This is a Data Procurement Document (DPD) for NASA's Lunar Reactor 1 (LR-1) Phase 1 Task Order, dated August 11, 2026, establishing data requirements for the LR-1 development through hardware-driven Preliminary Design Review (PDR).

The document defines three types of contractual data deliverables: Type 1 requires NASA written approval before formal release; Type 2 allows NASA a 28-day review period with automatic approval if no disapproval is issued; and Type 3 requires no NASA approval but must satisfy all contractual requirements. The Contract Data Requirements List (CDRL) identifies 20 specific data deliverables spanning project management, systems engineering, safety and mission assurance, software, and supply chain assessment. Key deliverables include the Project Management Plan (LR1-PM-001, Type 2), Integrated Master Schedule (LR1-PM-002, Type 3), Flight System and ETU Requirements (LR1-SE-001, Type 1), Test Plans and Reports (LR1-SE-002/003, Types 2-3), preliminary design CAD and models (LR1-SE-004/006, Type 3), ETU Design Description and User Manual (LR1-SE-005/007, Type 3), Final Report (LR1-SE-008, Type 2), Safety and Mission Assurance Plan (LR1-SMA-002, Type 3), Failure Modes and Effects Analysis (LR1-SMA-003, Type 2), Preliminary Hazards Analysis (LR1-SMA-004, Type 2), Software Plans and Release (LR1-SW-001/002, Types 2-3), Regulatory Engagement Plan (LR1-NLAM-001, Type 3), and Supply Chain Assessment Report (LR1-SC-001, Type 3). Submission frequencies vary from one-time deliveries at phase end to monthly updates for schedules and monthly management review packages. The document establishes general requirements for document format (electronic PDF or Microsoft Office formats preferred), data restrictions and markings (including ITAR and Export Administration Regulations notices), transmittal procedures via collaborative platforms, and maintenance procedures including NASA-initiated and contractor-initiated change processes. All DRDs are reviewable at Contractor-led reviews at task order completion.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT_VERSION 1

National Aeronautics and Space Administration

DATE: AUGUST 11, 2026

LUNAR REACTOR 1 – PHASE 1 TASK ORDER

(LR-1 P1 TO)

DATA PROCUREMENT DOCUMENT (DPD)

LUNAR REACTOR 1 (LR-1) DEVELOPMENT THROUGH HARDWARE-DRIVEN

PRELIMINARY DESIGN REVIEW (PDR)