Recovery: camp nesbit improvements environmental educational youth camp - ottawa national forest- kenton ranger district - iron county, michigan

Award Notice Posted

Solicitation number
AG-4419-S-10-0554
Agency
Awarded
to Quality Built Pole Buildings
Set-aside
No set-aside

Opportunity facts

Contract number
AG-4419-C-10-0546 Federal contract award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Not on record
Place of performance
Usda Forest Service Ottawa National Forest Kenton Ranger District Ironwood, Michigan 49938, United States

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

RECOVERY DESCRIPTION: Camp Nesbit Improvements - Environmental Educational Youth Camp - Ottawa National Forest, Kenton Ranger District in Iron County, Michigan.

The project is to provide: 1) Reconstruction of existing accessible elements/components (i. e. ramps, entrances / exits, doorways, doors, routes, etc. ) of A) Kitchen / Mess Hall, B) Recreation Hall, & C) three sleeping quarters building units 2) Construction of accessible elements/components (i.e. ramps, entrances / exits, doorways, doors, routes, etc.) for A) Nine remaining non-accessible sleeping quarters building units, B) three bathroom/ shower buildings , & C) the Director 's/ Caretaker 's sleeping quarters building unit 3) Demolition (i.e. "gutting") and renovation/ reconstruction / rehabiiitation of the interiors of three bathroom / shower buildings to meet current ABA standards; 4) Refinishing and / or replacement of flooring in the Recreation Hall building and in the Kitchen / Mess Hall building; 5) Repair exposed stone chimneys on the three bathroom/ shower buildings & on the Director's , Caretaker's sleeping quarters building unit; 6) Replace plumbing fixtures in Kitchen / Mess Hall building restroom; 7) In the Kitchen areas of the Kitchen / Mess Hall building, add floor drains & connect to existing sanitary piping below floor; and 8) Replace ceiling and walI finishes in the Kitchen areas.



PROJECT LOCATION: 7 miles south of Sidnaw, MI: From the intersection of South Sidnaw Rd & State Highway M-28 (nearer the east side of the town of Sidnaw), travel approx 5.8 mi southerly along South Sidnaw Rd to the intersection of Soulh Sidnaw Rd & F. R. 2400 (aka Norway Lake Rd) thence, easterly along F. R. 2400 approx 1. 7 mi to the intersection of F. R. 2400 & F. R. 2493 (aka entrance Rd to Camp Nesbit) thence, southerly & westerly along F. R. 2493 approx 0.5 mi to Camp Nesbit. See location maps in proiect documents for more details.



*Price Range for this project is: Between: $250,000 - $500,000*



"THIS PROCUREMENT IS HEREBY DETERMINED "UNRESTRICTED".



Recovery: This project is funded in whole by the American Recovery & Reinvestment Act (ARRA).



NOTICE: FACSIMILE/EMAIL PROPOSALS AND BIDS ARE NOT ACCEPTABLE"



ALL VENDORS ARE REQUIRED TO BE REGISTERED IN THE CENTRAL CONTRACTOR REGISTRATION (CCR/ORCA) PRIOR TO AWARD OF A CONTRACT, HTTP:://WWW.CCR.GOV/

RECOVERY DESCRIPTION: Camp Nesbit Improvements - Environmental Youth Camp - Kenton Ranger District, Ottawa National Forest roofing and staining. The base/first part of this project if repairing (by replacement) the roofs of 15 buildings at Camp Nesbit )approx 11, 800 square feet of asphalt shingle replacement). The optional/second (final) part of the project is staining 23 of the buildings at Camp Nesbit )approx 29, 275 square feet of staining).



The intent of this project is to:

1. Repair, by replacement, 15 roofs and

2. Stain the exterior of 23 buildings located in the Camp Nesbit Complex



Update #2 ·

*THIS NOTICE IS PROVIDED TO CONSOLIDATE PRE-SOLICITATION AG-4419-S-10-0554 &

AG-4419-S-10-0556*



RECOVERY DESCRIPTION: Camp Nesbit Improvements - Environmental Youth Camp - Kenton Ranger District, Ottawa National Forest roofing and staining. The base/first part of this project if repairing (by replacement) the roofs of 15 buildings at Camp Nesbit )approx 11, 800 square feet of asphalt shingle replacement). The optional/second (final) part of the project is staining 23 of the buildings at Camp Nesbit )approx 29, 275 square feet of staining).



The intent of this project is to:

1. Repair, by replacement, 15 roofs and

2. Stain the exterior of 23 buildings located in the Camp Nesbit Complex



Update #1 ·

RECOVERY DESCRIPTION:Camp Nesbit Improvements - Environmental Educational Youth Camp Kenton Ranger District, Ottawa National Forest in Iron County, Michigan.

The project is to provide: 1) Reconstruction of existing accessible elements /components (i. e. ramps, entrances / exits, doorways, doors, routes, etc. ) of A) Kitchen / Mess Ha11, B) Recreation Ha11, & C) three sleeping quarters building unitsi 2) Construction of accessible elements/components (i.e. ramps, entrances / exits, doorways, doors, routes, etc.) for A) Nine remaining non-accessible sleeping quarters building units, B) three bathroom/ shower buildings , & C) the Director 's/ Caretaker 's sleeping quarters building unit 3) Demolition (i.e. "gutting") and renovation/ reconstruction / rehabiiitation of the interiors of three bathroom / shower buildings to meet current ABA standards; 4) Refinishing and / or replacement of flooring in the Recreation Hall building and in the Kitchen / Mess Hall building; 5) Repair exposed stone chimneys on the three bathroom/ shower buildings & on the Director's , Caretaker's sleeping quarters building unitil; 6) Replace plumbing fixtures in Kitchen / Mess Hall buiiding restroom; 7) In the Kitchen areas of the Kitchen / Mess Hall building, add floor drains & connect to existing sanitary piping below floor; and 8) Replace ceiling and walI finishes in the Kitchen areas.



PROJECT LOCATION: 7 miles south of Sidnaw, MI: From the intersection of South Sidnaw Rd & State Highway M-28 (nearer the east side of the town of Sidnaw), travel approx 5.8 mi southerly along South Sidnaw Rd to the intersection of Soulh Sidnaw Rd & F. R. 2400 (aka Norway Lake Rd) thence, easterly along F. R. 2400 approx 1. 7 mi to the intersection of F. R. 2400 & F. R. 2493 (aka entrance Rd to Camp Nesbit) thence, southerly & westerly along F. R. 2493 approx 0.5 mi to Camp Nesbit. See location maps in proiect documents for more details.



Price Range: The Government estimate is between: $250,000 - $500,000.



Set a-side determination will be made at time of solicitation Posting.



Recovery: This project is funded in whole by the American Recovery & Reinvestment Act (ARRA).



ALL VENDORS ARE REQUIRED TO BE REGISTERED IN THE CENTRAL CONTRACTOR REGISTRATION (CCR) PRIOR TO AWARD OF A CONTRACT, HTTP:://WWW.CCR.GOV/

Files

File Type Posted
Pre-Bid Attendees Sign In Sheet.PDF PDF
Pre-Bid Meeting Summary.docx DOCX document
SF 30 Amendment 3.pdf PDF
Location map.pdf PDF
Final Plans.pdf PDF
SF 30 Amendment 2.pdf PDF
SF 30 Amendment.pdf PDF
DBA.pdf PDF
Plans 1.pdf PDF
SF 1442 Cont _ 0554.docx DOCX document
Building Photos 3.pdf PDF
SF 1442 Cover Pg.pdf PDF
Work Restrictions.pdf PDF
Camp Nesbit Construction Notes 01.pdf PDF
Camp Nesbit Description Photo 4.pdf PDF
Photo 1.pdf PDF
Final Specs.pdf PDF
SOW 2.pdf PDF
Layout Plan 2.pdf PDF
Camp Nesbit - Building Photos 2.pdf PDF
Show all 20

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors