About this file

Appendix T Harbor Development Permit for Pier G Appendix U Geotechnical / Environmental Report(s) Appendix V List of Standard Plans Appendix W General Construction Permits (NPDES) for Pier G

View the file

Other files

File Type Posted
Bid abstract 09-b-0009 Port of LB.pdf PDF
AM07.pdf PDF
Am0006.pdf PDF
Am05.pdf PDF
Am04.pdf PDF
Am03.pdf PDF
plans_am2.pdf PDF
spec_am2.pdf PDF
AppX_Replacement Drawings_am2.pdf PDF
AppY_CatTermPermits_05-28-09_am2.pdf PDF
AM01.PDF PDF
AppG_ACOE Permit No. SPL-200700708-TS.pdf PDF
W912PL-09-B-0009_plans2C.pdf PDF
AppQ_Previously Discovered Military Munitions.pdf PDF
W912PL-09-B-0009_SPEC_VOL2.pdf PDF
AppF_General Const. Activity Stormwater Permit and Template.pdf PDF
W912PL-09-B-0009_plans2D.pdf PDF
AppI_Pre-Design Sediment Sampling by Weston Solutions.pdf PDF
W912PL-09-B-0009_plans3A.pdf PDF
W912PL-09-B-0009_Plans1.pdf PDF
W912PL-09-B-0009_Spec_Vol1B.pdf PDF
AppP_Available Dwgs of POLB St-19_Fence.pdf PDF
AppB_IR Site Summary.pdf PDF
AppE_Electrical Dredge Substation O M Manual.pdf PDF
AppAA_Geotechnical.pdf PDF
AppM_Available Dwgs of Pier 11.pdf PDF
AppD_WDR's File No. 08-133.pdf PDF
AppR_Dredge Reporting Forms.pdf PDF
W912PL-09-B-0009_plans3B.pdf PDF
AppL_Hazardous Materials Survey Report for Pier 11.pdf PDF
AppJ_Remedial Action Plan and Design Report by Anchor.pdf PDF
AppH_Report of Offshore Sampling by Kleinfelder.pdf PDF
AppX_RefDrawings.pdf PDF
AppC_IR Site Safety Plan Requirements.pdf PDF
W912PL-09-B-0009_plans4.pdf PDF
AppA_USA and COLB Lease.pdf PDF
AppN_Available Drawings of Electrical Dredge.pdf PDF
AppZ_CatalinaExpressGeotech_SSSurvey.pdf PDF
W912PL-09-B-0009_plans2A.pdf PDF
AppY_ Cat Term Permits 04-08-09.pdf PDF
AppK_LBHP Underwater Observations of Sunken Barges and Debris Rep.pdf PDF
W912PL-09-B-0009_plans2B.pdf PDF
AppS_Harbor Development Permit for IR Site 7.pdf PDF
AppO_Available Drawings of Irrigation System at Laydown Area.pdf PDF
W912PL-09-B-0009_Spec_Vol1A.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX T

HARBOR DEVELOPMENT PERMIT

APPENDIX U

GEOTECHICAL/ENVIRONMENTAL REPORT(S)

Report Title Page No.

REPORT OF ADDITIONAL GEOTECHNICAL INVESTIGATION PROPOSED STORM DRAINS

AND PAVEMENT IMPROVEMENTS, ITS TERMINAL DEVELOPMENT PROJECT, PORT OF LONG

BEACH, KLEINFELDER, DRAFT DATED 7-AUGUST-2007

O-1

TECHNICAL MEMORANDUM, ADDITIONAL GEOTECHNICAL RECOMMENDATIONS /

EVALUATION OF STATIC AND SEISMIC PASSIVE EARTH PRESSURES ON THE SHEETPILE

QUAY WALLS, NORTH SLIP FILL DIKE, TERMINAL REDEVELOPMENT, PORT OF LONG BEACH,

KLEINFELDER, DATED 23-JANUARY-09

O-113

REPORT OF OFFSHORE SAMPLING, DREDGE BORROW WESTERN ANCHORAGE AREA, NORTH

SLIP FILL AT PIER G, PORT OF LONG BEACH, KLEINFELDER, DATED 17-DECEMBER-07

O-119

TECHNICAL MEMORANDUM, GEOTECHNICAL RECOMMENDATIONS FOR DESIGN OF ANCHOR

SYSTEM, PROPOSED SHEETPILE QUAY WALL, NORTH SLIP FILL DIKE, TERMINAL

REDEVELOPMENT, PORT OF LONG BEACH, KLEINFELDER, DATED 12-JANUARY-09

O-207

O - 1

O - 2

O - 3

O - 4

O - 5

O - 6

O - 7

O - 8

O - 9

O - 10

O - 11

O - 12

O - 13

O - 14

O - 15

O - 16

O - 17

O - 18

O - 19

O - 20

O - 21

O - 22

O - 23

O - 24

O - 25

O - 26

O - 27

O - 28

O - 29

O - 30

O - 31

O - 32

O - 33

O - 34

O - 35

O - 36

O - 37

O - 38

O - 39

O - 40

O - 41

O - 42

O - 43

O - 44

O - 45

O - 46

O - 47

O - 48

O - 49

O - 50

O - 51

O - 52

O - 53

O - 54

O - 55

O - 56

O - 57

O - 58

O - 59

O - 60

O - 61

O - 62

O - 63

O - 64

O - 65

O - 66

O - 67

O - 68

O - 69

O - 70

O - 71

O - 72

O - 73

O - 74

O - 75

O - 76

O - 77

O - 78

O - 79

O - 80

O - 81

O - 82

O - 83

O - 84

O - 85

O - 86

O - 87

O - 88

O - 89

O - 90

O - 91

O - 92

O - 93

O - 94

O - 95

O - 96

O - 97

O - 98

O - 99

O - 100

O - 101

O - 102

O - 103

O - 104

O - 105

O - 106

O - 107

O - 108

O - 109

O - 110

O - 111

O - 112

O - 113

O - 114

O - 115

O - 116

O - 117

O - 118

O - 119

O - 120

O - 121

O - 122

O - 123

O - 124

O - 125

O - 126

O - 127

O - 128

O - 129

O - 130

O - 131

O - 132

O - 133

O - 134

O - 135

O - 136

O - 137

O - 138

O - 139

O - 140

O - 141

O - 142

O - 143

O - 144

O - 145

O - 146

O - 147

O - 148

O - 149

O - 150

O - 151

O - 152

O - 153

O - 154

O - 155

O - 156

O - 157

O - 158

O - 159

O - 160

O - 161

O - 162

O - 163

O - 164

O - 165

O - 166

O - 167

O - 168

O - 169

O - 170

O - 171

O - 172

O - 173

O - 174

O - 175

O - 176

O - 177

O - 178

O - 179

O - 180

O - 181

O - 182

O - 183

O - 184

O - 185

O - 186

O - 187

O - 188

O - 189

O - 190

O - 191

O - 192

O - 193

O - 194

O - 195

O - 196

O - 197

O - 198

O - 199

O - 200

O - 201

O - 202

O - 203

O - 204

O - 205

O - 206

O - 207

O - 208

O - 209

O - 210

O - 211

O - 212

O - 213

O - 214

O - 215

O - 216

O - 217

APPENDIX V

LIST OF STANDARD PLANS

POLB Standard Plan No. D-23 Manhole No. 2, 36” Pipe or Larger POLB Standard Plan No. D-37 Trench Width and Bedding Requirements POLB Standard Plan No. ST-19 Chain Link Fence and Gates POLB Standard Plan No. U-1 Trench Requirements in Streets POLB Standard Plan No. T-1 Traffic Sign Installation POLB Standard Plan No. T-3 Pavement Markers and Traffic Lines POLB Standard Plan No. T-11 Pedestrian Marking at Crosswalk Stop and

Stop Bar CALTRANS Standard Plan No. T-3 Temporary Railing (Type K) w c

EXCAVATION SlOPE

B C

A

SLOPE

A = DIMENSION OF TRENCH OF TOP OF PIPE

A (MAX.) - C + 20· (NOTE 1)

8 = 6" MINIMUM. 10" MAXIMUM

C ~ OUTSIDE DIAMETER Of CONDUIT o = IN ACCORDANCE WITH CAL-OSHA GUIOEUNES

SLOPE = AS DETERMINED BY lHE SallS ENGlNEER

W ~ SURfACE TRENCH \\1DlH (AS APPROVED BY lHE CHiEf HARBOR ENGINEER)

NOTE:

1. UNLESS OlHERWISE APPROVED BY lHE CHIEF HARBOR ENGINEER.

mENCH W1Plli REQUIREMENTS

THE PORT OF LONG BEACH ENGINEERING DIVISION

REVISiONS STANDARD PLAN

NO. DATE TRENCH WIDTH AND BEDDING REQUIREMENTS& 0-37

.&. APPROVED BY: R.E. NO.: DAlE: 1 OF 4CHIEF HARBOR ENGfNEER

Be

"BEDDING BELOW BOnOM

OF PIPE NOT REQUIRED

CLASS "A" BEDDING

LOAD FACTOR 1.5

Be

CLASS "A" BEDDING

LOAD FACTOR 1.8

Be

BEDDING MATERIAL

CONCRETE

P.,.-~»::S:~F--'->:;;-J;<:l:4-GRANULAR BEDDING /. MATERiAl

Be/4 BUT NOT LESS lHAN 4'

CLASS "B" BEDDING

LOAD FACTOR 2.5

CLASS "C" BEDDING

LOAD FACTOR 3.0

BEDDING MATERiAl

CONCRETE

NOTES

1. CLASS"A" BEDDING SHALL BE USED, UNLESS OTHERWISE NOTED ON PROJECT PLANS.

2. BEDDING MATERIAL SHALL CONFORM TO SECllON 306-1.2.1 OF THE STANDARD SPECIFICAllONS. SAND EQUIVALENT OF NOT LESS THAN 30.

3. WHEN CONCRETE BEDDING IS USED, PIPE SHAU BE SECURELY ANCHORED AT EACH

JOINT TO PREVENT PIPE FROM FLOATING.

4. SHEEllNG NOT SHOWN.

5. GRANULAR MATERIAL SHALL BE NO. 4 AGGREGATE OR ~.. CRUSHED ROCK.

6. CONCRETE BEDDING SHALL BE CLASS 450-C-2000.

7. IF TRENCH IS OVER EXCAVATED, A MINIMUM OF 4" OF BEDDING MATERIAL SHAU BE

PLACED ON NAllVE SOIL UNDER THE PIPE.

THE PORT OF LONG BEACH ENGINEERING DIVISION

RE~SIONS STANDARD PLAN

NO. DATE TRENCH WIDTH AND BEDDING REQUIREMENTS& 0-37

APPROVED BY: R.E. NO.' DATE: 2 OF 4CHIEF ARBOR ENGINEER

CONCRETE

GRANULAR

BEDDING

MATERIAL

rBACKFlLL

< MATERIAL'\.

1-7---.,--,-.~,....,...'--<~~Be/4 BUT NOT

'-';;'-'''-'-1>:<---+ LESS THAN 4"

0.5 Be

0.5 Be

.....,,4~-+Be/4 BUT NOT

~"""7.T----:.","---,~~~*-,-LESS THAN 4"

CLASS "0" BEDDING

LOAD FACTOR 3.2

(TO BE USEO ONLY WHEN SEVERE GROUNO WATER CONDITIONS OCCUR)

Be /.""BACKFlLL< I MATERIAL

CONCRETE

1-7-f----,~~J--,-......-l~___,._ Be/6 BUT NOT

.'-ii-"'-'-i"L--'- LESS THAN 5" A:>'''--~

0.5 Be

CLASS "E" BEDDING

LOAD FACTOR 3.2

.....-;-BACKFlLl

< I MATERIAL

CONCRE1E-~

CLASS "F" BEDDING

LOAD FACTOR 4,5

TABLE OF T DIMENSIONS

PIPE SlZE (1.0.) T

6" 24" 6'

27- - 33- 8' 36" 39" 9'

42' - 60" 10'

REV1SIONS

. NO. DATE

THE PORT OF LONG BEACH ENGINEERING DIVISION

TRENCH WIDTH AND BEDDING REQUIREMENTS

APPROVED BY: R.E. NO.: DATE:

a-tIEF HARBOR ENGINEER

STANDARD PLAN

0-37

BASE /

SEE NOl£ 5---./

SEE POLS U-2 "lRENCH WIDTH AND

BEDDING REQUIREMENTS"

CASE I

NATIVE SOIL WITH SANP

EQUIVALENT LESS THAN 15

CASE II

NA]VE SOIL WIlli SANP

EQUIVALENT 15 OR GREATER

REVISIONS

NO. DAlE it

NOTES; (SEE POLB STD U-4 - TRENCH RESTORATION)

1. TRENCHES FOR BDTH CONCRETIE AND ASPHALT CONCRETE PAVEMENTS SHALL BE

SAW CUT TO FULL DEPTH OF THE PAVEMENT.

2. ALL DISTURBED SUBGRADE. AND BACKFlLL SHALL BE COMPACTIED TO NOT LESS THAN NINETY PERCENT (9D7-) RELATIVE COMPACTION, UNLESS OTHERWISE NOTlEO ON

PROJECT PLAN.

3. CASE I - lRENCH BACKFILL SHALL BE lRENCH BACKFILL SLURRY. CLASS 100

E-100 CONCRETE OR APPROVED BACKFILL MATIERIAL \\1TH A SAND EQUIVALENT OF

15 DR GREATIER.

4. CASE II - NATIVE MATIERIAL IS SUITABLE FOR BACKFILL.

5. TRENCH BACKFlLL SLURRY MAY BE USED IN LIEU OF REPLACING EXISTING BASE MATlERIAL.

6. TlEMPORARY ASPHALT CONCRETIE SHALL BE ~ INCH MINIMUM THICKNESS.

COMPACTION AND SURFACE FlNISH SHALL BE EQUAL TO THAT SPECIFIED FOR

PERMANENT ASPHALT CONCRETIE PAVEMENT.

THE PORT OF LONG IIEACJI ENGINEERING DIVISION

TRENCH REQUIREMENTS IN STREETS

APPROVED BY: R.E. NO.: DA.lE:

CHI F HAR OR NGIN R

STANDARD PlAN

U-l en -l Z o

:II

o "ll,...

Z

-l Col

'"oo

T3

Traffic this side only

RAILING

Kl

See Note 3

Cross street

SECTION F-F

See Note 3

NO SCALE

STATE OF CALIFORNIA

OEPARTMENT OF TRANSPORTATION

CURVED LAYOUT

TEMPORARY

(TYPE

4. Wnera tne offset dlstonca from tha exposed od~e of deck to the closest edge of tho temporary roilmg is loss than 2'-0", ottoch Mch panel to deck slob witn 1" diameter threoded rods (total four per panel) inserted through tho slottod halos of the panel and bond In drilled halos 6" daep in the deck slobs.

See "Bridge Memo to Designors" Monual.

NOTES:

1. For end treatment, layout and crash cushions, Where needed, seo Project Plans or Special ProvIsions.

2. All :>Y2" gaps at removable ponals are to be booked at the bOse with #8 " 10" dowel or 1" ¢ pin each side of joint. See Saction G-G.

3. Where Temporary Roil1ng (Type K) is placed on curves and rodll that are too severa to oonnact panels with bOltad joints, the roiling is to be backed continuously with earth fill. See Sactlon F-F.

Edge of deck or Excavated slope

Traffic this side only

100'Mln To next open ng if required

MINIMUM EDGE

DISTANCE

See Note 4

PETAIL

118 x 10" Dowel, drill and bond In hole 5" deep within 1'-0" of removable panel joint. Soe ~lote 2.

ELEVATION

TYPICAL OPENING

SECTlON C-C

100' Min 20'-0"

SECTION H H ELEVATION

REMOVABLE PANEL GROOVE DETAILS

4" x 1Y2" Groove Removable ponets only

Removable panel only

SECTlON G-G *

* Section G-G is for concrete povament. Alternative detail, 1" ¢ pins 2'_0" long driven In AC""I:: or firm soil permitted, minimum 1'-6" daep.

l~l~ Povemellt or",J.--'-"*::::J====='-''",,,,, ground I ina

To next opening I Removoble panel If required It. Opening

(G'u-... 10'-0"

,~;nG03- ,:;'~" -1,1 "2';~p 1" Cop

~l1=~",-,o,-,,~--,g{;", ,~mo~"" Typ panel and adjocent panel sections with block point.

#5 Cant Tot 6

#5 x 6'-6%" Totol 3 per scupper

#4 Ii 3 per scupper r i i I

SECTION E-E

Tot J per scupper

ELEVATION

one I

5" 5"

VIEW p-p

SECTlON B-B c

1¥4'~

I #5 C) Total 2~i

--! ~1'-0" ' Min lop , #4 X 6'-61"4" Total:> per scupper~~71:~;!~~1] 11/4" x 6" Slatted hole

¥." Chamfer

Pavement or ground lIne

Chamfer

A-A

ELEVATION

BOLT CONNECTION DETAIL

~jO plate W'thickU'-- Bor 11/4" ¢ x 2'-2" long

ALTERNATIVE HEAD DETAIL

1".' ¢ Stael bars tot~1 2"1per end j ~oint

1.'~ except a .-- IC_'/~'''''' removable panel.O\k) ,F=====

J ~ ~I

- I n

"@ tl ====="- -- - -===== " ~~ k I ,_

Bolt 1Y~" ¢ x 2'-2" )0 - w/hex head ond t washer \V-- ¥.!" x J" Oia

#5 Cont Tot 6

R"'10"

4" P Lifting hale

Povemellt or groulld line

#41\a18MO),t total 16 per panel

APPENDIX W

GENERAL CONSTRUCTION PERMIT (NPDES)

Text1:

File details come from the government source that posted it. Updated .