PN 72426 Military Working Dog Facility
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W912PM21R0002
- Agency
-
ENDIST Wilmington
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Fort Bragg Nc Usa
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks proposals for the construction and design of a Special Operations Forces Military Working Dog Facility at Fort Bragg, North Carolina. The U.S. Army Corps of Engineers Engineering District Wilmington will award a firm-fixed-price contract for the project, with a period of performance of 540 calendar days. Proposals will be evaluated based on corporate experience, past performance, key personnel qualifications, and a small business participation plan. Proposals are due by January 22, 2021.
The scope of work includes building a 48-kennel facility with a veterinary clinic containing surgical, radiological, and pharmacy spaces, as well as classrooms and administrative offices. Additional requirements include demolishing two existing modular buildings, installing HVAC, sound suppression, parking, fire suppression and security systems, and compliance with DoD sustainability standards. There is no set-aside designation. The primary NAICS code is 238210 and PSC code S206. The potential award value is approximately $17.7 million. The place of performance is Fort Bragg, North Carolina.
Notice text
7 versions
Update #7 · Latest ·
This Request for Proposal (RFP) solicits construction and design of a SOF Military Working Dog Facility, at Fort Bragg NC. The scope of work includes: Construction of a facility that contains 48 kennels, a veterinary clinic, surgery rooms, educational spaces, including a classroom, and an administrative area including office space for a permanent party cadre. The veterinary clinic includes three distinct areas: surgical space, radiological space, and a pharmacy. The facility will house a total of 48 kennels, which will include: 42 standard kennels and 6 kennels used for isolation of the military working dogs. An existing obstacle course and exercise yard will be shared to serve this projects mission. A portion of the existing obstacle course will be relocated, as it is currently on the site for the new kennel project. The kennels, isolation kennels, veterinary clinic, and administrative space will require dedicated HVAC units. Sound suppression will be provided in the kennel areas. Organizational parking will require six spaces for a truck and trailer as well as eight spaces for a training fleet of sedans and/or sport utility vehicles. Non-organizational parking will require 15 spaces. Provide fire suppression, fire alarm, mass notification, and security measures. Install cybersecurity measures including identity assurance of and operational resilience to fire life safety systems, building automation (EMCS/UEMCS) systems, and electronic access control systems, integrated commercial intrusion detection security systems (CCTV, IDS), cable TV, a protected distribution system, and connection to the energy management control system. Provide sustainability/energy measures and building information systems. Access for individuals with disabilities will be provided. Furnishings and equipment, comprehensive interior design, electronic security systems, and audio visual services are included. Department of Defense principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and Executive Orders. Demolish 2 modular buildings at Fort Bragg, NC (3,352 SF Total SF). Air Conditioning (Estimated 95 Tons). Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope, and integrated building systems performance.
November 23, 2020 - Included four (4) J&As for Security Solutions, Siemon, Corning & Honeywell
December 15,2020 - Included site visit sign in sheet and Attachment 5 to the solicitation.
December 18, 2020 - Issued Amendment 0001 to the solicitation.
January 13, 2021 - Issued Amendment 0002 to the solicitation.
January 14, 2021 - Issued Amendment 0003 to the solicitation extending proposal due date to January 22, 2021.
January 19, 2021 - Issued Amendment 0004 to the solicitation.
