Bid Abstract for Solicitation No. W912PL-09-B-0009

View the file

Other files

File Type Posted
AM07.pdf PDF
Am0006.pdf PDF
Am05.pdf PDF
Am04.pdf PDF
Am03.pdf PDF
plans_am2.pdf PDF
spec_am2.pdf PDF
AppX_Replacement Drawings_am2.pdf PDF
AppY_CatTermPermits_05-28-09_am2.pdf PDF
AM01.PDF PDF
AppG_ACOE Permit No. SPL-200700708-TS.pdf PDF
W912PL-09-B-0009_plans2C.pdf PDF
AppQ_Previously Discovered Military Munitions.pdf PDF
W912PL-09-B-0009_SPEC_VOL2.pdf PDF
AppF_General Const. Activity Stormwater Permit and Template.pdf PDF
W912PL-09-B-0009_plans2D.pdf PDF
AppI_Pre-Design Sediment Sampling by Weston Solutions.pdf PDF
W912PL-09-B-0009_plans3A.pdf PDF
W912PL-09-B-0009_Plans1.pdf PDF
W912PL-09-B-0009_Spec_Vol1B.pdf PDF
AppP_Available Dwgs of POLB St-19_Fence.pdf PDF
AppB_IR Site Summary.pdf PDF
AppE_Electrical Dredge Substation O M Manual.pdf PDF
AppAA_Geotechnical.pdf PDF
AppM_Available Dwgs of Pier 11.pdf PDF
AppT_W_NSlipDikeandDredging.pdf PDF
AppD_WDR's File No. 08-133.pdf PDF
AppR_Dredge Reporting Forms.pdf PDF
W912PL-09-B-0009_plans3B.pdf PDF
AppL_Hazardous Materials Survey Report for Pier 11.pdf PDF
AppJ_Remedial Action Plan and Design Report by Anchor.pdf PDF
AppH_Report of Offshore Sampling by Kleinfelder.pdf PDF
AppX_RefDrawings.pdf PDF
AppC_IR Site Safety Plan Requirements.pdf PDF
W912PL-09-B-0009_plans4.pdf PDF
AppA_USA and COLB Lease.pdf PDF
AppN_Available Drawings of Electrical Dredge.pdf PDF
AppZ_CatalinaExpressGeotech_SSSurvey.pdf PDF
W912PL-09-B-0009_plans2A.pdf PDF
AppY_ Cat Term Permits 04-08-09.pdf PDF
AppK_LBHP Underwater Observations of Sunken Barges and Debris Rep.pdf PDF
W912PL-09-B-0009_plans2B.pdf PDF
AppS_Harbor Development Permit for IR Site 7.pdf PDF
AppO_Available Drawings of Irrigation System at Laydown Area.pdf PDF
W912PL-09-B-0009_Spec_Vol1A.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID ABSTRACT FOR IFB W912PL-09-B-0009

PORT OF LONG BEACH & OTHER LONG BEACH

PROJECTS, LOS ANGELES COUNTY, CA

BID OPENING DATE: 18 SEP 2009

UNRESTRICTED-10% HUBZONE PREF

7 AMENDMENTS

INDEPENDENT GOVERNMENT ESTIMATE

BASE BID ITEMS

ITEM NO. DESCRIPTION ESTIMATED UNIT UNIT PRICE AMOUNT

QUANTITY

Port of Long Beach (Deepening)

1 Mobilization and Demobilization 1 Job Lump Sum $1,012,000.00 1a. Federal ARRA Funded (35% of Item No.1) 1b. Federal CG Funded (15% of Item No. 1) 1c. Non-Federal Funded (50% of Item No. 1)

2 Dredging, D102 w/Placement at F101 90,000 Cubic Yards $13.20 $1,188,000.00 2a. Federal ARRA Funded (First 45,000 Cubic Yards of Item No.2) 2b. Non-Federal Funded (Second 45,000 Cubic Yards of Item No.2)

3 Dredging, D102 w/Placement at F105 & 106 460,000 Cubic Yards $10.00 $4,600,000.00 3a. Federal CG Funded (First 230,000 Cubic Yards of Item No.3) 3b. Non-Federal Funded (Second 230,000 Cubic Yards of Item No.3)

4 Dredging, D103 w/Placement at F103 90,000 Cubic Yards $17.20 $1,548,000.00 4a. Federal ARRA Funded (First 45,000 Cubic Yards of Item No.4) 4b. Non-Federal Funded (Second 45,000 Cubic Yards of Item No.4)

Sub-Total Turning Basin Deepening $8,348,000.00

Pier G North Slip Dike and Dredging

5 Mobilization and Demobilization 1 Job Lump Sum $960,000.00

6 Steel Sheet Pile Wall 1 Job Lump Sum $3,936,000.00

7 Settlement Monitoring 1 Job Lump Sum $144,200.00

8 SWPPP Development & Compliance 1 Job Lump Sum $10,000.00

9 Dredging, D101 w/Placement at F102 15,000 Cubic Yards $14.40 $216,000.00

10 Dredging, D108 w/Placement at F104, F105, & F106 200,000 Cubic Yards $7.20 $1,440,000.00

11 Furnish Concrete Piles 9,000 Linear Feet $109.00 $981,000.00

12 Drive Concrete Piles 88 Each $6,600.00 $580,800.00

13 Storm Drain System 1 Job Lump Sum $860,000.00

14 Crushed Miscellaneous Base 15,000 Tons $27.00 $405,000.00

15 Asphalt Concrete 5,000 Tons $140.00 $700,000.00

16 Wick Drains 1,050,000 Linear Feet $1.27 $1,333,500.00

17 Quarry Run Rock 220,000 Tons $26.00 $5,720,000.00

18 Armor Stone 15,000 Tons $32.40 $486,000.00

19 Furnish and Place Pavement Markings & Signage 1 Job Lump Sum $119,400.00

Sub-Total Pier G North Slip Fill $17,891,900.00

Pier T, West Basin IR Site 7 Sediment Remediation

20 Mobilization and Demobilization 1 Job Lump Sum $648,000.00

21 IR Site 7 Demolition 1 Job Lump Sum $933,000.00

22 Barge Removal 1 Job Lump Sum $864,000.00

23 SWPPP Development and Compliance 1 Job Lump Sum $10,000.00

24 Dredging, D104/D105 w/Placement at F102/F103 587,000 Cubic Yards $15.40 $9,039,800.00

25 Hydroseeding 6 Acres $41,800.00 $250,800.00

26 Restoration & Repair of Temp Irrigation System 1 Job Lump Sum $169,000.00

27 Required Insurance 1 Job Lump Sum $406,000.00

28 On Site SUXOS Personnel 1 Job Lump Sum $450,000.00

Sub-Total West Basin IR Site 7 Sediment Clean-Up $12,770,600.00

Catalina Express Terminal Maintenance Dredging and Demolition

29 Mobilization and Demobilization 1 Job Lump Sum $791,000.00

30 Dredging, D106, w/Placement at F105 37,000 Cubic Yards $16.40 $606,800.00

31 Catalina Landing Demolition 1 Job Lump Sum $253,000.00

Sub-Total Catalina Express Terminal $1,650,800.00

Pier T, West Basin IR Site 7 Sediment Remediation

32 Additional Set-ups 5 Each $39,200.00 $196,000.00

33 Re-Dredging D104/D105 w/Placement at F102/F103 59,000 Cubic Yards $45.40 $2,678,600.00

34 Daily Stand-by Time 14 Days $62,600.00 $876,400.00

35 Hourly Stand-by Time 48 Hours $2,600.00 $124,800.00

Sub-Total West Basin IR Site 7 Sediment Clean-Up (Option) $3,875,800.00

TOTAL BID AMOUNT $44,537,100.00

PROJECTS, LOS ANGELES COUNTY, CA

BID OPENING DATE: 18 SEP 2009

UNRESTRICTED-10% HUBZONE PREF

7 AMENDMENTS

MANSON CONSTRUCTION CO.

5209 E. MARGINAL WAY S

SEATTLE, WA 98134 206-762-0850

BASE BID ITEMS:

ITEM NO. DESCRIPTION ESTIMATED UNIT UNIT PRICE AMOUNT

QUANTITY

Port of Long Beach (Deepening)

1 Mobilization and Demobilization 1 Job Lump Sum $3,400,000.00 1a. Federal ARRA Funded (35% of Item No.1) 1b. Federal CG Funded (15% of Item No. 1) 1c. Non-Federal Funded (50% of Item No. 1)

2 Dredging, D102 w/Placement at F101 90,000 Cubic Yards $13.00 $1,170,000.00 2a. Federal ARRA Funded (First 45,000 Cubic Yards of Item No.2) 2b. Non-Federal Funded (Second 45,000 Cubic Yards of Item No.2)

3 Dredging, D102 w/Placement at F105 & 106 460,000 Cubic Yards $8.00 $3,680,000.00 3a. Federal CG Funded (First 230,000 Cubic Yards of Item No.3) 3b. Non-Federal Funded (Second 230,000 Cubic Yards of Item No.3)

4 Dredging, D103 w/Placement at F103 90,000 Cubic Yards $15.00 $1,350,000.00 4a. Federal ARRA Funded (First 45,000 Cubic Yards of Item No.4) 4b. Non-Federal Funded (Second 45,000 Cubic Yards of Item No.4)

Sub-Total Turning Basin Deepening $9,600,000.00

5 Mobilization and Demobilization 1 Job Lump Sum $800,000.00

6 Steel Sheet Pile Wall 1 Job Lump Sum $3,250,000.00

7 Settlement Monitoring 1 Job Lump Sum $10,000.00

8 SWPPP Development & Compliance 1 Job Lump Sum $10,000.00

9 Dredging, D101 w/Placement at F102 15,000 Cubic Yards $12.00 $180,000.00

10 Dredging, D108 w/Placement at F104, F105, & F106 200,000 Cubic Yards $7.50 $1,500,000.00

11 Furnish Concrete Piles 9,000 Linear Feet $100.00 $900,000.00

12 Drive Concrete Piles 88 Each $3,000.00 $264,000.00

13 Storm Drain System 1 Job Lump Sum $900,000.00

14 Crushed Miscellaneous Base 15,000 Tons $15.00 $225,000.00

15 Asphalt Concrete 5,000 Tons $100.00 $500,000.00

16 Wick Drains 1,050,000 Linear Feet $0.50 $525,000.00

17 Quarry Run Rock 220,000 Tons $27.00 $5,940,000.00

18 Armor Stone 15,000 Tons $41.00 $615,000.00

19 Furnish and Place Pavement Markings & Signage 1 Job Lump Sum $55,000.00

Sub-Total Pier G North Slip Fill $15,674,000.00

Pier T, West Basin IR Site 7 Sediment Remediation

20 Mobilization and Demobilization 1 Job Lump Sum $1,300,000.00

21 IR Site 7 Demolition 1 Job Lump Sum $700,000.00

22 Barge Removal 1 Job Lump Sum $150,000.00

23 SWPPP Development and Compliance 1 Job Lump Sum $10,000.00

24 Dredging, D104/D105 w/Placement at F102/F103 587,000 Cubic Yards $15.00 $8,805,000.00

25 Hydroseeding 6 Acres $5,000.00 $30,000.00

26 Restoration & Repair of Temp Irrigation System 1 Job Lump Sum $70,000.00

27 Required Insurance 1 Job Lump Sum $20,000.00

28 On Site SUXOS Personnel 1 Job Lump Sum $375,000.00

Sub-Total West Basin IR Site 7 Sediment Clean-Up $11,460,000.00

Catalina Express Terminal Maintenance Dredging and Demolition

29 Mobilization and Demobilization 1 Job Lump Sum $50,000.00

30 Dredging, D106, w/Placement at F105 37,000 Cubic Yards $16.00 $592,000.00

31 Catalina Landing Demolition 1 Job Lump Sum $140,000.00

Sub-Total Catalina Express Terminal $782,000.00

Pier T, West Basin IR Site 7 Sediment Remediation

32 Additional Set-ups 5 Each $60,000.00 $300,000.00

33 Re-Dredging D104/D105 w/Placement at F102/F103 59,000 Cubic Yards $20.00 $1,180,000.00

34 Daily Stand-by Time 14 Days $50,000.00 $700,000.00

35 Hourly Stand-by Time 48 Hours $2,200.00 $105,600.00

Sub-Total West Basin IR Site 7 Sediment Clean-Up (Option) $2,285,600.00

TOTAL BID AMOUNT $39,801,600.00

PROJECTS, LOS ANGELES COUNTY, CA

BID OPENING DATE: 18 SEP 2009

UNRESTRICTED-10% HUBZONE PREF

7 AMENDMENTS

DUTRA DREDGING COMPANY

2350 Kerner Boulevard., Suite 200

San Rafael, CA 94901 415-258-6876

BASE BID ITEMS:

ITEM NO. DESCRIPTION ESTIMATED UNIT UNIT PRICE AMOUNT

QUANTITY

Port of Long Beach (Deepening)

1 Mobilization and Demobilization 1 Job Lump Sum $700,000.00 1a. Federal ARRA Funded (35% of Item No.1) 1b. Federal CG Funded (15% of Item No. 1) 1c. Non-Federal Funded (50% of Item No. 1)

2 Dredging, D102 w/Placement at F101 90,000 Cubic Yards $8.50 $765,000.00 2a. Federal ARRA Funded (First 45,000 Cubic Yards of Item No.2) 2b. Non-Federal Funded (Second 45,000 Cubic Yards of Item No.2)

3 Dredging, D102 w/Placement at F105 & 106 460,000 Cubic Yards $14.50 $6,670,000.00 3a. Federal CG Funded (First 230,000 Cubic Yards of Item No.3) 3b. Non-Federal Funded (Second 230,000 Cubic Yards of Item No.3)

4 Dredging, D103 w/Placement at F103 90,000 Cubic Yards $13.25 $1,192,500.00 4a. Federal ARRA Funded (First 45,000 Cubic Yards of Item No.4) 4b. Non-Federal Funded (Second 45,000 Cubic Yards of Item No.4)

Sub-Total Turning Basin Deepening $9,327,500.00

5 Mobilization and Demobilization 1 Job Lump Sum $1,140,000.00

6 Steel Sheet Pile Wall 1 Job Lump Sum $4,200,000.00

7 Settlement Monitoring 1 Job Lump Sum $21,000.00

8 SWPPP Development & Compliance 1 Job Lump Sum $10,000.00

9 Dredging, D101 w/Placement at F102 15,000 Cubic Yards $8.50 $127,500.00

10 Dredging, D108 w/Placement at F104, F105, & F106 200,000 Cubic Yards $14.50 $2,900,000.00

11 Furnish Concrete Piles 9,000 Linear Feet $120.00 $1,080,000.00

12 Drive Concrete Piles 88 Each $4,850.00 $426,800.00

13 Storm Drain System 1 Job Lump Sum $1,220,000.00

14 Crushed Miscellaneous Base 15,000 Tons $16.10 $241,500.00

15 Asphalt Concrete 5,000 Tons $90.00 $450,000.00

16 Wick Drains 1,050,000 Linear Feet $0.46 $483,000.00

17 Quarry Run Rock 220,000 Tons $35.10 $7,722,000.00

18 Armor Stone 15,000 Tons $53.00 $795,000.00

19 Furnish and Place Pavement Markings & Signage 1 Job Lump Sum $38,500.00

Sub-Total Pier G North Slip Fill $20,855,300.00

Pier T, West Basin IR Site 7 Sediment Remediation

20 Mobilization and Demobilization 1 Job Lump Sum $3,225,000.00

21 IR Site 7 Demolition 1 Job Lump Sum $1,420,000.00

22 Barge Removal 1 Job Lump Sum $300,000.00

23 SWPPP Development and Compliance 1 Job Lump Sum $10,000.00

24 Dredging, D104/D105 w/Placement at F102/F103 587,000 Cubic Yards $9.25 $5,429,750.00

25 Hydroseeding 6 Acres $3,000.00 $18,000.00

26 Restoration & Repair of Temp Irrigation System 1 Job Lump Sum $94,200.00

27 Required Insurance 1 Job Lump Sum $1,350.00

28 On Site SUXOS Personnel 1 Job Lump Sum $100,000.00

Sub-Total West Basin IR Site 7 Sediment Clean-Up $10,598,300.00

Catalina Express Terminal Maintenance Dredging and Demolition

29 Mobilization and Demobilization 1 Job Lump Sum $1,150,000.00

30 Dredging, D106, w/Placement at F105 37,000 Cubic Yards $13.00 $481,000.00

31 Catalina Landing Demolition 1 Job Lump Sum $705,000.00

Sub-Total Catalina Express Terminal $2,336,000.00

Pier T, West Basin IR Site 7 Sediment Remediation

32 Additional Set-ups 5 Each $8,150.00 $40,750.00

33 Re-Dredging D104/D105 w/Placement at F102/F103 59,000 Cubic Yards $13.00 $767,000.00

34 Daily Stand-by Time 14 Days $38,500.00 $539,000.00

35 Hourly Stand-by Time 48 Hours $1,600.00 $76,800.00

Sub-Total West Basin IR Site 7 Sediment Clean-Up (Option) $1,423,550.00

TOTAL BID AMOUNT $44,540,650.00