9 EXHIBIT A breakdown example.xlsx
XLSX spreadsheet 34 KB Posted
- Solicitation number
- 75D301-24-R-73077
About this file
This document appears to be an Excel spreadsheet titled "9 EXHIBIT A breakdown example.xlsx" that provides a cost proposal form for a construction project. The form includes various construction cost categories such as general conditions, civil/structural, architectural, mechanical, electrical, and building automation systems. Each category has detailed line items with quantities, unit costs, labor hours, and total costs. The spreadsheet also includes sections for calculating sales tax, contractor overhead and profit, and the overall grand total construction cost.
The related federal contract opportunity is for a solicitation to replace the existing copper water piping system and related components in Building 110 at the CDC's Chamblee Campus. The work involves installing parallel CPVC water lines and systems, constructing a separate riser system, installing new ball valves, replacing equipment, and performing switchover to the new systems. The full scope of work is detailed in the attached Statement of Work, Specifications, and Drawings. The solicitation number is 75D301-24-R-73077 and the contracting agency is the Department of Health and Human Services Centers for Disease Control and Prevention Office of Acquisition Services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 11 Pre-Bid RFI Log-P20221008080 08082024.xlsx | XLSX spreadsheet | |
| Amendment 00002 to 75D301-24-R-73077 signed.pdf | ||
| 13 Pre-Bid RFI Log-P20221008080 07262024.xlsx | XLSX spreadsheet | |
| 14 75D301-24-R-73077 Site Visit Notes.pdf | ||
| 12 Pre-Bid RFI Log-P20221008080 07242024.xlsx | XLSX spreadsheet | |
| A19 75D301-24-R-73077 Solicitation 07182024.pdf | ||
| 11 Pre-Bid RFI Log-P20221008080 07182024.xlsx | XLSX spreadsheet | |
| 10 TEMPLATE - Document Tracking Log.xls | XLS spreadsheet | |
| Amendment 00001 to 75D301-24-R-73077 signed.pdf | ||
| 6 Visitors Request Form For Access To CDC Campuses.docx | DOCX document | |
| 75D301-24-R-73077 Solicitation.pdf | ||
| 4 Employee Non-Disclosure Agreement.docx | DOCX document | |
| 2 Davis Bacon WD GA20240305 03222024 rev 1.pdf | ||
| 6 Visitors Request Form For Access To CDC Campuses.docx | DOCX document | |
| 1 Statement of Work (SOW) P20221008080.pdf | ||
| 3 Contractors Non-Disclosure Agreement.docx | DOCX document | |
| 5 Past Performance Questionnaire.docx | DOCX document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASSEMBLY
| CONSTRUCTION COST PROPOSAL FORM | Sub. Date: | Estimate sheet of | |||||||||||||||
| A satisfied Microsoft Office user: Leave Sheet numbering blank for Project Officer to fill in. | Phase Code | Name | Contingency | ||||||||||||||
| CONTRACTOR: | Date Printed : | 7/11/20 | Project #: | P2010-000 | A | Feasibility Study | 30% | ||||||||||
| P2011-000 PROPOSAL | Expiration Date: | CDC Contracting Officer: | Ms. Smith | ||||||||||||||
| A satisfied Microsoft Office user: Use one of the following: A for Feasibility Study B for Scope & Estimate C for Schematic Design D for Design Development E for 90% Final Design F for Final Design G for Other (describe) Click 'OK' to exit and input | B | Scope & Estimate | 20% | ||||||||||||||
| 0 | Estimator: | CDC Project Officer: | Mr. Jones | C | Schematic Design | 10% | |||||||||||
| Checked By: | 0 | D | Design Development | 7% | |||||||||||||
| E | 90% Final Design | 2% | |||||||||||||||
| M | QUANT. | MATERIALS | LABOR | SUB, EQUIP, OTHER (TAX, O&P INCLUDED) | TOTAL COST $ | F | 100% Final Design | 0 | |||||||||
| TE | ASSEMBLY | ||||||||||||||||
| A satisfied Microsoft Office user: Type in Discipline & Task: Architectural/ Concrete or Masonry or Finishes or etc. | # | Unit | $ per | Total | mhrs | $ per | Total | $ per | Total | G | Other | ||||||
| I | Units | size | unit | ($) | /unit | unit | |||||||||||
| A satisfied Microsoft Office user: $ per unit may be changed to $ per manhour (mh) and use column 'F' for mh/ unit. Total Labor (col. 'H') must then multiply columns 'B' * 'F' * 'G'. | ($) | unit | |||||||||||||||
| A satisfied Microsoft Office user: $ per unit may be changed to $ per manhour (mh) and use column 'F' for mh/ unit. Total Labor (col. 'H') must then multiply columns 'B' * 'F' * 'G'. | ($) | ||||||||||||||||
| $0 | |||||||||||||||||
| 1 | GENERAL CONDITIONS | ||||||||||||||||
| 2 | Dumpster | 3 | mo | 0 | 0 | 200.00 | 600 | $600 | |||||||||
| 3 | Telphone | 3 | mo | 35 | 105 | $105 | |||||||||||
| 4 | Supervision | 3 | mo | 1,200.00 | 3,600.00 | $3,600 | |||||||||||
| 5 | GENERAL CONDITIONS TOTALS | $0 | $3,600 | $705 | $4,305 | ||||||||||||
| 6 | CIVIL |
A satisfied Microsoft Office user: Add or Remove 50 Rows between row 10 & Subtotal for each extra page. - If adding rows, copy formulas for columns A, F-L into new rows.
| A satisfied Microsoft Office user: $ per unit may be changed to $ per manhour (mh) and use column 'F' for mh/ unit. Total Labor (col. 'H') must then multiply columns 'B' * 'F' * 'G'. | 7 | 1.5" 9MM Asphalt Surface Course with Hydrated Lime | 4000 | sy | 7.19 | 28,750 | $28,750 | |||||
| 8 | 8" Ductile Iron Pipe w/ fittings | 30 | lf | 40.00 | 1,200 | 12 | 30.00 | 360 | $1,560 | |||
| 9 | 8" Ductile Iron Pipe (Compactor) | 10 | hr | 10 | 16.00 | 160 | 25 | 250 | $410 | |||
| 10 | 8" Ductile Iron Pipe (Backhoe) | 5 | hr | 0 | 5 | 22.00 | 110 | 35 | 175 | $285 | ||
| 11 | CIVIL TOTALS | $1,200 | $630 | $30,585 | $31,005 | |||||||
| 12 | ||||||||||||
| 13 | ARCHITECTURAL | 0 | 0 | $0 | ||||||||
| 14 | Wood Casework, frames, base cabinets, counter storage 24x36 | 30 | ea | 0 | 0 | 210 | 28,750 | $28,750 | ||||
| 15 | Wood Columns, hemlock, tapered, T&G 20" Diam 14' High | 100 | ea | 185.00 | 18,500 | 50 | 25.00 | 1,250 | $19,750 | |||
| 16 | Scaffolding Rental (per week) | 6 | ea | 0 | 6 | 28.00 | 168 | 25 | 150 | $318 | ||
| 17 | ||||||||||||
| 18 | ARCHITECTURAL TOTALS | $18,500 | $1,418 | $28,900 | $48,818 | |||||||
| 19 | 0 | 0 | $0 | |||||||||
| 20 | MECHANICAL | 0 | 0 | $0 | ||||||||
| 21 | Demolition: Boiler Gar fired 200 MBH | 1 | ea | 100.00 | 100 | 40 | 50.00 | 2,000 | $2,100 | |||
| 22 | Pipe hanger, support , split ring, malleable iron, for non insulated | 100 | ea | 12.68 | 1,268 | 0.25 | 16.00 | 1,600 | $2,868 | |||
| 23 | Central station air handling unit, packaged indoor , variable air Volume, 30,00 CFM | 2 | ea | 100,000 | 200,000 | 203 | 60.00 | 12,200 | $212,200 | |||
| 24 | Crane | 1 | day | 8 | 30.00 | 240 | 850.00 | 850 | $1,090 | |||
| 25 | Fire Dampers 12X12 | 3 | ea | 32.00 | 96 | 3 | 45.00 | 135 | $231 | |||
| 26 | 1" Pipe | 100 | lf | 3.00 | 300 | 100 | 4.00 | 400 | $700 | |||
| 27 | Demolition of Ductwork | 4 | hr | 0 | 4 | 45.00 | 180 | $180 | ||||
| 28 | Motor Sheaves | 2 | ea | 700.00 | $1,400 | 3 | 45.00 | $90 | $1,490 | |||
| 29 | ||||||||||||
| 30 | MECHANICAL TOTALS | $203,164 | $16,040 | $850 | $220,859 | |||||||
| 31 | 0 | 0 | $0 | |||||||||
| 32 | ELECTRICAL | 0 | 0 | $0 | ||||||||
| 33 | 400 AMP electrical panel | 2 | ea | 300.00 | 600 | 3 | 44.00 | 88 | $688 | |||
| 34 | 3/4" EMT | 600 | lf | 1.50 | 900 | 12 | 1.00 | 600 | $1,500 | |||
| 35 | 3/4" EMT couplings | 54 | ea | 1.23 | 66 | 7 | 0.45 | 24 | $91 | |||
| 36 | Crane | 1 | day | 8 | 30.00 | 240 | 850.00 | 850 | $1,090 | |||
| 37 | Small tools | 1 | ea | |||||||||
| 38 | ELECTRICAL TOTALS | $1,566 | $952 | $850 | $3,369 | |||||||
| 39 | ||||||||||||
| 40 | BAS/CONTROLS | 0 | 0 | 0 | ||||||||
| 41 | Controller | 2 | ea | 350.00 | 700 | 10 | 56.00 | 1,120 | $1,820 | |||
| 42 | Cable | 400 | lf | 0.25 | 100 | 0.64 | 30.00 | 0 | 0 | $100 | ||
| 43 | 3/4" EMT | 600 | lf | 1.50 | 900 | 12 | 1.00 | 600 | $1,500 | |||
| 44 | Electrician | 46 | hrs | 0 | 29.50 | 1,357 | $1,357 | |||||
| 45 | BAS/CONTROLS TOTALS | $1,700 | $1,720 | $1,357 | $4,777 | |||||||
| 46 | 0 | 0 | 0 | |||||||||
| 47 | FIXTURES FURNISHINGS AND EQUIPMENT | 0 | 0 | 0 | $0 | |||||||
| 48 | Carpet | 100 | sy | Gov Furnished | 100 | 8.63 | 0.10 | 10 | $10 | |||
| 49 | Modular office set | 2 | ea | 3,600.00 | 7,200 | 0 | 0 | $7,200 | ||||
| 50 | Guest Chair | 6 | ea | 150.00 | 900 | $900 | ||||||
| 51 | Interior Design Services | 10 | hrs | 35.00 | 350 | $350 | ||||||
| 52 | Labor-Deliver and install | 40 | hrs | 29.50 | 1,180 | $1,180 | ||||||
| 53 | FIXTURES FURNISHINGS AND EQUIPMENT TOTALS | $8,100 | $1,530 | $10 | $9,640 | |||||||
| 54 | 0 | 0 | $0 | |||||||||
| 55 | DIRECT CONSTRUCTION COST |
A satisfied Microsoft Office user: Type in Discipline & Task: Architectural/ Concrete or Masonry or Finishes or etc.
A satisfied Microsoft Office user: Leave Sheet numbering blank for Project Officer to fill in.
| A satisfied Microsoft Office user: Type in Discipline & Task: Architectural/ Concrete or Masonry or Finishes or etc. | Material: | $234,230 | Labor: | $25,890 | Other: | $63,257 | $322,773 | 605 | ||
| 56 | ||||||||||
| 57 | MATERIALS SALES TAX | % | ||||||||
| 58 | subtotal | |||||||||
| 59 | PRIME CONTRACTOR LABOR, FICA & OTHER | % | ||||||||
| 60 | subtotal | |||||||||
| 61 | PRIME CONTRACTOR OVERHEAD | 0% |
A satisfied Microsoft Office user: Typically 10% OH&P for Prime with Subs. If one, general service contactor is expected, using NO SUBS, Sub OH&P should be 0 and prime OH&P should increase to 21%.
| A satisfied Microsoft Office user: Use one of the following: A for Feasibility Study B for Scope & Estimate C for Schematic Design D for Design Development E for 90% Final Design F for Final Design G for Other (describe) Click 'OK' to exit and input | % | ||
| 62 | subtotal | ||
| 63 | PRIME CONTRACTOR PROFIT | % | |
| 64 | subtotal | ||
| 65 | BOND | % | |
| 66 | subtotal | ||
| 67 | GRAND TOTAL COST |
A satisfied Microsoft Office user: Type in Discipline & Task: Architectural/ Concrete or Masonry or Finishes or etc.
A satisfied Microsoft Office user: $ per unit may be changed to $ per manhour (mh) and use column 'F' for mh/ unit. Total Labor (col. 'H') must then multiply columns 'B' * 'F' * 'G'.
EXHIBIT "A"
BREAKDOWN EXAMPLE
SUMMARY.XLE
| PROJECT COST PROPOSAL | Submittal Date | Government Estimate Sheet 1 of 1 | |||||
| A satisfied Microsoft Office user: Project Officer should fill in all discipline sheet numbering. | Phase Code | Title | |||||
| Date Printed : | Project # | A | Feasibility Study | ||||
| CDC/BFO | Expiration Date: | Phase: | B | Scope & Estimate | |||
| P2011-000 PROPOSAL | C | Schematic Design | |||||
| Proj. Officer: | D | Design Development | |||||
| checked by: | E | 90% Final Design | |||||
| TOTAL | F | 100% Final Design | |||||
| CONSTRUCTION COSTS SUMMARY | COST | G | Other | ||||
| ($) |
| GENERAL CONDITIONS, Division 1 |
| General Conditions Construction Costs ............................................................................ |
| CIVIL/ STRUCTURAL, Divisions 2 & 3 |
| Civil/ Structural Construction Costs....(from outside , if applicable)....................................................................................................................................... |
A satisfied Microsoft Office user: Delete any "(NONE)" cell if Cost line item is used.
A satisfied Microsoft Office user: Project Officer should fill in all discipline sheet numbering. $0
| ARCHITECTURAL, Divisions 4-14 | |
| Architectural Construction Costs................................................................................................................... | $0 |
| MECHANICAL, Division 15 | ||
| Mechanical HVAC Construction Costs........................................................................................................................................................................................... | $0 | |
| Plumbing Construction Costs............................................................................................................................................................................................ | $0 | |
| Fire Protection Construction Costs................................................................................................................................................................................ | $0 | |
| Total Mechanical Construction Costs | $0 |
| $0 | |
| ELECTRICAL, Division 16 | |
| Electrical Construction Costs...................................................................................................................................................................................... | $0 |
| BUILDING AUTOMATION SYSTEM, Division 17 | |
| BAS Construction Costs...................................................................................................................................................................................... | $0 |
$0
A satisfied Microsoft Office user: Adjust factor as needed depending on historical data; review with Branch chief A satisfied Microsoft Office user: Type A for Feasibility Study B for Scope & Estimate C for Schematic Design D for Design Development E for 90% Final Design F for 100% Final Design G for Other A satisfied Microsoft Office user: Enter the respective Project officers initials
| A satisfied Microsoft Office user: General Conditions are describe in Means Div. 1. Typical (Govt.) costs of Prime Contractor is 6-10% of total. Minimum of $500. Note - Add for temporary toilets x no. of weeks needed etc.- no use of toilet facilities permitted] (More info to come) | 0% | $0 | ||
| Subtotal Construction Cost: | $0 | |||
| Bond: | $0 | |||
| GRAND TOTAL CONSTRUCTION COSTS: | $0 |