About this file

Final Plans

View the file

Other files

File Type Posted
Pre-Bid Meeting Summary.docx DOCX document
SF 30 Amendment 3.pdf PDF
Pre-Bid Attendees Sign In Sheet.PDF PDF
Location map.pdf PDF
SF 30 Amendment 2.pdf PDF
SF 30 Amendment.pdf PDF
Building Photos 3.pdf PDF
Final Specs.pdf PDF
SOW 2.pdf PDF
DBA.pdf PDF
Plans 1.pdf PDF
Layout Plan 2.pdf PDF
SF 1442 Cont _ 0554.docx DOCX document
Camp Nesbit - Building Photos 2.pdf PDF
Work Restrictions.pdf PDF
SF 1442 Cover Pg.pdf PDF
Camp Nesbit Description Photo 4.pdf PDF
Photo 1.pdf PDF
Camp Nesbit Construction Notes 01.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ISSUE DATE: 1/29/2010 2/12/2010 2/25/2010 MM/DD/YY MM/DD/YY

G100 PROJECT TITLE SHEET X X X

G101 PROJECT SITE MAP & PROJECT PHASING X X X

G102 PROJECT ABBREVIATIONS & SYMBOLS X X X

G103 SITE UTILITY PLAN X X X

A101 BUILDING NO. 1 ('BLUE JAY') FLOOR PLANS & ELEVATIONS X X X

A102 BUILDING NO. 2 ('LOON') FLOOR PLANS & ELEVATIONS X X X

A103 BUILDING NO. 3 ('HAWK') FLOOR PLANS & ELEVATIONS X X X

A104 BUILDING NO. 4 ('BLACK BEAR') FLOOR PLANS & ELEVATIONS X X X

A105 BUILDING NO. 5 ('WHITE TAIL") FLOOR PLANS & ELEVATIONS X X X

A106 BUILDING NO. 6 ('EAGLE') FLOOR PLANS & ELEVATIONS X X X

A107 BUILDING NO. 7 ('BOBCAT') FLOOR PLANS & ELEVATIONS X X X

A108 BUILDING NO. 8 ('OWL') FLOOR PLANS & ELEVATIONS X X X

A109 BUILDING NO. 9 ('OTTER') FLOOR PLANS & ELEVATIONS X X X

A110 BUILDING NO. 10 ('MOOSE') FLOOR PLANS & ELEVATIONS X X X

A111 BUILDING NO. 11 ('WALLEYE') FLOOR PLANS & ELEVATIONS X X X

A112 BUILDING NO. 12 ('WARBLER') FLOOR PLANS & ELEVATIONS X X X

A113 BUILDING NO. 13 ('BOY'S BATH') FLOOR PLANS & ELEVATIONS X X X

A114 BUILDING NO. 14 ('GIRL'S BATH') FLOOR PLANS & ELEVATIONS X X X

A115 BUILDING NO. 15 ('BOY'S/GIRL'S') FLOOR PLANS & ELEVATIONS X X X

A116 BUILDING NO. 16 ('MESS HALL') FLOOR PLANS X X X

A116.1 BUILDING NO. 16 ('MESS HALL') FLOOR PLANS & ELEVATIONS X X X

A117 BUILDING NO. 17 ('REC. HALL') FLOOR PLANS X X X

A117.1 BUILDING NO. 17 ('REC. HALL') FLOOR PLANS & ELEVATIONS X X X

A118 BUILDING NO. 18 ('FIRST AID') FLOOR PLANS & ELEVATIONS X X X

A119 BUILDING NO. 19 (DIRECTOR'S CABIN) FLOOR PLANS & ELEVATIONS X X

A200 ENLARGED STAIR & RAMP ELEVATIONS & DETAILS X X X

A201 SECTIONS & DETAILS X X

A700 DOOR SCHEDULE, DOOR TYPES & DETAILS X X X

A701 ROOM FINISH SCHEDULE & PARTITION TYPES X X X

REVISION

NO. 1

ISSUED

FOR FINAL

CONST.

REVISION

NO. 2

ARCHITECTURAL / STRUCTURAL / MEP DRAWINGS

GENERAL INFORMATION/TITLE SHEETS

ISSUED

FOR 95%

DESIGN

REVIEW

SHEET TITLESHEET NO.

ISSUED

FOR 60%

DESIGN

REVIEW

X X X

A800 ENLARGED BATHROOM PLANS & DETAILS X X

A801 ENLARGED BATHROOM PLANS & DETAILS X X

S200 STRUCTURAL SCHEDULES & ENLARGED DETAILS X X

P101 PLUMBING FLOOR PLANS, BUILDINGS 13, 14 AND 15 X X

P200 PLUMBING RISER DIAGRAMS, BUILDINGS 13, 14 AND 15 X

P201 PLUMBING SCHEDULE X

M101 MECHANICAL FLOOR PLANS, BUILDINGS 13, 14 AND 15 X

E101 ELECTRICAL FLOOR PLANS, BUILDINGS 13, 14 AND 15 X X

NORTH SOUTH EAST WEST MATERIAL HEIGHT

13A ENTRY EP-1 EP-1 CMU-1 MRG-1 CMU-1 CMU-1 MRG-1 EXIST. (1)

13B SHOWER AREA EP-1 EP-1 MRG-1 MRG-1 CMU-1 MRG-1 MRG-1 EXIST. (1)

13C TOILETS EP-1 EP-1 MRG-1 MRG-1 MRG-1 CMU-1 MRG-1 EXIST. (1)

13D MECHANICAL SCONC. - MRG-1 CMU-2 CMU-2 CMU-2 MRG-1 EXIST. (1)

14A ENTRY EP-1 EP-1 CMU-1 MRG-1 CMU-1 CMU-1 MRG-1 EXIST. (1)

14B SHOWER AREA EP-1 EP-1 MRG-1 MRG-1 CMU-1 MRG-1 MRG-1 EXIST. (1)

14C TOILETS EP-1 EP-1 MRG-1 MRG-1 MRG-1 CMU-1 MRG-1 EXIST. (1)

14D MECHANICAL SCONC. - MRG-1 CMU-2 CMU-2 CMU-2 MRG-1 EXIST. (1)

15A VESTIBULE EP-1 EP-1 CMU-1 MRG-1 CMU-1 CMU-1 MRG-1 EXIST. (1)

15B MECHANICAL SCONC. - MRG-1 CMU-2 CMU-2 CMU-2 MRG-1 EXIST. (1)

15C BOY'S EP-1 EP-1 MRG-1 CMU-1 MRG-1 CMU-1 MRG-1 EXIST. (1)

15D SHOWER AREA EP-1 EP-1 CMU-1 MRG-1 MRG-1 CMU-1 MRG-1 EXIST. (1)

15E GIRL'S EP-1 EP-1 MRG-1 CMU-1 CMU-1 MRG-1 MRG-1 EXIST. (1)

15F SHOWER AREA EP-1 EP-1 CMU-1 MRG-1 CMU-1 MRG-1 MRG-1 EXIST. (1)

16A EXIST. DINING WD-1 - - - - - - -

16B EXIST. KITCHEN/SERVING EP-1 EP-1 FRP-1 FRP-1 FRP-1 FRP-1 MRG-1 EXIST. (1) (4)

16C EXIST. DISH AREA EP-1 EP-1 FRP-1 FRP-1 FRP-1 FRP-1 MRG-1 EXIST. (1) (4)

16D EXIST. TOILET EP-1 EP-1 FRP-1 FRP-1 FRP-1 FRP-1 MRG-1 EXIST. (1) (4)

16E EXIST. STORAGE EP-1 EP-1 ETR ETR ETR ETR MRG-1 EXIST. (1) (4)

16F EXIST. WALK-IN - - - - - - - - -

17A EXIST. RECREATION ROOM WD-1 RR ETR ETR ETR ETR - - (2)

17B EXIST. OFFICE WD-1 - - - - - ETR EXIST -

17C LIVING QUARTERS WD-1 RR ETR ETR ETR ETR ETR EXIST -

17D EXIST. TOILET WD-1 WQR ETR ETR ETR ETR ETR EXIST -

17E EXIST. CLOSET WD-1 - - - - - ETR EXIST -

17F EXIST. CLOSET WD-1 - - - - - ETR EXIST -

RR - REMOVE AND REINSTALL

WQR - NEW WOOD QUARTER ROUND

EP-1 - EPOXY COVE WITH FLOOR SYSTEM

WALL FINISHES

MRG-1 - PAINTED MOISTURE RESISTANT GYPSUM BOARD. SEE SPECIFICATIONS.

CMU-1 - CMU GLAZED BLOCK. SEE SPECIFICATIONS.

4.) SEE DETAIL 1/A701 FOR FLOOR SUBSTRATE AND EPOXY DETAIL

WD-2 - NEW POLYURETHANE FINISH ON EXISTING WOOD FLOORING.

SEE SPECIFICATIONS.

WD-1 - NEW VERTICAL WOOD WALL PANELING OVER EXISTING 2x WOOD FRAMING.

SEE SPECIFICATIONS.

FRP-1 - FIBERGLASS REINFORCED PLASTIC PANELS

ETR - EXISTING TO REMAIN.

BASE MOLDINGS

ETR - EXISTING TO REMAIN.

FLOOR FINISHES

SCONC - SEALED CONCRETE FLOOR

EP-1 - NEW EPOXY FLOOR SYSTEM

SEE SPECIFICATIONS.

BUILDING NO. 14 ('GIRLS'S BATH')

BUILDING NO. 15 ('BOY'S/GIRLS'S BATH')

BUILDING NO. 16 ('MESS HALL')

BUILDING NO. 17 ('RECREATION HALL')

CMU-2 - PAINTED CMU BLOCK. SEE SPECIFICATIONS.

ROOM FINISH REMARKS: SCHEDULED FINISHES

2.) PATCH & REPAIR EXISTING WALL FINISHES TO MATCH ADJACENT SURFACES AS REQUIRED

WHERE NEW OPENING HAS BEEN PROVIDED.

CEILING

ROOM FINISH REMARKS

BUILDING NO. 13 ('BOY'S BATH')

WD-1 - NEW WOOD FLOORING w/ POLYURETHANE FINISH OVER EXISTING SUBSTRATE.

ETR - EXISTING TO REMAIN.

1.) NEW FINISHED CEILING HEIGHT TO MATCH EXISTING. FIELD VERIFY.

CEILING FINISHES

MRG-1 - PAINTED MOISTURE RESISTANT GYPSUM WALL BOARD. SEE SPECIFICATIONS.

GYP-1 - PAINTED GYPSUM WALL BOARD. SEE SPECIFICATIONS.

3.) NEW WOOD WALL PANELING TO MATCH THE EXISTING WALL PANELING USED IN THE

RECREATION BUILDING. (BUILDING 17) FIELD VERIFY

ROOM FINISH SCHEDULE

ROOM NAMEROOM NO. FLOOR BASE

WALL FINISH

** NOTE: WALL FINISHES NOTED BASED ON PLAN NORTH BEING PAGE UP **

File details come from the government source that posted it. Updated .