Q and A 4.docx

DOCX document 12 KB Posted

Attached to
Repair Apron Joint Sealant Scott AFB IL
Solicitation number
W50S7S21R0001
Issued by

About this file

This document contains a solicitation for repair work on an air force base apron joint sealant project. The solicitation is for furnishing all labor, equipment, tools, materials, travel, licenses, and permits to complete repair work on the apron joints in three zones at Scott Air Force Base in Illinois over a 150 day period for between $250,000 and $500,000. Interested contractors are required to attend the pre-proposal conference on July 13, 2021 and submit any questions by July 1, 2021 via email. The site visit will follow the pre-proposal conference.

View the file

Other files

File Type Posted
Q and A 3.docx DOCX document
Q and A 2.docx DOCX document
AMDT W50S7S21R0001 - 0001.pdf PDF
Q and A 1.docx DOCX document
Site Visit MFR.pdf PDF
Site Visit Sign In Sheet - Redacted.pdf PDF
Exhibit G Grid Map.pdf PDF
Exhibit F UFGS 32 01 19 joint sealant.pdf PDF
Exhibit E Revised SOW.docx DOCX document
Apron.Sealing.Grid.Map.pdf PDF
Exhibit A.doc DOC document
Exhibit E SOW.docx DOCX document
Exhibit B.doc DOC document
Exhibit C_Reference_Questionnaire_Package 18Jan18_NEW.docx DOCX document
Exhibit D Letter of Commitment.docx DOCX document
W50S7S21R0001 SF1442.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

•While at the site visit there was some discussion of the partial depth repairs along joints and at joint intersections on the apron. Will concrete partial depth repairs be added to the scope of work? If so, can the COR please provide a square foot (SF) quantity of partial depth repair as a basis for bidding?

It was mentioned at the site visit that there may be partial depth repairs, and if those are required as part of the joint repair process, we will address it as a modification to the contract. It is not included in the initial basis for bidding.

•Will cones need to be removed after a days work and put back up in the morning around the zone the contractor is working in or will cones be placed around the zone and stay there overnight until all work is completed?

We will work with the 126th Airfield Management (Ms. Lisa Weekely) to allow the cones to remain onsite as needed. However, there may be instances where you may have to clean up the job site to allow for night operations if we cannot find another way to get planes in and out safely.

•There are painted lines running for hundreds of feet along concrete joints that will be resealed. If the paint is damaged does it only need to be repainted at the joint where it’s damaged or does the entire line need to be repainted?

If the paint is damaged due to the joint repair, only repaint where the joint is being replaced. No need to repaint the entire line.