Repair Apron Joint Sealant Scott AFB IL

Closed Solicitation Posted

Solicitation number
W50S7S21R0001
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Scott AFB, Illinois 62225, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks proposals to repair approximately 120,000 linear feet of concrete joint sealant across three zones of the aircraft parking apron at Scott Air Force Base in Illinois. The Department of the Army National Guard is soliciting bids to complete repairs to zones one and two as the base requirement, with an option to include work in zone three. Proposals will be evaluated based on technical approach, past performance, and price, which are considered to be of equal importance. The pre-proposal conference is scheduled for July 13, 2021, with any questions due by July 1, 2021. Proposed work must be completed within 150 days of the notice to proceed.

The opportunity is set aside for total small business concerns. The NAICS code is 237990 and PSC code is S206. The estimated value ranges from $250,000 to $500,000 to be completed at Scott Air Force Base, IL 62225. The base bid includes repair of approximately 90,000 linear feet in zones one and two, with 30,000 additional linear feet included in the optional work for zone three. Interested parties must comply with registration and base access requirements to attend the pre-proposal conference and site visit.

Notice text

10 versions

Update #10 · Latest ·

Mod 10: Added 4th questions and answers.

Mod 9: Added missing set of 3rd questions and answers. Clarifying: The Base Contracting Officer will be present in the Office from 1200 to 1300 (1PM) on 7/30/2021 in order to recieve hand delivered submissions. 


Mod 8: Added 3rd questions and answers and discussed submitting proposals. The 30th is a "flex day" for the wing. If hand delivering proposals on that day, contact Contracting Office directly to coordinate delivery such that your proposal is recieved timely. Mail also is not typically directly delivered to Contracting. Ensure mailed proposals have adequate time for hard copies to be delivered.

Mod 7: Added 2nd questions and answers

Mod 6: Added document AMDT W50S7S21R0001 - 0001. Removed Past Peformance subfactors. Removed requirement for Exhibit C.

Mod 5: Added 1st questions and answers.

Mod 4: Added site visit notes
Mod 2 and 3: Changed document permissions and uploaded revised documents.
Mod 1: Added drawings.

Description of Proposed Construction:

The work specified consists of furnishing all labor, equipment, tools, materials, travel, licenses, and permits required to complete the project. Contractor shall bid the project in two sections, Base and Option. The base bid will be to complete the following for Zone 1 and Zone 2. The option will be to complete the following for Zone 3. The work shall be completed in compliance with UFC 3-260-04 and USAF AFI 31-101 and updated to all other codes, instructions and regulations.

The Magnitude of this project is between $250,000.00 and $500,000.00. Construction/contract completion time is anticipated to be 150 days after notice to proceed to include inspection and punch list.

See attachments for full solication details.

The date for the pre-proposal conference is 13 July 2021, 9:00AM local time at the 126th ARW at Scott Air Force Base, IL. Interested contractors are encouraged to attend and shall follow conference registration and base access requirements shown in the solicitation. A site visit will follow the pre-proposal conference. All questions for the pre-proposal conference must be submitted by 1 July 2021 via email (preferred) to 126.ARW.MSC.Org@us.af.mil.

Update #9 ·

Mod 9: Added missing set of 3rd questions and answers. Clarifying: The Base Contracting Officer will be present in the Office from 1200 to 1300 (1PM) on 7/30/2021 in order to recieve hand delivered submissions. 


Mod 8: Added 3rd questions and answers and discussed submitting proposals. The 30th is a "flex day" for the wing. If hand delivering proposals on that day, contact Contracting Office directly to coordinate delivery such that your proposal is recieved timely. Mail also is not typically directly delivered to Contracting. Ensure mailed proposals have adequate time for hard copies to be delivered.

Mod 7: Added 2nd questions and answers

Mod 6: Added document AMDT W50S7S21R0001 - 0001. Removed Past Peformance subfactors. Removed requirement for Exhibit C.

Mod 5: Added 1st questions and answers.

Mod 4: Added site visit notes
Mod 2 and 3: Changed document permissions and uploaded revised documents.
Mod 1: Added drawings.

Description of Proposed Construction:

The work specified consists of furnishing all labor, equipment, tools, materials, travel, licenses, and permits required to complete the project. Contractor shall bid the project in two sections, Base and Option. The base bid will be to complete the following for Zone 1 and Zone 2. The option will be to complete the following for Zone 3. The work shall be completed in compliance with UFC 3-260-04 and USAF AFI 31-101 and updated to all other codes, instructions and regulations.

The Magnitude of this project is between $250,000.00 and $500,000.00. Construction/contract completion time is anticipated to be 150 days after notice to proceed to include inspection and punch list.

See attachments for full solication details.

The date for the pre-proposal conference is 13 July 2021, 9:00AM local time at the 126th ARW at Scott Air Force Base, IL. Interested contractors are encouraged to attend and shall follow conference registration and base access requirements shown in the solicitation. A site visit will follow the pre-proposal conference. All questions for the pre-proposal conference must be submitted by 1 July 2021 via email (preferred) to 126.ARW.MSC.Org@us.af.mil.

Update #8 ·

Mod 8: Added 3rd questions and answers and discussed submitting proposals. The 30th is a "flex day" for the wing. If hand delivering proposals on that day, contact Contracting Office directly to coordinate delivery such that your proposal is recieved timely. Mail also is not typically directly delivered to Contracting. Ensure mailed proposals have adequate time for hard copies to be delivered.

Mod 7: Added 2nd questions and answers

Mod 6: Added document AMDT W50S7S21R0001 - 0001. Removed Past Peformance subfactors. Removed requirement for Exhibit C.

Mod 5: Added 1st questions and answers.

Mod 4: Added site visit notes
Mod 2 and 3: Changed document permissions and uploaded revised documents.
Mod 1: Added drawings.

Description of Proposed Construction:

The work specified consists of furnishing all labor, equipment, tools, materials, travel, licenses, and permits required to complete the project. Contractor shall bid the project in two sections, Base and Option. The base bid will be to complete the following for Zone 1 and Zone 2. The option will be to complete the following for Zone 3. The work shall be completed in compliance with UFC 3-260-04 and USAF AFI 31-101 and updated to all other codes, instructions and regulations.

The Magnitude of this project is between $250,000.00 and $500,000.00. Construction/contract completion time is anticipated to be 150 days after notice to proceed to include inspection and punch list.

See attachments for full solication details.

The date for the pre-proposal conference is 13 July 2021, 9:00AM local time at the 126th ARW at Scott Air Force Base, IL. Interested contractors are encouraged to attend and shall follow conference registration and base access requirements shown in the solicitation. A site visit will follow the pre-proposal conference. All questions for the pre-proposal conference must be submitted by 1 July 2021 via email (preferred) to 126.ARW.MSC.Org@us.af.mil.

Update #7 ·

Mod 7: Added 2nd questions and answers

Mod 6: Added document AMDT W50S7S21R0001 - 0001. Removed Past Peformance subfactors. Removed requirement for Exhibit C.

Mod 5: Added 1st questions and answers.

Mod 4: Added site visit notes
Mod 2 and 3: Changed document permissions and uploaded revised documents.
Mod 1: Added drawings.

Description of Proposed Construction:

The work specified consists of furnishing all labor, equipment, tools, materials, travel, licenses, and permits required to complete the project. Contractor shall bid the project in two sections, Base and Option. The base bid will be to complete the following for Zone 1 and Zone 2. The option will be to complete the following for Zone 3. The work shall be completed in compliance with UFC 3-260-04 and USAF AFI 31-101 and updated to all other codes, instructions and regulations.

The Magnitude of this project is between $250,000.00 and $500,000.00. Construction/contract completion time is anticipated to be 150 days after notice to proceed to include inspection and punch list.

See attachments for full solication details.

The date for the pre-proposal conference is 13 July 2021, 9:00AM local time at the 126th ARW at Scott Air Force Base, IL. Interested contractors are encouraged to attend and shall follow conference registration and base access requirements shown in the solicitation. A site visit will follow the pre-proposal conference. All questions for the pre-proposal conference must be submitted by 1 July 2021 via email (preferred) to 126.ARW.MSC.Org@us.af.mil.

Update #6 ·

Mod 6: Added document AMDT W50S7S21R0001 - 0001. Removed Past Peformance subfactors. Removed requirement for Exhibit C.

Mod 5: Added 1st questions and answers.

Mod 4: Added site visit notes
Mod 2 and 3: Changed document permissions and uploaded revised documents.
Mod 1: Added drawings.

Description of Proposed Construction:

The work specified consists of furnishing all labor, equipment, tools, materials, travel, licenses, and permits required to complete the project. Contractor shall bid the project in two sections, Base and Option. The base bid will be to complete the following for Zone 1 and Zone 2. The option will be to complete the following for Zone 3. The work shall be completed in compliance with UFC 3-260-04 and USAF AFI 31-101 and updated to all other codes, instructions and regulations.

The Magnitude of this project is between $250,000.00 and $500,000.00. Construction/contract completion time is anticipated to be 150 days after notice to proceed to include inspection and punch list.

See attachments for full solication details.

The date for the pre-proposal conference is 13 July 2021, 9:00AM local time at the 126th ARW at Scott Air Force Base, IL. Interested contractors are encouraged to attend and shall follow conference registration and base access requirements shown in the solicitation. A site visit will follow the pre-proposal conference. All questions for the pre-proposal conference must be submitted by 1 July 2021 via email (preferred) to 126.ARW.MSC.Org@us.af.mil.

Update #5 ·

Mod 5: Added 1st questions and answers.

Mod 4: Added site visit notes
Mod 2 and 3: Changed document permissions and uploaded revised documents.
Mod 1: Added drawings.

Description of Proposed Construction:

The work specified consists of furnishing all labor, equipment, tools, materials, travel, licenses, and permits required to complete the project. Contractor shall bid the project in two sections, Base and Option. The base bid will be to complete the following for Zone 1 and Zone 2. The option will be to complete the following for Zone 3. The work shall be completed in compliance with UFC 3-260-04 and USAF AFI 31-101 and updated to all other codes, instructions and regulations.

The Magnitude of this project is between $250,000.00 and $500,000.00. Construction/contract completion time is anticipated to be 150 days after notice to proceed to include inspection and punch list.

See attachments for full solication details.

The date for the pre-proposal conference is 13 July 2021, 9:00AM local time at the 126th ARW at Scott Air Force Base, IL. Interested contractors are encouraged to attend and shall follow conference registration and base access requirements shown in the solicitation. A site visit will follow the pre-proposal conference. All questions for the pre-proposal conference must be submitted by 1 July 2021 via email (preferred) to 126.ARW.MSC.Org@us.af.mil.

Update #4 ·

Mod 4: Added site visit notes
Mod 2 and 3: Changed document permissions and uploaded revised documents.
Mod 1: Added drawings.

Description of Proposed Construction:

The work specified consists of furnishing all labor, equipment, tools, materials, travel, licenses, and permits required to complete the project. Contractor shall bid the project in two sections, Base and Option. The base bid will be to complete the following for Zone 1 and Zone 2. The option will be to complete the following for Zone 3. The work shall be completed in compliance with UFC 3-260-04 and USAF AFI 31-101 and updated to all other codes, instructions and regulations.

The Magnitude of this project is between $250,000.00 and $500,000.00. Construction/contract completion time is anticipated to be 150 days after notice to proceed to include inspection and punch list.

See attachments for full solication details.

The date for the pre-proposal conference is 13 July 2021, 9:00AM local time at the 126th ARW at Scott Air Force Base, IL. Interested contractors are encouraged to attend and shall follow conference registration and base access requirements shown in the solicitation. A site visit will follow the pre-proposal conference. All questions for the pre-proposal conference must be submitted by 1 July 2021 via email (preferred) to 126.ARW.MSC.Org@us.af.mil.

Update #3 ·

Mod 2 and 3: Changed document permissions and uploaded revised documents.
Mod 1: Added drawings.

Description of Proposed Construction:

The work specified consists of furnishing all labor, equipment, tools, materials, travel, licenses, and permits required to complete the project. Contractor shall bid the project in two sections, Base and Option. The base bid will be to complete the following for Zone 1 and Zone 2. The option will be to complete the following for Zone 3. The work shall be completed in compliance with UFC 3-260-04 and USAF AFI 31-101 and updated to all other codes, instructions and regulations.

The Magnitude of this project is between $250,000.00 and $500,000.00. Construction/contract completion time is anticipated to be 150 days after notice to proceed to include inspection and punch list.

See attachments for full solication details.

The date for the pre-proposal conference is 13 July 2021, 9:00AM local time at the 126th ARW at Scott Air Force Base, IL. Interested contractors are encouraged to attend and shall follow conference registration and base access requirements shown in the solicitation. A site visit will follow the pre-proposal conference. All questions for the pre-proposal conference must be submitted by 1 July 2021 via email (preferred) to 126.ARW.MSC.Org@us.af.mil.

Update #2 ·

Mod 1: Added drawings.

Description of Proposed Construction:

The work specified consists of furnishing all labor, equipment, tools, materials, travel, licenses, and permits required to complete the project. Contractor shall bid the project in two sections, Base and Option. The base bid will be to complete the following for Zone 1 and Zone 2. The option will be to complete the following for Zone 3. The work shall be completed in compliance with UFC 3-260-04 and USAF AFI 31-101 and updated to all other codes, instructions and regulations.

The Magnitude of this project is between $250,000.00 and $500,000.00. Construction/contract completion time is anticipated to be 150 days after notice to proceed to include inspection and punch list.

See attachments for full solication details.

The date for the pre-proposal conference is 13 July 2021, 9:00AM local time at the 126th ARW at Scott Air Force Base, IL. Interested contractors are encouraged to attend and shall follow conference registration and base access requirements shown in the solicitation. A site visit will follow the pre-proposal conference. All questions for the pre-proposal conference must be submitted by 1 July 2021 via email (preferred) to 126.ARW.MSC.Org@us.af.mil.

Update #1 ·

Description of Proposed Construction:

The work specified consists of furnishing all labor, equipment, tools, materials, travel, licenses, and permits required to complete the project. Contractor shall bid the project in two sections, Base and Option. The base bid will be to complete the following for Zone 1 and Zone 2. The option will be to complete the following for Zone 3. The work shall be completed in compliance with UFC 3-260-04 and USAF AFI 31-101 and updated to all other codes, instructions and regulations.

The Magnitude of this project is between $250,000.00 and $500,000.00. Construction/contract completion time is anticipated to be 150 days after notice to proceed to include inspection and punch list.

See attachments for full solication details.

The date for the pre-proposal conference is 13 July 2021, 9:00AM local time at the 126th ARW at Scott Air Force Base, IL. Interested contractors are encouraged to attend and shall follow conference registration and base access requirements shown in the solicitation. A site visit will follow the pre-proposal conference. All questions for the pre-proposal conference must be submitted by 1 July 2021 via email (preferred) to 126.ARW.MSC.Org@us.af.mil.

Files

File Type Posted
Q and A 4.docx DOCX document
Q and A 3.docx DOCX document
Q and A 2.docx DOCX document
AMDT W50S7S21R0001 - 0001.pdf PDF
Q and A 1.docx DOCX document
Site Visit MFR.pdf PDF
Site Visit Sign In Sheet - Redacted.pdf PDF
Exhibit G Grid Map.pdf PDF
Exhibit F UFGS 32 01 19 joint sealant.pdf PDF
Exhibit E Revised SOW.docx DOCX document
Apron.Sealing.Grid.Map.pdf PDF
Exhibit C_Reference_Questionnaire_Package 18Jan18_NEW.docx DOCX document
Exhibit E SOW.docx DOCX document
Exhibit B.doc DOC document
Exhibit A.doc DOC document
Exhibit D Letter of Commitment.docx DOCX document
W50S7S21R0001 SF1442.pdf PDF
Show all 17

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Repair Apron Joint Sealant Scott AFB IL Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Fuel Station Pump Repair Scott Air Force Base, Illinois 62225, United States · NAICS 237120 Air Mobility Command Woman-Owned Small Business
Airlift Efficiency Commercial Solutions Opening (CSO) Scott AFB, Illinois, United States · NAICS 541715 Air Mobility Command No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors