RECOVERY GSA/NCR Design-Build Construction Project Funded by the Recovery Act (Reagan Bldg)

Award Notice Posted

Solicitation number
GS-11P-10-YA-C-0049
Agency
Awarded
to Turtle Associates LLC
Set-aside
Competitive 8(a)

Opportunity facts

Contract number
GS11P10YAC0121 Federal contract award
PSC
Not on record
Place of performance
Ronald Reagan Building Washington, District of Columbia 20407, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

RECOVERY ACT


This is a Request for Proposal (RFP) for Design-Build projects with the U.S General Services Administration's (GSA) National Capitol region.



This is a competitive 8a acquisition under FAR Part 15, Firm Fixed Price acquisition for Design/Build (DB) projects. The North American Industry Classification system (NAICS) Codes are: 236220 (Construction), 541310 (Architect) and/or 541330 (Engineering). 


  


This competitive 8a requirement is for Design/Build (D-B) projects with the purpose of re-commissioning federal facilities located in the Washington D.C. area, State of Virginia, and the State of Maryland. The scopes of work will include, but not be limited to: 1) upgrading Building Systems via installation of high-performance HVAC components in buildings which will both decrease energy consumption and operations cost; 2) building tune-ups which include re-commissioning to reduce energy demand, reduce operation and maintenance costs, improve building system control, and occupant comfort (This may include hardware and software upgrades to the building control systems or replacing the existing building automation software systems-These building tune-ups include many small-cost, high-impact changes to motors, sensors, and equipment-Data input devices such as advanced utility meters and meteorological instruments may be included) and 3) lighting replacement projects which include high-performance lighting that will both decrease energy consumption and cost, and improve working conditions and productivity for building occupants to both improve the quality of light and working conditions and result in significant reduction in the lighting energy consumption.  In addition to the work described above, it is anticipated that the contracts may include specified repair, asbestos, PCB, and lead-base paint abatement, and design and construction services relating to, but not limited to, civil, mechanical, plumbing, structural, electrical, heating, ventilation and air conditioning (HVAC), instrumentation, anti-terrorism and force protection, in addition to all other general design and construction activities.


 


 


NOTE: These projects require firms to provide for Architect, Engineering, and Construction Services. If your company lacks one of these required services, your firm must create a partnership with a business that can complement/fulfill ALL the needed requirements by the submission of solicitation due date, which is scheduled for April 16, 2010.


 

Update #1 ·

RECOVERY ACT


This is a Request for Proposal (RFP) for Design-Build projects with the U.S General Services Administration's (GSA) National Capitol region.



This is a competitive 8a acquisition under FAR Part 15, Firm Fixed Price acquisition for Design/Build (DB) projects. The North American Industry Classification system (NAICS) Codes are: 236220 (Construction), 541310 (Architect) and/or 541330 (Engineering). 


  


This competitive 8a requirement is for Design/Build (D-B) projects with the purpose of re-commissioning federal facilities located in the Washington D.C. area, State of Virginia, and the State of Maryland. The scopes of work will include, but not be limited to: 1) upgrading Building Systems via installation of high-performance HVAC components in buildings which will both decrease energy consumption and operations cost; 2) building tune-ups which include re-commissioning to reduce energy demand, reduce operation and maintenance costs, improve building system control, and occupant comfort (This may include hardware and software upgrades to the building control systems or replacing the existing building automation software systems-These building tune-ups include many small-cost, high-impact changes to motors, sensors, and equipment-Data input devices such as advanced utility meters and meteorological instruments may be included) and 3) lighting replacement projects which include high-performance lighting that will both decrease energy consumption and cost, and improve working conditions and productivity for building occupants to both improve the quality of light and working conditions and result in significant reduction in the lighting energy consumption.  In addition to the work described above, it is anticipated that the contracts may include specified repair, asbestos, PCB, and lead-base paint abatement, and design and construction services relating to, but not limited to, civil, mechanical, plumbing, structural, electrical, heating, ventilation and air conditioning (HVAC), instrumentation, anti-terrorism and force protection, in addition to all other general design and construction activities.


 


 


NOTE: These projects require firms to provide for Architect, Engineering, and Construction Services. If your company lacks one of these required services, your firm must create a partnership with a business that can complement/fulfill ALL the needed requirements by the submission of solicitation due date, which is scheduled for March 29, 2010.


 

Files

File Type Posted
List of Changes —
ECM 103 Revision.pdf PDF
ECM-103-1.pdf PDF
SF1442 —
List of Changes - Amendment-2 —
Questions - Global.xls XLS spreadsheet
Minority Goals —
Reagan DB SOW 3-16-2010.pdf PDF
SF1442 —
Questions - Group 4 - Final.xls XLS spreadsheet
List of Changes - Amendment-2 —
Solicitation_GS11P10YAC0049 —
List of Changes —
Sign in sheet 4.pdf PDF
Sign in sheet 2.pdf PDF
3-8-10 Pre-Proposal Meeting Presentation FINAL.ppt PPT presentation
Sign in sheet 1.pdf PDF
Sign in sheet 3.pdf PDF
ARRA.8(a) DB Competitive Agreement GS11P10YAC0049.doc DOC document
REPS-CERTS GS11P10YA-C-0049.doc DOC document
ARRA.8(a) DB Competitive Solicitation GS11P10YAC0049.doc DOC document
WD-DC.doc DOC document
FOB8 - Document Transmittal Form - 0049.doc DOC document
Reagan DB SOW 2-24-2010.pdf PDF
Show all 24

Notice history

Notice Type Posted
Recovery - Design Build Contract for High Performance Buildings Latest Award Notice
This notice Original Award Notice

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors