedule:

Associated

CLIN

Performance Incentive Title

Standard Performance Requirement Objective Criteria Amount

Example:

Extended Design Life

System Requirement LR- 1-009 - LR-1 shall be

The Contractor’s LR-1 Design developed

$300,000 designed to operate continuously at full power output, on the Lunar surface, for a minimum of 5 years without maintenance from the time of deployment.

under CLIN 002 will provide for a 7-year design life from the time of deployment without requiring maintenance. A specific analysis performed on results from ETU testing with substantiate the design life estimate. NASA review and approval of the analysis to determine if this incentive has been met.

[OFI] [OFI] [OFI] [OFI] [OFI]

NOTE: Offerors shall add additional rows to the table above if necessary to document all Performance Incentives. This note will be removed at task order award.

(c) Delivery Incentives (1) Delivery incentives are associated with meeting an objective, accelerated date for the delivery of an item or completion of a significant milestone under this task order. The conditions of each Delivery Incentive are identified in the table below. The Contractor earns a separate positive incentive amount for each item meeting the accelerated delivery/completion date identified below.

(2) Each individual Delivery Incentive included in the table below must correspond to a specific Performance-Based Payment documented in the PBP Schedule.

(3) Delivery Incentive Schedule:

Associated

CLIN

Delivery Incentive

Title

Standard Delivery Date

Accelerated Delivery/Completion Date and Objective Criteria Amount

Example:

Accelerated Delivery of

ETU

Hardware

August 1, 2028 July 1, 2028 - Contractor delivery and NASA acceptance of all ETU hardware required under CLIN 003.

$450,000

[OFI] [OFI] [OFI] [OFI] [OFI]

NOTE: Offerors shall add additional rows to the table above if necessary to document all Delivery Incentives. This note will be removed at task order award.

(d)(1) All performance and delivery incentive payments will be held until the end of the Period of Performance of this task order. Upon completion of all requirements of this task order, the Contractor will provided all necessary evidence to justify that the Objective Criteria associated with any or all performance or delivery incentive payments have been met. NASA may review this evidence for a period of up to three months after the end of the period of performance.

During this time, additional requests for evidence may be sent to the Contractor. Failure by the Contractor to provide additional evidence may result in in the Contracting Officer’s determination that the Objective Criteria for an incentive was not met.

(2) Upon making the determination that a performance or delivery incentive’s objective criteria has not been met, the Contracting Officer will communicate this determination to the Contractor and has authority to issue a unilateral contract modification updating the task order to reflect the removal of the incentive (i.e. Performance/Delivery Incentive Schedule, PBP Schedule, Firm-Fixed Price, CLIN Amount).

(e) The Contracting Officer’s determination made as to the Contractor’s successful completion or failure to complete any Performance or Delivery Incentive is subject to the Disputes clause.

(End of Clause)

1852.216-78 Firm Fixed Price. (DEC 2025)(DEVIATION)

The total firm-fixed-price of this contract is $[OFI, proposed price including incentives and excluding GTA costs].

(End of Clause)

Section C - Description/Specifications/Statement of Work

Requirements

Lunar Reactor – 1 Phase 1 Task Order. The Contractor shall meet the requirements defined in Attachment J.1-A – LR-1 Phase 1 SOW and Attachment J.1-B – LR-1 Phase 1 DPD.

Section D - Packaging and Marking

(End Of Section)

Section E - Inspection and Acceptance

Section F - Deliveries or Performance

Additional Information/Notes:

All physical deliveries completed in the performance of this TO shall be delivered to:

NASA Glenn Research Center 21000 Brookpark Rd Cleveland, OH 44135

See SPARC clause 1852.246-72.

Place of Performance

The following plants or facilities which are located at a different address from the address of the contractor will be used in the performance of this task order:

Place of Performance (Street Address, City, State, County, Zip Code)

Name and Address of Owner and Operator of the Plant or Facility (if Other than the Contractor)

[OFI, if applicable] [OFI, if applicable]

NOTE: Offerors may add additional rows to the table above if necessary to disclose additional plants or facilities. This note will be removed at task order award.

Section G – Contract Administration Data

Capital Asset Reporting

(a) Clause 1852.245-73 is included in the SPARC contract.

(b) Reporting requirements under 1852.245-73(c)(3) are applicable for items determined to be capital assets and valued at or above the threshold defined in 1852.245-73(c)(3).

(c) Per NPR 9250, required reporting under 1852.245-73(c)(3) shall be completed in NASA's Contractor Held Asset Tracking System (CHATS).

GRC 52.245-100 Capital Asset Acquisition (JUN 2025)

(a) The following contract line items have been designated by NASA as capital assets*:

CLIN Description Quantity Unit Price Total Price 0003 ETU Hardware

Likely Capital Asset**

[OFI] [OFI] [OFI]

*A capital asset is tangible property or software that NASA determines to be capital based on the following criteria: 1) has a total acquisition (purchase, fabrication, construction, modification, etc.) cost of $1,000,000 or more, 2) has an estimated useful life of 2 years or more, 3) is not intended for sale in the ordinary course of operations, 4) has been acquired and/or constructed by the contractor with the intention of being used, or being available for use, by NASA, and 5) If acquired for an R&D activity, have an alternative future use. (Note: Items and/or services with values less than $1,000,000 that contribute to the acquisition or increased value of a capital asset (e.g. design for real property projects, components combined to fabricate capital equipment, or generally all costs necessary to bring the property to a usable condition) are also subject to capitalization rules. Generally, NASA will make the capital determination and inform the contractor if such items are classified as capital assets and/or services are needed for a capital project.)

**NOTE: NASA will determine if the ETU Hardware is a capital asset following task order award. For pricing purposes, offerors should assume that capital asset reporting is required.

Following contract award, a task order modification will be negotiated if it is found that capital asset reporting is not required. This note will be removed at task order award.

(b) During contract performance, if the contractor or NASA determines a need to acquire or fabricate tangible property that may meet the capitalization threshold of $1,000,0000, the contractor shall submit a written request for approval to the contracting officer. Based on internal NASA review, if the items are determined necessary for contract performance and determined to be capital assets, the contracting officer will modify the contract to: 1) Add separate line items to the contract appropriately, and 2) reference those items in paragraph (A) of this clause.

(c) If NASA Contractor Financial Management Reports (NASA Form (NF) 533’s) are required under this contract, the contractor shall report all costs incurred against each identified capital asset on its own report page on the NF 533’s.

(d) The costs incurred for each item designated as a capital asset shall be identified separately on any invoice, voucher, progress payment request, or other authorized payment request submitted by the contractor under this contract.

(End of clause)

Section H – Special Contract Requirements

Identification and Representation of Limited Rights Data and Restricted Computer Software (Combined Clause)

(a) This clause does not apply to restrictions based solely on copyright.

(b) Consistent with FAR 52.227-15(b), Limited Rights Data and Restricted Computer Software to be delivered in performance of this contract will be identified and listed pursuant to this clause. The Contractor shall not deliver any data in performance of this contract with restrictive or limiting markings unless the data are listed herein or later identified and certified by the Contractor that such data qualify as Limited Rights Data or Restricted Computer Software in accordance with their respective definitions in FAR 52.227-14(a), as specified in paragraph (c) of this clause.

(c) Pre-Award Identification.

(Start of identification and representation)

The Contractor represents it has accurately identified, through recorded information, the stages of technical development and the source of funds at a lowest segregable level pertaining to an item, component, process, or computer software, and hereby certifies that the data related thereto and identified below qualify as Limited Rights Data or Restricted Computer Software in accordance with their respective definitions in FAR 52.227-14 (a):

Technical Data* or Computer Software** to be Furnished with Restrictions

Basis for Representation***

Represented Rights Category****

Name of Person Representing Restrictions*****

[OFI, if applicable] [OFI, if applicable] [OFI, if applicable] [OFI, if applicable]

NOTE: Offerors may add rows to the table above as necessary to allow for additional Limited Rights Data or Restricted Computer Software. This note will be removed at TO award.

* A representation of limited rights data is applicable to a lowest segregable level pertaining to an item, component, or process. Identify the lowest level pertaining to an item, component, or process.

** A representation of restricted computer software is applicable to a lowest segregable level pertaining to computer software. Identify the lowest segregable level pertaining to computer software.

*** Generally, the development of an item, component, process, or computer software at private expense is the only basis for representing limited or restricted rights on the Government. If development was not at private expense, enter the specific reason for asserting that the Government's right should be limited or restricted.

**** Enter represented rights category (e.g., limited rights, restricted rights, SBIR rights).

***** Corporation, individual, or other person, as appropriate. Date

Printed Name and Title Signature

(End of identification and representation)

(d) Post-Award Identification. In addition to the representations made within this clause, other representations may be made after award when based on new information or inadvertent omission unless the inadvertent omission would have materially affected the Government's source selection decision, a payment decision, or both. Such identification and representations may be made after award whereby the Contractor shall submit a request to the Contracting Officer as soon as practicable after initial identification in the following format and signed by an official authorized to contractually obligate the Contractor. The Contracting Officer will consider such a request and determine whether or not to accept the request by incorporating it in a contract modification. Such post-award identification shall be made in the following format:

(Start of identification and representation)

Identification and Representation of Limited Rights Data and Restricted Computer Software

The Contractor asserts additional data not previously identified pursuant to the

IDENTIFICATION AND REPRESENTATION OF LIMITED RIGHTS DATA AND

RESTRICTED COMPUTER SOFTWARE clause and required to fulfill the data delivery requirements qualify as limited rights data or restricted computer software. The Contractor represents it has accurately identified, through recorded information, the stages of technical development and the source of funds at a lowest segregable level pertaining to an item, component, process, or computer software. Furthermore, the Contractor represents it has verified such recorded information and hereby certifies that the data identified below qualify as limited rights data or restricted computer software in accordance with their respective definitions in FAR 52.227-14(a):

Technical Data* or Computer Software** to be Furnished with Restrictions

Basis for Representation***

Represented Rights Category****

Name of Person Representing Restrictions*****

Contractor Fill-in******

Contractor Fill-in******

Contractor Fill-in******

Contractor Fill-in******

* A representation of technical data asserted as limited rights data is applicable to a lowest segregable level pertaining to an item, component, or process. Identify the lowest segregable level pertaining to an item, component, or process.

** A representation of restricted computer software is applicable to a lowest segregable level pertaining to computer software. Identify the lowest segregable level pertaining to computer software.

*** A representation of other data shall be made at a lowest segregable level (i.e., broad descriptions are generally unacceptable due to indefiniteness). Generally, the development data entirely at private expense is the only basis for representing limited or restricted rights on the Government. If development was not at private expense, enter the specific reason for asserting that the Government's rights should be limited or restricted.

**** Enter represented rights category (e.g., limited rights, restricted rights, SBIR rights).

***** Corporation, individual, or other person, as appropriate.

******Contractor fill-in after award as applicable. Date

Printed Name and Title Signature

(End of identification and representation)

(e) If requested by the Contracting Officer, the Contractor shall provide sufficient recorded information to justify the validity of limited rights data or restricted computer software identified in this clause. Such written justification shall include historical documentary evidence that clearly identifies the stages of technical development and the source of funds at a lowest segregable level pertaining to an item, component, process, or computer software. Conclusory statements without supporting historical documentary evidence shall constitute a failure to provide written justification to substantiate the propriety of the markings. Costs and expenses associated with providing sufficient recorded information to justify the validity of limited rights data or restricted computer software are unallowable costs under this contract. The Contractor shall substantiate its limited rights data or restricted computer software assertions at its own expense.

(f) Based on the Contractor's actions or deliberate inaction, an omission regarding failing to identify data or a failure by the Contractor to identify, analyze, or verify data as described in this clause may be deemed as an act in deliberate ignorance or reckless disregard of the truth or falsity of the information. The Contractor may not rely on past or commensurate actions or inactions by the Government regarding data not previously identified to the Government as limited rights data or restricted computer software yet delivered to the Government with restrictive or limiting markings and actually or constructively accepted by the Government.

(g) Subcontracting. If applicable, the Contractor shall obtain from its subcontractors sufficient recorded information to justify the validity of limited rights data or restricted computer software identified in this clause necessary to fulfill the Contractor's obligation in paragraph (e) of this clause. If a subcontractor refuses to accept terms affording the Contractor to provide such sufficient recorded information to the Contracting Officer, the Contractor shall promptly notify the Contracting Officer of the refusal and shall not proceed with the subcontract award without authorization in writing from the Contracting Officer.

(End of Clause)

IT Purchase Authorization

(a) The contractor shall ensure all IT products and services direct charged to the contract are approved through the OCIO’s Commercial IT Request (CITR) Application. This includes, but is not limited to, FITARA, Supply Chain Risk Management (SCRM), IPv6, and 508 compliance.

No purchases of commercial IT products or services should be made prior to coordination and approval by the OCIO. Contractor shall report purchases monthly utilizing DRD LR1-IT-001.

(b) This contract shall only be used to purchase software, software maintenance, hardware, or hardware maintenance necessary for the performance of this contract. NASA shall own the license(s) or subscriptions for any software or applications purchased. All hardware shall be titled to NASA.

(End of Clause)

1852.232-77 Limitation of Funds (Fixed-Price Contract). (MAR 1989)

(a) Of the total price of items 1 through 5, the sum of $[TBD, to be filled in by the Government prior to TO award] is presently available for payment and allotted to this contract. It is anticipated that from time to time additional funds will be allocated to the contract in accordance with the following schedule, until the total price of said items is allotted:

SCHEDULE FOR ALLOTMENT OF FUNDS

Date Amounts

[TBD, to be filled in by the Government prior to TO award]

[TBD, to be filled in by the Government prior to TO award]

(b) The Contractor agrees to perform or have performed work on the items specified in paragraph

(a) of this clause up to the point at which, if this contract is terminated pursuant to the Termination for Convenience of the Government clause of this contract, the total amount payable by the Government (including amounts payable for subcontracts and settlement costs) pursuant to paragraphs (f) and (g) of that clause would, in the exercise of reasonable judgment by the Contractor, approximate the total amount at the time allotted to the contract. The Contractor is not obligated to continue performance of the work beyond that point. The Government is not obligated in any event to pay or reimburse the Contractor more than the amount from time to time allotted to the contract, anything to the contrary in the Termination for Convenience of the Government clause notwithstanding.

(c)(1) It is contemplated that funds presently allotted to this contract will cover the work to be performed until [TBD, to be filled in by the Government prior to TO award].

(2) If funds allotted are considered by the Contractor to be inadequate to cover the work to be performed until that date, or an agreed date substituted for it, the Contractor shall notify the Contracting Officer in writing when within the next 60 days the work will reach a point at which, if the contract is terminated pursuant to the Termination for Convenience of the Government clause of this contract, the total amount payable by the Government (including amounts payable for subcontracts and settlement costs) pursuant to paragraphs (f) and (g) of that clause will approximate 75 percent of the total amount then allotted to the contract.

(3)(i) The notice shall state the estimate when the point referred to in paragraph (c)(2) of this clause will be reached and the estimated amount of additional funds required to continue performance to the date specified in paragraph (c)(1) of this clause, or an agreed date substituted for it.

(ii) The Contractor shall, 60 days in advance of the date specified in paragraph (c)(1) of this clause, or an agreed date substituted for it, advise the Contracting Officer in writing as to the estimated amount of additional funds required for the timely performance of the contract for a further period as may be specified in the contract or otherwise agreed to by the parties.

(4) If, after the notification referred to in paragraph (c)(3)(ii) of this clause, additional funds are not allotted by the date specified in paragraph (c)(1) of this clause, or an agreed date substituted for it, the Contracting Officer shall, upon the Contractor's written request, terminate this contract on that date or on the date set forth in the request, whichever is later, pursuant to the Termination for Convenience of the Government clause.

(d) When additional funds are allotted from time to time for continued performance of the work under this contract, the parties shall agree on the applicable period of contract performance to be covered by these funds. The provisions of paragraphs (b) and (c) of this clause shall apply to these additional allotted funds and the substituted date pertaining to them, and the contract shall be modified accordingly.

(e) If, solely by reason of the Government's failure to allot additional funds in amounts sufficient for the timely performance of this contract, the Contractor incurs additional costs or is delayed in the performance of the work under this contract, and if additional funds are allotted, an equitable adjustment shall be made in the price or prices (including appropriate target, billing, and ceiling prices where applicable) of the items to be delivered, or in the time of delivery, or both.

(f) The Government may at any time before termination, and, with the consent of the Contractor, after notice of termination, allot additional funds for this contract

(g) The provisions of this clause with respect to termination shall in no way be deemed to limit the rights of the Government under the default clause of this contract. The provisions of this Limitation of Funds clause are limited to the work on and allotment of funds for the items set forth in paragraph (a) of this clause. This clause shall become inoperative upon the allotment of funds for the total price of said work except for rights and obligations then existing under this clause.

(h) Nothing in this clause shall affect the right of the Government to terminate this contract pursuant to the Termination for Convenience of the Government clause of this contract.

Section I – Contract Clauses

FAR Clauses Incorporated by Reference

Clause Number

Clause Title Date

52.211-15 Defense Priority and Allocation Requirements. Apr 2008 52.215-11 Price Reduction for Defective Certified Cost or Pricing Data-

Modifications.

(DEVIATION)

52.215-13 Subcontractor Certified Cost or Pricing Data-Modifications. (DEVIATION) 52.215-21 Requirements for Certified Cost or Pricing Data and Data

Other Than Certified Cost or Pricing Data-Modifications.

(DEVIATION)

52.246-24 Limitation of Liability-High-Value Items. Feb 1997 52.246-25 Limitation of Liability-Services. Feb 1997

NFS Clauses Incorporated by Reference

Clause Number

Clause Title Date

1852.227-71 Requests for Waiver of Rights to Inventions. (DEVIATION)

52.232-32 Performance-Based Payments. (APR 2012)

(a) Amount of payments and limitations on payments. Subject to such other limitations and conditions as are specified in this contract and this clause, the amount of payments and limitations on payments shall be specified in the contract’s description of the basis for payment.

(b) Contractor request for performance-based payment. The Contractor may submit requests for payment of performance-based payments not more frequently than monthly, in a form and manner acceptable to the Contracting Officer. Unless otherwise authorized by the Contracting Officer, all performance-based payments in any period for which payment is being requested shall be included in a single request, appropriately itemized and totaled. The Contractor’s request shall contain the information and certification detailed in paragraphs (l) and (m) of this clause.

(c) Approval and payment of requests. (1) The Contractor shall not be entitled to payment of a request for performance-based payment prior to successful accomplishment of the event or performance criterion for which payment is requested. The Contracting Officer shall determine whether the event or performance criterion for which payment is requested has been successfully accomplished in accordance with the terms of the contract. The Contracting Officer may, at any time, require the Contractor to substantiate the successful performance of any event or performance criterion which has been or is represented as being payable.

(2) A payment under this performance-based payment clause is a contract financing payment under the Prompt Payment clause of this contract and not subject to the interest penalty provisions of the Prompt Payment Act. The designated payment office will pay approved requests on the 30th day after receipt of the request for performance-based payment by the designated payment office. However, the designated payment office is not required to provide payment if the Contracting Officer requires substantiation as provided in paragraph (c)(1) of this clause, or inquires into the status of an event or performance criterion, or into any of the conditions listed in paragraph (a) of this clause, or into the Contractor certification.

The payment period will not begin until the Contracting Officer approves the request.

(3) The approval by the Contracting Officer of a request for performance-based payment does not constitute an acceptance by the Government and does not excuse the Contractor from performance of obligations under this contract.

(d) Liquidation of performance-based payments. (1) Performance-based finance amounts paid prior to payment for delivery of an item shall be liquidated by deducting a percentage or a designated dollar amount from the delivery payment. If the performance-based finance payments are on a delivery item basis, the liquidation amount for each such line item shall be the percent of that delivery item price that was previously paid under performance-based finance payments or the designated dollar amount. If the performance-based finance payments are on a whole contract basis, liquidation shall be by either predesignated liquidation amounts or a liquidation percentage.

(2) If at any time the amount of payments under this contract exceeds any limitation in this contract, the Contractor shall repay to the Government the excess. Unless otherwise determined by the Contracting Officer, such excess shall be credited as a reduction in the unliquidated performance-based payment balance(s), after adjustment of invoice payments and balances for any retroactive price adjustments.

(e) Reduction or suspension of performance-based payments. The Contracting Officer may reduce or suspend performance-based payments, liquidate performance-based payments by deduction from any payment under the contract, or take a combination of these actions after finding upon substantial evidence any of the following conditions:

(1) The Contractor failed to comply with any material requirement of this contract (which includes paragraphs (h) and (i) of this clause).

(2) Performance of this contract is endangered by the Contractor’s-

(i) Failure to make progress; or

(ii) Unsatisfactory financial condition.

(3) The Contractor is delinquent in payment of any subcontractor or supplier under this contract in the ordinary course of business.

(f) Title. (1) Title to the property described in this paragraph (f) shall vest in the Government.

Vestiture shall be immediately upon the date of the first performance-based payment under this contract, for property acquired or produced before that date. Otherwise, vestiture shall occur when the property is or should have been allocable or properly chargeable to this contract.

(2) "Property," as used in this clause, includes all of the following described items acquired or produced by the Contractor that are or should be allocable or properly chargeable to this contract under sound and generally accepted accounting principles and practices:

(i) Parts, materials, inventories, and work in process;

(ii) Special tooling and special test equipment to which the Government is to acquire title;

(iii) Nondurable (i.e., noncapital) tools, jigs, dies, fixtures, molds, patterns, taps, gauges, test equipment and other similar manufacturing aids, title to which would not be obtained as special tooling under paragraph (f)(2)(ii) of this clause; and

(iv) Drawings and technical data, to the extent the Contractor or subcontractors are required to deliver them to the Government by other clauses of this contract.

(3) Although title to property is in the Government under this clause, other applicable clauses of this contract (e.g., the termination clauses) shall determine the handling and disposition of the property.

(4) The Contractor may sell any scrap resulting from production under this contract, without requesting the Contracting Officer’s approval, provided that any significant reduction in the value of the property to which the Government has title under this clause is reported in writing to the Contracting Officer.

(5) In order to acquire for its own use or dispose of property to which title is vested in the Government under this clause, the Contractor shall obtain the Contracting Officer’s advance approval of the action and the terms. If approved, the basis for payment (the events or performance criteria) to which the property is related shall be deemed to be not in compliance with the terms of the contract and not payable (if the property is part of or needed for performance), and the Contractor shall refund the related performance-based payments in accordance with paragraph (d) of this clause.

(6) When the Contractor completes all of the obligations under this contract, including liquidation of all performance-based payments, title shall vest in the Contractor for all property (or the proceeds thereof) not-

(i) Delivered to, and accepted by, the Government under this contract; or

(ii) Incorporated in supplies delivered to, and accepted by, the Government under this contract and to which title is vested in the Government under this clause.

(7) The terms of this contract concerning liability for Government-furnished property shall not apply to property to which the Government acquired title solely under this clause.

(g) Risk of loss. Before delivery to and acceptance by the Government, the Contractor shall bear the risk of loss for property, the title to which vests in the Government under this clause, except to the extent the Government expressly assumes the risk. If any property is lost (see 45.101), the basis of payment (the events or performance criteria) to which the property is related shall be deemed to be not in compliance with the terms of the contract and not payable (if the property is part of or needed for performance), and the Contractor shall refund the related performance-based payments in accordance with paragraph (d) of this clause.

(h) Records and controls. The Contractor shall maintain records and controls adequate for administration of this clause. The Contractor shall have no entitlement to performance-based payments during any time the Contractor’s records or controls are determined by the Contracting Officer to be inadequate for administration of this clause.

(i) Reports and Government access. The Contractor shall promptly furnish reports, certificates, financial statements, and other pertinent information requested by the Contracting Officer for the administration of this clause and to determine that an event or other criterion prompting a financing payment has been successfully accomplished. The Contractor shall give the Government reasonable opportunity to examine and verify the Contractor’s records and to examine and verify the Contractor’s performance of this contract for administration of this clause.

(j) Special terms regarding default. If this contract is terminated under the Default clause, (1) the Contractor shall, on demand, repay to the Government the amount of unliquidated performance-based payments, and (2) title shall vest in the Contractor, on full liquidation of all performance-based payments, for all property for which the Government elects not to require delivery under the Default clause of this contract. The Government shall be liable for no payment except as provided by the Default clause.

(k) Reservation of rights.

(1) No payment or vesting of title under this clause shall-

(i) Excuse the Contractor from performance of obligations under this contract; or

(ii) Constitute a waiver of any of the rights or remedies of the parties under the contract.

(2) The Government’s rights and remedies under this clause-

(i) Shall not be exclusive, but rather shall be in addition to any other rights and remedies provided by law or this contract; and

(ii) Shall not be affected by delayed, partial, or omitted exercise of any right, remedy, power, or privilege, nor shall such exercise or any single exercise preclude or impair any further exercise under this clause or the exercise of any other right, power, or privilege of the Government.

(l) Content of Contractor’s request for performance-based payment. The Contractor’s request for performance-based payment shall contain the following:

(1) The name and address of the Contractor;

(2) The date of the request for performance-based payment;

(3) The contract number and/or other identifier of the contract or order under which the request is made;

(4) Such information and documentation as is required by the contract’s description of the basis for payment; and

(5) A certification by a Contractor official authorized to bind the Contractor, as specified in paragraph (m) of this clause.

(m) Content of Contractor's certification. As required in paragraph (l)(5) of this clause, the Contractor shall make the following certification in each request for performance-based payment:

I certify to the best of my knowledge and belief that-

(1) This request for performance-based payment is true and correct; this request (and attachments) has been prepared from the books and records of the Contractor, in accordance with the contract and the instructions of the Contracting Officer;

(2) (Except as reported in writing on __________), all payments to subcontractors and suppliers under this contract have been paid, or will be paid, currently, when due in the ordinary course of business;

(3) There are no encumbrances (except as reported in writing on _________) against the property acquired or produced for, and allocated or properly chargeable to, the contract which would affect or impair the Government's title;

(4) There has been no materially adverse change in the financial condition of the Contractor since the submission by the Contractor to the Government of the most recent written information dated _____________; and

(5) After the making of this requested performance-based payment, the amount of all payments for each deliverable item for which performance-based payments have been requested will not exceed any limitation in the contract, and the amount of all payments under the contract will not exceed any limitation in the contract.

(End of clause)

52.243-1 Changes-Fixed-Price. (DEVIATION)-Alternate V (DEVIATION)

(a)(1) At any time, the Contracting Officer may issue a written order to make changes within the scope of this contract in any one or more of the following:

(i) Drawings, designs, or specifications.

(ii) Method of shipment or packing.

(iii) Place of inspection, delivery, or acceptance.

(2) If there are any sureties, the Contracting Officer does not need to notify them of a written order.

(b) If any such change causes an increase or decrease in the estimated cost of, or the time required for, performance of any part of the work under this contract, whether or not changed by the order, or otherwise affects any other terms and conditions of this contract, the Contracting Officer shall make an equitable adjustment in the—

(1) Estimated cost, delivery or completion schedule, or both;

(2) Amount of any fixed fee; and

(3) Other affected terms and shall modify the contract accordingly.

(c) The Contractor must assert its right to an adjustment under this clause within 30 days from the date of receipt of the written order. However, if the Contracting Officer decides that the facts justify it, the Contracting Officer may receive and act upon a proposal submitted before final payment of the contract.

(d) Failure to agree to any adjustment shall be a dispute under the Disputes clause. However, nothing in this clause shall excuse the Contractor from proceeding with the contract as changed.

(e) Notwithstanding the terms and conditions of paragraphs (a) and (b) of this clause, the estimated cost of this contract and, if this contract is incrementally funded, the funds allotted for the performance of this contract, shall not be increased or considered to be increased except by specific written modification of the contract indicating the new contract estimated cost and, if this contract is incrementally funded, the new amount allotted to the contract. Until this modification is made, the Contractor shall not be obligated to continue performance or incur costs beyond the point established in the Limitation of Cost or Limitation of Funds clause of this contract.

(End of clause)

52.252-2 Clauses Incorporated by Reference. (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

https://www.acquisition.gov/far-overhaul https://www.hq.nasa.gov/office/procurement/regs/NFS.pdf

Draf t http://www.acquisition.gov/far-overhaul http://www.hq.nasa.gov/office/procurement/regs/NFS.pdf

52.252-6 Authorized Deviations in Clauses. (NOV 2020)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.

(b) The use in this solicitation or contract of any NASA FAR Supplement (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

Section J – List of Attachments

J.1 – Task Order Attachments

J.1-A – LR-1 Phase 1 Statement of Work

J.1-B – LR-1 Phase 1 Data Procurement Document1

J.1-C – Government Task Agreements (if applicable)2

J.1-D – CITAR Report Template3

1These attachments are included in the SPARC solicitation as attachments J.2-5 and J.2-6. Upon the award of an LR-1 Phase 1 TO, they will shift to the TO-level as attachments J.1-A and J.1-B.

This paragraph will be removed upon TO award.

2This attachment is included in the SPARC solicitation as attachment J.2-13 (if applicable).

Upon the award of an LR-1 Phase 1 TO, it will shift to the TO-level as attachments J.1-C (if applicable). This paragraph will be removed upon TO award.

3Attachment J.1-D will be provided as part of ASTO award. It provides a template related to LR1-IT-001. This paragraph will be removed upon TO award.

(End of Clause)

(End Of Section)

Section A – Solicitation/Contract Form
Section B – Supplies or Services and Prices/Cost
Performance-Based Payment (PBP) Schedule
Performance and Delivery Incentives
1852.216-78 Firm Fixed Price. (DEC 2025)(DEVIATION)
Section C - Description/Specifications/Statement of Work
Requirements
Section D - Packaging and Marking
Section E - Inspection and Acceptance
Section F - Deliveries or Performance
Additional Information/Notes:
Place of Performance
Section G – Contract Administration Data
Capital Asset Reporting
GRC 52.245-100 Capital Asset Acquisition (JUN 2025)
Section H – Special Contract Requirements
Identification and Representation of Limited Rights Data and Restricted Computer Software (Combined Clause)
IT Purchase Authorization
1852.232-77 Limitation of Funds (Fixed-Price Contract). (MAR 1989)
Section I – Contract Clauses
FAR Clauses Incorporated by Reference
NFS Clauses Incorporated by Reference
52.232-32 Performance-Based Payments. (APR 2012)
52.243-1 Changes-Fixed-Price. (DEVIATION)-Alternate V (DEVIATION)
52.252-2 Clauses Incorporated by Reference. (FEB 1998)
52.252-6 Authorized Deviations in Clauses. (NOV 2020)
Section J – List of Attachments
J.1 – Task Order Attachments