This document contains details for a federal contract solicitation to repair apron joint sealant at Scott Air Force Base in Illinois. The solicitation seeks bids to complete repair work in three zones, with the base bid covering Zones 1 and 2 and an option to cover Zone 3. Contractors are encouraged to propose value engineering or alternate installation methods. Work must be completed within 150 days of notice to proceed and in compliance with UFC 3-260-04, USAF AFI 31-101, and other codes and regulations. A pre-proposal conference will be held on July 13th followed by a site visit, and all questions must be submitted by July 1st via email. Bidders must follow conference registration and base access requirements contained in the solicitation. The magnitude of the project is estimated between $250,000 and $500,000.

View the file

Other files

File Type Posted
Q and A 4.docx DOCX document
Q and A 3.docx DOCX document
Q and A 2.docx DOCX document
AMDT W50S7S21R0001 - 0001.pdf PDF
Site Visit MFR.pdf PDF
Site Visit Sign In Sheet - Redacted.pdf PDF
Exhibit G Grid Map.pdf PDF
Exhibit F UFGS 32 01 19 joint sealant.pdf PDF
Exhibit E Revised SOW.docx DOCX document
Apron.Sealing.Grid.Map.pdf PDF
Exhibit A.doc DOC document
Exhibit E SOW.docx DOCX document
Exhibit B.doc DOC document
Exhibit C_Reference_Questionnaire_Package 18Jan18_NEW.docx DOCX document
Exhibit D Letter of Commitment.docx DOCX document
W50S7S21R0001 SF1442.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Is there a plan set for this project?

Yes, see attached What is the existing material in the joints?

Rubber joint sealant.

What sealant material is being specified for this project?

Cold applied jet-fuel resistant FS SS-S-200 Type M or H and COE CRD-C 525. Follow UFGS 32 01 19.

What is the existing width of the concrete joints?

3 of the lines are 1.25 inch and the rest are approximately ¾ inch.

What is the completion date for the project?

150 After Notice to Proceed. Companies can propose alternative dates using the exception clause, but this might disqualify one’s proposal if it does not meet the government mission.

Does the engineer have a recommendation or preference for the two part Type H or Type M cold mix/applied product manufacturer?

No.

The spec UFGS 32 01 19 does not appear to reference silicone but the revised SOW does. Do we follow the 32 01 19 spec (issued with the SOW) for a 2 part polyurethane or is a single part silicone product acceptable?

Follow the UFGS 32 01 19 spec.

Are bidders encouraged to present value engineering or alternate product installation pricing?

Yes.

Our supplier is telling me that the two part sealants are no longer available and that the two part material is obsolete. We have been using 1 part silicone which is both jet blast and fuel resistant. I have attached the material literature from multiple manufactures of the one part silicone. Please note they meet the same standards as the old two part material. Please note the FAA specifies one part silicone under their P-605 Joint sealing specification.