Replace Roofing Staff Housing - FCI Safford
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 15B60924Q00000008
- Agency
-
Bureau of Prisons
Department of Justice
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 238160 Roofing Contractors
- PSC
- 5650 Roofing And Siding Materials
- Place of performance
- Safford, Arizona 85546, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Justice's Bureau of Prisons is seeking a contractor to replace the roofing on the staff housing complex at the Federal Correctional Institution (FCI) in Safford, Arizona. The contractor will be responsible for removing and replacing the existing flat roof section with a new sloped roof, as well as removing and replacing the pitched truss roof section. Key requirements include installing new synthetic underlayment, fascia, soffit, shingles, drip edge, and rain gutters, while also caulking, priming, and painting all new components. Construction must be performed while the housing remains occupied, and the contractor must take measures to protect the housing areas from weather and minimize disruption to the staff.
The solicitation is unrestricted, and there are no set-aside designations. The magnitude of the project is between $100,000 and $250,000. The work must be completed at the FCI Safford facility located in Safford, Arizona. The solicitation closing date has been extended to August 5, 2024, and a site visit is scheduled for July 16, 2024.
Notice text
1. FLAT ROOF SECTION: The contractor shall be responsible for the removal and haul away of the existing flat rolled roofing, roof decking, fascia, shingle mold, drip edge, and rain gutters on the flat section located on the back of the staff housing complex. A new conventional framed sloped roof will need to be constructed to have a slope equal to or greater than 3:12 pitch to meet shingle manufactures specifications. The existing rafters will not be removed but the new rafters attached to the existing with any alterations that may be required. The rafters will need to be long enough to make the new soffit 16 inches past the exterior wall. This new section of constructed roof will be required to have ½ plywood decking or OSB with plywood clips and required fasteners. The contractor will be required to install new synthetic underlayment, sub fascia (traditional lumber), fascia (5/4” LP Smartside engineered wood trim), soffit (LP Smartside plywood panels), shingle mold (1x2 pine), metal drip edge (2”x2”), 30yr Owens Corning asphalt architectural shingles (sierra gray in color), roof jacks, flashings, and rain gutters.
2. PITCHED TRUSS SECTION: The Contractor shall be responsible for the removal and haul away of the existing asphalt shingles, felt(underlayment), shingle mold, metal drip edge, rain gutters, flashings, soffit, fascia, and roof jacks on the entire trussed staff housing complex. A row of sheeting will need to be removed to extend truss tails or install outriggers to make the new soffit overhang 16 inches past the exterior wall. Once that has been removed the contractor will be required to install new synthetic underlayment, sub fascia (traditional lumber), fascia (5/4” LP Smartside engineered wood trim), soffit (LP Smartside plywood panels), shingle mold (1x2 pine), metal drip edge (2”x2”), 30yr Owens Corning asphalt architectural shingles (sierra gray in color), roof jacks, flashings, and rain gutters.
3. Housing will be occupied during construction. All construction activities must be conducted so that housing areas are protected from weather, and that staff living there are minimally impacted by construction.
4. The contractor shall be responsible for caulking, filling holes, priming, and painting all fascia, soffit, and drip edge on the staff housing complex.
5. Required sealant around all penetrations before roof is complete.
Files
Show all 11
Notice history
| Notice | Type | Posted |
|---|---|---|
| Replace Roofing Staff Housing - FCI Safford | Award Notice | |
| This notice | Solicitation | |
| Replace Roofing Staff Housing - FCI Safford | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| 26Z1AY6_Replace Roofing_FCC Butner | BOP Field Acquisition Office | No set-aside | |
| GAOA Remove and Replace Roofing on Island Park Admin Site Housing Units | Forest Service | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity