Recovery--Y--recovery-port of long beach (DEEPENING)and other long beach projects, LOS angeles county, california project no. 013274
Award Notice Posted
- Solicitation number
- W912PL-09-B-0009
- Agency
-
ENDIST Los Angeles
US Army Corps of Engineers, Department of Defense
- Awarded
- to Manson Construction Co
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W912PL-09-C-0033 Federal contract award
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
5 versions
Update #5 · Latest ·
The project consists of dredging to deepen the turning basin within the Port of Long Beach; construction of a rock dike; fill operations; wick drain installation, settlement monitoring; dredging of POLB's West Basin IR site; removal of 2 submerged barges; dredging of Catalina Landing; some demolition work; dreding of surcharge material from the West Anchorage Borrow site.
Update #4 ·
RECOVERY-The proposed contract consists of filling the northern portion of the Slip G Area to create land. This work includes construction of rock dike, dredging, fill operations, wick drain installation, settlement monitoring, etc. Also, deepening of the Port of Long Beach (POLB) Turning Basin to -76 ft.--approximately 600,000 cubic yards; dredging POLB's West Basin IR Site 7--approximately 600,000 cubic yards, and removal of 4 submerged barges; dredging of Catalina Express Terminal--approximately 37,000 cubic yards, and some demolition work; dredging of surcharge material from the Western Anchorage Borrow Site. All dredge material to be placed in the Pier G North Slip Fill. All dredging, except Catalina Express Terminal and CLosure Dike Foundation, shall be electric powered. The estimated cost range of this project is over $10,000,000.
NOTE: This procurement was authorized for construction under the American Recovery and Reinvestment Act (ARRA) of 2009.
NOTE: This procurement is issued under full and open competition without exclusion of sources (UNRESTRICTED). When applicable, FAR 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns will be applied to this action.
ALL OFFERORS/BIDDERS ARE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELED OR REVISED AT ANY TIME DURING THE SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.
THE SOLICITATION (PLANS AND SPECS) WILL BE AVAILABLE ON OR ABOUT 29 JULY 2009, ONLY AT THE WEBSITE, www.fbo.gov. All parties (primes and subcontractors) requesting to view/download the IFB, Plans and Specs documents from www.fbo.gov will require prior registration in Central Contractor Registration (www.ccr.gov), possess a MPIN and either a DUNS # or CAGE code.
Subcontracting plans are required for all construction contracts awarded to a large business when the award amount exceed $1,000,000.00. The plan shall be prepared in accordance with FAR 52.219-9. Failure to submit an acceptable subcontracting plan may make the bidder ineligible for award of the contract The Los Angeles District subcontracting goals are specific percentages of the contractors total planned subcontract amount. The goals are as follows: 70% with small business; 6.2% with small disadvantaged business; 7.0% with woman owned small business; 9.8% HUBZone small business 3.0% Veteran-Owned small business 0.9% Service-Disabled Veteran-Owned small business. All interested contractors are reminded that the successful contractor will be expected to place subcontracts to the maximum practicable extent with small and disadvantaged firms in accordance with the provisions of Public Law 95-507.
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK WWW.FBO.GOV FREQUENTLY FOR ANY AMENDMENTS OR CHANGES TO THE SOLICITATION. THE GOVERNMENT IS NOT RESPONSIBLE FOR ANY LOSS OF INTERNET CONNECTIVITY OR FOR AN OFFERORS INABILITY TO ACCESS THE DOCUMENTS POSTED AT THE REFERENCED WEBSITE. NO CDs OR HARD COPIES WILL BE MADE AVAILABLE.
If you would like to list your firm so that others can see you are an interested vendor, you must click the Add Me to Interested Vendors button in the listing for this solicitation on www.fbo.gov. Planholders or Bidder's list are ONLY available on the FBO website by clicking the "Interested Vendors" tab for the Presolicitation Notice or Solicitation Document Package.
Update #3 ·
RECOVERY-The proposed contract consists of filling the northern portion of the Slip G Area to create land. This work includes construction of rock dike, dredging, fill operations, wick drain installation, settlement monitoring, etc. Also, deepening of the Port of Long Beach (POLB) Turning Basin to -76 ft.--approximately 600,000 cubic yards; dredging POLB's West Basin IR Site 7--approximately 600,000 cubic yards, and removal of 4 submerged barges; dredging of Catalina Express Terminal--approximately 37,000 cubic yards, and some demolition work; dredging of surcharge material from the Western Anchorage Borrow Site. All dredge material to be placed in the Pier G North Slip Fill. All dredging, except Catalina Express Terminal and CLosure Dike Foundation, shall be electric powered. The estimated cost range of this project is over $10,000,000.00.
NOTE: This procurement was authorized for construction under the American Recovery and Reinvestment Act (ARRA) of 2009.
NOTE: This procurement is issued under full and open competition without exclusion of sources (UNRESTRICTED). When applicable, FAR 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns will be applied to this action.
ALL OFFERORS/BIDDERS ARE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELED OR REVISED AT ANY TIME DURING THE SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.
THE SOLICITATION (PLANS AND SPECS) WILL BE AVAILABLE ON OR ABOUT 29 JULY 2009, ONLY AT THE WEBSITE, www.fbo.gov. All parties (primes and subcontractors) requesting to view/download the IFB, Plans and Specs documents from www.fbo.gov will require prior registration in Central Contractor Registration (www.ccr.gov), possess a MPIN and either a DUNS # or CAGE code.
Subcontracting plans are required for all construction contracts awarded to a large business when the award amount exceed $1,000,000.00. The plan shall be prepared in accordance with FAR 52.219-9. Failure to submit an acceptable subcontracting plan may make the bidder ineligible for award of the contract The Los Angeles District subcontracting goals are specific percentages of the contractors total planned subcontract amount. The goals are as follows: 70% with small business; 6.2% with small disadvantaged business; 7.0% with woman owned small business; 9.8% HUBZone small business 3.0% Veteran-Owned small business 0.9% Service-Disabled Veteran-Owned small business. All interested contractors are reminded that the successful contractor will be expected to place subcontracts to the maximum practicable extent with small and disadvantaged firms in accordance with the provisions of Public Law 95-507.
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK WWW.FBO.GOV FREQUENTLY FOR ANY AMENDMENTS OR CHANGES TO THE SOLICITATION. THE GOVERNMENT IS NOT RESPONSIBLE FOR ANY LOSS OF INTERNET CONNECTIVITY OR FOR AN OFFERORS INABILITY TO ACCESS THE DOCUMENTS POSTED AT THE REFERENCED WEBSITE. NO CDs OR HARD COPIES WILL BE MADE AVAILABLE.
If you would like to list your firm so that others can see you are an interested vendor, you must click the Add Me to Interested Vendors button in the listing for this solicitation on www.fbo.gov. Planholders or Bidder's list are ONLY available on the FBO website by clicking the "Interested Vendors" tab for the Presolicitation Notice or Solicitation Document Package.
Update #2 ·
RECOVERY-The proposed contract consists of filling the northern portion of the Slip G Area to create land. This work includes includes construction of rock dike, dredging, fill operations, wick drain installation, settlement monitoring, etc. Also, deepening of the Port of Long Beach (POLB) Turning Basin to -76 ft.--approximately 600,000 cubic yards; dredging POLB's West Basin IR Site 7--approximately 600,000 cubic yards, and removal of 4 submerged barges; dredging of Catalina Express Terminal--approximately 50,000 cubic yards, and some demolition work; dredging of surcharge material from the Western Anchorage Borrow Site. All dredge material to be placed in the Pier G North Slip Fill. All dredging, except Catalina Express Terminal, shall be electric powered. The estimated cost range of this project is over $10,000,000.00.
NOTE: This procurement was authorized for construction under the American Recovery and Reinvestment Act (ARRA) of 2009.
NOTE: This procurement is issued under full and open competition without exclusion of sources (UNRESTRICTED). When applicable, FAR 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns will be applied to this action.
ALL OFFERORS/BIDDERS ARE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELED OR REVISED AT ANY TIME DURING THE SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.
THE SOLICITATION (PLANS AND SPECS) WILL BE AVAILABLE ON OR ABOUT 29 JULY 2009, ONLY AT THE WEBSITE, www.fbo.gov. All parties (primes and subcontractors) requesting to view/download the IFB, Plans and Specs documents from www.fbo.gov will require prior registration in Central Contractor Registration (www.ccr.gov), possess a MPIN and either a DUNS # or CAGE code.
Subcontracting plans are required for all construction contracts awarded to a large business when the award amount exceed $1,000,000.00. The plan shall be prepared in accordance with FAR 52.219-9. Failure to submit an acceptable subcontracting plan may make the bidder ineligible for award of the contract The Los Angeles District subcontracting goals are specific percentages of the contractors total planned subcontract amount. The goals are as follows: 70% with small business; 6.2% with small disadvantaged business; 7.0% with woman owned small business; 9.8% HUBZone small business 3.0% Veteran-Owned small business 0.9% Service-Disabled Veteran-Owned small business. All interested contractors are reminded that the successful contractor will be expected to place subcontracts to the maximum practicable extent with small and disadvantaged firms in accordance with the provisions of Public Law 95-507.
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK WWW.FBO.GOV FREQUENTLY FOR ANY AMENDMENTS OR CHANGES TO THE SOLICITATION. THE GOVERNMENT IS NOT RESPONSIBLE FOR ANY LOSS OF INTERNET CONNECTIVITY OR FOR AN OFFERORS INABILITY TO ACCESS THE DOCUMENTS POSTED AT THE REFERENCED WEBSITE. NO CDs OR HARD COPIES WILL BE MADE AVAILABLE.
If you would like to list your firm so that others can see you are an interested vendor, you must click the Add Me to Interested Vendors button in the listing for this solicitation on www.fbo.gov. Planholders or Bidder's list are ONLY available on the FBO website by clicking the "Interested Vendors" tab for the Presolicitation Notice or Solicitation Document Package.
Update #1 ·
RECOVERY-The proposed contract consists of filling the northern portion of the Slip G Area to create land. This work includes includes construction of rock dike, dredging, fill operations, wick drain installation, settlement monitoring, etc. Also, deepening of the Port of Long Beach (POLB) Turning Basin to -76 ft.--approximately 600,000 cubic yards; dredging POLB's West Basin IR Site 7--approximately 600,000 cubic yards, and removal of 2 submerged barges; dredging of Catalina Landing--approximately 50,000 cubic yards, and some demolition work; dredging of surcharge material from the West Anchorage Borrow Site. All dredge material to be placed in the Pier G North Slip Fill. All dredging, except Catalina Landing, shall be electric powered. The estimated cost range of this project is over $10,000,000.00.
NOTE: This procurement was authorized for construction under the American Recovery and Reinvestment Act (ARRA) of 2009.
NOTE: This procurement is issued under full and open competition without exclusion of sources (UNRESTRICTED). When applicable, FAR 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns will be applied to this action.
ALL OFFERORS/BIDDERS ARE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELED OR REVISED AT ANY TIME DURING THE SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.
THE SOLICITATION (PLANS AND SPECS) WILL BE AVAILABLE ON OR ABOUT 28 JULY 2009, ONLY AT THE WEBSITE, www.fbo.gov. All parties (primes and subcontractors) requesting to view/download the IFB, Plans and Specs documents from www.fbo.gov will require prior registration in Central Contractor Registration (www.ccr.gov), possess a MPIN and either a DUNS # or CAGE code.
Subcontracting plans are required for all construction contracts awarded to a large business when the award amount exceed $1,000,000.00. The plan shall be prepared in accordance with FAR 52.219-9. Failure to submit an acceptable subcontracting plan may make the bidder ineligible for award of the contract The Los Angeles District subcontracting goals are specific percentages of the contractors total planned subcontract amount. The goals are as follows: 70% with small business; 6.2% with small disadvantaged business; 7.0% with woman owned small business; 9.8% HUBZone small business 3.0% Veteran-Owned small business 0.9% Service-Disabled Veteran-Owned small business. All interested contractors are reminded that the successful contractor will be expected to place subcontracts to the maximum practicable extent with small and disadvantaged firms in accordance with the provisions of Public Law 95-507.
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK WWW.FBO.GOV FREQUENTLY FOR ANY AMENDMENTS OR CHANGES TO THE SOLICITATION. THE GOVERNMENT IS NOT RESPONSIBLE FOR ANY LOSS OF INTERNET CONNECTIVITY OR FOR AN OFFERORS INABILITY TO ACCESS THE DOCUMENTS POSTED AT THE REFERENCED WEBSITE. NO CDs OR HARD COPIES WILL BE MADE AVAILABLE.
If you would like to list your firm so that others can see you are an interested vendor, you must click the Add Me to Interested Vendors button in the listing for this solicitation on www.fbo.gov. Planholders or Bidder's list are ONLY available on the FBO website by clicking the "Interested Vendors" tab for the Presolicitation Notice or Solicitation Document Package.
Files
Show all 46
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity