About this opportunity

The U.S. Coast Guard Sector Key West seeks repair and replacement of its non-functioning CCTV camera, recording, and data transmission systems, with quotes due August 21, 2026 at 3:00 p.m. EST. This procurement is a Total Small Business Set-Aside under simplified acquisition procedures (FAR Part 13), and the solicitation number is 37140PR260000076.

Place of performance is Key West, Florida at 100 Trumbo Road, Sector Key West. Work is restricted to 8:00 a.m. to 4:00 p.m., Monday through Friday, excluding holidays; weekend access requires written Contracting Officer approval. Contractor personnel must obtain base access through NAS Boca Chica Security Office and provide names in advance.

The scope encompasses six buildings: B107 (UPH) requiring wireless bridge relocation and system upgrade; B109 (SFLC) requiring exterior surveillance expansion with multi-directional cameras and wireless components; B108 (Storage Hanger/ANT Shop) requiring antenna relocation, new server closet installation, and weatherproof rewiring; B48 (Command) requiring complete system upgrade with AI-enabled Hanwha cameras or functionally equivalent alternatives; B102 (Outdoor Gym) requiring new 180-degree CCTV coverage with wireless connectivity to B48; and IDS requiring cellular communicator installation. All cameras must be NDAA compliant. The contractor must hold current manufacturer certification as an approved installer and provide a one-year general quality warranty.

The contract is firm fixed price. Award is anticipated August 31, 2026, with work commencing no later than 10 business days after award. Evaluation uses Lowest Price, Technically Acceptable. NAICS code 561621 applies; vendors must be registered in SAM with active status prior to award. Wage determination 2015-4583 (May 13, 2026) applies. Quotes are submitted by email to angel.melendez@uscg.mil. A mandatory site visit was scheduled for August 5; questions were due August 12. Amendment 2 extended the deadline from August 17 to August 21.

Notice text

3 versions

Update #3 · Latest ·

This combined synopsis/solicitation for services prepared in accordance with the format in subpart
12.6 of the Federal Acquisition Regulation (FAR) as supplemented with additional information 
included in this notice. This synopsis/solicitation is being advertised as Small Business Set-Aside 
only. This announcement constitutes the only solicitation; no separate written solicitation will be 
issued.

The solicitation number is 37140PR260000076. Applicable North American Industry Classification 
Standard (NAICS) codes are:

NAICS
561621 - Security Systems Services


This requirement is for a firm fixed price service contract. The contract will be awarded 
using simplified acquisition procedures in accordance with FAR part 13

The Government will award a contract resulting from this solicitation to the proposer responsible, whose offer conforming to the solicitation will be most advantageous to the Government, Lowest Price, Technically Acceptable.

Anticipated award date: 10 business days after close of solicitation, OOA 31 August 2026

Quotes are to be received no later than close of business (3 p.m.) on 17 August 2026. Quotes can be 
 email to: angel.melendez@uscg.mil

Telephone requests of quotes, will not be accepted, a formal notice of changes (if applicable) will 
be issued in Sam.Gov

Wage determination: 2015-4583 May 13, 2026

SCOPE OF WORK:


CCTV Camera, Recording and Data Transmission Replacement
U.S. Coast Guard Sector Key West

GENERAL REQUIREMENTS

PART 1 – General:
United States Coast Guard Sector Key West is accepting proposals for qualified individuals or firms 
to replace the existing CCTV surveillance system located at Sector Key West. The existing system 
has reached the end of its service life and no longer provides the reliability, recording 
capability, and surveillance coverage required to support coast Guard security operations.

1. Sector Key West: Relocate the existing wireless bridge to restore network connectivity between 
UPH and B48. Provide (2) new wireless bridge that will link to existing B107 with B48.
2. Sector Key West B107 (UPH): Upgrade and replace existing CCTV system.
3. Sector Key West B109 (SFLC): Replacing and upgrading exterior surveillance coverage. Work 
includes installation of a new multi-directional network camera, wireless bridge components, 
mounting hardware, surge protection, and a Poe+ network switch.
4. Sector Key West B108 (Storage Hanger/ANT Shop): Relocate wireless antennae, install new server 
closet and rewire with weatherproof cabling.
5. Sector Key West B48 (Command): Complete upgrade of existing CCTV system. Replacing outdated 
camera technology with modern Hanwha AI-enable cameras or functionally equivalent alternative.
6. Sector Key West B102 (Outdoor Gym): Add CCTV System for 180-degree coverage of outdoor gym. 
Include switch and antenna with line of sight to B48.
7. Sector Key West IDS: Install cellular communicator and all associated equipment to enable 
cellular emergency communication from Sector Armory, Sector Command Center, and Station Key West
Armory to Federal Protective Services monitoring station. Ensure connectivity to FPS’s current IP
Address.
8. General Notes: All cameras must be NDAA compliant and Hanwha is preferred as basis of design. 
Contractor must hold current manufacturer certification as approved installer of the proposed 
equipment. 1-year general contractor quality warranty. Product specs, cut sheets and manufacturer 
warranty letters to be provided as deliverables to the government.

The POC’s are: Brett Foster, Phone: (305) 292-8756, email: Brett.A.Foster@uscg.mil and Amanda 
Green, Phone: (305) 292-8708 email: Amanda.F.Green@uscg.mil

PART 2 – Location:
U.S. Coast Guard Sector Key West 100 Trumbo Rd
Key West, Florida 33040
PART 3 – Parts Required:
EQUIPMENT LIST
(*below list is provided for basis as design, functionally equivalent alternatives to 
equipment/parts are acceptable with government approval):
1. Sector Key West B107 (UPH):
• (2) 5GHz NanoBeam ac Gen2 19dBi US
• (2) Universal Antenna Mount
• (2) External PoE Surge Protector
• (1) 26-Port Gigabit Poe Switch
• (300) Cat 6 Dir Bur Black 1M, Honeywell Cable
• (12) Hanwha 5MP vandal-resistant dome cameras
• (2) 5MP AI-enabled IR wall-mount cameras

• (2) TNP-A6550RW ruggedized PTZ positioning cameras (IP66/IP68, IK10, NEMA 4X)
• (2) SBP-156LMW1 telescopic parapet mounts
• (1) Wave NVR with 32TB storage, Windows Server OS, and 4 included licenses
• Wave Pro Licenses: 8-channel, 5-channel, and 4-channel
• (1) 48-port Gigabit WebSmart PoE switch (740W, 4 uplinks)
2. Sector Key West B109 (SFLC):
• (1) 4-Channel × 4MP Outdoor Multi-Directional Network Camera – Weather-rated, vandal-resistant, 
multi-sensor camera for exterior coverage
• (1) Mounting Hole Cover, Polycarbonate, White
• (1) Wall Mount, white
• (1) Corner Mount Adapter
• (1) 5GHz NanoBeam AC Gen2 19dBi Wireless Bridge (IS) – Point-to-point wireless transmission for 
network connectivity
• (1) Universal Antenna Mount
• (1) External Surge Protector – Protection for wireless and network equipment
• (1) 8-Port Gigabit PoE+ Unmanaged Switch – Provides power and network connectivity for the camera 
system
• (1) 26-Port Gigabit Poe Switch
3. Sector Key West B108 (Storage Hanger/ANT Shop):
• (1) 4K AI Bullet Camera, 6.91-214.7mm Varifocal Lens, 31x Optical
• (1) Waterproof Backbox For Vandal X-Core And X-Plus Cameras, White
• (2) 4-Channel x 4MP Outdoor Multi-Directional Network Camera, Mount
• (2) Mounting Hole Cover, Polycarbonate, White
• (2) Wall Mount, White
• (2) Corner Mount Adapter, White
• (1) 5GHz NanoBeam ac Gen2 19dBi US
• (1) Universal Antenna Mount
• (1) External PoE Surge Protector
• Cat 6 Dir Bur Black 1M, Honeywell cable
• (1) 26-Port Gigabit Poe Switch
• (2) Wall and Pole Mount Adaptor, White, 3-Pack
• (1) New 1U Rack for POE Switch


4. Sector Key West B48 (Command):
• (2) WAVE Professional License. Enables eight (8) IP stream record
• (1) WAVE, 4X IP CAMERA LICENSE
• (2) Wall and Pole Mount Adaptor, White, 3-Pack
• (2) Mounting Hole Cover, Polycarbonate, White
• (2) 5GHz NanoBeam ac Gen2 19dBi US
• (2) Universal Antenna Mount
• (2) Wall Mount, White
• (2) External PoE Surge Protector
• (2) Corner Mount Adapter, White
• (7) 2MP indoor mini dome camera 4mm fixed h.265/h.264 people cou
• (1) License Plate Reader camera
• (2) 4-Channel x 4MP Outdoor Multi-Directional Network Camera, Mount
• (2) Cap Adapter for the PNM-9000VD Multi-sen
• (1) 26-Port Gigabit Poe Switch
Page 3 of 4

• (2) 4MP IP Bullet 2-10mm motorized VF H.265 IP66, IK10
5. Sector Key West B102 (Outdoor Gym):
• (1) WAVE, 4X IP CAMERA LICENSE
• (1) Wall and Pole Mount Adaptor, White
• (1) Mounting Hole Cover, Polycarbonate, White
• (1) 5GHz NanoBeam ac Gen2 19dBi US, NDAA Compliant
• (1) Universal Antenna Mount
• (1) Wall Mount, White
• (1) External PoE Surge Protector
• (1) 4-Channel x 4MP Outdoor Multi-Directional Network Camera, NDAA Compliant
• (1) Cap Adapter for the PNM-9000VD Multi-sen
• (1) 26-Port Gigabit Poe Switch

6. Sector Key West IDS:
• (3) Attack resistant enclosure, large, grey
• (3) OUTDR MLTBND ANTENNA, CELL 25FT
• (2) OCTO-INPUT MODULE
• (3) 8-Output Expansion Module
• (3) Intrusion panel
• (3) 2 Line Alpha Numeric Keypad
• (3) Plug-In Cellular Module, Vzw Lte
PART 4 – Facility Operating Hours:
1. The facility shall remain in operation throughout the service. Contractor access to the service 
site shall be limited to the following: 8:00am to 4:00pm, Monday through Friday, excluding 
holidays. Access to the site shall not be permitted on the weekends without prior approval from the 
Contracting Officer in writing.

PART 5 – Security Requirements
1. Contractor shall provide a list of names for required personnel needing to access the base to 
the Coast Guard COR for access to the base.
2. Personnel will be required to first report to the NAS Boca Chica Security Office for an entry 
pass unless they already have base access.
3. All personnel shall present their ID and base entry pass to the security personnel at the 
entrance to the base for access.
PART 6 – Contractor Responsibilities:
1. Contractor shall furnish all labor, supervision, tools, equipment, transportation, and 
incidental materials necessary to complete the project.
2. Contractor shall remove existing equipment as required to support the installation of new CCTV 
and network devices.
3. Contractor shall install all cameras, wireless bridges, antennas, network switches, surge 
protection devices, servers, and associated mounting hardware in accordance with manufacturer 
specifications.
4. Contractor shall mount, align, and secure all surveillance and wireless communication equipment.
5. Contractor shall terminate, label, and test all network, power, and communication cabling 
required for system operation.
6. Contractor shall program and configure all cameras, wireless bridges, network devices, and 
supporting equipment for proper operation.

Page 4 of 4

Page 5 of 4
7. Contractor shall integrate the new equipment with the existing Coast Guard CCTV and video
management system.
8. Contractor shall verify network connectivity, wireless communication, and video streaming 
functionality.
9. Contractor shall perform functional testing, commissioning, and final system verification to 
ensure all equipment operates as intended.
10. Contractor shall reuse existing wiring and infrastructure whenever practical and serviceable.
11. Contractor shall notify the COR of any damaged, unsafe, or incompatible infrastructure 
requiring replacement prior to performing additional work.
12. Contractor shall maintain a clean and safe work area throughout the project and comply with all 
applicable Coast Guard security and safety requirements.
13. Contractor shall coordinate work to minimize disruption to facility operations and complete 
work with authorized access hours.
14. Contractor shall provide basic end-user orientation and operational instruction to Coast Guard 
personnel upon project completion.
15. Contractor shall deliver a fully operational, tested, and commissioned CCTV system in 
accordance with the contract requirements.

PART 7 – Final Acceptance:
1. The contractor shall provide all required project documentation, including equipment inventory, 
configuration records, warranty information, manufacturer documentation, and any applicable test 
results upon completion of the project.
2. The contractor shall complete all installation, programming, integration, testing, and 
commissioning activities and certify that CCTV system is fully operational in accordance with the 
contract requirements.
3. The contractor shall coordinate and participate in a final inspection and system demonstration 
with the COR. The demonstration shall verify proper operation of all cameras, wireless bridges, 
network equipment, recording functions, and system connectivity.
4. The contractor shall correct, at no additional cost to the government, any deficiencies, 
discrepancies, or non-conforming work identified during the final inspection before final 
acceptance.

*Submittal of invoice(s) information will be provided once award of contract has been made.
 

*Submittal of invoice(s) information will be provided once award of contract has been made.
 


Period of Performance: Work is expected to commence at NLT 10 business days after award is made and 
submitted to awardee. Anticipated award date: 31 August 2026

Site visit: It is highly recommended and encouraged that a site visit is performed at  the unit to 
field verify the requirements within the SOW and speak with the unit POC for this project. A site 
visit has been scheduled for Wednesday August 5th at 1000. 

Vendors are to coordinate a site visit with the below listed unit personnel. Vendor  must ensure 
company personnel attending site visit have a proper government issued  ID in order to gain access 
to the Coast Guard Station.


Q&A’s: Questions concerning the work requested must be sent via email to angel.melendez@uscg.mil by 
COB 12 August 2026. These Q&A’s will be answered and posted to this solicitation as an amendment to 
solicitation prior to closing.

52.222-90 Addressing DEI Discrimination by Federal Contractors Construction-Specific Clauses (FAR 
Subpart 36.5)

•  52.236-2 Differing Site Conditions: Protects the contractor if subsurface or physical conditions 
differ materially from those indicated in the contract.
•  52.236-3 Site Investigation and Conditions Affecting the Work: Requires the contractor to 
investigate the site and conditions before bidding.
•  52.236-5 Material and Workmanship: Requires all materials to be new and of the most suitable 
grade unless otherwise specified.
•  52.236-7 Permits and Responsibilities: Holds the contractor responsible for getting all 
necessary licenses, permits, and complying with federal, state, and local laws.
•  52.236-13 Accident Prevention: Requires contractors to provide a safe work environment and 
comply with relevant safety and health standards (e.g., OSHA).


Labor Standards

For construction projects over $2,000 in the United States, solicitations must include wage rate 
and labor standards requirements:

•  52.222-6 Construction Wage Rate Requirements: Mandates that mechanics and laborers are paid the 
prevailing local wages as determined by the Department of Labor.
•  52.222-11 Subcontracts (Labor Standards): Requires contractors to flow down wage requirements to 
all subcontracts.
Socioeconomic Clauses

•  52.219-14 Limitations on Subcontracting: Limits the percentage of work that a small business 
prime contractor can subcontract to other businesses.

4. General Contract Clauses

•  52.232-5 Payments under Fixed-Price Construction Contracts: Details the procedures and 
requirements for progress payments.
•  52.249-10 Default (Fixed-Price Construction): Outlines the government's rights if the contractor 
fails to prosecute the work with the diligence required or fails to complete it on time.


Work hours: Monday through Friday, 0800 – 1500 (8 am – 3 pm) No weekends or Holidays authorized.

See attached applicable FAR Clauses by reference.
Offerors may obtain full text version of these clauses electronically at: www.arnet.gov/far


The following Homeland Security Acquisition Regulations (HSAR) are incorporated as addenda to this 
solicitation: HSAR 3052.209-70 Prohibition on Contracts with Corporate Expatriates (Jun 2006); 
Contracting Officers Technical Representative (Dec 2003) (COTR) HSAR 3052.237-72. Copies of HSAR 
clauses may be obtained electronically at http://www.dhs.gov.


Request Company’s tax ID information and UEI number.

Vendors providing an offer must be registered in SAM (System for Award Management) prior
to close of this solicitation. https://www.sam.gov/portal/public/SAM/. The vendors SAM
registration must be in an “ACTIVE” status prior to award.

Vendors must ensure that the above listed NAICS codes are listed on their SAM registration to
perform this type of service.
 

Update #2 ·

This combined synopsis/solicitation for services prepared in accordance with the format in subpart
12.6 of the Federal Acquisition Regulation (FAR) as supplemented with additional information 
included in this notice. This synopsis/solicitation is being advertised as Small Business Set-Aside 
only. This announcement constitutes the only solicitation; no separate written solicitation will be 
issued.

The solicitation number is 37140PR260000076. Applicable North American Industry Classification 
Standard (NAICS) codes are:

NAICS
561621 - Security Systems Services


This requirement is for a firm fixed price service contract. The contract will be awarded 
using simplified acquisition procedures in accordance with FAR part 13

The Government will award a contract resulting from this solicitation to the proposer responsible, whose offer conforming to the solicitation will be most advantageous to the Government, Lowest Price, Technically Acceptable.

Anticipated award date: 10 business days after close of solicitation, OOA 31 August 2026

Quotes are to be received no later than close of business (3 p.m.) on 17 August 2026. Quotes can be 
 email to: angel.melendez@uscg.mil

Telephone requests of quotes, will not be accepted, a formal notice of changes (if applicable) will 
be issued in Sam.Gov

Wage determination: 2015-4583 May 13, 2026

SCOPE OF WORK:


CCTV Camera, Recording and Data Transmission Replacement
U.S. Coast Guard Sector Key West

GENERAL REQUIREMENTS

PART 1 – General:

United States Coast Guard Sector Key West is accepting proposals for qualified individuals or firms 
to replace the existing CCTV surveillance system located at Sector Key West. The existing system 
has reached the end of its service life and no longer provides the reliability, recording 
capability, and surveillance coverage required to support coast Guard security operations.

1. Sector Key West: Relocate the existing wireless bridge to restore network connectivity between 
UPH and B48. Provide (2) new wireless bridge that will link to existing B107 with B48.
2. Sector Key West B107 (UPH): Upgrade and replace existing CCTV system.
3. Sector Key West B109 (SFLC): Replacing and upgrading exterior surveillance coverage. Work 
includes installation of a new multi-directional network camera, wireless bridge components, 
mounting hardware, surge protection, and a Poe+ network switch.
4. Sector Key West B108 (Storage Hanger/ANT Shop): Relocate wireless antennae, install new server 
closet and rewire with weatherproof cabling.
5. Sector Key West B48 (Command): Complete upgrade of existing CCTV system. Replacing outdated 
camera technology with modern Hanwha AI-enable cameras or functionally equivalent alternative.

The POC’s are: Brett Foster, Phone: (305) 292-8756, email: Brett.A.Foster@uscg.mil and Amanda 
Green, Phone: (305) 292-8708 email: Amanda.F.Green@uscg.mil

PART 2 – Location:
U.S. Coast Guard Sector Key West 100 Trumbo Rd
Key West, Florida 33040

PART 3 – Parts Required:

EQUIPMENT LIST
(*below list is provided for basis as design, functionally equivalent alternatives to 
equipment/parts are acceptable with government approval):

1. Sector Key West B107 (UPH):
• (2) 5GHz NanoBeam ac Gen2 19dBi US
• (2) Universal Antenna Mount
• (2) External PoE Surge Protector
• (1) 26-Port Gigabit Poe Switch
• (300) Cat 6 Dir Bur Black 1M, Honeywell Cable
• (12) Hanwha 5MP vandal-resistant dome cameras
• (2) 5MP AI-enabled IR wall-mount cameras
• (2) TNP-A6550RW ruggedized PTZ positioning cameras (IP66/IP68, IK10, NEMA 4X)
• (2) SBP-156LMW1 telescopic parapet mounts
• (1) Wave NVR with 32TB storage, Windows Server OS, and 4 included licenses
• Wave Pro Licenses: 8-channel, 5-channel, and 4-channel
• (1) 48-port Gigabit WebSmart PoE switch (740W, 4 uplinks)

2. Sector Key West B109 (SFLC):
• (1) 4-Channel × 4MP Outdoor Multi-Directional Network Camera – Weather-rated, vandal-resistant, 
multi-sensor camera for exterior coverage
• (1) Mounting Hole Cover, Polycarbonate, White

• (1) Wall Mount, white
• (1) Corner Mount Adapter
• (1) 5GHz NanoBeam AC Gen2 19dBi Wireless Bridge (IS) – Point-to-point wireless transmission for 
network connectivity
• (1) Universal Antenna Mount
• (1) External Surge Protector – Protection for wireless and network equipment
• (1) 8-Port Gigabit PoE+ Unmanaged Switch – Provides power and network connectivity for the camera 
system
• (1) 26-Port Gigabit Poe Switch

3. Sector Key West B108 (Storage Hanger/ANT Shop):
• (1) 4K AI Bullet Camera, 6.91-214.7mm Varifocal Lens, 31x Optical
• (1) Waterproof Backbox For Vandal X-Core And X-Plus Cameras, White
• (2) 4-Channel x 4MP Outdoor Multi-Directional Network Camera, Mount
• (2) Mounting Hole Cover, Polycarbonate, White
• (2) Wall Mount, White
• (2) Corner Mount Adapter, White
• (1) 5GHz NanoBeam ac Gen2 19dBi US
• (1) Universal Antenna Mount
• (1) External PoE Surge Protector
• Cat 6 Dir Bur Black 1M, Honeywell cable
• (1) 26-Port Gigabit Poe Switch
• (2) Wall and Pole Mount Adaptor, White, 3-Pack

4. Sector Key West B48 (Command):
• (2) WAVE Professional License. Enables eight (8) IP stream record
• (1) WAVE, 4X IP CAMERA LICENSE
• (2) Wall and Pole Mount Adaptor, White, 3-Pack
• (2) Mounting Hole Cover, Polycarbonate, White
• (2) 5GHz NanoBeam ac Gen2 19dBi US
• (2) Universal Antenna Mount
• (2) Wall Mount, White
• (2) External PoE Surge Protector
• (2) Corner Mount Adapter, White
• (7) 2MP indoor mini dome camera 4mm fixed h.265/h.264 people cou
• (1) License Plate Reader camera
• (2) 4-Channel x 4MP Outdoor Multi-Directional Network Camera, Mount
• (2) Cap Adapter for the PNM-9000VD Multi-sen
• (1) 26-Port Gigabit Poe Switch
• (2) 4MP IP Bullet 2-10mm motorized VF H.265 IP66, IK10

PART 4 – Facility Operating Hours:
1. The facility shall remain in operation throughout the service. Contractor access to the service 
site shall be limited to the following: 8:00am to 4:00pm, Monday through Friday, excluding 
holidays. Access to the site shall not be permitted on the weekends without prior approval from the 
Contracting Officer in writing.

PART 5 – Security Requirements
1. Contractor shall provide a list of names for required personnel needing to access the base to 
the Coast Guard COR for access to the base.

2. Personnel will be required to first report to the NAS Boca Chica Security Office for an entry 
pass unless they already have base access.

3. All personnel shall present their ID and base entry pass to the security personnel at the 
entrance to the base for access.

PART 6 – Contractor Responsibilities:

1. Contractor shall furnish all labor, supervision, tools, equipment, transportation, and incidental materials necessary to complete the project.

2. Contractor shall remove existing equipment as required to support the installation of new CCTV and network devices.

3. Contractor shall install all cameras, wireless bridges, antennas, network switches, surge protection devices, servers, and associated mounting hardware in accordance with manufacturer specifications.

4. Contractor shall mount, align, and secure all surveillance and wireless communication equipment.

5. Contractor shall terminate, label, and test all network, power, and communication cabling required for system operation.

6. Contractor shall program and configure all cameras, wireless bridges, network devices, and supporting equipment for proper operation.

7. Contractor shall integrate the new equipment with the existing Coast Guard CCTV and video management system.

8. Contractor shall verify network connectivity, wireless communication, and video streaming functionality.

9. Contractor shall perform functional testing, commissioning, and final system verification to ensure all equipment operates as intended.

10. Contractor shall reuse existing wiring and infrastructure whenever practical and serviceable.

11. Contractor shall notify the COR of any damaged, unsafe, or incompatible infrastructure requiring replacement prior to performing additional work.

12. Contractor shall maintain a clean and safe work area throughout the project and comply with all applicable Coast Guard security and safety requirements.

13. Contractor shall coordinate work to minimize disruption to facility operations and complete work with authorized access hours.

14. Contractor shall provide basic end-user orientation and operational instruction to Coast Guard personnel upon project completion.

15. Contractor shall deliver a fully operational, tested, and commissioned CCTV system in accordance with the contract requirements.

PART 7 – Final Acceptance:

1. The contractor shall provide all required project documentation, including equipment inventory, 
configuration records, warranty information, manufacturer documentation, and any applicable test 
results upon completion of the project.

2. The contractor shall complete all installation, programming, integration, testing, and 
commissioning activities and certify that CCTV system is fully operational in accordance with the 
contract requirements.

3. The contractor shall coordinate and participate in a final inspection and system demonstration 
with the COR. The demonstration shall verify proper operation of all cameras, wireless bridges, 
network equipment, recording functions, and system connectivity.

4. The contractor shall correct, at no additional cost to the government, any deficiencies, 
discrepancies, or non-conforming work identified during the final inspection before final 
acceptance.

*Submittal of invoice(s) information will be provided once award of contract has been made.
 


Period of Performance: Work is expected to commence at NLT 10 business days after award is made and 
submitted to awardee. Anticipated award date: 31 August 2026

Site visit: It is highly recommended and encouraged that a site visit is performed at  the unit to 
field verify the requirements within the SOW and speak with the unit POC for this project. A site 
visit has been scheduled for Wednesday August 5th at 1000. 

Vendors are to coordinate a site visit with the below listed unit personnel. Vendor  must ensure 
company personnel attending site visit have a proper government issued  ID in order to gain access 
to the Coast Guard Station.


Q&A’s: Questions concerning the work requested must be sent via email to angel.melendez@uscg.mil by 
COB 12 August 2026. These Q&A’s will be answered and posted to this solicitation as an amendment to 
solicitation prior to closing.

52.222-90 Addressing DEI Discrimination by Federal Contractors Construction-Specific Clauses (FAR 
Subpart 36.5)

•  52.236-2 Differing Site Conditions: Protects the contractor if subsurface or physical conditions 
differ materially from those indicated in the contract.
•  52.236-3 Site Investigation and Conditions Affecting the Work: Requires the contractor to 
investigate the site and conditions before bidding.
•  52.236-5 Material and Workmanship: Requires all materials to be new and of the most suitable 
grade unless otherwise specified.
•  52.236-7 Permits and Responsibilities: Holds the contractor responsible for getting all 
necessary licenses, permits, and complying with federal, state, and local laws.
•  52.236-13 Accident Prevention: Requires contractors to provide a safe work environment and 
comply with relevant safety and health standards (e.g., OSHA).


Labor Standards

For construction projects over $2,000 in the United States, solicitations must include wage rate 
and labor standards requirements:

•  52.222-6 Construction Wage Rate Requirements: Mandates that mechanics and laborers are paid the 
prevailing local wages as determined by the Department of Labor.
•  52.222-11 Subcontracts (Labor Standards): Requires contractors to flow down wage requirements to 
all subcontracts.
Socioeconomic Clauses

•  52.219-14 Limitations on Subcontracting: Limits the percentage of work that a small business 
prime contractor can subcontract to other businesses.

4. General Contract Clauses

•  52.232-5 Payments under Fixed-Price Construction Contracts: Details the procedures and 
requirements for progress payments.
•  52.249-10 Default (Fixed-Price Construction): Outlines the government's rights if the contractor 
fails to prosecute the work with the diligence required or fails to complete it on time.


Work hours: Monday through Friday, 0800 – 1500 (8 am – 3 pm) No weekends or Holidays authorized.

See attached applicable FAR Clauses by reference.
Offerors may obtain full text version of these clauses electronically at: www.arnet.gov/far


The following Homeland Security Acquisition Regulations (HSAR) are incorporated as addenda to this 
solicitation: HSAR 3052.209-70 Prohibition on Contracts with Corporate Expatriates (Jun 2006); 
Contracting Officers Technical Representative (Dec 2003) (COTR) HSAR 3052.237-72. Copies of HSAR 
clauses may be obtained electronically at http://www.dhs.gov.


Request Company’s tax ID information and UEI number.

Vendors providing an offer must be registered in SAM (System for Award Management) prior
to close of this solicitation. https://www.sam.gov/portal/public/SAM/. The vendors SAM
registration must be in an “ACTIVE” status prior to award.

Vendors must ensure that the above listed NAICS codes are listed on their SAM registration to
perform this type of service.
 

Update #1 ·

This combined synopsis/solicitation for services prepared in accordance with the format in subpart
12.6 of the Federal Acquisition Regulation (FAR) as supplemented with additional information 
included in this notice. This synopsis/solicitation is being advertised as Small Business Set-Aside 
only. This announcement constitutes the only solicitation; no separate written solicitation will be 
issued.

The solicitation number is 37140PR260000076. Applicable North American Industry Classification 
Standard (NAICS) codes are:

NAICS
561621 - Security Systems Services


This requirement is for a firm fixed price service contract. The contract will be awarded 
using simplified acquisition procedures in accordance with FAR part 13

The Government will award a contract resulting from this solicitation to the proposer responsible, 
whose offer conforming to the solicitation will be most advantageous to the Government, Lowest 
Price, Technically Acceptable.

Anticipated award date: 10 business days after close of solicitation, OOA 31 August 2026

Quotes are to be received no later than close of business (3 p.m.) on 17 August 2026. Quotes can be 
 email to: angel.melendez@uscg.mil

Telephone requests of quotes, will not be accepted, a formal notice of changes (if applicable) will 
be issued in Sam.Gov

Wage determination: 2015-4583 May 13, 2026

SCOPE OF WORK:


CCTV Camera, Recording and Data Transmission Replacement
U.S. Coast Guard Sector Key West

GENERAL REQUIREMENTS

PART 1 – General:
United States Coast Guard Sector Key West is accepting proposals for qualified individuals or firms 
to replace the existing non-functioning CCTV camera, recording and transmission systems located on 
Sector Key West buildings. These replacements will be broken down by location.
1. Sector Key West UPH.
•  Relocate exiting wireless bridge due to the existing ongoing construction obstructing the 
field
of view of the existing field of view from the barracks to building 48. Two new wireless bridge 
will now link the existing Barracks building with the Main Sector building and building 108.
•  Replace server at the barracks due to inability to record and view.
2. Sector Key West SFLC Building
•  Replace bullet camera, networking and wireless connectivity with main Sector building.
3. Station Key West Building 108
•  Relocate wireless antennae, install new server closet and rewire with weatherproof 
cabling.

The POC’s are: Amanda Green, Phone: (305) 292-8708, email: Amanda.F.Green@uscg.mil and Omar Perez, 
Phone: (786) 797-0032 email: Omar.I.Perez@uscg.mil

PART 2 – Location:
U.S. Coast Guard Sector Key West 100 Trumbo Rd
Key West, Florida 33040

PART 3 – Itemized Requirements:
1. A site visit is required to troubleshoot replacement/connectivity issues Report findings to the 
POCs listed above.
2. Provide all necessary replacement or modernized parts to include resetting/reprogramming 
services to restore the system back to operable status with monitoring company.
3. If the system cannot be restored to full functionality, provide a report on the specific items 
that remain discrepant and the limitations that will be experienced.

PART 4 – Facility Operating Hours:
1. The facility shall remain in operation throughout the service. Contractor access to the service 
site shall be limited to the following: 7:00am to 3:00pm, Monday through Friday, excluding 
holidays. Access to the site shall not be permitted on the weekends without prior approval from the 
Contracting Officer in writing.

PART 5 – Security Requirements
1. Contractor shall provide a list of names for required personnel needing to access the base to 
the Coast Guard COR for access to the base.
2. Personnel will be required to first report to the NAS Boca Chica Security Office for an entry 
pass unless they already have base access.
3. All personnel shall present their ID and base entry pass to the security personnel at the 
entrance to the base for access.

PART 6 – Contractor Responsibilities:
1. Contractor shall provide a list of and cut sheets for all materials needed to complete the work.
2. Contractor shall install all components and devices in accordance with all manufacturer’s 
instructions and record local weather information when performing work to verify compliance with 
manufacturer instructions. Contractor shall notify the government when manufacturer instructions 
are unable to be followed.

PART 7 – Final Acceptance:
1. After repair, the contractor shall perform a final inspection with Sector Key West POCs to 
verify acceptability.
Submittal of invoice(s) information will be provided once award of contract has been made.

See attached SOW for details.


Location:
U.S. Coast Guard Sector Key West
100 Trumbo Rd
Key West, Florida 33040

Sector Key West 100 Trumbo Rd Key West, FL

Attn: Amanda Green
Period of Performance: Work is expected to commence at NLT 10 business days after award is made and 
submitted to awardee. Anticipated award date: 31 August 2026

Site visit: It is highly recommended and encouraged that a site visit is performed at  the unit to 
field verify the requirements within the SOW and speak with the unit POC  for this project. A site 
visit has been scheduled for Wednesday August 5th at 1000. 
Vendors are to coordinate a site visit with the below listed unit personnel. Vendor  must ensure 
company personnel attending site visit have a proper government issued  ID in order to gain access 
to the Coast Guard Station.


Q&A’s: Questions concerning the work requested must be sent via email to angel.melendez@uscg.mil by 
COB 12 August 2026. These Q&A’s will be answered and posted to this solicitation as an amendment to 
solicitation prior to closing.

52.222-90 Addressing DEI Discrimination by Federal Contractors Construction-Specific Clauses (FAR 
Subpart 36.5)

•  52.236-2 Differing Site Conditions: Protects the contractor if subsurface or physical conditions 
differ materially from those indicated in the contract.
•  52.236-3 Site Investigation and Conditions Affecting the Work: Requires the contractor to 
investigate the site and conditions before bidding.
•  52.236-5 Material and Workmanship: Requires all materials to be new and of the most suitable 
grade unless otherwise specified.
•  52.236-7 Permits and Responsibilities: Holds the contractor responsible for getting all 
necessary licenses, permits, and complying with federal, state, and local laws.
•  52.236-13 Accident Prevention: Requires contractors to provide a safe work environment and 
comply with relevant safety and health standards (e.g., OSHA).


Labor Standards

For construction projects over $2,000 in the United States, solicitations must include wage rate 
and labor standards requirements:

•  52.222-6 Construction Wage Rate Requirements: Mandates that mechanics and laborers are paid the 
prevailing local wages as determined by the Department of Labor.
•  52.222-11 Subcontracts (Labor Standards): Requires contractors to flow down wage requirements to 
all subcontracts.
Socioeconomic Clauses

•  52.219-14 Limitations on Subcontracting: Limits the percentage of work that a small business 
prime contractor can subcontract to other businesses.

4. General Contract Clauses

•  52.232-5 Payments under Fixed-Price Construction Contracts: Details the procedures and 
requirements for progress payments.
•  52.249-10 Default (Fixed-Price Construction): Outlines the government's rights if the contractor 
fails to prosecute the work with the diligence required or fails to complete it on time.


Work hours: Monday through Friday, 0800 – 1500 (8 am – 3 pm) No weekends or Holidays authorized.

See attached applicable FAR Clauses by reference.
Offerors may obtain full text version of these clauses electronically at: www.arnet.gov/far


The following Homeland Security Acquisition Regulations (HSAR) are incorporated as addenda to this 
solicitation: HSAR 3052.209-70 Prohibition on Contracts with Corporate Expatriates (Jun 2006); 
Contracting Officers Technical Representative (Dec 2003) (COTR) HSAR 3052.237-72. Copies of HSAR 
clauses may be obtained electronically at http://www.dhs.gov.


Request Company’s tax ID information and UEI number.

Vendors providing an offer must be registered in SAM (System for Award Management) prior
to close of this solicitation. https://www.sam.gov/portal/public/SAM/. The vendors SAM
registration must be in an “ACTIVE” status prior to award.

Vendors must ensure that the above listed NAICS codes are listed on their SAM registration to
perform this type of service.
 

Files

Notice history

Notice Type Posted
Repair/Replace Security Systems at Sector Key West Award Award Notice
This notice Latest solicitation Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
W9124G26CBARRACKS Fort Rucker, Alabama 36362, United States · NAICS 561621 MICC Fort Eustis Total Small Business
Corrective and Preventative Maintenance of Electronic Security Systems at the Ronald Reagan Building Washington, District of Columbia, United States · NAICS 561621 Office of Procurement Operations Woman-Owned Small Business
USCGC Hudson Capstan & Davit Inspection & Repair Miami Beach, Florida 33139, United States · NAICS 336611 Coast Guard Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity