12 Pre-Bid RFI Log-P20221008080 07242024.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Amendment 00002 for P2021008080 Atlanta Water Line Installation Services
Solicitation number
75D301-24-R-73077
Issued by

About this file

This document is a Pre-Bid RFI Log for a federal contract opportunity to replace the existing copper water piping system and related components in Building 110 at the CDC's Chamblee Campus. The solicitation number is 75D301-24-R-73077.

The key details include:

  • The project will be phased, and the contractor must install parallel CPVC water lines and systems in interstitial floors, construct a separate riser system, install new ball valves, replace equipment, and provide as-built documents.
  • Respondents had several questions regarding requirements such as personnel, phasing, building occupancy, temporary utilities, and material lead times, which the CDC addressed in their responses.
  • Respondents also requested certain forms and documents, such as a document tracking log and construction cost proposal format, which the CDC provided.
  • The CDC clarified that all materials must comply with the Buy American Act and provided cost allowances for restroom wall tiles and water fountain glass walls.
  • The contract drawings are available, but an NDA must be submitted to the Contracting Officer to receive them.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Pre-Bid RFI Log
Project : P20221008080 B110 Domestic Water Replacement - GACH0110
Contracting Officer: Mike DavisSolicitation No: 75D301-24-R-73077
RFI No.DescriptionCompany AuthorDate Received by the CDCResponse DateCDC Response
01Do the Superintendent, SSHO and QC Manager need to be 3 separate individuals?Mckenzie7/9/247/16/24It is not a requirement for superintendent, SSHO, or QC to be 3 separate individuals
02Are there any phasing requirements?Mckenzie7/9/247/16/24Yes. Follow the contract drawings.
03How many people will be in the building?Mckenzie7/9/247/16/24The building will be occupied at all time.
04Are there any temporary heating/cooling requirements?Mckenzie7/9/247/16/24Follow the contract and Specifications documents
05Can the period of performance be extended after award once the material/equipment lead times are confirmed due to current market conditions for the equipment for this project?Mckenzie7/9/247/16/24The current schedule duration provides ample time to accommodate the current market condition. Unless CDC agrees that there are some some valid reasons, the period of perfomance will not change.
06Can you provide as builds for pipe removal logistics?Mckenzie7/9/247/16/24Asbuilds will be provided after the project is awarded.
07Drawings are mentioned in the SOW & Solicitation, can you provide these drawings?Mckenzie7/9/247/16/24NDA for companies and for individuals who will have access to the contract documents will need to be sent to the contracting officer, Mike Davis in order to receive the Specifications and drawings.
08While going through the bid documents we have identified a couple of forms we need. Please see attached “Form Needed” document: Document tracking logEmery Associates7/11/247/16/24Document tracking log is attached.
09While going through the bid documents we have identified a couple of forms we need. Please see attached “Form Needed” document: Construction cost proposal formatEmery Associates7/11/247/16/24Construction cost proposal format is attached.
10Do all materials used for the replace project need to fall under the "Buy American Act."?Emery Associates7/15/247/16/24Follow FAR 52.225-9 Buy American-Construction Materials (Nov 2021) clause
11Can you please clarify / specify the Tiles required for the RestroomsEmery Associates7/16/247/18/24Provide an allowance of $12 per square feet to replace wall tiles
12Can you please clarify / specify the Tiles required for the Water fountainsEmery Associates7/16/247/18/24Provide an allowance of $20 per square feet to replace glass wall.
13Can someone please let me know what size paper I need to print to in order to have the scale correctly representedA.S.M. McClain Enterprises7/24/247/24/24The PDF file size for the contract drawings is 24"x36"