00 01 10_Table of Contents _ Rev 02 _ 05122025.pdf

PDF 99 KB Posted

Attached to
Siding at FSD ATCT (Sioux Falls, S. D. )
Solicitation number
697DCK-25-R-00245
Issued by

About this file

This document is a Table of Contents for the Federal Aviation Administration's Sioux Falls Air Traffic Control Tower construction project, dated May 12, 2025. The comprehensive table of contents spans multiple divisions including Procurement and Contracting Requirements, General Requirements, Existing Conditions, Wood/Plastics/Composites, Thermal and Moisture Protection, Openings, Finishes, Plumbing, Heating/Ventilating/Air Conditioning, and Electrical systems. Key technical sections cover construction documentation, safety procedures, project administration, quality requirements, demolition, carpentry, waterproofing, metal wall panels, window installations, electrical systems, and exterior lighting. The document provides a detailed organizational framework for the technical specifications and requirements for the air traffic control tower renovation project, indicating a comprehensive and structured approach to the facility upgrade.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FEDERAL AVIATION ADMINISTRATION Revised May 12, 2025 Sioux Falls Air Traffic Control Tower

TABLE OF CONTENTS 00 01 10 - 1

DOCUMENT 00 01 10 – TABLE OF CONTENTS

DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 10 SUMMARY

DIVISION 01 - GENERAL REQUIREMENTS

01 32 10 CONSTRUCTION PROGRESS DOCUMENTATION

01 33 00 SUBMITTAL PROCEDURES

01 35 29 HEALTH, SAFETY AND EMERGENCY RESPONSE PROCEDURES

Attachment-FAA Pre-Construction and Maintenance Project Safety and Health Checklist.

01 77 00 CLOSEOUT PROCEDURES

01 78 23 OPERATION AND MAINTENANCE DATA

01 81 09 TESTING FOR INDOOR AIR QUALITY

01 00 00 GENERAL

01 10 12 CONSTRUCTION ADMINISTRATION FORMS

01 31 19 PROJECT MEETINGS

01 40 00 QUALITY REQUIREMENTS

01 50 00 TEMPORARY FACILITIES AND CONTROLS

01 71 33.10 PROTECTION OF WORK AND PROPERTY

01 74 13 CONSTRUCTION CLEANING

01 74 23 FINAL CLEANING

01 78 36 WARRANTIES AND GUARANTEES

01 78 39 PROJECT RECORD DOCUMETS

DIVISION 02 - EXISTING CONDITIONS

02 41 19 SELECTIVE DEMOLITION

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 16 00 SHEATHING

06 40 23 INTERIOR ARCHITECTURAL WOODWORK

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 13 53 ELASTOMERIC SHEET WATERPROOFING

07 42 13 METAL WALL PANELS

TABLE OF CONTENTS 00 01 10 - 2

07 42 13.19 INSULATED MEETAL WALL PANELS

07 62 00 SHEET METAL FLASHING AND TRIM

07 84 13 PENETRATION FIRESTOPPING

07 95 00 EXPANSION CONTROL

DIVISION 08 - OPENINGS

08 11 13 HOLLOW METAL DOORS AND FRAMES

08 31 13 ACCESS DOORS AND FRAMES

08 51 13 ALUMINUM WINDOWS

08 51 50 ATCT CAB WINDOW FRAMING

08 56 53 BLAST RESISTANT TEMPERED GLASS WINDOWS

08 71 00 DOOR HARDWARE08 91 19 FIXED LOUVERS

DIVISION 09 - FINISHES

09 91 00 PAINTING

09 94 13 TEXTURE FINISHING

DIVISION 22 - PLUMBING

22 05 00 COMMON WORK RESULTS FOR PLUMBING

22 31 13 METAL DUCTS

DIVISION 23 - HEATING VENTILATING AND AIR CONDITIONING

23 33 00 AIR DUCT ACCESSORIES

DIVISION 26 - ELECTRICAL

26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

26 05 33 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS

26 27 26 WIRING DEVICES

26 56 00 EXTERIOR LIGHTING

TABLE OF CONTENTS 00 01 10 - 3

END OF SECTION 00 01 10

File details come from the government source that posted it. Updated .