Design build services

Ended Definitive Contract Awarded Last action

Contract number
GS11P10YAC0121
Awardee
Awarding agency
Obligated
$11,841,409

Award facts

Opportunity
Contract value 100% obligated
$11,841,409.00 Current and potential, with all options
Completion date 100% complete
Current and potential, with all options
Set-aside
Competitive 8(a)
Competition
Full and Open Competition after exclusion of sources · 7 offers Negotiated Proposal / Quote
Pricing
Firm Fixed Price
Place of performance
Washington, DC 20004, USA
Legislative mandates

Award details come from SAM.gov/FPDS.

Transactions

Action Obligated Date
Supplemental Agreement for work within scope PS34 · Ronald reagan design-build project, wash., DC: deobligation of excess funds remaining from completed scope of work under arra programming. -$13,220
Other Administrative Action PA33 · Change CO $0
Change Order PC32 · Deductive MOD -$4,132
Other Administrative Action PA31 · The purpose of this admin modification is to extend the period of performance from april 20, 2013 to september 30, 2013. $0
Change Order PS30 · MOD for contract deductions -$227,533
Change Order PS29 · This is an arra program modification to delete contingency allowances. -$232,349
Change Order PA28 · DE0BLIGATIONS of allowances -$93,017
Change Order PA26 · Deobligations for ECM delteted -$103,950
Change Order PA25 · MOD to DE-obligate and RE-obligate funds for lighting fixtures reagan bldg. Arra project. $0
Change Order PA23 · MOD for reagan lighting retro fix kits and fabric screen doors. $0
Other Administrative Action PA22 · Change contingency amount (corrects previous MOD). $0
Other Administrative Action PS20 · ADM MOD $0
Change Order PS21 · Revises ECM-202, pneumatic air compressor requirements as identified in the scope of work dated 06 june 2011. $0
Other Administrative Action PA19 · The purpose of this modification is to revise the energy conservation measures (ecms) in which the contingency allowance is applied. $0
Other Administrative Action PA17 · This modification revises the energy conservation measures (ecms) in which the contingency allowance is applied. Contingency allowances specified in PS-12 for… $0
Other Administrative Action PC16 · This no cost modification revises the loading dock door size opening requirements specified in contract GS-11P-10-YA-c-0121 for ECM-103 fabric speed doors to… $0
Change Order PC15 · This modification will allow the contractor turtle associates LLC. To utilizes the contingency allowance to fund survey and architectural and electrical… $0
Other Administrative Action PA14 · This modification reduces the existing contract allowance amount of $687,837.50 by $48,000.00 to $639,837.50. The existing contract amount of $12,515,609.50… $0
Other Administrative Action PS13 · The purpose of this modification is to incorporate updated change of requirements for option no. 3, ECM-206, demand control ventilation into the contract. All… $0
Change Order PS12 · This modification revises the contract allowance amount per ECM 211,ECM 212,ECM 213 requirements addressed in scope of work dated 3-9-2011. This modification… $387,838
Change Order PS11 · This modification revises the allowance amount per ECM 211,ECM 212, and ECM 213 $300,000
Other Administrative Action PA10 · Modification is to assign michael vrobel as the contracting officer effective january 24,2011. $0
Other Administrative Action PA09 · The purpose of this modification is to change the PDN# in modification(PA06)from PN0N03429 back to the original PDN# PJ0N02439. There is no additional cost… $0
Change Order PA08 · The purpose of this modification is to incorporate an updated safety and health specification 01546 into the contract. There is no additional cost associated… $0
Exercise an Option PS07 · This modification exercises option 11 ECM 413 replace centralized LTG. Control sys. W/dist. LTG. Control system-clin modification for system to cover the… $1,417,652
Exercise an Option PS05 · This modification to the contract is to exercise two options and delete ECM 431 requirements for replacing garage lighting on levels B3 and B4. Modifing ECM 430… $387,026
Other Administrative Action PA06 · This modidication change PDN# PJ0N02439 to PN0N03429. Recovery $0
Exercise an Option PS04 · This modification exercises ECM option numbers 3,8,13 and 14 $1,650,459
Other Administrative Action PA03 · Admin MOD to correct 1442. Add elaina s. Walker as contracting officer. $0
Other Administrative Action PA02 · Admin modification $0
Original award $8,372,635
Show all 31

About this award

This is a $11,841,409.00 Firm Fixed Price definitive contract awarded by the National Capital Region of the General Services Administration (GSA) to Turtle Associates LLC, a tribally owned, minority-owned, and small disadvantaged business. The contract is for design-build services and was set aside for competition among 8(a) certified small businesses. The period of performance runs through September 30, 2015. The contract does not appear to be associated with a larger contract vehicle based on the information provided.

Quick answers

Who was awarded contract GS11P10YAC0121?

GS11P10YAC0121 was awarded to Turtle Associates LLC by National Capital Region (Public Buildings Service) on June 14, 2010.

How much is contract GS11P10YAC0121 worth?

The government has obligated $11,841,409 on GS11P10YAC0121.

Was contract GS11P10YAC0121 competed?

The extent of competition for GS11P10YAC0121 was full and open competition after exclusion of sources. The government received 7 offers. It was set aside: Competitive 8(a).

On GovTribe

See this award's full record

  • Every transaction and funding action
  • The awardee's other awards and teaming partners
  • Similar awards and recompete opportunities
  • Ask GovTribe AI about this award