9 EXHIBIT A breakdown example.xlsx

XLSX spreadsheet 34 KB Posted

Attached to
Amendment 00002 for P2021008080 Atlanta Water Line Installation Services
Solicitation number
75D301-24-R-73077
Issued by

About this file

This document appears to be an Excel spreadsheet titled "9 EXHIBIT A breakdown example.xlsx" that provides a cost proposal form for a construction project. The form includes various construction cost categories such as general conditions, civil/structural, architectural, mechanical, electrical, and building automation systems. Each category has detailed line items with quantities, unit costs, labor hours, and total costs. The spreadsheet also includes sections for calculating sales tax, contractor overhead and profit, and the overall grand total construction cost.

The related federal contract opportunity is for a solicitation to replace the existing copper water piping system and related components in Building 110 at the CDC's Chamblee Campus. The work involves installing parallel CPVC water lines and systems, constructing a separate riser system, installing new ball valves, replacing equipment, and performing switchover to the new systems. The full scope of work is detailed in the attached Statement of Work, Specifications, and Drawings. The solicitation number is 75D301-24-R-73077 and the contracting agency is the Department of Health and Human Services Centers for Disease Control and Prevention Office of Acquisition Services.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASSEMBLY

CONSTRUCTION COST PROPOSAL FORMSub. Date:Estimate sheet of
A satisfied Microsoft Office user: Leave Sheet numbering blank for Project Officer to fill in.Phase CodeNameContingency
CONTRACTOR:Date Printed :7/11/20Project #:P2010-000AFeasibility Study30%
P2011-000 PROPOSALExpiration Date:CDC Contracting Officer:Ms. Smith
A satisfied Microsoft Office user: Use one of the following: A for Feasibility Study B for Scope & Estimate C for Schematic Design D for Design Development E for 90% Final Design F for Final Design G for Other (describe) Click 'OK' to exit and inputBScope & Estimate20%
0Estimator:CDC Project Officer:Mr. JonesCSchematic Design10%
Checked By:0DDesign Development7%
E90% Final Design2%
MQUANT.MATERIALSLABORSUB, EQUIP, OTHER (TAX, O&P INCLUDED)TOTAL COST $F100% Final Design0
TEASSEMBLY
A satisfied Microsoft Office user: Type in Discipline & Task: Architectural/ Concrete or Masonry or Finishes or etc.#Unit$ perTotalmhrs$ perTotal$ perTotalGOther
IUnitssizeunit($)/unitunit
A satisfied Microsoft Office user: $ per unit may be changed to $ per manhour (mh) and use column 'F' for mh/ unit. Total Labor (col. 'H') must then multiply columns 'B' * 'F' * 'G'.($)unit
A satisfied Microsoft Office user: $ per unit may be changed to $ per manhour (mh) and use column 'F' for mh/ unit. Total Labor (col. 'H') must then multiply columns 'B' * 'F' * 'G'.($)
$0
1GENERAL CONDITIONS
2Dumpster3mo00200.00600$600
3Telphone3mo35105$105
4Supervision3mo1,200.003,600.00$3,600
5GENERAL CONDITIONS TOTALS$0$3,600$705$4,305
6CIVIL

A satisfied Microsoft Office user: Add or Remove 50 Rows between row 10 & Subtotal for each extra page. - If adding rows, copy formulas for columns A, F-L into new rows.

A satisfied Microsoft Office user: $ per unit may be changed to $ per manhour (mh) and use column 'F' for mh/ unit. Total Labor (col. 'H') must then multiply columns 'B' * 'F' * 'G'.71.5" 9MM Asphalt Surface Course with Hydrated Lime4000sy7.1928,750$28,750
88" Ductile Iron Pipe w/ fittings30lf40.001,2001230.00360$1,560
98" Ductile Iron Pipe (Compactor)10hr1016.0016025250$410
108" Ductile Iron Pipe (Backhoe)5hr0522.0011035175$285
11CIVIL TOTALS$1,200$630$30,585$31,005
12
13ARCHITECTURAL00$0
14Wood Casework, frames, base cabinets, counter storage 24x3630ea0021028,750$28,750
15Wood Columns, hemlock, tapered, T&G 20" Diam 14' High100ea185.0018,5005025.001,250$19,750
16Scaffolding Rental (per week)6ea0628.0016825150$318
17
18ARCHITECTURAL TOTALS$18,500$1,418$28,900$48,818
1900$0
20MECHANICAL00$0
21Demolition: Boiler Gar fired 200 MBH1ea100.001004050.002,000$2,100
22Pipe hanger, support , split ring, malleable iron, for non insulated100ea12.681,2680.2516.001,600$2,868
23Central station air handling unit, packaged indoor , variable air Volume, 30,00 CFM2ea100,000200,00020360.0012,200$212,200
24Crane1day830.00240850.00850$1,090
25Fire Dampers 12X123ea32.0096345.00135$231
261" Pipe100lf3.003001004.00400$700
27Demolition of Ductwork4hr0445.00180$180
28Motor Sheaves2ea700.00$1,400345.00$90$1,490
29
30MECHANICAL TOTALS$203,164$16,040$850$220,859
3100$0
32ELECTRICAL00$0
33400 AMP electrical panel2ea300.00600344.0088$688
343/4" EMT600lf1.50900121.00600$1,500
353/4" EMT couplings54ea1.236670.4524$91
36Crane1day830.00240850.00850$1,090
37Small tools1ea
38ELECTRICAL TOTALS$1,566$952$850$3,369
39
40BAS/CONTROLS000
41Controller2ea350.007001056.001,120$1,820
42Cable400lf0.251000.6430.0000$100
433/4" EMT600lf1.50900121.00600$1,500
44Electrician46hrs029.501,357$1,357
45BAS/CONTROLS TOTALS$1,700$1,720$1,357$4,777
46000
47FIXTURES FURNISHINGS AND EQUIPMENT000$0
48Carpet100syGov Furnished1008.630.1010$10
49Modular office set2ea3,600.007,20000$7,200
50Guest Chair6ea150.00900$900
51Interior Design Services10hrs35.00350$350
52Labor-Deliver and install40hrs29.501,180$1,180
53FIXTURES FURNISHINGS AND EQUIPMENT TOTALS$8,100$1,530$10$9,640
5400$0
55DIRECT CONSTRUCTION COST

A satisfied Microsoft Office user: Type in Discipline & Task: Architectural/ Concrete or Masonry or Finishes or etc.

A satisfied Microsoft Office user: Leave Sheet numbering blank for Project Officer to fill in.

A satisfied Microsoft Office user: Type in Discipline & Task: Architectural/ Concrete or Masonry or Finishes or etc.Material:$234,230Labor:$25,890Other:$63,257$322,773605
56
57MATERIALS SALES TAX%
58subtotal
59PRIME CONTRACTOR LABOR, FICA & OTHER%
60subtotal
61PRIME CONTRACTOR OVERHEAD0%

A satisfied Microsoft Office user: Typically 10% OH&P for Prime with Subs. If one, general service contactor is expected, using NO SUBS, Sub OH&P should be 0 and prime OH&P should increase to 21%.

A satisfied Microsoft Office user: Use one of the following: A for Feasibility Study B for Scope & Estimate C for Schematic Design D for Design Development E for 90% Final Design F for Final Design G for Other (describe) Click 'OK' to exit and input%
62subtotal
63PRIME CONTRACTOR PROFIT%
64subtotal
65BOND%
66subtotal
67GRAND TOTAL COST

A satisfied Microsoft Office user: Type in Discipline & Task: Architectural/ Concrete or Masonry or Finishes or etc.

A satisfied Microsoft Office user: $ per unit may be changed to $ per manhour (mh) and use column 'F' for mh/ unit. Total Labor (col. 'H') must then multiply columns 'B' * 'F' * 'G'.

EXHIBIT "A"

BREAKDOWN EXAMPLE

SUMMARY.XLE

PROJECT COST PROPOSALSubmittal DateGovernment Estimate Sheet 1 of 1
A satisfied Microsoft Office user: Project Officer should fill in all discipline sheet numbering.Phase CodeTitle
Date Printed :Project #AFeasibility Study
CDC/BFOExpiration Date:Phase:BScope & Estimate
P2011-000 PROPOSALCSchematic Design
Proj. Officer:DDesign Development
checked by:E90% Final Design
TOTALF100% Final Design
CONSTRUCTION COSTS SUMMARYCOSTGOther
($)
GENERAL CONDITIONS, Division 1
General Conditions Construction Costs ............................................................................
CIVIL/ STRUCTURAL, Divisions 2 & 3
Civil/ Structural Construction Costs....(from outside , if applicable).......................................................................................................................................

A satisfied Microsoft Office user: Delete any "(NONE)" cell if Cost line item is used.

A satisfied Microsoft Office user: Project Officer should fill in all discipline sheet numbering. $0

ARCHITECTURAL, Divisions 4-14
Architectural Construction Costs...................................................................................................................$0
MECHANICAL, Division 15
Mechanical HVAC Construction Costs...........................................................................................................................................................................................$0
Plumbing Construction Costs............................................................................................................................................................................................$0
Fire Protection Construction Costs................................................................................................................................................................................$0
Total Mechanical Construction Costs$0
$0
ELECTRICAL, Division 16
Electrical Construction Costs......................................................................................................................................................................................$0
BUILDING AUTOMATION SYSTEM, Division 17
BAS Construction Costs......................................................................................................................................................................................$0

$0

A satisfied Microsoft Office user: Adjust factor as needed depending on historical data; review with Branch chief A satisfied Microsoft Office user: Type A for Feasibility Study B for Scope & Estimate C for Schematic Design D for Design Development E for 90% Final Design F for 100% Final Design G for Other A satisfied Microsoft Office user: Enter the respective Project officers initials

A satisfied Microsoft Office user: General Conditions are describe in Means Div. 1. Typical (Govt.) costs of Prime Contractor is 6-10% of total. Minimum of $500. Note - Add for temporary toilets x no. of weeks needed etc.- no use of toilet facilities permitted] (More info to come)0%$0
Subtotal Construction Cost:$0
Bond:$0
GRAND TOTAL CONSTRUCTION COSTS:$0

P:\project number\SPRDSHT\&F

File details come from the government source that posted it. Updated .