Siding at FSD ATCT (Sioux Falls, S. D. )
Closed Solicitation Posted
- Solicitation number
- 697DCK-25-R-00245
- Agency
-
Southwestern Region
Federal Aviation Administration, Department of Transportation
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238170 Siding Contractors
- PSC
- Z1AA Maintenance Of Office Buildings
- Place of performance
- Sioux Falls, South Dakota 57104, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Federal Aviation Administration (FAA) Southwestern Region is seeking a small business contractor to perform comprehensive renovation work on the Air Traffic Control Tower (ATCT) at the Sioux Falls Regional Airport in South Dakota. The project involves replacing the Tower Cab walkway roofing systems, removing existing vinyl siding, updating utilities and HVAC components, installing insulated metal panel siding, and replacing windows with new double-pane casement windows. Contractors will be evaluated based on technical capabilities, past performance, and ability to meet specific renovation specifications. The solicitation requires a mandatory site visit, with questions due by May 13, 2025, and the Request for Proposal (RFP) due by June 4, 2025. Evaluation criteria will focus on the contractor's ability to meet technical requirements, demonstrate quality of work, adhere to project schedules, and provide cost-effective solutions.
The contract is set aside exclusively for small businesses with a size standard of $19.0 million under NAICS code 238170 for Siding Contractors. The estimated project value ranges between $500,000 and $1,000,000, with a performance period from July 8, 2025, to December 19, 2025. Contractors must provide performance and payment bonds and comply with Davis-Bacon wage requirements, which specify prevailing wage rates for various construction trades. The place of performance is located in Sioux Falls, South Dakota 57104, with work to be conducted primarily during non-operational hours to minimize disruption to air traffic control operations. The project requires careful coordination with FAA personnel, submission of necessary documentation such as FAA Form 7460-1 for crane usage, and ensuring critical air traffic control systems remain uninterrupted throughout the renovation process.
Notice text
4 versions
Update #4 · Latest ·
Amendment 0003
Provide answers to the Questions and Answers (Q&A).
Extend the RFP due date to 06/04/25.
Amendment 0002
Definitize Questions and Answers (Q&A) due date
Amendment 0001
Establish the site visit date of 04/29/25 at 9:00am CST/local time.
The scope of works includes, but is not limited to:
1.) Replace Tower Cab walkway roofing systems
2.) Removel all vinyl siding
3.) Remove and replace all utilities and HVAC appurtenances on the exterior of the Tower
4.) Install insulated metal panel siding and new openings
5.) Replace windows on the Tower with new double pane casement windows
6.) Reinstall flashing at the Link built up roof
7.) Refinish and reinstall the Tower Cab walkway level louvers
8.) Finish work around windows in building interior
Update #3 ·
Amendment 0002
Definitize Questions and Answers (Q&A) due date
Amendment 0001
Establish the site visit date of 04/29/25 at 9:00am CST/local time.
The scope of works includes, but is not limited to:
1.) Replace Tower Cab walkway roofing systems
2.) Removel all vinyl siding
3.) Remove and replace all utilities and HVAC appurtenances on the exterior of the Tower
4.) Install insulated metal panel siding and new openings
5.) Replace windows on the Tower with new double pane casement windows
6.) Reinstall flashing at the Link built up roof
7.) Refinish and reinstall the Tower Cab walkway level louvers
8.) Finish work around windows in building interior
Update #2 ·
Amendment 0001
Establish the site visit date of 04/29/25 at 9:00am CST/local time.
The scope of works includes, but is not limited to:
1.) Replace Tower Cab walkway roofing systems
2.) Removel all vinyl siding
3.) Remove and replace all utilities and HVAC appurtenances on the exterior of the Tower
4.) Install insulated metal panel siding and new openings
5.) Replace windows on the Tower with new double pane casement windows
6.) Reinstall flashing at the Link built up roof
7.) Refinish and reinstall the Tower Cab walkway level louvers
8.) Finish work around windows in building interior
Update #1 ·
The scope of works includes, but is not limited to:
1.) Replace Tower Cab walkway roofing systems
2.) Removel all vinyl siding
3.) Remove and replace all utilities and HVAC appurtenances on the exterior of the Tower
4.) Install insulated metal panel siding and new openings
5.) Replace windows on the Tower with new double pane casement windows
6.) Reinstall flashing at the Link built up roof
7.) Refinish and reinstall the Tower Cab walkway level louvers
8.) Finish work around windows in building interior
Files
Show all 17
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| PN: 438-21-403, Renovate First Floor Kitchen (SF) | Veterans Integrated Service Network 23 | Service-Disabled Veteran-Owned Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity