B08_ATTACHMENT_B_MAPS_AND_PHOTOS.pdf
PDF 3 MB Posted
- Solicitation number
- 140P8125B0006
About this file
The document B08_ATTACHMENT_B_MAPS_AND_PHOTOS.pdf contains site overview images and technical documentation for a communications tower replacement project at Mount Perkins in Lake Mead National Recreation Area. The images include Google Earth aerial maps showing the site location, detailed photographs of the existing communications infrastructure, and technical documentation of current equipment.
Key visual details include a solar-powered communications tower with multiple antenna arrays situated on a rocky mountaintop with panoramic views of the surrounding desert landscape. The images document the existing cable bridge, power cable conduit, and current tower infrastructure that will be removed and replaced. Specific elements to be addressed include removing the existing 20-foot communications tower and foundation, installing a new 40-foot self-supporting tower, new foundation, attachments, and cable bridge at the existing Mount Perkins Communications Site.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lake Mead National Recreation Area
Mount Perkins Communications Tower and Cable Bridge replacement
Site overview photos
Existing cable bridge to be removed
Existing power cable conduit to re-route or encapsulate in new foundation
File details come from the government source that posted it. Updated .