This document is a technical specification for Thermoplastic-Polyolefin (TPO) Roofing installation at the Sioux Falls Air Traffic Control Tower, issued by the Federal Aviation Administration on May 12, 2025. The specification details comprehensive requirements for a roofing system, including 60-mil white TPO roofing membrane, vapor retarder, roof insulation, electronic leak-detection materials, and associated accessories. Key installation requirements include precise membrane alignment, adhering and mechanically fastening the roofing system, flashing penetrations, and ensuring watertight installation.
The document provides extensive technical guidance for roofing installation, including pre-installation meetings, submittal requirements, quality assurance standards, and a 20-year manufacturer's warranty. Critical installation specifications include side and end lap dimensions, bonding adhesive application, mechanical fastening at terminations and perimeters, and detailed flashing procedures. The specification mandates that all roofing system components must be obtained from the roofing membrane manufacturer and installed in strict accordance with manufacturer's written instructions to maintain warranty coverage.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEDERAL AVIATION ADMINISTRATION Issued May 12, 2025
Sioux Falls Air Traffic Control Tower
THERMOPLASTIC-POLYOLEFIN (TPO) ROOFING 07 54 23 - 1
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Thermoplastic polyolefin (TPO) roofing system.
2. Accessory roofing system materials.
3. Substrate board.
4. Vapor retarder.
5. Roof insulation and accessories.
6. Cover board..
7. Electronic leak-detection (ELD) materials.
8. Ballast.
9. Walkways.
B. Section contains the installation of sound-absorbing insulation strips in ribs of acoustical steel roof deck. Sound-absorbing insulation strips are furnished under Section 053100 "Steel Decking."
C. Related Requirements:
1. Section 061000 "Rough Carpentry" for wood nailers, curbs, and blocking; and for wood-based, structural-use roof deck panels.
2. Section 079200 "Joint Sealants" for joint sealants, joint fillers, and joint preparation.
1.2 DEFINITIONS
A. Roofing Terminology: Definitions in ASTM D1079 and glossary in NRCA's " Roofing Manual:
Membrane Roof Systems" apply to Work of this Section.
1.3 PREINSTALLATION MEETINGS
A. Preliminary & Pre-Installation Roofing Conference: Before starting roof deck construction, conduct conference at ATCT Project Site Location.
1. Invite for meeting the Owner (FAA), Contractor’s testing and inspecting agency representative, Roofing System Installer, roofing system manufacturer's representative, deck Installer, air barrier Installer, and installers whose work interfaces with or affects roofing, including installers of roof accessories and roof-mounted equipment, or others as needed.
2. Review methods and procedures related to roofing installation, including manufacturer's written instructions.
3. Review and finalize construction schedule, and verify availability of materials, Installer's personnel, equipment, and facilities needed to make progress and avoid delays.
4. Review deck substrate requirements for conditions and finishes, including flatness and fastening.
THERMOPLASTIC-POLYOLEFIN (TPO) ROOFING 07 54 23 - 2
5. Review structural loading limitations of roof deck during and after roofing.
6. Review base flashings, special roofing details, roof drainage, roof penetrations, equipment curbs, and condition of other construction that affects roofing system.
7. Review governing regulations and requirements for insurance and certificates if applicable.
8. Review temporary protection requirements for roofing system during and after installation.
9. Review roof observation and repair procedures after roofing installation.
1.4 ACTION SUBMITTALS
A. Product Data: For each type of approved product.
B. Shop Drawings: Include roof plans, sections, details, and attachments to other work, including the following:
1. Layout and thickness of insulation.
2. Base and sheet flashings and membrane termination details.
3. Flashing details at penetrations.
4. Tapered insulation layout, thickness, and slopes.
5. Roof plan showing orientation of roof deck and orientation of roofing membrane, fastening spacings, and pattern for corner, perimeter, and field-of-roof locations.
6. Insulation fastening patterns for corner, perimeter, and field-of-roof locations.
7. Crickets, saddles, and tapered edge strips, including slopes.
8. Tie-in with adjoining wall system air barrier.
C. Samples for Verification: For the following products:
1. Roofing membrane and flashings, of color required.
2. Walkways, of color required.
D. Wind-Uplift-Resistance Submittal: For roofing system indicating compliance with wind-uplift performance requirements.
1.5 INFORMATIONAL SUBMITTALS
A. Manufacturer Certificates:
1. Performance Requirement Certificate: Signed by roofing membrane manufacturer, certifying that roofing system complies with requirements specified in "Performance
Requirements" Article.
a. Submit evidence of compliance with specified performance requirements.
2. Special Warranty Certificate: Signed by roofing membrane manufacturer, certifying that all materials supplied under this Section are acceptable for special warranty.
B. Product Test Reports: For roofing membrane and insulation, tests performed by an independent qualified testing agency indicating compliance with specified requirements.
C. Field Test Reports:
THERMOPLASTIC-POLYOLEFIN (TPO) ROOFING 07 54 23 - 3
1. Concrete internal relative humidity test reports.
2. Fastener-pullout test results and manufacturer's revised requirements for fastener patterns.
D. Field quality-control reports.
E. Qualification Data: For roofing system, identify Installer, Manufacturer and independent testing agency.
F. Sample warranties.
1.6 CLOSEOUT SUBMITTALS
A. Maintenance Data: For roofing system.
B. Certified statement from existing roofing system manufacturer stating that existing roof warranty has not been affected by the Work performed under this Section.
1.7 QUALITY ASSURANCE
A. Manufacturer Qualifications: A qualified manufacturer for roofing system identical to that used for this Project.
B. Installer Qualifications: A qualified firm that is approved, authorized, certified, or licensed by roofing system manufacturer to install manufacturer's product and that is eligible to receive manufacturer's special warranty.
1.8 DELIVERY, STORAGE, AND HANDLING
A. Deliver roofing system materials to Project site in original containers with seals unbroken and labeled with manufacturer's name, product brand name and type, date of manufacture, approval or listing agency markings, and directions for storing and mixing with other components.
B. Store liquid materials in their original undamaged containers in a clean, dry, protected location and within the temperature range required by roofing system manufacturer.
1. Protect stored liquid material from direct sunlight.
2. Discard and legally dispose of liquid material that cannot be applied within its stated shelf life.
C. Protect roof insulation materials from physical damage and from deterioration by sunlight, moisture, soiling, and other sources.
1. Store in a dry location.
2. Comply with insulation manufacturer's written instructions for handling, storing, and protecting during installation.
D. Handle and store roofing system materials, and place equipment in a manner to avoid permanent deflection of deck.
THERMOPLASTIC-POLYOLEFIN (TPO) ROOFING 07 54 23 - 4
1.9 FIELD CONDITIONS
A. Weather Limitations: Proceed with installation only when existing and forecasted weather conditions permit roofing system to be installed in accordance with manufacturer's written installation instructions and warranty requirements.
1.10 WARRANTY
A. Special Warranty: Manufacturer agrees to repair or replace components of roofing system that fail in materials or workmanship within specified warranty period.
1. Special warranty to include all components of roofing system, such as substrate board, vapor retarder, roof insulation, fasteners, adhesives, cover board, roofing membrane, base flashing sheet, ballast, walkways, and other components of roofing system.
2. Warranty Period: 20 years from date of Substantial Completion.
1.11 SOURCE LIMITATIONS
A. Obtain components for roofing system from roofing membrane manufacturer.
1.12 PERFORMANCE REQUIREMENTS
A. General Performance: Installed roofing system and flashings to withstand specified uplift pressures, thermally induced movement, and exposure to weather without failure due to defective manufacture, fabrication, installation, or other defects in construction. Roofing system and flashings to remain watertight.
1. Accelerated Weathering: Roofing membrane to withstand 2000 hours of exposure when tested in accordance with ASTM G152, ASTM G154, or ASTM G155.
2. Impact Resistance: Roofing membrane to resist impact damage when tested in accordance with ASTM D3746/D3746M, ASTM D4272/D4272M, or the Resistance to Foot Traffic
Test in FM Approvals 4470.
B. Material Compatibility: Roofing system materials to be compatible with one another and adjacent materials under conditions of service and application required, as demonstrated by roofing membrane manufacturer based on testing and field experience.
1.13 THERMOPLASTIC POLYOLEFIN (TPO) ROOFING SYSTEM
A. TPO Roofing Membrane Sheet: ASTM D6878/D6878M, internally fabric- or scrim-reinforced, fabric-backed or self-adhering TPO sheet.
1. Contractor to to select in-kind product for replacement.
2. Thickness: 60 mil (1.5 mm), nominal.
3. Exposed Face Color: White.
http://www.specagent.com/LookUp/?ulid=5109&mf=&src=wd
THERMOPLASTIC-POLYOLEFIN (TPO) ROOFING 07 54 23 - 5
1.14 ACCESSORY ROOFING SYSTEM MATERIALS
A. General: Accessory materials as recommended in writing by roofing membrane manufacturer for intended use and compatible with other roofing system components.
1. Adhesive and Sealants: Comply with VOC limits of authorities having jurisdiction.
B. Base and Sheet Flashings: Manufacturer's standard sheet flashing of same material, type, reinforcement, thickness, and color as roofing membrane.
C. Prefabricated Pipe Flashings: As recommended in writing by roofing membrane manufacturer.
D. Roof Vents: As recommended in writing by roofing membrane manufacturer.
1. Size: Not less than 4-inch (100-mm) diameter.
E. Bonding Adhesive: Roofing membrane manufacturer's standard[, water based].
F. Slip Sheet: ASTM D2178/D2178M, Type IV; glass fiber; asphalt-impregnated felt
Manufacturer's standard, of thickness required for application.
G. Fasteners: Factory-coated steel fasteners and metal or plastic plates complying with corrosion-resistance provisions in FM Approvals 4470, designed for fastening roofing system components to substrate; tested for required pullout strength, and acceptable to roofing membrane manufacturer.
H. Safety Accessories: Roofing membrane manufacturer's standard yellow seaming tape for designating safety perimeters and rooftop hazards.
I. Miscellaneous Accessories: As recommended in writing by roofing membrane manufacturer.
1.15 VAPOR RETARDER
A. Rubberized-Asphalt-Sheet Vapor Retarder, Self-Adhering: ASTM D1970/D1970M, polyethylene film laminated to layer of rubberized asphalt adhesive, minimum 40-mil (1.0-mm) total thickness;
maximum permeance rating of 0.1 perm (6 ng/Pa x s x sq. m); cold applied, with slip-resisting surface and release paper backing. Provide primer when recommended by vapor retarder manufacturer.
1.16 ROOF INSULATION AND ACCESSORIES
A. General: Preformed roof insulation boards manufactured or approved by roofing membrane manufacturer, approved for use in similar roof assemblies.
1.17 ELECTRONIC LEAK-DETECTION (ELD) MATERIALS
A. Conductive Medium: Electrically conductive material specifically designed to enable ELD testing procedures as approved in writing by roofing membrane manufacturer.
THERMOPLASTIC-POLYOLEFIN (TPO) ROOFING 07 54 23 - 6
1. Conductive medium to be located directly under roofing membrane in accordance with
ASTM D7877 and ASTM D8231.
B. Moisture-Monitoring System: Permanently embedded, continuously monitored moisture-detection system.
1. Sensors measuring moisture content to be placed within roofing system and connected to a monitoring program, with a notification indicating location of breach.
PART 2 - EXECUTION
2.1 EXAMINATION
A. Examine substrates, areas, and conditions, with Roofing System Installer present, for compliance with requirements and other conditions affecting performance of the Work.
1. Verify that roof openings and penetrations are in place, curbs are set and braced, and roof-drain bodies are securely clamped in place.
2. Verify that wood blocking, curbs, and nailers are securely anchored to roof deck at penetrations and terminations and that nailers match thicknesses of insulation.
3. Verify that deck is securely fastened with no projecting fasteners and with no adjacent units in excess of 1/16 inch (1.6 mm) out of plane relative to adjoining deck.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
2.2 PREPARATION
A. Clean substrate of dust, debris, moisture, and other substances detrimental to roofing system installation in accordance with roofing system manufacturer's written instructions. Remove sharp projections.
B. Prevent materials from entering and clogging roof drains and conductors and from spilling or migrating onto surfaces of other construction. Remove roof-drain plugs when no work is taking place or when rain is forecast.
C. Prime surface of concrete deck with primer in accordance with roofing system manufacturer's written installation instructions and allow primer to dry.
D. Perform fastener-pullout tests in accordance with roofing system manufacturer's written instructions.
1. Submit test result within 24 hours after performing tests.
a. Include manufacturer's requirements for any revision to previously submitted fastener patterns required to achieve specified wind uplift requirements.
THERMOPLASTIC-POLYOLEFIN (TPO) ROOFING 07 54 23 - 7
2.3 INSTALLATION OF THERMOPLASTIC-POLYOLEFIN (TPO) ROOFING SYSTEM,
GENERAL
A. Install roofing system materials and components in accordance with roofing system manufacturer's written installation instructions.
B. Complete terminations and base flashings and provide temporary seals to prevent water from entering completed sections of roofing system at end of workday or when rain is forecast. Remove and discard temporary seals before beginning Work on adjoining roofing.
2.4 INSTALLATION OF VAPOR RETARDER
A. Install vapor retarder in a single layer over roof area in accordance with manufacturer's written installation instructions, side and end lapping each sheet a minimum of 2 and 6 inches
(50 and 150 mm), respectively.
1. Extend vertically up parapet walls and projections to a minimum height equal to height of insulation and cover board.
2. Continuously seal side and end laps with tape.
B. Completely seal vapor retarder at terminations, obstructions, and penetrations to prevent air movement into roofing system.
2.5 INSTALLATION OF ROOF INSULATION AND ACCESSORIES
A. Coordinate installation of roofing system components so insulation is not exposed to precipitation or left exposed at end of workday.
B. Comply with roofing system and insulation manufacturer's written installation instructions. Install minimum of two layers of insulation under area of roofing to achieve required thickness.
2.6 INSTALLATION OF ELECTRONIC LEAK-DETECTION (ELD) MATERIALS
A. Install conductive medium directly under roofing membrane in accordance with ASTM D7877 and
ASTM D8231.
B. Install sensors, connections, and accessory items required for complete continuously monitored moisture-detection system in accordance with manufacturer's written installation instructions.
2.7 INSTALLATION OF TPO ROOFING MEMBRANE
A. Install roofing membrane over roof area for application method in accordance with roofing system manufacturer's written installation instructions.
B. Unroll roofing membrane and allow it to relax before installing.
C. Start installation in presence of FAA/COR.
THERMOPLASTIC-POLYOLEFIN (TPO) ROOFING 07 54 23 - 8
D. Accurately align roofing membrane and maintain uniform side and end laps of minimum dimensions required by manufacturer. Stagger end laps. Apply roofing membrane with side laps shingled with slope of roof deck where possible.
E. Adhered Application: Apply bonding adhesive to substrate and underside of roofing membrane at rate required by manufacturer and allow to partially dry before installing roofing membrane. Do not apply to splice area of roofing membrane.
1. In addition to adhering, mechanically fasten roofing membrane securely at terminations, penetrations, and perimeter of roof area.
F. Mechanically Attached Application: Secure roofing membrane over area to receive roofing in accordance with roofing system manufacturer's written installation instructions.
1. Mechanically fasten or adhere roof membrane securely at terminations, penetrations, and perimeter of roofing.
2. Induction-Weld Attachment: Secure roofing membrane to plates creating 100 percent bond between underside of membrane and top of plates; a partial bond is unacceptable. Test welds to verify adhesion of roofing membrane to top of plates in accordance with manufacturer's instructions.
2.8 INSTALLATION OF BASE AND SHEET FLASHINGS
A. General: Install and adhere base and sheet flashing and preformed flashing accessories to substrates in accordance with roofing system manufacturer's written installation instructions.
B. Apply bonding adhesive to substrate and underside of flashings at required rate and allow to partially dry. Do not apply to seam area of flashing.
C. Flash penetrations and field-formed inside and outside corners.
D. Clean seam areas, overlap, and firmly roll flashings into the adhesive. Hot-air-weld side seams and end laps to ensure a watertight installation.
E. Terminate and seal top of flashings and mechanically anchor to substrate through termination bars.
2.9 PROTECTING AND CLEANING
A. Protect roofing system from damage and wear during remainder of construction period. When remaining construction does not affect or endanger roofing system, inspect roofing system for deterioration and damage, describing its nature and extent in a written report, with copies to Architect and Owner.
B. Correct deficiencies in or remove roofing system that does not comply with requirements, repair substrates, and repair or reinstall roofing system to a condition free of damage and deterioration at time of Substantial Completion and according to warranty requirements.
THERMOPLASTIC-POLYOLEFIN (TPO) ROOFING 07 54 23 - 9
2.10 ROOFING SYSTEM INSTALLER'S WARRANTY
A. WHEREAS _______________________________ of ___________________________, herein called the "Roofing System Installer," has performed roofing and associated Work on the following
Project:
1. Owner: <Insert name of Owner>.
2. Owner Address: <Insert address>.
3. Building Name/Type: <Insert information>.
4. Building Address: <Insert address>.
5. Area of Work: <Insert information>.
6. Acceptance Date: _________________.
7. Warranty Period: [Two] [Five] <Insert number> years from date of Substantial
Completion.
8. Date of Substantial Completion: __________________.
B. AND WHEREAS Roofing System Installer has contracted (either directly with Owner or indirectly as a subcontractor) to warrant said Work against leaks and faulty or defective materials and workmanship for designated Warranty Period, C. NOW THEREFORE Roofing System Installer hereby warrants, subject to terms and conditions herein set forth, that during Warranty Period Roofing Installer will, at Roofing System Installer's own cost and expense, make or cause to be made such repairs to or replacements of said Work as are necessary to correct faulty and defective work and as are necessary to maintain said Work in a watertight condition.
D. This Warranty is made subject to the following terms and conditions:
1. Specifically excluded from this Warranty are damages to Work and other parts of the building, and to building contents, caused by:
a. lightning;
b. peak gust wind speed exceeding 60 mph
c. fire;
d. failure of roofing system substrate, including cracking, settlement, excessive deflection, deterioration, and decomposition;
e. faulty construction of parapet walls, copings, chimneys, skylights, vents, equipment supports, and other edge conditions and penetrations of the Work;
f. vapor condensation on bottom of roofing; and
g. activity on roofing by others, including construction contractors, maintenance personnel, other persons, and animals, whether authorized or unauthorized by
Owner.
2. When Work has been damaged by any of foregoing causes, Warranty will be null and void until such damage has been repaired by Roofing System Installer and until cost and expense thereof have been paid by Owner or by another responsible party so designated.
3. Roofing System Installer is responsible for damage to Work covered by this Warranty but is not liable for consequential damages to building or building contents resulting from leaks or faults or defects of Work.
4. During Warranty Period, if Owner allows alteration of Work by anyone other than Roofing
System Installer, including cutting, patching, and maintenance in connection with
THERMOPLASTIC-POLYOLEFIN (TPO) ROOFING 07 54 23 - 10
penetrations, attachment of other work, and positioning of anything on roof, this Warranty will become null and void on date of said alterations, but only to the extent said alterations affect Work covered by this Warranty. If Owner engages Roofing System Installer to perform said alterations, Warranty will not become null and void unless Roofing System
Installer, before starting said Work, will have notified Owner in writing, showing reasonable cause for claim, that said alterations would likely damage or deteriorate Work, thereby reasonably justifying a limitation or termination of this Warranty.
5. During Warranty Period, if original use of roof is changed and it becomes used for, but was not originally specified for, a promenade, work deck, spray-cooled surface, flooded basin, or other use or service more severe than originally specified, this Warranty will become null and void on date of said change, but only to the extent said change affects Work covered by this Warranty.
6. Owner will promptly notify Roofing System Installer of observed, known, or suspected leaks, defects, or deterioration and afford reasonable opportunity for Roofing System
Installer to inspect Work and to examine evidence of such leaks, defects, or deterioration.
7. This Warranty is recognized to be the only warranty of Roofing System Installer on said
Work and will not operate to restrict or cut off Owner from other remedies and resources lawfully available to Owner in cases of roofing failure. Specifically, this Warranty will not operate to relieve Roofing System Installer of responsibility for performance of original
Work in accordance with requirements of the Contract Documents, regardless of whether
Contract was a contract directly with Owner or a subcontract with Owner's General
Contractor.
E. IN WITNESS THEREOF, this instrument has been duly executed this ___________ day of
1. Authorized Signature: _______________________________________.
2. Name: ______________________________________.
3. Title: _______________________________________.
END OF SECTION 07 54 23