Update #6 ·
This Request for Proposal (RFP) solicits construction and design of a SOF Military Working Dog Facility, at Fort Bragg NC. The scope of work includes: Construction of a facility that contains 48 kennels, a veterinary clinic, surgery rooms, educational spaces, including a classroom, and an administrative area including office space for a permanent party cadre. The veterinary clinic includes three distinct areas: surgical space, radiological space, and a pharmacy. The facility will house a total of 48 kennels, which will include: 42 standard kennels and 6 kennels used for isolation of the military working dogs. An existing obstacle course and exercise yard will be shared to serve this projects mission. A portion of the existing obstacle course will be relocated, as it is currently on the site for the new kennel project. The kennels, isolation kennels, veterinary clinic, and administrative space will require dedicated HVAC units. Sound suppression will be provided in the kennel areas. Organizational parking will require six spaces for a truck and trailer as well as eight spaces for a training fleet of sedans and/or sport utility vehicles. Non-organizational parking will require 15 spaces. Provide fire suppression, fire alarm, mass notification, and security measures. Install cybersecurity measures including identity assurance of and operational resilience to fire life safety systems, building automation (EMCS/UEMCS) systems, and electronic access control systems, integrated commercial intrusion detection security systems (CCTV, IDS), cable TV, a protected distribution system, and connection to the energy management control system. Provide sustainability/energy measures and building information systems. Access for individuals with disabilities will be provided. Furnishings and equipment, comprehensive interior design, electronic security systems, and audio visual services are included. Department of Defense principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and Executive Orders. Demolish 2 modular buildings at Fort Bragg, NC (3,352 SF Total SF). Air Conditioning (Estimated 95 Tons). Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope, and integrated building systems performance.
November 23, 2020 - Included four (4) J&As for Security Solutions, Siemon, Corning & Honeywell
December 15,2020 - Included site visit sign in sheet and Attachment 5 to the solicitation.
December 18, 2020 - Issued Amendment 0001 to the solicitation.
January 13, 2021 - Issued Amendment 0002 to the solicitation.
January 14, 2021 - Issued Amendment 0003 to the solicitation extending proposal due date to January 22, 2021.
Update #5 ·
This Request for Proposal (RFP) solicits construction and design of a SOF Military Working Dog Facility, at Fort Bragg NC. The scope of work includes: Construction of a facility that contains 48 kennels, a veterinary clinic, surgery rooms, educational spaces, including a classroom, and an administrative area including office space for a permanent party cadre. The veterinary clinic includes three distinct areas: surgical space, radiological space, and a pharmacy. The facility will house a total of 48 kennels, which will include: 42 standard kennels and 6 kennels used for isolation of the military working dogs. An existing obstacle course and exercise yard will be shared to serve this projects mission. A portion of the existing obstacle course will be relocated, as it is currently on the site for the new kennel project. The kennels, isolation kennels, veterinary clinic, and administrative space will require dedicated HVAC units. Sound suppression will be provided in the kennel areas. Organizational parking will require six spaces for a truck and trailer as well as eight spaces for a training fleet of sedans and/or sport utility vehicles. Non-organizational parking will require 15 spaces. Provide fire suppression, fire alarm, mass notification, and security measures. Install cybersecurity measures including identity assurance of and operational resilience to fire life safety systems, building automation (EMCS/UEMCS) systems, and electronic access control systems, integrated commercial intrusion detection security systems (CCTV, IDS), cable TV, a protected distribution system, and connection to the energy management control system. Provide sustainability/energy measures and building information systems. Access for individuals with disabilities will be provided. Furnishings and equipment, comprehensive interior design, electronic security systems, and audio visual services are included. Department of Defense principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and Executive Orders. Demolish 2 modular buildings at Fort Bragg, NC (3,352 SF Total SF). Air Conditioning (Estimated 95 Tons). Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope, and integrated building systems performance.
November 23, 2020 - Included four (4) J&As for Security Solutions, Siemon, Corning & Honeywell
December 15,2020 - Included site visit sign in sheet and Attachment 5 to the solicitation.
December 18, 2020 - Issued Amendment 0001 to the solicitation.
January 13, 2021 - Issued Amendment 0002 to the solicitation.
Update #4 ·
This Request for Proposal (RFP) solicits construction and design of a SOF Military Working Dog Facility, at Fort Bragg NC. The scope of work includes: Construction of a facility that contains 48 kennels, a veterinary clinic, surgery rooms, educational spaces, including a classroom, and an administrative area including office space for a permanent party cadre. The veterinary clinic includes three distinct areas: surgical space, radiological space, and a pharmacy. The facility will house a total of 48 kennels, which will include: 42 standard kennels and 6 kennels used for isolation of the military working dogs. An existing obstacle course and exercise yard will be shared to serve this projects mission. A portion of the existing obstacle course will be relocated, as it is currently on the site for the new kennel project. The kennels, isolation kennels, veterinary clinic, and administrative space will require dedicated HVAC units. Sound suppression will be provided in the kennel areas. Organizational parking will require six spaces for a truck and trailer as well as eight spaces for a training fleet of sedans and/or sport utility vehicles. Non-organizational parking will require 15 spaces. Provide fire suppression, fire alarm, mass notification, and security measures. Install cybersecurity measures including identity assurance of and operational resilience to fire life safety systems, building automation (EMCS/UEMCS) systems, and electronic access control systems, integrated commercial intrusion detection security systems (CCTV, IDS), cable TV, a protected distribution system, and connection to the energy management control system. Provide sustainability/energy measures and building information systems. Access for individuals with disabilities will be provided. Furnishings and equipment, comprehensive interior design, electronic security systems, and audio visual services are included. Department of Defense principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and Executive Orders. Demolish 2 modular buildings at Fort Bragg, NC (3,352 SF Total SF). Air Conditioning (Estimated 95 Tons). Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope, and integrated building systems performance.
November 23, 2020 - Included four (4) J&As for Security Solutions, Siemon, Corning & Honeywell
December 15,2020 - Included site visit sign in sheet and Attachment 5 to the solicitation.
December 18, 2020 - Issued Amendment 0001 to the solicitation.
Update #3 ·
This Request for Proposal (RFP) solicits construction and design of a SOF Military Working Dog Facility, at Fort Bragg NC. The scope of work includes: Construction of a facility that contains 48 kennels, a veterinary clinic, surgery rooms, educational spaces, including a classroom, and an administrative area including office space for a permanent party cadre. The veterinary clinic includes three distinct areas: surgical space, radiological space, and a pharmacy. The facility will house a total of 48 kennels, which will include: 42 standard kennels and 6 kennels used for isolation of the military working dogs. An existing obstacle course and exercise yard will be shared to serve this projects mission. A portion of the existing obstacle course will be relocated, as it is currently on the site for the new kennel project. The kennels, isolation kennels, veterinary clinic, and administrative space will require dedicated HVAC units. Sound suppression will be provided in the kennel areas. Organizational parking will require six spaces for a truck and trailer as well as eight spaces for a training fleet of sedans and/or sport utility vehicles. Non-organizational parking will require 15 spaces. Provide fire suppression, fire alarm, mass notification, and security measures. Install cybersecurity measures including identity assurance of and operational resilience to fire life safety systems, building automation (EMCS/UEMCS) systems, and electronic access control systems, integrated commercial intrusion detection security systems (CCTV, IDS), cable TV, a protected distribution system, and connection to the energy management control system. Provide sustainability/energy measures and building information systems. Access for individuals with disabilities will be provided. Furnishings and equipment, comprehensive interior design, electronic security systems, and audio visual services are included. Department of Defense principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and Executive Orders. Demolish 2 modular buildings at Fort Bragg, NC (3,352 SF Total SF). Air Conditioning (Estimated 95 Tons). Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope, and integrated building systems performance.
November 23, 2020 - Included four (4) J&As for Security Solutions, Siemon, Corning & Honeywell
December 15,2020 - Included site visit sign in sheet and Attachment 5 to the solicitation.
Update #2 ·
This Request for Proposal (RFP) solicits construction and design of a SOF Military Working Dog Facility, at Fort Bragg NC. The scope of work includes: Construction of a facility that contains 48 kennels, a veterinary clinic, surgery rooms, educational spaces, including a classroom, and an administrative area including office space for a permanent party cadre. The veterinary clinic includes three distinct areas: surgical space, radiological space, and a pharmacy. The facility will house a total of 48 kennels, which will include: 42 standard kennels and 6 kennels used for isolation of the military working dogs. An existing obstacle course and exercise yard will be shared to serve this projects mission. A portion of the existing obstacle course will be relocated, as it is currently on the site for the new kennel project. The kennels, isolation kennels, veterinary clinic, and administrative space will require dedicated HVAC units. Sound suppression will be provided in the kennel areas. Organizational parking will require six spaces for a truck and trailer as well as eight spaces for a training fleet of sedans and/or sport utility vehicles. Non-organizational parking will require 15 spaces. Provide fire suppression, fire alarm, mass notification, and security measures. Install cybersecurity measures including identity assurance of and operational resilience to fire life safety systems, building automation (EMCS/UEMCS) systems, and electronic access control systems, integrated commercial intrusion detection security systems (CCTV, IDS), cable TV, a protected distribution system, and connection to the energy management control system. Provide sustainability/energy measures and building information systems. Access for individuals with disabilities will be provided. Furnishings and equipment, comprehensive interior design, electronic security systems, and audio visual services are included. Department of Defense principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and Executive Orders. Demolish 2 modular buildings at Fort Bragg, NC (3,352 SF Total SF). Air Conditioning (Estimated 95 Tons). Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope, and integrated building systems performance.
November 23, 2021 - Included four (4) J&As for Security Solutions, Siemon, Corning & Honeywell
Update #1 ·
This Request for Proposal (RFP) solicits construction and design of a SOF Military Working Dog Facility, at Fort Bragg NC. The scope of work includes: Construction of a facility that contains 48 kennels, a veterinary clinic, surgery rooms, educational spaces, including a classroom, and an administrative area including office space for a permanent party cadre. The veterinary clinic includes three distinct areas: surgical space, radiological space, and a pharmacy. The facility will house a total of 48 kennels, which will include: 42 standard kennels and 6 kennels used for isolation of the military working dogs. An existing obstacle course and exercise yard will be shared to serve this projects mission. A portion of the existing obstacle course will be relocated, as it is currently on the site for the new kennel project. The kennels, isolation kennels, veterinary clinic, and administrative space will require dedicated HVAC units. Sound suppression will be provided in the kennel areas. Organizational parking will require six spaces for a truck and trailer as well as eight spaces for a training fleet of sedans and/or sport utility vehicles. Non-organizational parking will require 15 spaces. Provide fire suppression, fire alarm, mass notification, and security measures. Install cybersecurity measures including identity assurance of and operational resilience to fire life safety systems, building automation (EMCS/UEMCS) systems, and electronic access control systems, integrated commercial intrusion detection security systems (CCTV, IDS), cable TV, a protected distribution system, and connection to the energy management control system. Provide sustainability/energy measures and building information systems. Access for individuals with disabilities will be provided. Furnishings and equipment, comprehensive interior design, electronic security systems, and audio visual services are included. Department of Defense principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and Executive Orders. Demolish 2 modular buildings at Fort Bragg, NC (3,352 SF Total SF). Air Conditioning (Estimated 95 Tons). Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope, and integrated building systems performance.
Files
Show all 36
Notice history
| Notice | Type | Posted |
|---|---|---|
| PN 72426 Military Working Dog Facility | Award Notice | |
| This notice | Solicitation | |
| PN 72426 Military Working Dog Facility | Pre-Solicitation | |
| PN 72426 Military Working Dog Facility | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| MACH1_AOI_Military Working Dog Facility_ Vandenberg Space Force_LOE 1 and LOE 2 | Air Force Installation Contracting Agency | No set-aside | |
| FY26-FY31 JIOP Commercial Range Services BPA at Fort Bragg | — | Total Small Business | |
| PN 110205 - SOS Hangar Renovation - Progressive-Design-Build OT | ENDIST Wilmington | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity