Amendment 00002 for P2021008080 Atlanta Water Line Installation Services

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
75D301-24-R-73077
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Atlanta, Georgia 30341, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Health and Human Services Centers for Disease Control and Prevention Office of Acquisition Services is seeking contractors to replace the existing copper water piping system and related components in Building 110 at the CDC's Chamblee Campus in Atlanta, Georgia. The work includes installing parallel CPVC water lines and systems, constructing a separate riser system, installing new ball valves, replacing equipment, and providing as-built documents. The contract will be awarded through an open competition using a tradeoff process evaluating technical factors like experience, technical approach, and personnel as well as price. Offers are due by August 9, 2024, and the CDC has set a final RFI deadline of July 25, 2024.

This is a total small business set-aside procurement with an estimated price range between $5,000,000 and $10,000,000. The contract has a 540 calendar day period of performance and is subject to the Davis-Bacon Act requirements. The work must comply with the Buy American Act, and the contractor will be subject to liquidated damages of $282 per calendar day for late completion.

Notice text

6 versions

Update #6 · Latest ·

Amendment 00002 posted on 08/08/2024 to post Pre-Bid RFI Log dated 08/08/2024

Site Photos posted on 8/5/2024. 

Final RF Log is posted on 7/29/2024 as well as notes and attendance from the site visit.

RFI Log is updated on 7/24/2024. 

Amendment 00001 is posted on 7/18/2024.

The purpose of this amendment is to add the following attachments.
9 EXHIBIT A breakdown example
10 TEMPLATE - Document Tracking Log
11 Pre-Bid RFI Log-P20221008080 07182024
This amendment also adds an RFI final due date of 2 PM on July 25th 2024.

The work of this project is to replace the existing copper water piping system and related components in Building
110 at the CDC’s Chamblee Campus. This replacement and installation consists of, but is not limited to, the
following aspects:
1) Perform phased work as approved by CDC to install parallel CPVC water lines and systems in interstitial floors.
a. Construct a separate riser system as shown on the drawings.
b. Install new ball valves to isolate systems and fixtures as shown on the drawings.
c. Install replacement equipment as shown on the drawings.
d. Perform switch over to new systems as approved by the CDC.
e. Provide as built documents for project as defined in Section 01 70 00.
The full scope of work is found within the attached Statement of Work, Specifications, and Drawings.

Update #5 ·

Site Photos posted on 8/5/2024. 

Final RF Log is posted on 7/29/2024 as well as notes and attendance from the site visit.

RFI Log is updated on 7/24/2024. 

Amendment 00001 is posted on 7/18/2024.

The purpose of this amendment is to add the following attachments.
9 EXHIBIT A breakdown example
10 TEMPLATE - Document Tracking Log
11 Pre-Bid RFI Log-P20221008080 07182024
This amendment also adds an RFI final due date of 2 PM on July 25th 2024.

The work of this project is to replace the existing copper water piping system and related components in Building
110 at the CDC’s Chamblee Campus. This replacement and installation consists of, but is not limited to, the
following aspects:
1) Perform phased work as approved by CDC to install parallel CPVC water lines and systems in interstitial floors.
a. Construct a separate riser system as shown on the drawings.
b. Install new ball valves to isolate systems and fixtures as shown on the drawings.
c. Install replacement equipment as shown on the drawings.
d. Perform switch over to new systems as approved by the CDC.
e. Provide as built documents for project as defined in Section 01 70 00.
The full scope of work is found within the attached Statement of Work, Specifications, and Drawings.

Update #4 ·

Final RF Log is posted on 7/29/2024 as well as notes and attendance from the site visit.

RFI Log is updated on 7/24/2024. 

Amendment 00001 is posted on 7/18/2024.

The purpose of this amendment is to add the following attachments.
9 EXHIBIT A breakdown example
10 TEMPLATE - Document Tracking Log
11 Pre-Bid RFI Log-P20221008080 07182024
This amendment also adds an RFI final due date of 2 PM on July 25th 2024.

The work of this project is to replace the existing copper water piping system and related components in Building
110 at the CDC’s Chamblee Campus. This replacement and installation consists of, but is not limited to, the
following aspects:
1) Perform phased work as approved by CDC to install parallel CPVC water lines and systems in interstitial floors.
a. Construct a separate riser system as shown on the drawings.
b. Install new ball valves to isolate systems and fixtures as shown on the drawings.
c. Install replacement equipment as shown on the drawings.
d. Perform switch over to new systems as approved by the CDC.
e. Provide as built documents for project as defined in Section 01 70 00.
The full scope of work is found within the attached Statement of Work, Specifications, and Drawings.

Update #3 ·

RFI Log is updated on 7/24/2024. 

Amendment 00001 is posted on 7/18/2024.

The purpose of this amendment is to add the following attachments.
9 EXHIBIT A breakdown example
10 TEMPLATE - Document Tracking Log
11 Pre-Bid RFI Log-P20221008080 07182024
This amendment also adds an RFI final due date of 2 PM on July 25th 2024.

The work of this project is to replace the existing copper water piping system and related components in Building
110 at the CDC’s Chamblee Campus. This replacement and installation consists of, but is not limited to, the
following aspects:
1) Perform phased work as approved by CDC to install parallel CPVC water lines and systems in interstitial floors.
a. Construct a separate riser system as shown on the drawings.
b. Install new ball valves to isolate systems and fixtures as shown on the drawings.
c. Install replacement equipment as shown on the drawings.
d. Perform switch over to new systems as approved by the CDC.
e. Provide as built documents for project as defined in Section 01 70 00.
The full scope of work is found within the attached Statement of Work, Specifications, and Drawings.

Update #2 ·

Amendment 00001 is posted on 7/18/2024.

The purpose of this amendment is to add the following attachments.
9 EXHIBIT A breakdown example
10 TEMPLATE - Document Tracking Log
11 Pre-Bid RFI Log-P20221008080 07182024
This amendment also adds an RFI final due date of 2 PM on July 25th 2024.

The work of this project is to replace the existing copper water piping system and related components in Building
110 at the CDC’s Chamblee Campus. This replacement and installation consists of, but is not limited to, the
following aspects:
1) Perform phased work as approved by CDC to install parallel CPVC water lines and systems in interstitial floors.
a. Construct a separate riser system as shown on the drawings.
b. Install new ball valves to isolate systems and fixtures as shown on the drawings.
c. Install replacement equipment as shown on the drawings.
d. Perform switch over to new systems as approved by the CDC.
e. Provide as built documents for project as defined in Section 01 70 00.
The full scope of work is found within the attached Statement of Work, Specifications, and Drawings.

Update #1 ·

The work of this project is to replace the existing copper water piping system and related components in Building
110 at the CDC’s Chamblee Campus. This replacement and installation consists of, but is not limited to, the
following aspects:
1) Perform phased work as approved by CDC to install parallel CPVC water lines and systems in interstitial floors.
a. Construct a separate riser system as shown on the drawings.
b. Install new ball valves to isolate systems and fixtures as shown on the drawings.
c. Install replacement equipment as shown on the drawings.
d. Perform switch over to new systems as approved by the CDC.
e. Provide as built documents for project as defined in Section 01 70 00.
The full scope of work is found within the attached Statement of Work, Specifications, and Drawings.

Files

Show all 18

Notice history

Notice Type Posted
Award Notice for P2021008080 Atlanta Water Line Installation Services Award Award Notice
This notice Latest solicitation Solicitation
Sources Sought for Atlanta Water line Installation Services Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Oconaluftee Waterline Replacement Cherokee, North Carolina 28719, United States · NAICS 237110 Forest Service Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity