Replace Radio Tower and Concrete Foundation - Lake
Closed Solicitation Posted
- Solicitation number
- 140P8125B0006
- Agency
-
Pacific West Region
National Park Service, Department of the Interior
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Interior National Park Service Pacific West Region is seeking contractors to replace communications infrastructure at Mount Perkins in Lake Mead National Recreation Area, Arizona. The project involves removing an existing 20-foot communications tower and foundation and installing a new 40-foot self-supporting tower with new foundation, attachments, and cable bridge at the remote mountaintop site. This is an Invitation for Bid (IFB) requiring contractors to begin work within 10 calendar days of award and complete the project within 120 calendar days. Bids must be submitted electronically to PWR_MABO_LAKE_Bid@nps.gov by July 8, 2025, with electronic bid opening via Microsoft Teams. Bidders must provide bid guarantees and are expected to furnish performance and payment bonds, with evaluation based on the standard IFB lowest price technically acceptable criteria.
This procurement is designated as a small business set-aside with no current incumbent contractor identified in the documentation. The contract value is estimated between $250,000 and $500,000, with small business size standards set at $45.0 million in average annual receipts under NAICS code 237990 for Other Heavy and Civil Engineering Construction. The work must be performed at the MT Perkins Communications Site located at coordinates N35 34 11.85, W114 30 30.92, at approximately 5,500 feet elevation in Mohave County, Arizona. Due to the remote location, helicopter transport will be required for materials and equipment, and the contract period of performance runs from July 21, 2025, to December 31, 2025. The government will furnish the tower, foundation design documents, cable bridge, and associated equipment, while the contractor is responsible for transportation, installation, and proper disposal of existing infrastructure.
Notice text
4 versions
Update #4 · Latest ·
AMENDMENT #3: Answers Bidder Questions, attached.
Update #3 ·
AMENDMENT #2: Answers Bidder Questions, attached.
Update #2 ·
AMENDMENT #1: Answers Bidder Questions, attached.
Update #1 ·
Removal of the existing 20ft tall communications tower and foundation and the installation of a new tower foundation, 40ft tall self-supporting tower and attachments and cable bridge at the existing MT Perkins Communications Site at Lake Mead NRA.
Files
Show all 12
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Replace Radio Tower and Concrete Foundation - Lake Mead National Recreation Are | Pre-Solicitation | |
| Replace Radio Tower and Concrete Foundation - Lake Mead National Recreation Are | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Barillas Peak & Encino Vista Lookout Tower Restoration, Santa Fe NF | Forest Service | Total Small Business | |
| LAKE25-101-CC lift station pump repair | Pacific West Region | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity