Sources Sought: EIC Quadrupole Magnet Coils

Closed Pre-Solicitation Posted

Solicitation number
Stek-26-S455088
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Virginia 23606, United States

Notice details come from SAM.gov. Updated .

About this opportunity

Thomas Jefferson National Accelerator Facility (JLab), procuring on behalf of the Department of Energy, is conducting a sources-sought and Request for Information (RFI STek-26-S455088) for magnet coils destined for the Electron Ion Collider at Brookhaven National Laboratory, with responses due by August 18, 2026.

JLab is gathering preliminary cost and schedule information across three magnet coil categories: quadrupole and sextupole coils (nine types, 40 to 100 units total per type, with initial quantities of 4 units for select configurations), and corrector magnet coils (three types, 420 units total, with initial quantities of 2 units for two types). Magnets will be procured either build-to-print using JLab-provided drawings or build-to-specification with contractor design submissions subject to JLab approval. Manufacturing will include hollow oxygen-free high conductivity copper conductors with water cooling holes, fiberglass/vacuum-impregnated epoxy insulation, and stainless steel brazed water fittings for quadrupole and sextupole variants; corrector coils will use heavy build square copper wire wet wound with EPON 81C epoxy.

Contractors must demonstrate capacity to deliver first article magnet coils followed by production quantities within 12 to 18 months after receipt of order. JLab will award contracts to multiple vendors as needed. Responses must include budgetary cost estimates with NRE and tooling costs for both initial and full quantities, anticipated cost impacts for fiscal years 2027–2028, customs and duties information for offshore fabrication, subcontracting plans, percentage of work performed outside the U.S., and manufacturing recommendations. All vendors must register on the JLab Solicitation Bulletin Board and confirm qualifications under NAICS Code 335999 (600-employee size standard). Responses are due to beaver@jlab.org by 5:00 PM Eastern time on August 18, 2026. This RFI does not constitute an order or commitment to pay costs.

Notice text

Thomas Jefferson National Accelerator Facility (referred to as JLab from this point forward) is seeking to gain understanding of possible costs and schedule for different types of Magnets for use in the Electron Ion Collider (EIC) which will be installed at Brookhaven National Laboratory (BNL). The Magnet coils will be procured based on either drawing design or technical specifications. This request for information (RFI) communication is a critical first step in our path to success. Its intent is to bring our industry partners into the loop as early in the process as possible prior to release of any formal requests for proposal(s) (RFP). The RFI process is a tool utilized to gain industry input into the process on the strategy, specifications, and supporting documentation as they get finalized prior to any RFP(s).  

Files

File Type Posted
Magnet Coil Reference Drawings (2).zip ZIP file
RFI STek-26-S455088.pdf PDF
EIC-NCMAG-RFI-002 - RFI for ESR Magnet Coils.pdf PDF

Similar open opportunities

Opportunity Agency Set-aside Responses due
Dilution Refrigerator with a Superconducting Solenoid Newport News, Virginia 23606, United States · NAICS 334516 Department of Energy No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity